Fully automatic pipe bender

Info

Publication number
CN102317000A
CN102317000A CN 201080001817 CN201080001817A CN102317000A CN 102317000 A CN102317000 A CN 102317000A CN 201080001817 CN201080001817 CN 201080001817 CN 201080001817 A CN201080001817 A CN 201080001817A CN 102317000 A CN102317000 A CN 102317000A
Authority
CN
Grant status
Application
Patent type
Prior art keywords
device
bender
pipe
unit
cutter
Prior art date
Application number
CN 201080001817
Other languages
Chinese (zh)
Other versions
CN102317000B (en )
Inventor
五味田泰俊
齐藤浩司
Original Assignee
株式会社太洋
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D7/00Bending rods, profiles, or tubes
    • B21D7/02Bending rods, profiles, or tubes over a stationary forming member; by use of a swinging forming member or abutment
    • B21D7/024Bending rods, profiles, or tubes over a stationary forming member; by use of a swinging forming member or abutment by a swinging forming member
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D7/00Bending rods, profiles, or tubes
    • B21D7/12Bending rods, profiles, or tubes with programme control

Abstract

A fully automatic pipe bender which can drastically reduce the time required for a working cycle and can extremely efficiently manufacture a pipe product. A pipe bender (1) comprises a bender unit (3) which performs bending and a cutter unit (2) which cuts a material pipe (P1) and supplies the cut pipe to the bender unit (3). The bender unit (3) is provided with a bending device (12) and a stripper device (14). The cutter unit (2) is provided with a feeding device (5), a cutter device (8), an insertion clamp (9), and a stopper (11). The cutter device (8) is disposed in front of the feeding device (5). The insertion clamp (9) is disposed in front of the cutter device (8) and is configured so as to be movable along a supply line (L). The stopper (11) is disposed in front of the insertion clamp (9) and is configured so as to be movable from a position at which the stopper (11) blocks the supply line (L) to a position at which the stopper (11) opens the supply line (L).

Description

全自动型管折弯机 Automatic-tube bending machine

技术领域 FIELD

[0001] 本发明涉及一种金属管的弯曲加工装置,尤其是涉及从卷绕成盘卷状的状态的原料管材经过校直矫正、标准尺寸进给、切断、弯曲加工、制品排出等工序,连续且全自动地制造被弯曲成希望的形状的管制品的管折弯机。 [0001] The present invention relates to a metal pipe bending apparatus, particularly relates to a coil form wound from a state corrected feed pipe After straightening, the standard size feed, cutting, bending, and other products discharging step, manufactured fully automatically and continuously bent into a desired shape tubular article of a tube bending machine.

背景技术 Background technique

[0002] 作为从卷绕成盘卷状的状态的原料管材连续且全自动地制造被弯曲成希望的形状的管制品的装置,已知图6所示那样的管折弯机31。 [0002] As the shape of the coil wound state and automatic feed tube manufactured continuously bent into a desired shape of the article tube apparatus is known as a tube bending machine of FIG. 631 shown in FIG. 该管折弯机31如图6(1)所示,由刀具部32和折弯机部33构成。 The pipe bending machine 31 in FIG. 6 (1), the cutter portion 32 is constituted by portion 33 and the bending machine.

[0003] 刀具部32具有校直矫正装置34、进给装置35以及刀具装置38,通过驱动进给装置35,从盘卷46拉出原料管材Pl,由校直矫正装置34校直矫正,向折弯机部33供给,然后, 由刀具装置38将原料管材Pl切断。 [0003] The cutter portion 32 has a straightening correction means 34, the feeding device 35 and the cutter device 38, by driving the feeding device 35, is pulled out from the feed pipe Pl coil 46, the alignment correction means 34 correct alignment, to bending machines supplying unit 33, and then, the cutter device 38 to cut off feed pipe Pl.

[0004] 折弯机部33具有弯曲装置42、卸料装置44以及芯杆装置45,以相对于由刀具装置38切断的原料管材Pl (切断管P2),驱动弯曲装置42,实施弯曲加工,然后,由卸料装置44将管制品P3排出的方式构成。 [0004] The bender 33 has a curved portion 42, unloading device 44 and a core rod means 45 with respect to the feed pipe 38 Pl of the cutting means by the tool (cutting pipe P2), the drive means 42 is bent, a bending process, then, the discharge means composed of embodiment 44 of the discharge tube product P3.

[0005] 更具体地说,通过依次执行下面这样的工序,能够对原料管材Pl实施弯曲加工, 连续地制造管制品P3。 [0005] More specifically, by sequentially performing such a step below, can be implemented by bending the raw material pipe Pl, articles continuously manufactured tube P3.

[0006](起动准备) [0006] (ready to start)

[0007] 首先,最初如图6(1)所示,从盘卷46拉出原料管材Pl,使其前端通过校直矫正装置34的带槽的辊之间,进而,安装在进给装置35的上下的循环皮带之间的恰当的位置。 [0007] First, the first 6 (1), the coil 46 is pulled out from the feed pipe Pl, its front end through straightening correction means 34 between the grooved rollers, and further, the feeding device 35 is mounted an appropriate position between the upper and lower endless belt. 在该状态下驱动进给装置35,将原料管材Pl进一步从盘卷46拉出,并送出,直至原料管材Pl 的前端到达刀具装置38。 In this state, driving the feed device 35, the feed pipe Pl is further pulled out from the coil 46, and fed until the leading end reaches the feed pipe cutter device 38 Pl. 另外,从盘卷46拉出的原料管材Pl在穿过校直矫正装置34时, 被校直为直状。 Further, the coil 46 is pulled out from the feed pipe passing through the straightening Pl correction means 34, as is the straight alignment.

