CN102269786A - Load testing device for triple-frequency transformer - Google Patents

Load testing device for triple-frequency transformer Download PDF

Info

Publication number
CN102269786A
CN102269786A CN2011101182003A CN201110118200A CN102269786A CN 102269786 A CN102269786 A CN 102269786A CN 2011101182003 A CN2011101182003 A CN 2011101182003A CN 201110118200 A CN201110118200 A CN 201110118200A CN 102269786 A CN102269786 A CN 102269786A
Authority
CN
China
Prior art keywords
transformer
frequency
tested
test
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101182003A
Other languages
Chinese (zh)
Other versions
CN102269786B (en
Inventor
王清昊
石峰
张文广
赵传宗
王勇胜
苏旸
孟宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Fushun Power Supply Co of Liaoning Electric Power Co Ltd
Original Assignee
Fushun Power Supply Co of Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fushun Power Supply Co of Liaoning Electric Power Co Ltd filed Critical Fushun Power Supply Co of Liaoning Electric Power Co Ltd
Priority to CN201110118200.3A priority Critical patent/CN102269786B/en
Publication of CN102269786A publication Critical patent/CN102269786A/en
Application granted granted Critical
Publication of CN102269786B publication Critical patent/CN102269786B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a load testing device for a transformer, which is mainly applied in testing items of the transformer delivery, handover, overhaul and failure and can determine short-circuit impedance and load loss, provide important parameters for identifying the quality, the performances and the operation conditions of the transformer and provide the basic parameters for a temperature rise test of the transformer. The structure is as follows: the voltage of a triple-frequency power supply is loaded to the tested transformer through a voltage regulator and an intermediate transformer, a compensator is connected behind the intermediate transformer in parallel, a voltmeter, an ammeter, a power meter and a frequency meter are connected on the primary side of the tested transformer, and the secondary side of the tested transformer is in short circuit. When a short-circuit test is performed on the tested transformer under the conditions of the triple-frequency power supply, the obtained test data are converted to the corresponding value under a power frequency voltage through data fitting treatment and the test effects which are equivalent to those under the power frequency voltage can be realized. The required power supply capacity is small, the volume of a compensation condenser is small, the testing site is small, the wiring and the monitoring are convenient, and 50% Ie testing requirements can be met.

Description

Frequency tripling transformer load test unit
Technical field
The present invention relates to a kind of load test device, relate in particular to a kind of frequency tripling transformer load test unit, belong to the electric power application, be applied to that power transformer dispatches from the factory, the load test device after handing-over, overhaul and the fault.
Background technology
According to the GB requirement, under the power frequency condition, carry out the transformer load test, test current should reach 50%~100%Ie.Because the on-the-spot needed high capacity power supply of satisfied test that is difficult to is about about 10% of test specimen rated capacity, the load test of electric company can only be 10%Ie and following carrying out at present.Even adopt capacitor shunt compensation mode, when the experiment power supply capacity reaches 100kVA, also can only carry out the 50%Ie load test of 66kV and following electric pressure transformer, but required compensation condenser capacity is very big, about 50 μ F, generally need about weight 50kg, tens in the capacitor of electric capacity 8 μ F, jumbo in addition pressure regulator and intermediate transformer, difficulty such as cause that transportation, carrying, wiring and scene are put, and the measurements and calculations error is also very big.
How can be under less power supply capacity conditions, it is convenient, fast and accurate that to carry out the transformer load test be the current engineering technology problem that needs to be resolved hurrily.
Summary of the invention
Patent of the present invention is at the problems referred to above, proposition utilizes 3 frequency multiplication generators as experiment power supply, by the low capacity compensator, realizes that electric current reaches the transformer load test unit of 50% Ie, solved in the prior art and can't under the small power supply capacity conditions, carry out the problem of transformer load test.
Technical scheme of the present invention is as follows:
3 frequency multiplication generators are as experiment power supply, 3 frequency multiplication generators are loaded on the tested transformer by pressure regulator, intermediate transformer, compensator is connected in parallel between intermediate transformer and the tested transformer, voltage table, reometer, power meter, frequency meter all are connected the former limit of tested transformer, and tested transformer is paid the limit short circuit.
Be parallel with control box between described 3 frequency multiplication generators and the pressure regulator.
Described pressure regulator is any in electric voltage regulator or the manual voltage regulator.
Described compensator is inductor or capacitor.
Advantageous effect of the present invention is as follows:
1, adopt 3 frequency multiplication generators as experiment power supply, rig-site utilization is strong, test current can reach 50%Ie and more than.
2, compensation capacity is about 1/9,100 experiment power supply capacity of compensation capacity under the power frequency condition; All reduce greatly compensator volume, weight and required test site etc.
3, test connection facility, the working site is easy to safety custody, saves human and material resources.
4, test current significantly improves, and test figure is accurate, and test findings has more using value.
5, by the present invention under the small power supply capacity conditions, can carry out transformer load test, measure the short-circuit impedance and the load loss of transformer, provide important parameter for identifying transformer quality, performance service condition and temperature rise test.
Description of drawings
Fig. 1 is a schematic diagram of the present invention.
Fig. 2 is a wiring diagram of the present invention.
Among the figure, T1-frequency tripling generator; The T2-pressure regulator; The T3-intermediate transformer; The tested transformer of T4-; Hz-hertz table; The A-reometer; The W-power meter; The V-voltage table; 1, control box, 2, compensator.
Embodiment
Below in conjunction with accompanying drawing, in conjunction with specific embodiments, it is as follows to describe the present invention.
Embodiment 1
3 frequency multiplication generators are parallel with control box as experiment power supply between 3 frequency multiplication generators and the pressure regulator; 3 frequency multiplication generators are loaded on the tested transformer by electric voltage regulator, intermediate transformer, capacitive compensator is connected in parallel between intermediate transformer and the tested transformer, voltage table, reometer, power meter, frequency meter are connected the former limit of tested transformer, and tested transformer is paid the limit short circuit.
Embodiment 2
Described pressure regulator is a manual voltage regulator, and compensator is the inductance compensation device, and other structure is with embodiment 1.
Technical indicator of the present invention is as follows:
1,3 frequencys multiplication generator-capacity 100kVA, frequency 150Hz, voltage 380kV;
2, capacitive compensator-many taps electric capacity;
3, inductance compensation device-many taps inductance;
4,50%~100%Ie of test current-test specimen rated current;
5, environment temperature--5~30 0C;
6, ambient humidity-50%-80%.
Principle of work of the present invention and process are as follows:
Utilize 3 frequency multiplication generators to obtain the single-phase experiment power supply of 150Hz, tested transformer is inserted in the test circuit, select inductance or electric capacity as reactive-load compensator, tested transformer is paid the limit short circuit, as shown in Figure 2, measure original edge voltage, electric current, power, frequency, obtain short-circuit impedance and load loss data, carry out corrected Calculation such as electric current, temperature, frequency again, obtain short-circuit impedance and load loss value under the power frequency condition.

Claims (4)

1. frequency tripling transformer load test unit, it is characterized in that 3 frequency multiplication generators are as experiment power supply, 3 frequency multiplication generators are loaded on the tested transformer by pressure regulator, intermediate transformer, compensator is connected in parallel between intermediate transformer and the tested transformer, voltage table, reometer, power meter, frequency meter all are connected the former limit of tested transformer, and tested transformer is paid the limit short circuit.
2. frequency tripling transformer load test unit according to claim 1 is characterized in that being parallel with control box between described 3 frequency multiplication generators and the pressure regulator.
3. frequency tripling transformer load test unit according to claim 1 is characterized in that described pressure regulator is any in electric voltage regulator or the manual voltage regulator.
4. frequency tripling transformer load test unit according to claim 1 is characterized in that described compensator is inductor or capacitor.
CN201110118200.3A 2011-05-09 2011-05-09 Load testing device for triple-frequency transformer Active CN102269786B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110118200.3A CN102269786B (en) 2011-05-09 2011-05-09 Load testing device for triple-frequency transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110118200.3A CN102269786B (en) 2011-05-09 2011-05-09 Load testing device for triple-frequency transformer

Publications (2)

Publication Number Publication Date
CN102269786A true CN102269786A (en) 2011-12-07
CN102269786B CN102269786B (en) 2014-02-19

Family

ID=45052146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110118200.3A Active CN102269786B (en) 2011-05-09 2011-05-09 Load testing device for triple-frequency transformer

Country Status (1)

Country Link
CN (1) CN102269786B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102841257A (en) * 2012-09-10 2012-12-26 江苏省电力公司苏州供电公司 Instrument for measuring single-phase short-circuit impedance of transformer
CZ305577B6 (en) * 2014-11-28 2015-12-16 České Vysoké Učení Technické V Praze Fakulta Elektrotechnická Device to test control transformers
CN105807172A (en) * 2016-06-01 2016-07-27 国家电网公司 Ultrahigh voltage substation simulated operation verifying system
CN109917214A (en) * 2019-04-11 2019-06-21 孟庆安 A kind of transformer temperature rise test capacitance compensation automatic control system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05137239A (en) * 1991-11-13 1993-06-01 Meidensha Corp Method and circuit for testing ground directional relay
CN2733371Y (en) * 2004-08-23 2005-10-12 特变电工股份有限公司 An apparatus for testing transformer
CN101718804A (en) * 2009-12-04 2010-06-02 中国电力科学研究院 Power supply system of partial discharge test used for extra-high voltage transformer
CN201576074U (en) * 2009-12-18 2010-09-08 国网电力科学研究院武汉南瑞有限责任公司 Variable frequency resonance tester without partial discharge for ultrahigh voltage transformer
CN202041606U (en) * 2011-05-09 2011-11-16 辽宁省电力有限公司抚顺供电公司 Frequency tripling transformer load test device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05137239A (en) * 1991-11-13 1993-06-01 Meidensha Corp Method and circuit for testing ground directional relay
CN2733371Y (en) * 2004-08-23 2005-10-12 特变电工股份有限公司 An apparatus for testing transformer
CN101718804A (en) * 2009-12-04 2010-06-02 中国电力科学研究院 Power supply system of partial discharge test used for extra-high voltage transformer
CN201576074U (en) * 2009-12-18 2010-09-08 国网电力科学研究院武汉南瑞有限责任公司 Variable frequency resonance tester without partial discharge for ultrahigh voltage transformer
CN202041606U (en) * 2011-05-09 2011-11-16 辽宁省电力有限公司抚顺供电公司 Frequency tripling transformer load test device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102841257A (en) * 2012-09-10 2012-12-26 江苏省电力公司苏州供电公司 Instrument for measuring single-phase short-circuit impedance of transformer
CN102841257B (en) * 2012-09-10 2015-10-07 江苏省电力公司苏州供电公司 For testing the instrument of transformer single-phase short circuit impedance
CZ305577B6 (en) * 2014-11-28 2015-12-16 České Vysoké Učení Technické V Praze Fakulta Elektrotechnická Device to test control transformers
CN105807172A (en) * 2016-06-01 2016-07-27 国家电网公司 Ultrahigh voltage substation simulated operation verifying system
CN109917214A (en) * 2019-04-11 2019-06-21 孟庆安 A kind of transformer temperature rise test capacitance compensation automatic control system
CN109917214B (en) * 2019-04-11 2024-02-06 孟庆安 Automatic control system for capacitance compensation in temperature rise test of transformer

Also Published As

Publication number Publication date
CN102269786B (en) 2014-02-19

Similar Documents

Publication Publication Date Title
CN101424728B (en) On site precision detecting test line for high-voltage current transformer
CN103558573B (en) A kind of performance test methods of voltage transformer (VT)
CN201319064Y (en) Test circuit for field accuracy detection of high-voltage current transformer
CN105044479A (en) Apparatus for large-scale oil-immersed transformer no-load and on-load comprehensive tests and method
CN202041606U (en) Frequency tripling transformer load test device
CN103884933B (en) A kind of high-power transformer temperature-raising experimental method
CN109709425A (en) A kind of distribution transformer bears the pilot system and method for short-circuit capacity
CN102269786B (en) Load testing device for triple-frequency transformer
CN103336188A (en) Current boosting apparatus suitable for GIS equipment
Tarase et al. Monitoring & controlling of substation using IoT in distribution power grid
CN202330692U (en) Field check equipment for accuracy of current transformer
CN101806841B (en) Method for determining test parameter of winding and sleeve of power transformer
Prystupczuk et al. Hybrid power electronic transformer model for system-level benefits quantification in energy distribution systems
CN101257213A (en) Reactive-load compensation method for high capacity high electric impedance distributing transformator attrition experiment
CN103616581B (en) The method of without disconnecting power lead test reactive power compensator
CN202502205U (en) Variable frequency series resonance withstand voltage test apparatus
CN101656144B (en) Device for inhibiting harmonic amplification on third winding side of ultrahigh voltage transformer
CN104635083A (en) Field load testing device for power transformer
CN104793116A (en) Voltage withstand test device for large-capacity equipment
CN104111438A (en) Primary large-current loop monitoring method in current transformer error test
CN204613387U (en) For the electric supply installation that current transformer detects
CN104678218A (en) Estimation method of optimal compensation capacitance of cable current rise test system
CN104678219A (en) Capacitance compensation matching method based on high-current test system
CN204359884U (en) A kind of Power Transformer in Field load testing apparatus
CN104155625B (en) For the servicing unit of current mutual inductor with high transforming ratio field-checking in GIS

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20120919

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120919

Address after: 113008 West Xinfu Road, Liaoning, Fushun, No. 13

Applicant after: Fushun Power Supply Company of Liaoning Electric Power Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 113008 West Xinfu Road, Liaoning, Fushun, No. 13

Applicant before: Fushun Power Supply Company of Liaoning Electric Power Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant