CN102271355B - Method and device for determining attenuation switching splicing error of test device - Google Patents

Method and device for determining attenuation switching splicing error of test device Download PDF

Info

Publication number
CN102271355B
CN102271355B CN2011102344611A CN201110234461A CN102271355B CN 102271355 B CN102271355 B CN 102271355B CN 2011102344611 A CN2011102344611 A CN 2011102344611A CN 201110234461 A CN201110234461 A CN 201110234461A CN 102271355 B CN102271355 B CN 102271355B
Authority
CN
China
Prior art keywords
power
terminal
length
moment point
adjusted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011102344611A
Other languages
Chinese (zh)
Other versions
CN102271355A (en
Inventor
吴艳钊
李雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN2011102344611A priority Critical patent/CN102271355B/en
Publication of CN102271355A publication Critical patent/CN102271355A/en
Application granted granted Critical
Publication of CN102271355B publication Critical patent/CN102271355B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Telephone Function (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a method and device for determining an attenuation switching splicing error of a test device, relating to the communication technology. The embodiment of the invention performs the power adjustment through a control terminal so that the terminal, after the attenuation switching of the test device, obtains a second time point having the same terminal power value as the first time point before the switching, thereby determining that the attenuation switching splicing error of the test device is the difference between the power measurement value at the second time point and the power measurement value at the first time point. As the attenuation switching splicing error of the test device is obtained, the closed-loop power control test result of the terminal can be adjusted according to the attenuation switching splicing error of the test device; and as the attenuation switching splicing error of the test device, brought about by the attenuation switching of the test device, is considered during the test, the accuracy of the test is further improved.

Description

A kind of testing equipment decay switching stitching error is determined method and apparatus
Technical field
The present invention relates to the communication technology, especially a kind of testing equipment decay switching stitching error is determined method and apparatus.
Background technology
TD-SCDMA(Time Division Synchronized Code Division Multiple Access; The time-division synchronous CDMA system) comprehensive test instrument carries out UE(User Equipment, when closed-loop power control subscriber equipment) is tested, the emission of UE is dynamically generally at 80-90dB, comprehensive test instrument hardware is subject to the restriction at the bottom of system noise, in the situation that do not change the up link decay, more difficult realization is to whole dynamic covering.General by adjusting the decay of comprehensive test instrument receiver, to dynamically the covering and tested at twice of 80-90dB, then test result is spliced.
And due to same signal the measurement result when the different link attenuations, can there are differences, greatly about the 0.1dB left and right, so test is spliced and will be affected measurement result at twice.For example: input signal-20dBm, when up decay-35dBm, measurement result is-20dBm, decay to 0 o'clock measurement result for-20.135dBm, the therefore error of measurement result existence-0.135dBm after the switching decay.If therefore direct splicing, the closed-loop power control test result can be introduced error in splicing place, affects test result.
Existing comprehensive test instrument segmentation covers the closed-loop power control implementation as shown in Figure 1, in this terminal closed-loop power control method of testing, divides whole closed-loop power control test process three sections to complete, and three sections power are respectively A-B, C-D, and E-F, B-C and D-E are splicing place so.
So when acquisition power alignment error Δ P is tested in splicing place, because splicing is in the impact of the discrepancy delta P ' of measurement result under different link attenuations, be difficult to measure more accurately Δ P, concrete: the Modulating Power at splicing place UE is Y=Δ P+Step1+ Δ P ', Δ P=Y-Step1-Δ P ', wherein, Step1 needs terminal to carry out the step-length of power control, if ignore Δ P ', measured Δ P is due to the impact of Δ P ', and its accuracy is lower.
Summary of the invention
The embodiment of the present invention provides a kind of testing equipment decay switching stitching error to determine method and apparatus, to realize determining testing equipment decay switching stitching error.
A kind of testing equipment decay switching stitching error is determined method, comprising:
Determine performance number and the power measurement values of first moment point of terminal before testing equipment decay switching instant;
After testing equipment decay switching, the power of adjusting described terminal makes the performance number of terminal identical with the performance number of the first moment point, and determines that the described performance number moment point identical with the performance number of the first moment point is the second moment point;
Determine the power measurement values of described the second moment point, and the difference of the power measurement values of definite testing equipment decay switching stitching error power measurement values that is the second moment point and the first moment point.
A kind of testing equipment decay switching stitching error is determined device, comprising:
Power determining unit, for determining performance number and the power measurement values of first moment point of terminal before testing equipment decay switching instant;
Power adjustment unit, for after testing equipment decay switching, the power of adjusting described terminal makes the performance number of terminal identical with the performance number of the first moment point, and determines that the described performance number moment point identical with the performance number of the first moment point is the second moment point;
The error determining unit, for determining the power measurement values of described the second moment point, and the difference of the power measurement values of definite testing equipment decay switching stitching error power measurement values that is the second moment point and the first moment point.
The embodiment of the present invention provides a kind of testing equipment decay switching stitching error to determine method and apparatus, carry out the power adjustment by control terminal, make terminal after carrying out testing equipment decay switching, obtain the second moment point that the first moment point terminal power value front with switching is identical, thereby the difference of the power measurement values that definite testing equipment decay switching stitching error is the second moment point and the power measurement values of the first moment point, owing to having obtained testing equipment decay switching stitching error, so can adjust terminal closed-loop power control test result according to testing equipment decay switching stitching error, when being tested, considered the testing equipment decay switching stitching error brought while carrying out testing equipment decay switching, and then improved the accuracy of test.
The accompanying drawing explanation
Fig. 1 is terminal closed-loop power control implementation schematic diagram in prior art;
Fig. 2 determines method flow diagram for the testing equipment decay switching stitching error that the embodiment of the present invention provides;
Fig. 3 a-Fig. 3 j determines the method schematic diagram for power adjustment and the second moment point that the embodiment of the present invention provides;
Fig. 4 a-Fig. 4 d determines the method schematic diagram for the adjustment of preferably power and the second moment point that the embodiment of the present invention provides.
Fig. 5 determines the apparatus structure schematic diagram for the testing equipment decay switching stitching error that the embodiment of the present invention provides.
Embodiment
The embodiment of the present invention provides a kind of testing equipment decay switching stitching error to determine method and apparatus, carry out the power adjustment by control terminal, make terminal after carrying out testing equipment decay switching, obtain the second moment point that the first moment point terminal power value front with switching is identical, thereby the difference of the power measurement values that definite testing equipment decay switching stitching error is the second moment point and the power measurement values of the first moment point, owing to having obtained testing equipment decay switching stitching error, so can adjust terminal closed-loop power control test result according to testing equipment decay switching stitching error, when being tested, considered the testing equipment decay switching stitching error brought while carrying out testing equipment decay switching, and then improved the accuracy of test.
As shown in Figure 2, the testing equipment decay switching stitching error that the embodiment of the present invention provides determines that method comprises:
Step S201, determine performance number and the power measurement values of first moment point of terminal before testing equipment decay switching instant;
Step S202, after testing equipment decay switching, the second moment point after adjusting the power of terminal and determining testing equipment decay switching instant, make terminal identical with the performance number of the first moment point in the performance number of the second moment point;
Step S203, determine the power measurement values of the second moment point, and the difference of the power measurement values of definite testing equipment decay switching stitching error power measurement values that is the second moment point and the first moment point.
Owing to carrying out testing equipment decay switching front and back, respectively get a moment point that the terminal power value is identical, and obtain by the power measurement values of the first moment point and the second moment point the testing equipment decay switching stitching error that testing equipment decay switching brings, and then can adjust terminal closed-loop power control test result by this testing equipment decay switching stitching error, avoid the impact of testing equipment decay switching stitching error on terminal closed-loop power control test result, improve the measuring accuracy of terminal closed-loop power control test, certainly, when carrying out other test, if need to carry out testing equipment decay switching, also can obtain the testing equipment decay switching stitching error that testing equipment decay switching brings by the method, and then carry out the adjustment of test result, in embodiments of the present invention, the terminal closed-loop power control of take test describes as example.
Testing equipment in the embodiment of the present invention can be comprehensive tester, can be also that other have the testing equipment of carrying out the closed-loop power control test; The value that during power measurement values, testing equipment is measured terminal power.
In order to calculate testing equipment decay switching stitching error in test process, and revise test result, need to measure the equal-wattage value under two kinds of evanescent modes of UE at receiver before and after splice point, thereby obtain power measurement values.Due in TD-SCDMA uplink power control scheme, the operation that does not make UE power keep, the operation of only having UE power to raise or lower, therefore need by first raising afterwards and lower, or first lower the mode raised afterwards UE power is remained unchanged.
Now, in step S202, after testing equipment decay switching, adjust the power of terminal, specifically comprise:
When carrying out power decreasing, make terminal carry out after power decreasing the first step-length to carry out power and raise the second step-length, and make terminal carry out after power raises the second step-length to carry out power decreasing the second step-length, wherein, second step length is more than or equal to the first step-length;
Carrying out timing on power, make terminal carry out after power raises the first step-length and carry out power decreasing the second step-length, and after making terminal carry out power decreasing the second step-length, execution power is raising the second step-length, wherein, second step length is more than or equal to the first step-length.
Simultaneously due to the implementation difference of each terminal when carrying out the power adjustment, when upper adjusting power or lower adjusting power, its entry-into-force time point may there are differences, such as some terminal realizes the power adjustment in next subframe that receives power adjustment commands, at next the subframe power that receives power adjustment commands, be that capable of regulating is complete, some terminal realizes the power adjustment in lower two subframes that receive power adjustment commands, at the lower two subframe power that receive power adjustment commands, just adjusts complete.Therefore, the second moment point of selected the second step-length and selection can compatible these two kinds of power to adjust schemes better.