[0008] (插入工序) [0008] (inserting step)

[0009] 从图6(1)所示的状态进一步驱动进给装置35,将原料管材Pl向前方送出,直至像图6(¾所示那样,原料管材Pl的前端在弯曲装置42中通过,碰撞卸料装置44。此时,弯曲装置42的夹模42b以及压模42c均打开,切断管P2被插入弯曲装置42的恰当的位置。在原料管材Pl的插入完成后,关闭夹模42b,由成形辊4¾和夹模42b夹入原料管材Pl并进行固定。另外,在原料管材Pl被插入弯曲装置42时,由芯杆装置45,将芯杆4¾插入原料管材Pl内的规定位置(弯曲加工部分的内侧)。 [0009] Figure 6 (a) shows the state further driving the feed device 35, the feed pipe Pl fed forward, until as shown in FIG. 6 (¾ as the front end of the feed pipe bending apparatus Pl 42, discharging device 44. in this case the collision, the bending apparatus 42 of the mold clamping die 42c and 42b are opened, cutting off the bent pipe P2 is inserted into an appropriate position of the device 42. after completion of insertion of the feed pipe Pl, 42b close the mold clamping, when the forming roll 4¾ and clamp 42b is sandwiched feed pipe Pl and fixed. Further, the raw material pipe Pl is inserted into the bending means 42, 45, the core rod 4¾ inserted into a predetermined position in the feed pipe Pl by a core rod means (curved processing inner portion).

[0010](切断工序) [0010] (cutting step)

[0011] 在成形辊4¾和夹模42b对原料管材Pl的固定完成后,驱动刀具装置38,将原料管材Pl切断。 [0011] After the forming roll 42b is fixed mold clamping 4¾ and feed pipe Pl is completed, the tool drive means 38, the feed pipe cutting Pl. 然后,如图6C3)所示,使刀具部32整体后退到不干扰弯曲加工的位置。 Then, as shown in FIG 6C3), a portion of the entire tool 32 retracted to a position not to interfere with bending.

[0012](弯曲工序) [0012] (bending step)

[0013] 在使刀具部32后退后,如图6 (4)所示,一面由弯曲装置42的压模42c按压切断管P2的前端侧,一面使夹入切断管P2的后端侧并进行固定的成形辊4¾和夹模42b旋转(正转)规定角度,据此,进行切断管P2的弯曲加工,制造管制品P3。 [0013] In the rear portion of the tool 32 retracted, as shown in (4), by a curved face pressing means 42c stamper 42 cut tube 6 distal side P2, so that the rear end face side of the sandwich and cut pipe P2 4¾ fixed forming roll 42b and the clamp die rotation (forward rotation) by a predetermined angle, whereby the bending of the cutting pipe P2, pipe manufacturing products P3.

[0014] 然后,在弯曲加工结束后,打开夹模42b以及压模42c,解除管制品P3的固定,由芯杆装置45使芯杆4¾返回原来的位置,使卸料装置44向弯曲装置42侧移动。 [0014] Then, after the bending process, and open the clamp die 42b stamper 42c, the fixed tube product P3 is released, the stem 45 causes the stem 4¾ means returns to the original position of the discharge means 44 to the bending apparatus 42 side. 这样一来,管制品P3从弯曲装置42被推出,并被排出,由未图示出的运送构件向装置外运送。 Thus, the tube is pushed from the article P3 42 bending device, and is discharged, by courier member (not shown) to the outside of the device. 然后,使卸料装置44向原来的位置返回,使成形辊4¾和夹模42b反旋转,恢复到原来的位置。 Then, the discharge means 44 is returned to its original position, the forming roll and the clamp die 42b 4¾ reverse rotation, return to the original position. 另外,使后退的刀具部32前进,恢复到原来的位置。 Further, the cutter so that the forward portion 32 is retracted, return to the original position.

[0015] 在先技术文献 [0015] CITATION LIST

[0016] 专利文献 [0016] Patent Document

[0017] 专利文献1 :日本特开2008-1沈沈8号公报 [0017] Patent Document 1: Japanese Laid-Open Patent Publication 2008-1 fell 8

[0018] 专利文献2 :日本特开平6-328177号公报 [0018] Patent Document 2: Japanese Unexamined Patent Publication No. 6-328177

[0019] 图6所示那样的以往的管折弯机31能够通过依次反复进行由上述的插入工序、切断工序以及弯曲工序构成的一系列工序(加工循环),对原料管材Pl实施弯曲加工,连续地全自动地制造管制品P3。 Conventional tube bending machine such as a [0019] FIG. 6 through 31 can be repeated sequentially by the insertion step, cutting step, and a series of steps (processing cycle) constituted bending step, the raw material pipe bending Pl embodiment, automatic continuously produced tube products P3. 但是,图6的管折弯机31在加工速度方面还有改善的余地,期望通过缩短加工循环所需的时间来提高制造效率。 However, room 31 for improvement in the processing speed of the pipe bending machine in FIG. 6, it is desirable to improve the production efficiency by shortening the cycle time required for processing.

[0020] 本发明是为解决上述那样的问题而做出的发明,其目的在于,提供一种通过做成在折弯机部在进行弯曲加工的期间,能够执行下一循环的切断工序的结构,能够大幅缩短加工循环所需的时间,能够极其有效地制造管制品的全自动型管折弯机。 [0020] The present invention has been to solve the above described problems been made, and its object is to provide a bending machine during made by performing the bending portion, the cutting step can be performed in the next cycle of the structure , can significantly shorten the time required for machining cycles, the tube can be very effectively manufactured article automatic type pipe bending machine.

发明内容 SUMMARY

[0021] 有关本发明的管折弯机是由进行弯曲加工的折弯机部和将原料管材切断,并向折弯机部供给的刀具部构成的管折弯机,其特征在于,折弯机部具有弯曲装置以及卸料装置, 刀具部具有进给装置、刀具装置、插入夹钳以及挡块,刀具装置配置在进给装置的前方(原料管材或切断管的供给目的地方向,即,折弯机部侧),插入夹钳配置在刀具装置的前方(原料管材或切断管的供给目的地方向,即,折弯机部侧),以能沿供给线移动的方式构成, 挡块配置在插入夹钳的前方,以能够从将供给线隔断的位置向开放位置移动的方式构成。 [0021] For the present invention, pipe bending machine and the feed pipe is cut by the bending portion of the bending machine, pipe bending machine and constituting a bender cutter portion supplied, characterized in that the bending machine has a curved portion and a discharge device means, the tool unit has a feed means, the cutter device, the stopper and the insertion clamp, the tool means disposed in front of the feed device (feed pipes or tubes feed off destination direction, i.e., bending machine side), disposed in front of the clamp is inserted (direction of the material pipe or a supply destination of the cutting tube, i.e., bending machine side) of the cutter device to be movable along a feed-line configuration, the stopper disposed in front of the insertion gripper, it can be configured to supply line from the position of blocking the way to the open position.

[0022] 另外,在上述管折弯机中,能够执行下述工序,所述工序为:在挡块隔断供给线的状态且插入夹钳打开的状态下,驱动进给装置,将原料管材送出,直至原料管材的前端通过刀具装置以及插入夹钳,碰撞到挡块,此后,关闭插入夹钳,将原料管材固定,使刀具装置工作,将原料管材切断的切断工序;在挡块开放了供给线的状态下,使保持了切断管的状态的插入夹钳向折弯机部侧移动,将切断管插入弯曲装置的恰当的位置,此后,打开插入夹钳, 使插入夹钳恢复到切断时的位置的插入工序;相对于被插入到弯曲装置的切断管进行弯曲加工,制造管制品,由卸料装置,将制造出的管制品排出的弯曲工序,在该情况下,优选以在弯曲工序在折弯机部被执行的期间,在刀具部执行下一循环的切断工序的方式构成。 [0022] Further, in the pipe bending machine, capable of performing the following step, the step of: blocking the supply line of the stopper inserted into the lower jaw open state and a state, driving the feed means feeding the raw material pipe until the front end of the raw material pipe is inserted in the tool and the clamp means, the stopper collide, thereafter, inserting the clamp closed, the feed pipe is fixed, the tool device is operated, the raw material pipe cutting step of cutting; supply opening stopper line state, the holding state of the cutting insert clamp movement of the tube portion toward the bending machine, the cut pipe is inserted into an appropriate position of the bending device, thereafter, inserting the clamp opening, so that when the cutting insert clamp to return to a step of inserting position; bending, pipe manufacturing products, discharge means by the bending process, the manufactured article discharging pipe with respect to the bending device is inserted into the cutting tube, in this case, preferably the bending step during the bending machine section is executed, the tool configured in a manner of cutting off the portion of the step of the next cycle.

[0023] 发明效果 [0023] Effect of the Invention

[0024] 有关本发明的管折弯机与以往的管折弯机相比,能够大幅缩短加工循环所需的时间,能够极其有效地制造管制品。 [0024] For pipe bending machine according to the present invention as compared with conventional pipe bending machine, can significantly shorten the time required for machining cycles, the tube can be extremely efficiently produced article. 另外,在有关本发明的管折弯机中,在将切断管插入弯曲装置时,没有必要使其前端碰撞卸料装置,能够避免端部变形、卸料装置破损这样的问题, 另外,能够降低卸料装置的磨损量。 Further, in the pipe bending machine related to the present invention, when the cutting tube is inserted into the bending apparatus, it is not necessary to discharge means a front end collision, deformation of the end portion can be avoided, a problem damaged discharge means, further, can be reduced amount of wear unloading equipment. 附图说明 BRIEF DESCRIPTION

[0025] 图1是有关本发明的第一实施方式的管折弯机1的侧视图。 [0025] FIG. 1 is a side view of the pipe bending machine 1 to a first embodiment of the present invention.

[0026] 图2是在图1的管折弯机1中执行的切断工序的说明图。 [0026] FIG. 2 is a diagram illustrating a cutting step is performed in a tube bending machine of FIG.

[0027] 图3是在图1的管折弯机1中执行的插入工序的说明图。 [0027] FIG. 3 is an explanatory view of an insertion step is performed in a tube bending machine of FIG.

[0028] 图4是在图1的管折弯机1中执行的弯曲工序的说明图。 [0028] FIG. 4 is an explanatory view of the bending step performed in a tube bending machine 1 in FIG. 1.

[0029] 图5是在图1的管折弯机1以及图6的以往的管折弯机31中分别执行的一系列工序的流程图。 [0029] FIG. 5 is a flowchart of the pipe bending machine 1 in FIG. 1 and the series of steps of a conventional tube bending machine of FIG. 6, 31 respectively performed.

[0030] 图6是以往的管折弯机31中执行的插入工序、切断工序以及弯曲工序的说明图。 [0030] FIG. 6 is performed in step 31 is inserted into a conventional tube bending machine, the bending step and the cutting step described in FIG. 具体实施方式 detailed description

[0031] 下面,根据附图,说明本发明的“全自动型管折弯机”的实施方式。 [0031] Hereinafter, described in accordance with "automatic tube bending machine type" embodiments of the present invention. 图1是有关本发明的第一实施方式的管折弯机1的侧视图。 FIG. 1 is a side view of the pipe bending machine 1 to a first embodiment of the present invention. 该管折弯机1基本上由刀具部2和折弯机部3构成。 The tube bending machine 1 consists essentially of the cutter portion 2 and the bending portion 3.

[0032] 刀具部2是从配置在与折弯机部3相反侧的位置上的盘卷16拉出原料管材P1, 并校直矫正,在规定的长度位置切断,将该被切断的管(切断管P2)向折弯机部3供给的部件,由校直矫正装置4、进给装置5以及插入装置6构成。 [0032] The tool 2 is coiled portion 16 at a position opposite to the side on the bending portion 3 is pulled out from the feed pipe P1 configuration, and alignment correction, cut at a predetermined length position, the tube is cut ( cutting pipe P2) is supplied to the components of the bending machine section 3, a correction straightening means 4, 5 and the feed device 6 is inserted into the device configuration. 另一方面,折弯机部3是对由刀具部2供给的切断管P2实施弯曲加工的部件,由弯曲装置12、卸料装置14以及芯杆装置15 构成。 On the other hand, the bending portion 3 is cut off part of the pipe P2 is supplied from the tool part 2 of the bending process, 12, unloading device 14 and a core rod means 15 is constituted by bending means.

[0033] 校直矫正装置4配置在刀具部2的台架加上的最靠近盘卷16的位置上,以能够通过使从盘卷16拉出的原料管材Pl通过以规定的间隔排列了多个的带槽的辊之间,来矫正为直状的方式构成。 [0033] The alignment correction means 4 arranged in the tool part 2 of the gantry together with position 16 closest to the coil, so as to be arrayed at predetermined intervals by multi by feed pipe 16 is pulled out from the coil Pl between a grooved roll, to correct a linear configuration like manner. 进给装置5配置在校直矫正装置4的前方(原料管材Pl或切断管P2的供给目的地方向,即,折弯机部3侧,图1中左侧),以由上下一对带槽的循环皮带从上下夹入原料管材P1,通过驱动这些循环皮带,将原料管材Pl从盘卷16拉出,在规定的时刻向前方送入的方式构成。 Feeding means 5 disposed in front of the straightening correcting means (Pl feed pipe or feed pipe P2 cutting destination direction, i.e., the bending portion 3 side, the left side in FIG. 1) 4 to the upper and lower pair of slots with the endless belt is sandwiched from the upper and lower feed pipes P1, by the endless belt drive, the feed pipe Pl pulled out from the coil 16, constituting the fed forward manner at a predetermined timing.

[0034] 插入装置6是用于将从盘卷16拉出的原料管材Pl切断为规定的长度,并插入折弯机部3的恰当位置的部件,配置在刀具部2的台架加上的最靠近折弯机部3的位置上。 [0034] The means 6 is inserted into the coil 16 is pulled out from the feed pipe Pl predetermined cut length, and inserted into an appropriate position of the bending machine member portion 3 is disposed in the tool part 2 plus the gantry a position closest to the bending portion 3 of the machine. 该插入装置6由底座7、刀具装置8、插入夹钳9、前端夹钳10、挡块11以及多个导向器13 (后方导向器13a以及前方导向器13b)构成。 The insertion device 6 includes a base 7, the cutter device 8, 9 is inserted into the clamp, the distal end clamp 10, a plurality of stopper guides 11 and 13 (front and rear side guides 13a guide 13b) configured. 它们中的底座7以能够在台架加上沿原料管材Pl以及切断管P2的供给线L从进给装置5附近的位置移动到折弯机部3附近的位置的方式构成。 7 of them configured so as to be movable base to a position near the bending portion 3 at the position of the carriage along the feed pipe together with the pipe Pl and P2 of the cutting line L is supplied from the feed means 5 near manner. 另外,刀具装置8、插入夹钳9以及导向器13以在底座7上能够沿供给线L移动的方式构成。 Further, the cutter device 8, 9 is inserted into the clamp and the guide 13 in a manner to be movable on the base along the supply line 7 L configuration.

[0035] 刀具装置8配置在底座7上的靠近进给装置5的位置上,以能够将原料管材Pl切断的方式构成。 [0035] The cutter device 8 disposed on the base 7 of the feed device close to the 5 position, to be able to cut the raw material pipe Pl mode configuration. 插入夹钳9配置在刀具装置8的前方,具有在由刀具装置8切断原料管材Pl时固定原料管材Pl的功能和在切断后将切断管P2向折弯机部3送出的功能。 9 is inserted into the clamp means disposed in front of the tool 8 having a fixed feed pipe Pl P2 function and after cutting off the tube bending machine function portion 3 fed to the cutter device when cutting feed pipe 8 Pl.

[0036] 前端夹钳10配置在插入夹钳9的前方,具有在切断时固定原料管材Pl的功能。 [0036] The distal clamp 10 is disposed in front of the clamp 9 is inserted, having a fixed feed pipe during the cutting function of Pl. 另外,挡块11配置在底座7上的最靠近折弯机部3的位置上(前端夹钳10以及插入夹钳9 的前方),以能够向上下方向移动的方式配置,更具体地说,是以在下降位置隔断供给线L, 在上升位置开放供给线L的方式构成,具有通过在切断原料管材Pl前,使从进给装置5送出的原料管材Pl的前端碰撞下降位置的挡块11,来使送入停止,在与刀具装置8的位置关系方面,对切断的原料管材Pl进行定位的功能。 Further, the stopper 11 is disposed on the base portion 7 closest to the bending machine 3 on the position (the front end of the front clamp 10 and the insertion clamp 9) to be movable in the vertical direction are arranged, and more particularly, supply line is cut off in the lowered position L, L configuration in the raised position opening the supply line manner, by having the raw material prior to cutting the pipe Pl, so that a front end collision fed from the feed means 5 feed pipe Pl lowered position stopper 11 to stop so fed, in the positional relationship between the cutter device 8 for cutting the material pipe Pl positioning function.

[0037] 后方导向器13a配置在刀具装置8的后方侧,具有在刀具装置8和进给装置5之间,将原料管材Pl向恰当的位置引导的功能,前方导向器1¾配置在插入夹钳9的前方侧, 具有在插入夹钳9和前端夹钳10之间将原料管材Pl向恰当的位置引导的功能。 [0037] The rear guide device 13a disposed in the rear side 8 of the tool, the tool having means between the feeding device 8 and 5, the feed pipe Pl directed to the proper function of the position of the front guide disposed in the insertion jaw 1¾ 9 is a front side having a front end in the insertion jaw 9 and the jaw 10 between the feed pipe Pl guided to an appropriate position function.

[0038] 弯曲装置12由成形辊12a、夹模12b、压模12c以及伺服马达(未图示出)等构成, 从刀具部2插入到恰当的位置的切断管P2的一端侧由成形辊12a以及夹模12b夹入,并被固定,能够通过在该状态下,使成形辊12a以及夹模12b旋转规定角度(例如,180° ),对切断管P2实施弯曲加工。 One end side of the cutting pipe P2 is [0038] 12 is bent by the forming roller means 12a, clamp die 12b, and 12c stamper servomotor (not shown) or the like, the insertion portion 2 from the tool to the proper position by the forming rolls 12a Clamping and 12b is sandwiched and fixed, through in this state, the forming rolls 12a and 12b clamp the mold a predetermined angle (e.g., 180 °), for cutting the tube bending process P2.

[0039] 卸料装置14是用于将对切断管P2实施弯曲加工而制造出的管制品P3从弯曲装置12排出的部件。 [0039] The discharge means 14 is a cutting member will pipe P2 manufactured by bending a pipe P3 article 12 is discharged from the bending apparatus. 另外,芯杆装置15是用于在切断管P2的内部使芯杆移动的部件。 Further, core rod 15 is a means for cutting inside the pipe P2 of the core rod moving member. 另外,芯杆是以在进行弯曲装置12执行的弯曲加工时,避免弯曲部的异常的变形为目的而插入到切断管P2的内部的部件。 Further, core rod 12 is bent during the bending apparatus when executed to avoid deformation of the bent portion of the abnormality for the purpose of cutting the inside member is inserted into the pipe P2.

[0040] 这里,对使用有关本实施方式的管折弯机1,对原料管材Pl实施弯曲加工,连续地制造管制品P3的方法进行说明。 [0040] Here, relating to the use of the pipe bending machine according to the present embodiment 1, the raw material pipe bending process Pl, P3 articles continuously manufactured tube method will be described.

[0041](起动准备) [0041] (ready to start)

[0042] 首先,最初如图1所示,从盘卷16拉出原料管材Pl,使其前端通过校直矫正装置4 的带槽的辊之间,进而,安装在进给装置5的上下的循环皮带之间的恰当的位置。 [0042] First, as shown in FIG Initially, the coil 16 is pulled out from a feed pipe Pl, its front end through straightening rollers between grooved straightening means 4, in turn, is mounted in the vertical feed device 5 appropriate position between the endless belt. 在该状态下驱动进给装置5,将原料管材Pl进一步从盘卷16拉出,并送出,直至原料管材Pl的前端通过后方导向器13a,到达刀具装置8。 In this state, the driving feed means 5, the material is further pulled out from the pipe coil Pl 16, and out, until the front end of the pipe material by Pl rearward guide 13a, reaches the cutter unit 8. 另外,从盘卷16拉出的原料管材Pl在穿过校直矫正装置4时,被校直为直状。 Further, the coil 16 is pulled out from the feed pipe passing through the straightening Pl correcting means 4, alignment is a straight shape.

[0043](切断工序) [0043] (cutting step)

[0044] 如图2 (1)所示,在使挡块11下降了的状态(即,隔断供给线L的状态),且将插入夹钳9以及前端夹钳10均打开了的状态下,使进给装置5驱动,将原料管材Pl送出,直至如图2 (2)所示,原料管材Pl的前端通过刀具装置8、插入夹钳9、前方导向器13b以及前端夹钳10,碰撞挡块11。 [0044] 2 (1), the stopper 11 is lowered in a state shown in FIG (i.e., cut off the supply line L state), and the lower jaw 9 and the distal end is inserted into the clamp 10 are opened state, driving the feed device 5, the raw material feeding pipe Pl until 2 (2), the front end by the feed pipe Pl cutter device 8, 9 is inserted into the jaw, the front end of the front guide 13b, and the clamp 10, the collision speed block 11.

[0045] 然后,在原料管材Pl碰撞到挡块11后,停止进给装置5的送出,如图2C3)所示, 关闭插入夹钳9以及前端夹钳10,将原料管材Pl固定。 After [0045] Then, the raw material collides with the stopper Pl pipe 11, stops feeding out device 5, FIG. 2C3), a closed distal end is inserted into the clamp 9 and clamp 10, the feed pipe is fixed Pl. 接着,使刀具装置8工作,将原料管材Pl在规定的位置切断。 Next, the tool working means 8, the feed pipe cut at a predetermined position Pl. 此时,刀具装置8为使切断管P2成为规定的长度,而被设置在离开挡块11规定距离的位置。 At this time, the cutter device 8 to the cutting pipe P2 becomes a predetermined length, is disposed at a position separated from the stopper 11 a predetermined distance.

[0046] (插入工序) [0046] (inserting step)

[0047] 在切断结束后,如图3(1)所示,使挡块11上升,将供给线L开放,打开插入夹钳9。 [0047] At the end of the cutting, as shown in FIG. 3 (1), the stopper 11 rises, the supply line L is open, the clamp opening 9 is inserted. 而且,如图3(¾所示,使底座7向折弯机部3侧移动,然后,关闭插入夹钳9。接着,如图3 (3)所示,打开前端夹钳10,在底座7上,使保持了切断管P2的状态的插入夹钳9进一步向折弯机部3侧移动。 Further, as shown in FIG. 3 (¾, 7 is moved so that the base portion to the bending machine 3 side, and then, to close the clamp insert 9. Next, as shown in FIG. 3 (3), the front end of the clamp 10 is opened, the base 7 on-off state holding the pipe P2 is inserted into the jaw 9 moves further bending machine 3 side portions.

[0048] 此时,弯曲装置12的夹模12b以及压模12c均打开,切断管P2被插入弯曲装置12 的恰当位置。 [0048] At this time, the bending die means 12b and 12c clamp die 12 are opened, cutting off the bent pipe P2 is inserted into an appropriate position of the apparatus 12. 在切断管P2的插入完成后,关闭夹模12b,由成形辊1¾和夹模12b夹入并固定切断管P2。 After completion of cutting the pipe P2 is inserted into the closed mold clamping 12b, and the forming rolls 1¾ Clamp 12b sandwiched and fixed cutting pipe P2. 另外,在切断管P2被插入弯曲装置12时,由芯杆装置15将芯杆1¾插入切断管P2内的规定的位置(弯曲加工部分的内侧)。 Further, when cutting the pipe P2 is inserted into the bending apparatus 12, the core rod 15 from the stem portion of the cutting means 1¾ predetermined position P2 in the tube (the inner portion of the bending).

