CN102277834A - Construction bracket of bridge capping beam - Google Patents

Construction bracket of bridge capping beam Download PDF

Info

Publication number
CN102277834A
CN102277834A CN2011101191873A CN201110119187A CN102277834A CN 102277834 A CN102277834 A CN 102277834A CN 2011101191873 A CN2011101191873 A CN 2011101191873A CN 201110119187 A CN201110119187 A CN 201110119187A CN 102277834 A CN102277834 A CN 102277834A
Authority
CN
China
Prior art keywords
steel plate
deformed bar
bridge
construction bracket
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101191873A
Other languages
Chinese (zh)
Inventor
沈振
沈永康
王子峰
姚真明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wujiang City Minggang Road & Bridge Co Ltd
Original Assignee
Wujiang City Minggang Road & Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wujiang City Minggang Road & Bridge Co Ltd filed Critical Wujiang City Minggang Road & Bridge Co Ltd
Priority to CN2011101191873A priority Critical patent/CN102277834A/en
Publication of CN102277834A publication Critical patent/CN102277834A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a construction bracket of a bridge capping beam. The construction bracket comprises a finished deformed bar penetrating through the upright of the bridge, steel plate brackets arranged on the two end portions of the finished deformed bar and penetrating through the upright, and an I-steel support propped up by the steel plate brackets. A through hole is formed on each steel plate bracket. Besides, the finished deformed bar penetrates through the through holes and is fixedly connected with the steel plate brackets through screw caps. The construction bracket of the bridge capping beam is characterized in that the steel plate brackets are fixed to the upright by means of the screw caps via the finished deformed bar, and simultaneously the steel plate brackets form the support with the I-steel, so that the construction of the capping beam is convenient, low in cost, and safe and reliable.

Description

A kind of construction bracket of bridge bent cap
Technical field
The present invention relates to a kind of bracket system that is used for the construction of bridge bent cap.
Background technology
Anchor ear carriage or integral support are adopted in the construction of present most of bent cap carriages, the anchor ear carriage is to utilize suitable position on pier stud anchor ear is installed and is made it to clamp with pier stud, produce maximum static friction force, overcome the weight of temporory structure and bent cap, the safety of anchor ear carriage is bad like this, glides easily.And integral support is a huge structural entity, and the engineering time of integral support is long and cost is big, and integral support only is fit to the bent cap carriage of specific (special) requirements, for example tunnel.
Summary of the invention
Technical problem to be solved by this invention is to overcome the deficiencies in the prior art, and a kind of construction bracket of improved bridge bent cap is provided.
For solving the problems of the technologies described above, the present invention adopts following technical scheme: a kind of construction bracket of bridge bent cap, it comprise the column that runs through bridge finish rolling deformed bar, be arranged on the both ends that pass described column of finish rolling deformed bar the steel plate carriage and by the i iron support of steel plate bracket support, offer through hole on this steel plate carriage, finish rolling deformed bar passes described through hole, and fixedlys connected with the steel plate carriage by nut.
Because adopt above technical scheme, the present invention compared with prior art has following advantage:
The present invention is fixed on the steelframe supporting plate on the column by finish rolling deformed bar and the nut that runs through column, by the i iron support that is arranged on the steelframe supporting plate bent cap supported, and the bent cap easy construction, cost is low, and is safe and reliable.
Description of drawings
Below in conjunction with specific embodiment, the present invention will be further described in detail.
Fig. 1 looks schematic diagram for the master according to the construction bracket of bridge bent cap of the present invention;
Fig. 2 looks schematic diagram (partial cutaway) according to the left side of the construction bracket of bridge bent cap of the present invention;
Wherein: 1, column; 2, bent cap; 3, bent cap masterplate; 4, finish rolling deformed bar; 5, steel plate carriage; 6, nut; 7, i iron support.
The specific embodiment
As shown in Figure 1, according to the construction bracket of the bridge bent cap of present embodiment comprise the column 1 that runs through bridge finish rolling deformed bar 4, be arranged on steel plate carriage 5 on the both ends of the described column 1 of passing of finish rolling deformed bar 4 and the i iron support 7 that supports by steel plate carriage 5, offer through hole on this steel plate carriage 5, finish rolling deformed bar 4 passes described through hole, and fixedlys connected with steel plate carriage 5 by nut 6.
The construction bracket of above-mentioned bridge bent cap, determine the position of column 1 center hole earlier, run through the back and adopt finish rolling deformed bar 4 and nut 6 that steel plate carriage 5 is fixed on the column 1, utilize shearing force to carry out load-bearing, on steel plate carriage 5, place i iron support 7 underframe as a whole simultaneously.The masterplate 3 of bent cap is directly being supported in i iron support 7 upper ends, thereby is supporting bent cap 2.Therefore, compared with prior art safe and reliable by above-mentioned enforcement, easy construction, cost is low, and applied widely, the recycling rate of waterused height.
More than the present invention has been done detailed description; its purpose is to allow the personage that is familiar with this art can understand content of the present invention and is implemented; can not limit protection scope of the present invention with this; all equivalences of doing according to spiritual essence of the present invention change or modify, and all should be encompassed in protection scope of the present invention