When specifically carrying out power adjustments, also need the mode of carrying out the power adjustment according to terminal to carry out issuing of power adjustment commands, concrete, when terminal when next subframe that receives power adjustment commands realizes that power is adjusted, in step S202, the power of adjusting terminal is specially: transmitted power adjustment order after the last power adjustment commands of terminal is finished;
When terminal, when lower two subframes that receive power adjustment commands realize that power is adjusted, in step S202, the power of adjusting terminal is specially: in the last subframe transmitted power adjustment order that is finished of the last power adjustment commands of terminal.
In fact, in terminal when next subframe that receives power adjustment commands realizes that power is adjusted, the second step-length equals the first step-length can obtain the moment point that performance number is identical with the performance number of the first moment point, when but terminal realizes that in lower two subframes that receive power adjustment commands power is adjusted, possible terminal is before carrying out the first step-length adjustment, it is identical with the adjustment direction of the first step-length that it adjusts direction, be all to raise or be all to lower, the second step-length must be greater than the first step-length and could obtain the moment point that performance number is identical with the performance number of the first moment point so.
Below illustrate the second moment point that can select under different situations:
When terminal when next subframe that receives power adjustment commands realizes that power is adjusted, if the second step-length equals the first step-length, as shown in Figure 3 a and Figure 3 b shows, the second moment point is: t+2* Δ t, wherein t is the first moment point, and Δ t is that terminal power is adjusted the required time of the first step-length; If second step is grown up in the first step-length, as shown in Fig. 3 c and Fig. 3 d, the second moment point is: t+2* Δ t or t+ Δ t ', wherein, t is the first moment point, and Δ t is that terminal power is adjusted the required time of the first step-length, and Δ t ' adjusts the required time of the second step-length for terminal power, because second step is grown up in the first step-length, so Δ t ' is greater than Δ t.
When terminal when lower two subframes that receive power adjustment commands realize that power is adjusted, if terminal the first moment point t with all raised or all lowered in the t+1 moment point, the second step-length must be greater than the first step-length, if being the first step-length, the second step-length adds one, as shown in Fig. 3 e and Fig. 3 f, the second moment point is so: t+2*(Δ t+1), wherein, t is the first moment point, Δ t is that terminal power is adjusted the required time of the first step-length, if second step grow up in the first step-length add one and, as shown in Fig. 3 g and Fig. 3 h, t+2*(Δ t+1) or t+ Δ t ' the second moment point is so:, wherein, t is the first moment point, Δ t is that terminal power is adjusted the required time of the first step-length, Δ t ' adjusts the required time of the second step-length for terminal power, due to second step grow up in the first step-length add one and, so Δ t ' is greater than Δ t+1, terminal the first moment point t with on the t+1 moment point is carried out respectively, be in harmonious proportion to lower or when carrying out respectively lower mediation and raising, as shown in Fig. 3 i and Fig. 3 j, the second moment point is: t+2 or t+2* Δ t or t+ Δ t+ Δ t ', wherein, t is the first moment point, Δ t is that terminal power is adjusted the required time of the first step-length, and Δ t ' adjusts the required time of the second step-length for terminal power.
For power adjustment mode and the choosing of the second moment point that makes each terminal can access unification, the embodiment of the present invention provides a kind of power to adjust the mode of choosing of mode and the second moment point, power that can compatible different terminals scheme is adjusted strategy, calculate the error of closed-loop power control result at the splice point place, improve measuring accuracy.
When carrying out the power adjustment, unified selection the second step-length is that the first step-length adds one, like this, realize for next subframe receiving power adjustment commands the terminal that power is adjusted, realize with lower two subframes for receiving power adjustment commands the terminal that power is adjusted, all can access and the identical moment point of the first moment point performance number, and then select suitable moment point as the second moment point according to actual conditions.
Generally, when terminal is carried out the power rise or is carried out power decreasing, before it carries out the adjustment of the first step-length, it adjusts direction is identical with the adjustment direction of the first step-length, now, can be the second unified moment point of terminal regulation, concrete, when the first step-length is 1, can determine that the second step-length is 2, now can determine that the second moment point is t+4, wherein, t is the first moment point, and like this, selected the second moment point is all the moment point that performance number is identical with the first moment point for all types of terminals.