[0049] 接着,如图3 (4)所示,打开插入夹钳9,使底座7向进给装置5侧移动,返回切断时的位置。 [0049] Next, as shown in FIG. 3 (4), inserted into the clamp opening 9, so that the base 7 to move the feed device 5 side, returned cutting position. 另外,插入夹钳9也在底座7上向进给装置5侧移动,返回切断时的位置。 Further, the jaw 9 is also inserted into the chassis 7 side to the feeding device 5 is moved to return the cutting position. 最后, 使挡块11下降,成为隔断供给线L的状态。 Finally, the stopper 11 drops, the state of blocking the L supply line.

[0050](弯曲工序) [0050] (bending step)

[0051] 如图4(1)以及图4(2)所示,一面由弯曲装置12的压模12c按压切断管P2的前端侧,一面使夹入切断管P2的后端侧并进行固定的成形辊1¾和夹模12b旋转(正转)规定角度,据此,进行切断管P2的弯曲加工,制造管制品P3。 [0051] FIG. 4 (a) and 4 (2), the pressing face 12c by the bending mold tube 12 distal the cutting apparatus side P2 of the cutting side so that the rear end side of the sandwich pipe P2 and fixing clamp 1¾ forming roll 12b and the rotation (forward rotation) by a predetermined angle, whereby the bending of the cutting pipe P2, pipe manufacturing products P3. 然后,在弯曲加工结束后,如图4(3)所示,打开夹模12b以及压模12c,解除管制品P3的固定,由芯杆装置15使芯杆1¾ 返回原来的位置,如图4(4)所示,使卸料装置14向弯曲装置12侧移动。 Then, after the bending, as shown in FIG. 4 (3), the opening 12b and the clamp die stamper 12c, the fixed tube product P3 is released from the core rod 15 and the rod bar 1¾ means returns to the original position, as shown in FIG 4 (4), the discharge means 14 moves toward the bending device 12. 这样一来,管制品P3从弯曲装置12被推出,并被排出,由未图示出的运送构件向装置外运送。 Thus, the tube is pushed from the article P3 12 bending device, and is discharged, by courier member (not shown) to the outside of the device. 然后,使卸料装置14向原来的位置返回,另外,使成形辊1¾和夹模12b反旋转,恢复到原来的位置。 Then, the discharge means 14 is returned to the original position, Further, the forming roll 1¾ Clamp 12b and reverse rotation, return to the original position.

[0052] 有关本实施方式的管折弯机1通过未图示出的控制装置,全自动地执行上述的切断工序、插入工序以及弯曲工序。 [0052] For the present embodiment, the pipe bending machine by a control device (not shown), perform the above automatic cutting step, the insertion step and the bending step. 而且能够通过反复进行由上述的切断工序、插入工序以及弯曲工序构成的一系列工序,对原料管材Pl实施弯曲加工,连续地制造管制品P3。 But also by repeating the above cutting step, the step of inserting step and a series of curved step configuration, the raw material pipe bending Pl embodiment, the tube continuously manufactured article P3. 但是,各工序不是按顺序执行,在第二循环以后,切断工序与其前一循环的弯曲工序同时执行。 However, each step is not executed sequentially, after the second cycle, the cutting step of the previous cycle to its bending step performed simultaneously. 即, 在弯曲工序在折弯机部3被执行的期间,在刀具部2执行下一循环的切断工序。 That is, during the bending step of bending portion 3 is executed, the cutting step tool part 2 performs the next cycle.

[0053] 在图6所示的以往的管折弯机31中,因为原料管材Pl被插入到弯曲装置42内后, 执行切断工序,所以,在弯曲工序在折弯机部33被执行的期间,在刀具部32不能执行切断工序,只能待机。 [0053] 31, since the feed pipe Pl is inserted into the bending device 42, a cutting step performed in a conventional tube bending machine shown in FIG. 6, therefore, in the bending process portion 33 during bending machine executed in the cutter portion 32 can not perform the cutting step, only stand. 因此,如图5(2)所示,不得不在插入工序结束后,执行切断工序,在切断工序结束后,执行弯曲工序,在弯曲工序结束后,执行下一循环的插入工序。 Thus, in FIG. 5 (2), after the insertion step had performed the cutting step, after the cutting step, the bending step performed after completion of the bending step, the insertion step of the next cycle.

[0054] 与此相对,在本实施方式的管折弯机1中,从图5(1)也可以看出,在弯曲加工在折弯机部3进行的期间,在刀具部2执行下一循环的切断工序,另外,由于切断工序所需时间和弯曲工序所需时间大致相同,所以,在算出第二循环以后各循环的所需时间(由一次切断工序、一次插入工序以及一次弯曲工序构成的一系列工序所需时间)时,没有必要算上切断工序的所需时间,即,能够以插入工序的所需时间和弯曲工序的所需时间的合计值作为各循环的所需时间,相对于图6所示的以往的管折弯机31,能够缩短切断工序所需时间的量(约为整体的30〜40% )。 [0054] On the other hand, in an embodiment of the bending machine according to the present embodiment, may be seen from FIG. 5 (a), in the bending section during bending machine 3, the tool part in the execution of the next 2 the cutting step of the cycle, further, since the time required for the desired bending process and cutting process time is substantially the same, therefore, the time required for the second and subsequent cycles is calculated for each cycle (once by the cutting step, a step of inserting step and a curved configuration when the time) required for a series of steps, there is no need to count the time required for the cutting step, i.e., the total value of the time can be required to process time required for the insertion and bending process as the time required for each cycle, the relative conventional tube bending machine shown in FIG. 631, the cutting step can be shortened amount of time (about 30 to 40% of the total).

[0055] 另外,在以往的管折弯机31中,由于是在将原料管材Pl插入弯曲装置42时,通过使其前端碰撞卸料装置44来进行定位,所以,存在在原料管材Pl的前端产生变形或在卸料装置44产生破损或磨损的问题,但在本实施方式的管折弯机1中,没有必要在将切断管P2 插入弯曲装置12时,使其前端碰撞卸料装置14,能够避免端部变形、卸料装置14的破损这样的问题,另外,能够降低磨损量。 [0055] Further, in the conventional tube bending machine 31, since the feed tube is inserted Pl bending means 42, 44 so as to locate a front end collision by discharge means, therefore, the presence of material at the front end of the pipe Pl deformation or breakage or wear problems at the discharge means 44, but in the tube bending machine of the present embodiment 1, when it is not necessary to cut the pipe P2 is inserted into the bending means 12, 14 so that a front end collision discharge means, possible to avoid deformation of the end portion, the discharge is a problem of breakage apparatus 14, further, it is possible to reduce the amount of wear.

[0056] 符号说明 [0056] Description of Symbols

[0057] 1、31 :管折弯机;2、32 :刀具部;2a :台架;3、33 :折弯机部;4、34 :校直矫正装置; 5、35 :进给装置;6 :插入装置;7 :底座;8、38 :刀具装置;9 :插入夹钳;10 :前端夹钳;11 :挡块;12,42 :弯曲装置;12a,42a :成形辊;12b,42b :夹模;12c,42c :压模;13 :导向器;13a : 后方导向器;13b :前方导向器;14,44 :卸料装置;15,45 :芯杆装置;15a,45a :芯杆;16,46 : 盘卷;Pl :原料管材;P2 :切断管;P3 :管制品。 [0057] 1, 31: Tube bending machine; 2, 32: cutter;. 2A: a gantry; 3,33: bending machine portion; 4,34: alignment correction means; 5.35: feeding means; 6: insertion device; 7: a base; 8, 38: cutter means; 9: inserting the clamp; 10: distal clamp; 11: stopper; 12, 42: bending apparatus; 12a, 42a: forming roll; 12b, 42b : Clamping; 12c, 42c: stamper; 13: guides; 13a: rear guide; 13b: front guide; 14, 44: discharge means; 15, 45: core rod means; 15a, 45a: core rod ; 16, 46: coil; Pl is: feed pipe; P2: cutting tube; P3: tubular article.

Claims (5)

1. 一种管折弯机,所述管折弯机由进行弯曲加工的折弯机部和将原料管材切断,并向上述折弯机部供给的刀具部构成,其特征在于,上述折弯机部具有弯曲装置以及卸料装置,上述刀具部具有进给装置、刀具装置、插入夹钳以及挡块,上述刀具装置配置在上述进给装置的前方,上述插入夹钳配置在上述刀具装置的前方,以能沿上述供给线移动的方式构成,上述挡块配置在上述插入夹钳的前方,以能够从将上述供给线隔断的位置向开放位置移动的方式构成。 1. A pipe bending machine, pipe bending machines of the bending portion of the bending machine and the feed pipe cutting, bending machines and the cutter portion constituting the supplying part, wherein said bending machine has a curved portion and a discharge device means, said cutter portion having a feeding device, the cutter device, the stopper is inserted into the clamp and said cutter means disposed in front of the feeding device, the insertion gripper means disposed in the cutter forward, to be movable along said feed-line configuration, the stopper disposed in front of the insertion gripper, to be movable in the supply line from the blocking position to the open position configured.
2.如权利要求1所述的管折弯机,其特征在于,以执行下述工序的方式构成,所述工序为:在上述挡块隔断上述供给线的状态且上述插入夹钳打开的状态下,驱动上述进给装置,将原料管材送出,直至原料管材的前端通过上述刀具装置以及上述插入夹钳,碰撞到上述挡块,此后,关闭上述插入夹钳,将原料管材固定,使上述刀具装置工作,将原料管材切断的切断工序;在上述挡块开放了上述供给线的状态下,使保持了切断管的状态的上述插入夹钳向上述折弯机部侧移动,将切断管插入上述弯曲装置的恰当的位置,此后,打开上述插入夹钳, 使上述插入夹钳恢复到切断时的位置的插入工序;相对于被插入到上述弯曲装置的切断管进行弯曲加工,制造管制品,由上述卸料装置将制造出的管制品排出的弯曲工序。 2. A pipe bending machine according to claim 1, characterized in that, as to perform the steps constituting the process is: blocking the supply line of the stopper in the insertion state and an open state gripper lower, driving the feeding means, feeding the raw material pipe, until the front end of the pipe material by the cutter device and the insertion clamp, collide with the stopper, and thereafter closing said insertion clamp, the feed pipe is fixed, so that the cutter means work, the cutting step of cutting the raw material pipe; at the supply line is opened in a state the stopper, the holding state of the insertion tube is cut above the clamp portion moves toward the bending machine, the tube is inserted into the cut an appropriate position of the bending apparatus, after opening the jaw insert, so that the clamp is inserted into the insertion step recovery position during cutting; bending with respect to the bending device is inserted into the cutting tube, pipe products manufactured by said discharge means discharging articles manufactured tube bending step.
3.如权利要求2所述的管折弯机,其特征在于,在弯曲工序在上述折弯机部被执行的期间,在上述刀具部执行下一循环的切断工序。 Tube bending machine according to claim 2, wherein, during said bending step being performed bender portion, the cutter portion at the cutting step performed in the next cycle.
4. 一种管弯曲加工方法,是使用权利要求1所述的管折弯机连续进行管弯曲加工的方法,其特征在于,执行下述工序,所述工序为:在上述挡块隔断上述供给线的状态且上述插入夹钳打开的状态下,驱动上述进给装置,将原料管材送出,直至原料管材的前端通过上述刀具装置以及上述插入夹钳,碰撞到上述挡块,此后,关闭上述插入夹钳,将原料管材固定,使上述刀具装置工作,将原料管材切断的切断工序;在上述挡块开放了上述供给线的状态下,使保持了切断管的状态的上述插入夹钳向上述折弯机部侧移动,将切断管插入上述弯曲装置的恰当的位置,此后,打开上述插入夹钳, 使上述插入夹钳恢复到切断时的位置的插入工序;相对于被插入到上述弯曲装置的切断管进行弯曲加工,制造管制品,由上述卸料装置, 将制造出的管制品排出的弯曲工序 A tube bending method, using a pipe bending machine as claimed in claim 1, the tube bending process is carried out continuously, wherein, performing the following step, the step of: blocking the supply in the stopper the status line at the insertion and gripper open state, driving the feeding means, feeding the raw material pipe, until the front end of the pipe material by the cutter device and the insertion clamp, collide with the stopper, and thereafter, closing the insertion clamps, the feed pipe is fixed, so that the cutter device is operated, the material cutting step of cutting the pipe; at the supply line open the stopper in a state holding the cut-off state to the folded tube of the insertion gripper Bender moving side portion, the cut pipe is inserted into an appropriate position of the bending apparatus, after opening the jaw insert, so that the clamp is inserted into the insertion step recovery position during cutting; relative to the bending device is inserted into the cutting the tube bending, tube manufactured article by the discharge means, the manufactured article discharging pipe bending step
5.如权利要求4所述的管弯曲加工方法,其特征在于,在弯曲工序在上述折弯机部被执行的期间,在上述刀具部执行下一循环的切断工序。 5. A tube bending method according to claim 4, wherein, during said bending step being performed bender portion, the cutter portion at the cutting step performed in the next cycle.
CN 201080001817 2010-04-07 2010-04-07 Fully automatic pipe bender CN102317000B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2010/056321 WO2011125190A1 (en) 2010-04-07 2010-04-07 Fully automatic pipe bender

Publications (2)

Publication Number Publication Date
CN102317000A true true CN102317000A (en) 2012-01-11
CN102317000B CN102317000B (en) 2014-09-03

Family

ID=44292627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201080001817 CN102317000B (en) 2010-04-07 2010-04-07 Fully automatic pipe bender

Country Status (3)

Country Link
JP (1) JP4708508B1 (en)
CN (1) CN102317000B (en)
WO (1) WO2011125190A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9078505B2 (en) * 2012-10-09 2015-07-14 Brazeway, Inc. Method of applying lubrication to legs of a hairpin tube

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH105878A (en) * 1996-06-14 1998-01-13 Chiyoda Kogyo Kk Full automatic tube bending equipment
CN1978087A (en) * 2005-11-29 2007-06-13 珠海格力电器股份有限公司 Apparatus for processing U-shape metal pipe and processing method
US20080078226A1 (en) * 2006-10-03 2008-04-03 Antonios Anagnostopoulos System and process for production of three-dimensional products from wire
JP2008126268A (en) * 2006-11-21 2008-06-05 Taiyo:Kk Method and device for bending hair-pin tube
US20080302157A1 (en) * 2005-12-29 2008-12-11 Robert Bosch Gmbh Method and Device For Producing Bent Spring Elements

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2547694Y2 (en) * 1993-05-14 1997-09-10 株式会社林スプリング製作所 vendor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH105878A (en) * 1996-06-14 1998-01-13 Chiyoda Kogyo Kk Full automatic tube bending equipment
CN1978087A (en) * 2005-11-29 2007-06-13 珠海格力电器股份有限公司 Apparatus for processing U-shape metal pipe and processing method
US20080302157A1 (en) * 2005-12-29 2008-12-11 Robert Bosch Gmbh Method and Device For Producing Bent Spring Elements
US20080078226A1 (en) * 2006-10-03 2008-04-03 Antonios Anagnostopoulos System and process for production of three-dimensional products from wire
JP2008126268A (en) * 2006-11-21 2008-06-05 Taiyo:Kk Method and device for bending hair-pin tube

Also Published As

Publication number Publication date Type
CN102317000B (en) 2014-09-03 grant
JPWO2011125190A1 (en) 2013-07-08 application
WO2011125190A1 (en) 2011-10-13 application
JP4708508B1 (en) 2011-06-22 grant

Similar Documents

Publication Publication Date Title
US20100181165A1 (en) Laser blanking from coil strip profile conveyor system
US4409734A (en) Harness making apparatus and method
US4563802A (en) Method and apparatus for the production of exhaust pipes for automotive vehicles
CN101069912A (en) Fully-automatic bent-pipe punching machine
US7148446B2 (en) Method and apparatus for laser cutting sheet metal parts
CN102105256A (en) Progressive laser blanking device for high speed cutting
US1901514A (en) Method of producing wire rods
US5794481A (en) Device for bending or curving hollow-section strips
CN102205494A (en) Automatic forming device for refrigerator enclosing plate
CN102744574A (en) Full-automatic production technology and production equipment for variable cross-section reed blank
US3609276A (en) Machine for producing welded bearings and the like
JP2005186126A (en) Processing method and system for pipe
CN101020291A (en) Automatic scroll spring forming apparatus
CN1503709A (en) Facility and method for pipe cutting
CN1382538A (en) Method and apparatus for perforating on wall of thin-wall metal pipe
CN101065197A (en) Method and device for production of a longitudinal seam welded hollow profile
JP2012250285A (en) Method of and device for producing slit tube from plate material
JP2007237195A (en) Bending machine
KR20090040934A (en) Structure for steel wire bending machine
CN2910399Y (en) Working apparatus for integrally shaped coil of strip and retainer
EP1396296A1 (en) Method for cropping to size and optionally bending profiled elements with bending and shaping machines, particularly profiled elements supplied in bar form
CN2721278Y (en) Cutter of steel wire curtain cloth at range of 15-70 degrees
CN203526396U (en) Numerical control automatic wire rod bending machine
KR100649652B1 (en) Apparatus for welding of iron strip for manufacturing of steel pipe
US7721582B2 (en) Bending machine for rod-shaped workpieces made from wire, tubular material or the like