CN102277828B - Steel and concrete combined box-shaped structured pier - Google Patents
Steel and concrete combined box-shaped structured pier Download PDFInfo
- Publication number
- CN102277828B CN102277828B CN2011101269863A CN201110126986A CN102277828B CN 102277828 B CN102277828 B CN 102277828B CN 2011101269863 A CN2011101269863 A CN 2011101269863A CN 201110126986 A CN201110126986 A CN 201110126986A CN 102277828 B CN102277828 B CN 102277828B
- Authority
- CN
- China
- Prior art keywords
- steel
- concrete pier
- reinforced concrete
- pier shaft
- pier body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a steel and concrete combined box-shaped structured pier, which can effectively ensure the construction quality and reduce construction time and construction cost. The steel and concrete combined box-shaped structured pier comprises a reinforced concrete pier body (10) with a box-shaped cross section, and outer side longitudinal reinforcing steel bars (11) arranged in the reinforced concrete pier body (10) at intervals along the peripheral direction of the outer wall of the reinforced concrete pier body (10), and is characterized in that: inner wall steel plates (20) which are closed along the peripheral direction are arranged on the inner wall of the reinforced concrete pier body (10); and reinforcing steel bar anti-shearing instruments (12) which are used for reliably connecting the outer side longitudinal reinforcing steel bars (11) and the inner wall steel plates (20) are longitudinally arranged in the reinforced concrete pier body (10) at intervals. The steel bar anti-shearing instruments (12) in an undulatory manner surround the reinforced concrete pier body (10) on a cross section of the reinforced concrete pier body (10), and its wave peak parts come round and hook the corresponding outer side longitudinal reinforcing steel bars (11) and its trough parts are welded with the inner wall steel plates (20).
Description
Technical field
The present invention relates to bridge pier, particularly a kind of steel-concrete composite box structure bridge pier.
Background technology
Bridge box section bridge pier is the bridge pier form that bridge is commonly used, have that sectional area is little, second moment of area is large, from heavy and light, the rigidity of structure and intensity characteristics preferably, be particularly suitable for using at high pier and high seismic intensity area.But, because the bridge pier inner space is narrow and small, internal mold installation and removal difficulty is large, causing that construction is taken a lot of work, the problem of the aspects such as time-consuming, expense material and quality control difficulty.Along with the application of box section bridge pier is increasingly extensive, must effectively overcome the above problems the duration of guarantee bridge construction, quality and cost.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of steel-concrete composite box structure bridge pier, can effectively guarantee construction quality, reduce engineering time and expense.
The technical solution adopted for the present invention to solve the technical problems is as follows:
Steel-concrete composite box structure bridge pier of the present invention, comprise that cross section is the steel concrete pier shaft of box-shaped, and the outside longitudinal reinforcement of laying along its outer wall hoop interval in the steel concrete pier shaft, it is characterized in that: the inwall of described steel concrete pier shaft is provided with the inwall steel plate of hoop sealing, in the steel concrete pier shaft, longitudinal separation arranges outside longitudinal reinforcement, the reliable reinforcing bar shearing resistance device connected of inwall steel plate, reinforcing bar shearing resistance device on steel concrete pier shaft cross section undulate around steel concrete pier shaft wall body, its crest position is walked around and is hooked corresponding outside longitudinal reinforcement, the trough position with the inwall Plate Welding.
The invention has the beneficial effects as follows, with the inwall steel plate, make inner formword, do not need to remove after the perfusion of steel concrete pier shaft, reduce the pier construction duration, guarantee construction quality; Can reduce pier shaft arrangement of reinforcement number of steel bars and pier shaft wall thickness, therefore can effectively reduce engineering cost simultaneously; Pier shaft intensity, rigidity improve, and have strengthened bridge safty, and have had better anti-seismic performance.
The accompanying drawing explanation
This manual comprises following two width accompanying drawings:
Fig. 1 is the cross-sectional structure schematic diagram of steel-concrete composite box structure bridge pier of the present invention;
Fig. 2 is existing bridge box section bridge pier cross-sectional structure schematic diagram.
Component shown in figure, toponym and corresponding marker number: steel concrete pier shaft 10, outside longitudinal reinforcement 11, reinforcing bar shearing resistance device 12, inboard longitudinal reinforcement 13, inwall steel plate 20.
The specific embodiment
Below in conjunction with drawings and Examples, the present invention is further described.
With reference to Fig. 1, steel-concrete composite box structure bridge pier of the present invention, comprise that cross section is the steel concrete pier shaft 10 of box-shaped, and at the interior outside longitudinal reinforcement 11 of laying along its outer wall hoop interval of steel concrete pier shaft 10.The inwall of described steel concrete pier shaft 10 is provided with the inwall steel plate 20 of hoop sealing, in the interior longitudinal separation of steel concrete pier shaft 10, arranges outside longitudinal reinforcement 11, the reliable reinforcing bar shearing resistance device 12 connected of inwall steel plate 20.
With reference to Fig. 1, undulate is around steel concrete pier shaft 10 wall bodies on steel concrete pier shaft 10 cross sections for described reinforcing bar shearing resistance device 12, and its crest position is walked around and hooked corresponding outside longitudinal reinforcement 11, and weld with inwall steel plate 20 at the trough position.
Fig. 2 is existing bridge box section bridge pier cross-sectional structure schematic diagram, contrast Fig. 1 and Fig. 2 are not difficult to find, in existing bridge box section bridge pier pier shaft, except laying outside longitudinal reinforcement 11, go back in pier shaft and lay inboard longitudinal reinforcement 13 along its inwall hoop interval, and transverse reinforcement, complex structure.Topmost problem is because the bridge pier inner space is narrow and small, and internal mold installation and removal difficulty is large, causing that construction is taken a lot of work, the problem of the aspects such as time-consuming, expense material and quality control difficulty.And steel-concrete composite box structure bridge pier of the present invention is made inner formword with inwall steel plate 20, after 10 perfusions of steel concrete pier shaft, do not need to remove, reduce construction period, the assurance construction quality of steel concrete pier shaft 10.Because intensity, rigidity after the steel-concrete combination improve, cancel the inboard longitudinal reinforcement of conventional boxes tee section pier pier shaft and reduce pier shaft concrete wall thickness, therefore can effectively reduce engineering cost, can strengthen bridge safty simultaneously, make it to have better anti-seismic performance.
Some principles of the above steel-concrete composite box structure bridge pier of the present invention that just explains through diagrams, be not the present invention to be confined to shown in and in described concrete structure and the scope of application, therefore every corresponding modify likely be utilized and equivalent, all belong to the scope of the claims that the present invention applies for.
Claims (1)
1. steel-concrete composite box structure bridge pier, comprise that cross section is the steel concrete pier shaft (10) of box-shaped, and the outside longitudinal reinforcement (11) of laying along its outer wall hoop interval in steel concrete pier shaft (10), it is characterized in that: the inwall of described steel concrete pier shaft (10) is provided with the inwall steel plate (20) of hoop sealing, in steel concrete pier shaft (10), longitudinal separation arranges outside longitudinal reinforcement (11), the reliable reinforcing bar shearing resistance device (12) connected of inwall steel plate (20), this reinforcing bar shearing resistance device (12) on steel concrete pier shaft (10) cross section undulate around steel concrete pier shaft (10) wall body, its crest position is walked around and is hooked corresponding outside longitudinal reinforcement (11), weld with inwall steel plate (20) at the trough position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101269863A CN102277828B (en) | 2011-05-17 | 2011-05-17 | Steel and concrete combined box-shaped structured pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101269863A CN102277828B (en) | 2011-05-17 | 2011-05-17 | Steel and concrete combined box-shaped structured pier |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102277828A CN102277828A (en) | 2011-12-14 |
CN102277828B true CN102277828B (en) | 2013-12-04 |
Family
ID=45103532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011101269863A Active CN102277828B (en) | 2011-05-17 | 2011-05-17 | Steel and concrete combined box-shaped structured pier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102277828B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102677689A (en) * | 2012-03-28 | 2012-09-19 | 天津二十冶建设有限公司 | Structure for pouring column foundation cup mouth and pouring method |
CN103774550B (en) * | 2014-01-08 | 2016-01-20 | 华侨大学 | The box steel pier of embedded power consumption coverboard |
CN105563624B (en) * | 2015-12-23 | 2018-01-02 | 上海建工材料工程有限公司 | A kind of box internal model in concrete-bridge panel mold |
CN116201003A (en) * | 2023-03-23 | 2023-06-02 | 天津大学 | Novel high-strength steel bar UHPC-high-strength concrete combined hollow pier |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1400368A (en) * | 2001-07-27 | 2003-03-05 | 谢孟 | Form, its production method and application |
CN101225640A (en) * | 2008-01-30 | 2008-07-23 | 中铁十三局集团有限公司 | Diameter-adjustable sheet steel form for bridge abutments |
CN101634134A (en) * | 2008-07-21 | 2010-01-27 | 株式会社大宇建设 | Psc bridge pier assembled with precast concrete segments having steel duct and steel pipe and reinforcing bar, and constructing method thereof |
CN101701485A (en) * | 2009-10-26 | 2010-05-05 | 清华大学 | Hollow steel pipe-reinforced concrete superimposed member |
CN102031755A (en) * | 2010-11-26 | 2011-04-27 | 哈尔滨工程大学 | Multifunctional permanent template for girder bridge gravity type pier |
CN102041785A (en) * | 2010-11-26 | 2011-05-04 | 河海大学 | Pier steel-concrete composite structure column beam |
-
2011
- 2011-05-17 CN CN2011101269863A patent/CN102277828B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1400368A (en) * | 2001-07-27 | 2003-03-05 | 谢孟 | Form, its production method and application |
CN101225640A (en) * | 2008-01-30 | 2008-07-23 | 中铁十三局集团有限公司 | Diameter-adjustable sheet steel form for bridge abutments |
CN101634134A (en) * | 2008-07-21 | 2010-01-27 | 株式会社大宇建设 | Psc bridge pier assembled with precast concrete segments having steel duct and steel pipe and reinforcing bar, and constructing method thereof |
CN101701485A (en) * | 2009-10-26 | 2010-05-05 | 清华大学 | Hollow steel pipe-reinforced concrete superimposed member |
CN102031755A (en) * | 2010-11-26 | 2011-04-27 | 哈尔滨工程大学 | Multifunctional permanent template for girder bridge gravity type pier |
CN102041785A (en) * | 2010-11-26 | 2011-05-04 | 河海大学 | Pier steel-concrete composite structure column beam |
Also Published As
Publication number | Publication date |
---|---|
CN102277828A (en) | 2011-12-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102277828B (en) | Steel and concrete combined box-shaped structured pier | |
CN204530475U (en) | Little width bridge deck wet seam syndeton | |
CN104508220B (en) | The axial surrender delayed support member of type elastoplasticity and vibration-damp steel shelf structure thing | |
CN202644376U (en) | Dumbbell type steel tube concrete structure of non-filling abdominal cavity stiffening batten plate | |
CN104746420A (en) | Structure for connecting upper and lower parts of bridge wrapped with rubber cap steel tube and constructing method thereof | |
JP2015200158A (en) | Steel concrete composite structure of using sandwich type composite pile cap | |
CN103924693A (en) | Ultrathin reinforced concrete pond groove deformation joint water stop structure and construction method thereof | |
CN103953123A (en) | H-shaped steel frame node with partially restricted beam end and construction method thereof | |
CN104179256A (en) | Rectangular concrete filled steel tube column and steel beam single-side bolt connecting joint and construction method thereof | |
CN104060522B (en) | A kind of Integral Abutment seamless bridge applying double-layer pipe concrete flexible pile | |
CN104047378A (en) | Steel tube bundle combined structure shear wall field spliced node | |
CN204059610U (en) | Rectangular steel-tube concrete column and the monolateral bolt connection node of girder steel | |
CN202611719U (en) | Device for controlling thickness of tunnel secondary lining steel bar protection layer | |
CN203701292U (en) | Steel tube and concrete reinforced tubular joint with local hollow interlayers | |
CN109681234A (en) | A kind of metro shield section of jurisdiction | |
WO2021098113A1 (en) | Prefabricated lightweight high-strength crash barrier for bridge | |
CN205024585U (en) | Steel case liang dunliang solidifies structure | |
CN105088971A (en) | Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge | |
CN204435356U (en) | A kind of modified hollow square pile | |
CN204850189U (en) | Composite beam structure | |
CN203905210U (en) | Steel pipe bundle combined structure shear wall in-site splicing joint | |
CN103711073A (en) | Fixed connecting structure of steel tube arch rib and steel box girder | |
CN203284725U (en) | Steel corrugated plate circular arc arch bridge arch foot fixing structure | |
CN203320390U (en) | Box-type FRP-concrete composite beam | |
CN203460936U (en) | Truss type vehicle body of armored vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 610000 7-10 Floor, Block B, Building No. 4, 200 Tianfu Fifth Street, Chengdu High-tech Zone, Sichuan Province Patentee after: Sichuan Highway Planning, Survey and Design Research Institute Co., Ltd. Address before: 610031 No. 1 Hengjie, Wuhou Temple, Chengdu City, Sichuan Province Patentee before: Sichuan Department of Transportation Highway Planning, Prospecting and Design Research Institute |
|
CP03 | Change of name, title or address |