As shown in Figure 4 a-shown in Figure 4 d, when terminal need to be carried out power decreasing, can be according to-1, + 2,-2 power control sequence comes control terminal to carry out the power adjustment,-1st, adjust the first step-length downwards, + 2,-2 are respectively and adjust up and down the second step-length, when terminal when next subframe that receives power adjustment commands realizes that power is adjusted, after the t subframe issues power control command, in the t+1 subframe, come into force, start to adjust upward the second step-length, when terminal when lower two subframes that receive power adjustment commands realize that power is adjusted, after the t subframe issues power control command, in the t+2 subframe, come into force, start to adjust upward the second step-length.The moment that tc is comprehensive tester receiver gain switching, carry out the etching of testing equipment decay switching, solid dot is that closed-loop power control calculates the point used, hollow dots is to use in order to calculate and eliminate testing equipment decay switching stitching error.
Fig. 4 a is that terminal realizes the power adjustment in next subframe that receives power adjustment commands, and power change curve when terminal is carried out power decreasing, the t asterism is front last point of switching up link decay constantly, tc constantly after, according to :-1 ,+2,-2 change, t point and t+4 point are the same power points of terminal, and lay respectively at tc constantly before and tc constantly after, so Δ P'=P T+4-P tBe the error that closed-loop power control is introduced in splice point tc switching decay, wherein, P T+4For the power measurement values of t+4 moment terminal, P tPower measurement values for t moment terminal.
Equally, Fig. 4 b is that terminal realizes the power adjustment in lower two subframes that receive power adjustment commands, and power change curve when terminal is carried out power decreasing, moment t is front last point of switching up link decay, t+1 is after the moment, according to :-1, + 2 ,-2 change, and t point and t+4 point are the same power points of terminal, and lay respectively at tc constantly before and tc constantly after, so Δ P'=P T+4-P tBe the error that closed-loop power control is introduced in splice point tc switching decay, wherein, P T+4For the power measurement values of t+4 moment terminal, P tPower measurement values for t moment terminal.
Fig. 4 c is that terminal realizes the power adjustment in next subframe that receives power adjustment commands, and terminal is carried out the power change curve of timing on power, the t asterism is front last point of switching up link decay constantly, tc constantly after, according to :+1 ,-2, + 2 change, t point and t+4 point are the same power points of terminal, and lay respectively at tc constantly before and tc constantly after, so Δ P'=P T+4-P tBe the error that closed-loop power control is introduced in splice point tc switching decay, wherein, P T+4For the power measurement values of t+4 moment terminal, P tPower measurement values for t moment terminal.
Equally, Fig. 4 d is that terminal realizes the power adjustment in lower two subframes that receive power adjustment commands, and power change curve when terminal is carried out power decreasing, moment t is front last point of switching up link decay, t+1 is after the moment, according to :+1,-2 ,+2 change, and t point and t+4 point are the same power points of terminal, and lay respectively at tc constantly before and tc constantly after, so Δ P'=P T+4-P tBe the error that closed-loop power control is introduced in splice point tc switching decay, wherein, P T+4For the power measurement values of t+4 moment terminal, P tPower measurement values for t moment terminal.
When carrying out the test of terminal closed-loop power control, after having obtained testing equipment decay switching stitching error Δ P ', terminal power alignment error test result can be adjusted by Δ P ', thereby obtains and more accurate terminal power alignment error Δ P value.
Concrete, when the testing equipment decay switching stitching error Δ P ' performance number that is the second moment point deducts the value that the performance number of the first moment point obtains, terminal power alignment error test result Δ P=Y-step1-Δ P ', wherein, the actual adjustment of the power that Y is terminal result, step1 is the performance number that needs terminal to be adjusted; When the testing equipment decay switching stitching error Δ P ' performance number that is the first moment point deducts the value that the performance number of the second moment point obtains, terminal power alignment error test result Δ P=Y-step1+ Δ P ', wherein, the actual adjustment of the power that Y is terminal result, step1 is the performance number that needs terminal to be adjusted.
The embodiment of the present invention is also corresponding provides a kind of testing equipment decay switching stitching error to determine device, as shown in Figure 5, comprising:
Power determining unit 501, for determining performance number and the power measurement values of first moment point of terminal before testing equipment decay switching instant;
Power adjustment unit 502, for after testing equipment decay switching, the power of adjusting terminal makes the performance number of terminal identical with the performance number of the first moment point, and determines that the described performance number moment point identical with the performance number of the first moment point is the second moment point;