Claims (1)

1. the construction bracket of a bridge bent cap, it is characterized in that: described construction bracket comprises the finish rolling deformed bar (4) of the column (1) that runs through bridge, the i iron support (7) that is arranged on the steel plate carriage (5) on the both ends that pass described column (1) of described finish rolling deformed bar (4) and is supported by described steel plate carriage (5), offer through hole on the described steel plate carriage (5), described finish rolling deformed bar (4) passes described through hole, and fixedlys connected with described steel plate carriage (5) by nut (6).
CN2011101191873A 2011-05-10 2011-05-10 Construction bracket of bridge capping beam Pending CN102277834A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101191873A CN102277834A (en) 2011-05-10 2011-05-10 Construction bracket of bridge capping beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101191873A CN102277834A (en) 2011-05-10 2011-05-10 Construction bracket of bridge capping beam

Publications (1)

Publication Number Publication Date
CN102277834A true CN102277834A (en) 2011-12-14

Family

ID=45103537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101191873A Pending CN102277834A (en) 2011-05-10 2011-05-10 Construction bracket of bridge capping beam

Country Status (1)

Country Link
CN (1) CN102277834A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758523A (en) * 2012-07-23 2012-10-31 中国核工业华兴建设有限公司 Bracket for floor hoisting die construction and use method thereof
CN103290783A (en) * 2013-06-02 2013-09-11 福建省华航建设工程有限公司 Bridge upright supporting bracket
CN104131514A (en) * 2014-08-15 2014-11-05 山东省路桥集团有限公司 Steel plate girder bracket and construction method
CN106120562A (en) * 2016-07-08 2016-11-16 杭州市市政工程集团有限公司 Overpass rod iron bracket bent cap support for shuttering integral hoisting construction method
CN109468953A (en) * 2018-10-22 2019-03-15 广西路桥工程集团有限公司 A kind of T-type construction method of bent cap
CN110409315A (en) * 2019-08-15 2019-11-05 中国五冶集团有限公司 A kind of bridge heavy steel member anti-inclination device and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005113579A (en) * 2003-10-09 2005-04-28 Taisei Corp Movable form support
KR100809886B1 (en) * 2006-05-02 2008-03-06 한성산업(주) Coping form system and method for constructing bridge pier using thereof
CN201214768Y (en) * 2008-05-19 2009-04-01 中铁十一局集团第二工程有限公司 Pier stud through type coping template support
CN201686938U (en) * 2010-06-11 2010-12-29 天津二十冶建设有限公司 Pier used for bent cap construction
CN201695339U (en) * 2010-06-24 2011-01-05 中冶实久建设有限公司 Bent cap construction steel support
CN202073040U (en) * 2011-05-10 2011-12-14 吴江市明港道桥工程有限公司 Construction bracket for bridge bent cap

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005113579A (en) * 2003-10-09 2005-04-28 Taisei Corp Movable form support
KR100809886B1 (en) * 2006-05-02 2008-03-06 한성산업(주) Coping form system and method for constructing bridge pier using thereof
CN201214768Y (en) * 2008-05-19 2009-04-01 中铁十一局集团第二工程有限公司 Pier stud through type coping template support
CN201686938U (en) * 2010-06-11 2010-12-29 天津二十冶建设有限公司 Pier used for bent cap construction
CN201695339U (en) * 2010-06-24 2011-01-05 中冶实久建设有限公司 Bent cap construction steel support
CN202073040U (en) * 2011-05-10 2011-12-14 吴江市明港道桥工程有限公司 Construction bracket for bridge bent cap

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758523A (en) * 2012-07-23 2012-10-31 中国核工业华兴建设有限公司 Bracket for floor hoisting die construction and use method thereof
CN102758523B (en) * 2012-07-23 2014-10-01 中国核工业华兴建设有限公司 Bracket for floor hoisting die construction and use method thereof
CN103290783A (en) * 2013-06-02 2013-09-11 福建省华航建设工程有限公司 Bridge upright supporting bracket
CN104131514A (en) * 2014-08-15 2014-11-05 山东省路桥集团有限公司 Steel plate girder bracket and construction method
CN104131514B (en) * 2014-08-15 2016-06-22 山东省路桥集团有限公司 A kind of plate girder bracket and construction method
CN106120562A (en) * 2016-07-08 2016-11-16 杭州市市政工程集团有限公司 Overpass rod iron bracket bent cap support for shuttering integral hoisting construction method
CN109468953A (en) * 2018-10-22 2019-03-15 广西路桥工程集团有限公司 A kind of T-type construction method of bent cap
CN110409315A (en) * 2019-08-15 2019-11-05 中国五冶集团有限公司 A kind of bridge heavy steel member anti-inclination device and method

Similar Documents

Publication Publication Date Title
CN102277834A (en) Construction bracket of bridge capping beam
CN103698140B (en) The dynamic simulation test system of train traveling safety on railway bridge under earthquake
CN202073040U (en) Construction bracket for bridge bent cap
CN204552050U (en) A kind of anchor ear bearing frame and scaffolding platform assembly
CN105155828A (en) Lifting platform and four-upright guide rail bracket thereof
CN103663302B (en) L-type portal installation frame
CN201120994Y (en) Strip coil base
CN105014363B (en) The general dismounting stand of gun turret
CN204001189U (en) A kind of steel frame supporting structure system of not bearing vertical load
CN205295960U (en) Bridge construction support bracket
CN201305409Y (en) Bridge crane
CN204690721U (en) Ship booster supporting compartment horizontal guiding automatic centering damping device
CN103696362A (en) Straddle type light monorail transportation rail beam tensile support
CN201121294Y (en) Hydraulic sliding device
CN203390503U (en) Mounting tool for tumbler joint of bogie of passenger train
CN102632907B (en) Hydraulic cushion car stop on PC (poly carbonate) runway track
CN201933423U (en) Movable type protecting canopy frame
CN205206273U (en) Lift platform and four vertical guideway framves thereof
CN214005438U (en) Long cantilever bent cap assembled bracket
CN203021881U (en) Adjustable guide rail for underground coal mine crane
CN203700944U (en) Straddle type light-weight single-track traffic track beam tensile support
CN202482778U (en) Reinforcing device for midspan bearing platform support
CN202500238U (en) Abnormal-shaped buckling restrained brace
CN203701878U (en) Split-type bearing connection mechanism for vertical columns of platform screen door
CN202509500U (en) Steel purlin support structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111214