Error determining unit 503, for determining the power measurement values of the second moment point, and the difference of the power measurement values of definite testing equipment decay switching stitching error power measurement values that is the second moment point and the first moment point.
Concrete, the power that power adjustment unit 502 is adjusted terminal is specially:
When carrying out power decreasing, make terminal carry out after power decreasing the first step-length to carry out power and raise the second step-length, and make terminal carry out after power raises the second step-length to carry out power decreasing the second step-length, wherein, second step is grown up in the first step-length;
Carrying out timing on power, make terminal carry out after power raises the first step-length and carry out power decreasing the second step-length, and after making terminal carry out power decreasing the second step-length, execution power is raising the second step-length, wherein, second step is grown up in the first step-length.
Concrete, when terminal, when next subframe that receives power adjustment commands realizes that power is adjusted, the power of adjusting terminal is specially: transmitted power adjustment order after the last power adjustment commands of terminal is finished;
When terminal, when lower two subframes that receive power adjustment commands realize that power is adjusted, the power of adjusting terminal is specially: in the last subframe transmitted power adjustment order that is finished of the last power adjustment commands of terminal.
Power adjustment unit 502 is determined the second moment point after testing equipment decay switching instant, be specially: when terminal when next subframe that receives power adjustment commands realizes that power is adjusted, the second moment point is: t+2* Δ t or t+ Δ t ', wherein, t is the first moment point, Δ t is that terminal power is adjusted the required time of the first step-length, and Δ t ' adjusts the required time of the second step-length for terminal power, and Δ t ' is greater than Δ t;
When terminal when lower two subframes that receive power adjustment commands realize that power is adjusted,: when terminal the first moment point t with in the t+1 moment point, all raised or lower timing, t+2*(Δ t+1) or t+ Δ t ' the second moment point is:, wherein, t is the first moment point, Δ t is that terminal power is adjusted the required time of the first step-length, and Δ t ' adjusts the required time of the second step-length for terminal power, and Δ t ' is greater than Δ t+1; When terminal the first moment point t with on the t+1 moment point is carried out respectively, be in harmonious proportion to lower or when carrying out respectively lower mediation and raising, the second moment point is: t+2 or t+2* Δ t or t+ Δ t+ Δ t ', wherein, t is the first moment point, Δ t is that terminal power is adjusted the required time of the first step-length, and Δ t ' adjusts the required time of the second step-length for terminal power.
When carrying out the terminal closed-loop power control, after determining testing equipment decay switching stitching error, can also carry out adjustment as a result, now, in device, can also comprise for adjust the adjustment unit as a result of test result according to testing equipment decay switching stitching error, specifically for:
When the testing equipment decay switching stitching error Δ P ' performance number that is the second moment point deducts the value that the performance number of the first moment point obtains, terminal power alignment error test result Δ P=Y-step1-Δ P ', wherein, the actual adjustment of the power that Y is terminal result, step1 is the performance number that needs terminal to be adjusted;
When the testing equipment decay switching stitching error Δ P ' performance number that is the first moment point deducts the value that the performance number of the second moment point obtains, terminal power alignment error test result Δ P=Y-step1+ Δ P ', wherein, the actual adjustment of the power that Y is terminal result, step1 is the performance number that needs terminal to be adjusted.
The embodiment of the present invention provides a kind of testing equipment decay switching stitching error to determine method and apparatus, carry out the power adjustment by control terminal, make terminal after carrying out testing equipment decay switching, obtain the second moment point that the first moment point terminal power value front with switching is identical, thereby the difference of the power measurement values that definite testing equipment decay switching stitching error is the second moment point and the power measurement values of the first moment point, owing to having obtained testing equipment decay switching stitching error, so can adjust terminal closed-loop power control test result according to testing equipment decay switching stitching error, when being tested, considered the testing equipment decay switching stitching error brought while carrying out testing equipment decay switching, and then improved the accuracy of test.
Obviously, those skilled in the art can carry out various changes and modification and not break away from the spirit and scope of the present invention the present invention.Like this, if within of the present invention these are revised and modification belongs to the scope of the claims in the present invention and equivalent technologies thereof, the present invention also is intended to comprise these changes and modification interior.

Claims (10)

1. a testing equipment decay switching stitching error is determined method, it is characterized in that, comprising:
Determine performance number and the power measurement values of first moment point of terminal before testing equipment decay switching instant;
After testing equipment decay switching, the power of adjusting described terminal makes the performance number of terminal identical with the performance number of the first moment point, and determines that the described performance number moment point identical with the performance number of the first moment point is the second moment point;
Determine the power measurement values of described the second moment point, and the difference of the power measurement values of definite testing equipment decay switching stitching error power measurement values that is the second moment point and the first moment point.
2. the method for claim 1, is characterized in that, described after testing equipment decay switching, adjusts the power of described terminal, specifically comprises:
When carrying out power decreasing, after making terminal carry out power decreasing the first step-length, execution power raises the second step-length, and carry out power decreasing the second step-length after making terminal execution power raise the second step-length, wherein, described second step length is more than or equal to described the first step-length;
Carrying out timing on power, make terminal carry out after power raises the first step-length and carry out power decreasing the second step-length, and after making terminal carry out power decreasing the second step-length, execution power raises the second step-length, wherein, described second step length is more than or equal to described the first step-length.
3. the method for claim 1, it is characterized in that, when terminal, when next subframe that receives power adjustment commands realizes that power is adjusted, the power of the described terminal of described adjustment is specially: transmitted power adjustment order after the last power adjustment commands of terminal is finished;
When terminal, when lower two subframes that receive power adjustment commands realize that power is adjusted, the power of the described terminal of described adjustment is specially: in the last subframe transmitted power adjustment order that is finished of the last power adjustment commands of terminal.
4. method as claimed in claim 2, it is characterized in that, when terminal when next subframe that receives power adjustment commands realizes that power is adjusted, described the second moment point is: t+2* Δ t or t+ Δ t ', wherein, t is the first moment point, and Δ t is that terminal power is adjusted the required time of the first step-length, Δ t ' adjusts the required time of the second step-length for terminal power, and Δ t ' is greater than Δ t;
When terminal when lower two subframes that receive power adjustment commands realize that power is adjusted,: when described terminal the first moment point t with all raised in the t+1 moment point or all carried out lower timing, t+2*(Δ t+1) or t+ Δ t ' described the second moment point is:, wherein, t is the first moment point, Δ t is that terminal power is adjusted the required time of the first step-length, and Δ t ' adjusts the required time of the second step-length for terminal power, and Δ t ' is greater than Δ t+1; When described terminal the first moment point t with on the t+1 moment point is carried out respectively, be in harmonious proportion to lower or when carrying out respectively lower mediation and raising, described the second moment point is: t+2 or t+2* Δ t or t+ Δ t+ Δ t ', wherein, t is the first moment point, Δ t is that terminal power is adjusted the required time of the first step-length, and Δ t ' adjusts the required time of the second step-length for terminal power.
5. method as claimed in claim 2, is characterized in that, described the second step-length is that described the first step-length adds one.
6. method as claimed in claim 5, is characterized in that, described the first step-length is 1 o'clock, and described the second step-length is 2, and described the second moment point is t+4, and wherein, t is the first moment point.
7. a testing equipment decay switching stitching error is determined device, it is characterized in that, comprising:
Power determining unit, for determining performance number and the power measurement values of first moment point of terminal before testing equipment decay switching instant;
Power adjustment unit, for after testing equipment decay switching, the power of adjusting described terminal makes the performance number of terminal identical with the performance number of the first moment point, and determines that the described performance number moment point identical with the performance number of the first moment point is the second moment point;
The error determining unit, for determining the power measurement values of described the second moment point, and the difference of the power measurement values of definite testing equipment decay switching stitching error power measurement values that is the second moment point and the first moment point.
8. device as claimed in claim 7, is characterized in that, described power adjustment unit specifically for:
When carrying out power decreasing, make terminal carry out after power decreasing the first step-length to carry out power and raise the second step-length, and make terminal carry out after power raises the second step-length to carry out power decreasing the second step-length, wherein, described second step is grown up in described the first step-length;
Carrying out timing on power, make terminal carry out after power raises the first step-length and carry out power decreasing the second step-length, and after making terminal carry out power decreasing the second step-length, execution power is raising the second step-length, wherein, described second step is grown up in described the first step-length.
9. device as claimed in claim 7, it is characterized in that, described power adjustment unit specifically for: when terminal when next subframe that receives power adjustment commands realizes that power is adjusted, transmitted power adjustment order after the last power adjustment commands of terminal is finished; When terminal when lower two subframes that receive power adjustment commands realize that power is adjusted, in the last subframe transmitted power adjustment order that is finished of the last power adjustment commands of terminal.
10. device as claimed in claim 8, is characterized in that, described power adjustment unit determines that the moment point that described performance number is identical with the performance number of the first moment point is the second moment point, is specially:
When terminal when next subframe that receives power adjustment commands realizes that power is adjusted, described the second moment point is: t+2* Δ t or t+ Δ t ', wherein, t is the first moment point, Δ t is that terminal power is adjusted the required time of the first step-length, Δ t ' adjusts the required time of the second step-length for terminal power, and Δ t ' is greater than Δ t;
When terminal when lower two subframes that receive power adjustment commands realize that power is adjusted,: when described terminal the first moment point t with all raised in the t+1 moment point or all carried out lower timing, t+2*(Δ t+1) or t+ Δ t ' described the second moment point is:, wherein, t is the first moment point, Δ t is that terminal power is adjusted the required time of the first step-length, and Δ t ' adjusts the required time of the second step-length for terminal power, and Δ t ' is greater than Δ t+1; When described terminal the first moment point t with on the t+1 moment point is carried out respectively, be in harmonious proportion to lower or when carrying out respectively lower mediation and raising, described the second moment point is: t+2 or t+2* Δ t or t+ Δ t+ Δ t ', wherein, t is the first moment point, Δ t is that terminal power is adjusted the required time of the first step-length, and Δ t ' adjusts the required time of the second step-length for terminal power.
CN2011102344611A 2011-08-16 2011-08-16 Method and device for determining attenuation switching splicing error of test device Active CN102271355B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102344611A CN102271355B (en) 2011-08-16 2011-08-16 Method and device for determining attenuation switching splicing error of test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102344611A CN102271355B (en) 2011-08-16 2011-08-16 Method and device for determining attenuation switching splicing error of test device

Publications (2)

Publication Number Publication Date
CN102271355A CN102271355A (en) 2011-12-07
CN102271355B true CN102271355B (en) 2013-12-04

Family

ID=45053481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102344611A Active CN102271355B (en) 2011-08-16 2011-08-16 Method and device for determining attenuation switching splicing error of test device

Country Status (1)

Country Link
CN (1) CN102271355B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015139182A1 (en) * 2014-03-17 2015-09-24 华为技术有限公司 Ue, network side device, power adjustment method, and sg determination method
CN105309015A (en) * 2014-03-17 2016-02-03 华为技术有限公司 UE, network side device, power adjustment method, and SG determination method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7205842B2 (en) * 2005-01-13 2007-04-17 Telefonaktiebolaget Lm Ericsson (Publ) Continuous alternating closed-open loop power control
CN101009507A (en) * 2007-02-01 2007-08-01 中兴通讯股份有限公司 A method for uplink closed loop power control in the TD-SCDMA system
CN101018079A (en) * 2007-03-15 2007-08-15 北京中星微电子有限公司 Automatic gain control method, device and system
CN101132207A (en) * 2007-03-09 2008-02-27 中兴通讯股份有限公司 Descending power control method in TD-CDMA system
CN101192858A (en) * 2006-11-23 2008-06-04 鼎桥通信技术有限公司 Method and device for power control in the downlink high-speed data transmission system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7205842B2 (en) * 2005-01-13 2007-04-17 Telefonaktiebolaget Lm Ericsson (Publ) Continuous alternating closed-open loop power control
CN101192858A (en) * 2006-11-23 2008-06-04 鼎桥通信技术有限公司 Method and device for power control in the downlink high-speed data transmission system
CN101009507A (en) * 2007-02-01 2007-08-01 中兴通讯股份有限公司 A method for uplink closed loop power control in the TD-SCDMA system
CN101132207A (en) * 2007-03-09 2008-02-27 中兴通讯股份有限公司 Descending power control method in TD-CDMA system
CN101018079A (en) * 2007-03-15 2007-08-15 北京中星微电子有限公司 Automatic gain control method, device and system

Also Published As

Publication number Publication date
CN102271355A (en) 2011-12-07

Similar Documents

Publication Publication Date Title
CN103487782B (en) Electric meter calibrating method and automatic calibrating system
CN104184527B (en) Transmission power measuring device and transmission power measuring method
CN101447161B (en) Method for regulating flat panel display screen
CN103036623B (en) Mobile terminal power control test calibrating method and mobile terminal
CN102043138B (en) System and method for calibrating channel of oscilloscope
CN105119663B (en) WiFi signal method of testing and system
CN102076077B (en) Uplink synchronous control method, system and base station
CN103296940B (en) Self-adaptive PI (proportional-integral) control method and self-adaptive PI control system
CN102958074B (en) The calibration steps of mobile terminal
CN102324944B (en) Antenna calibration method and device
CN102271355B (en) Method and device for determining attenuation switching splicing error of test device
CN102820018A (en) Color coordinate regulating method and device thereof
CN103543425A (en) Method for automatically compensating for error caused by change in measuring plane of network analyzer
CN113922893B (en) GSM radio frequency front-end power calibration method and device
CN105515688B (en) A kind of calibration method of the calibration of power device of transmitter
CN102025410B (en) Method and device for implementing calibration, and terminal
KR20070054708A (en) Method and system for calibrating the transmission and/or reception of mobile radio devices
CN103500560B (en) A kind of processes and displays module brightness data method, system and display device
CN108834257A (en) Improve calibration method, calibrating installation and the calibration system of LED drive current precision
CN106298408B (en) A kind of control method and system improving magnetron output power stability
CN101682932B (en) Signal analysis device
CN109030986B (en) T/R assembly phase-shifting precision testing method and system based on triggering function
CN107462191B (en) A kind of multichannel vibrating wire sensor frequency measuring method, device and equipment
CN107860973B (en) Frequency response compensation method and system applied to spectrum analyzer
CN103618578A (en) Radio-frequency signal power agility method based on numerical control attenuation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant