CN101806841B CN2009103126392A CN200910312639A CN101806841B CN 101806841 B CN101806841 B CN 101806841B CN 2009103126392 A CN2009103126392 A CN 2009103126392A CN 200910312639 A CN200910312639 A CN 200910312639A CN 101806841 B CN101806841 B CN 101806841B
Authority
CN
China
Prior art keywords
power
transformer
reactive power
winding
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009103126392A
Other languages
Chinese (zh)
Other versions
CN101806841A (en
Inventor
王先秀
朱天宇
蒋旭平
谭萍
丁韬
杨光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN ZHONGDING TECHNOLOGY Co Ltd
Original Assignee
SICHUAN ZHONGDING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN ZHONGDING TECHNOLOGY Co Ltd filed Critical SICHUAN ZHONGDING TECHNOLOGY Co Ltd
Priority to CN2009103126392A priority Critical patent/CN101806841B/en
Publication of CN101806841A publication Critical patent/CN101806841A/en
Application granted granted Critical
Publication of CN101806841B publication Critical patent/CN101806841B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a method for determining test parameters of a winding and a sleeve of a power transformer. The method comprises the following steps of: obtaining a capacitive reactive power component by utilizing data obtained by the design, the manufacturing and the routine tests of the transformer through using a multiple-step integral method; establishing a physical model matched with a practical situation in consideration of counteraction effects of inductive reactive power to the capacitive reactive power component in the state of each test and the variation of an active power component of each test state, and finally forming a computer model, calculating an optimum frequency of each process according to the principle of complete reactive power compensation and calculating the active power component of each time period; converting each component into test parameters, such as actual current, voltage, power, efficiency and the like and constructing a run chart of various variables. The invention has the advantages of controlling an error range between a calculated value and an actual value within 1%, providing the actual guide value for the tests, avoiding mis-operations and illegal operations and ensuring the safety of test equipment and the tested transformer.

Description

Definite method of test parameter of winding and sleeve of power transformer
Technical field
The present invention relates to a kind of implementation method of large and medium-sized power transformer High-Voltage Experimentation Technology, especially relate to and utilize variable-frequency power sources to carry out " induced voltage and measurement of partial discharge when winding and sleeve of power transformer is long " method for determining test parameter.
Background technology
By regulation; Large and medium-sized power transformer is after preceding, the overhaul of putting into operation and behind the insulation fault; For whether check transformer primary element exists insulation defect; Whether dielectric level meets the requirement of regulation and producer's technical conditions of related standards, must carry out winding and sleeve induced voltage and measurement of partial discharge when long, finds the defective of transformer manufacturing, installation and maintenance technology timely and effectively.
Because when induced voltage and measurement of partial discharge, existing real component also has idle component to large and medium-sized power transformer, and existing capacitive component in the idle component, perceptual weight is also arranged, but idle component totally demonstrates capacitive component when winding and sleeve is long.
Along with reaching its maturity of Power Electronic Technique, induced voltage and measurement of partial discharge adopted converter plant as experiment power supply more and more widely when the winding and sleeve of power transformer was long.Advantages such as variable-frequency power sources has that starting current is little, the rate of rise is fast, do not have mechanical moving component, self partial discharge quantity is little, but its power is less, the most approximately 500kVA.Generally, the frequency conversion experiment power supply all must adopt reactor to carry out the compensation of capacitive reactive power, and nonetheless, to the test of super-huge, superhigh tension power transformer the time, if parameter matching is unreasonable, the variable-frequency power sources output power can not meet the demands.
Constitute the test loop by large and medium-sized power transformer (test specimen), testing transformer, compensation reactor, experiment power supply, voltage divider unit etc.; Make total comparatively complicated; Particularly under test condition, differed from operating condition by the examination transformer; Frequency, voltage, three-phase symmetry neither with, cause its real component, perceptual idle component, capacitive reactive power component to change, physical model is difficult for setting up; Test parameterss such as basic electric current by each parts in the experience estimation loop, voltage, frequency, test parameters and actual amount often have big large deviation.
Generally, connect test apparatus and test specimen by testing crew after, the examination up voltage if test parameters has than large deviation with estimated value, has to stop test, must the adjustment testing equipment, repeated multiple times like this.Since GB50150-2006 " electric device installation work electrical equipment commissioning test standard " to winding and sleeve of power transformer when long induced voltage and measurement of partial discharge be divided into I, II, III, IV, 5 time periods of V and carry out; The pressing time in each stage and magnitude of voltage all have very strict requirement; 5 pressure periods closely link to each other, necessary disposable completion, and the centre must not be interrupted; The adjustment testing equipment; Will cause by the examination transformer by pressurization repeatedly, bear the high voltage that not should bear and long pressing time, reduce its dielectric level.Because I, II, III, IV, V 5 stages apply voltage, frequency has nothing in common with each other; There is not direct derivation relation in each time period parameter; And have than big-difference, can not use the derive parameter of next time of the parameter of last pressing time of section, though at one time in the section change of a certain parameter will cause the rapid variation of all parameters; Several nothings of adjustment maybe in the on-the-spot short time; Particularly when the III section, will reach the highest trial voltage (the superhigh tension power transformer trial voltage is about 540kV), the longest 60s of time, the shortest only 24s.At this moment; If there is not the accurate Calculation parameter, the test operation personnel cannot observe a plurality of table meters at all simultaneously under high-strung situation; Adjust testing equipment again; The harm that excessive parameter error brings will be directly to damage to be worth millions of units and to be and the voltage transformer of tens million of units, and the accident that high-potting is damaged transformer often has generation, widely influence send out, transmission of electricity.
Summary of the invention
In order to overcome the above-mentioned shortcoming of prior art; The invention provides a kind of definite method of test parameter of winding and sleeve of power transformer, when winding and sleeve is long, before induced voltage and the measurement of partial discharge test, can accurately calculate each test parameters in advance; Testing crew, is only operated by this method established data when carrying out as required in test; And needn't adjust testing equipment repeatedly, each pressure period comprises that the pilot process between the stage accomplishs without any letup, and electric capacity idle component and inductance idle component offset all the time; Be in best compensating coefficient by the examination transformer always; The electric current that only is real component improves the serviceable life of variable-frequency power sources through variable-frequency power sources, and super-huge, superhigh tension power transformer test is carried out in available frequency conversion.
The technical solution adopted for the present invention to solve the technical problems is: a kind of definite method of test parameter of winding and sleeve of power transformer comprises the steps:
The first step, collect, like electric pressure, connect group, each winding over the ground and each other electric capacity, open circuit loss value etc. by examination power transformer technical data;
Second step, utilization are derived and are tried the capacitive reactive power and the lagging reactive power of transformer by the technical data of examination power transformer:
A, use integration by parts,, calculate the capacitive reactive power component of high pressure winding the distributed electrical capacity and the voltage step integration of high pressure winding: Middle capacitive reactive power component of pressing winding:
Figure GDA0000020607860000032
The capacitive reactive power component of low pressure winding:
Figure GDA0000020607860000033
All idle components are converted to the capacitive reactive power component of low pressure winding: Q Electric capacity=Q High pressure+ Q The middle pressure+ Q Low pressure
B, with the parabolic curve fitting process draw by the examination transformer silicon steel sheet the magnetization curve formula, be converted to the lagging reactive power of each pressure period;
The 3rd goes on foot, confirms each pressure period testing requirements value, selects the mode of connection of testing equipment;
The 4th step, foundation are tried transformer and testing equipment physical model: under the mode of connection of confirming; Will be by the capacitive reactive power of examination transformer; Lagging reactive power; Parameter integrations such as the power that the power that the lagging reactive power of compensation reactor, step-up transformer provide, efficient, gear, variable-frequency power sources provide, efficient are in same equivalent electrical circuit;
The 5th step, set up computer model: utilize ATPdraw software, physical model is integrated in the equivalent electrical circuit obtain by examination characteristic of transformer parameter, measurement voltage divider lumped parameter electric capacity is idle, step-up transformer characteristic parameter and variable-frequency power sources characteristic parameter are plotted in the template of ATPdraw software based on physical model;
The 6th step, basis be the principle Q of reactive power compensation fully Electric capacity=Q Inductance+ Q Compensation, calculate each process " optimum frequency ";
The 7th step, utilization " optimum frequency " calculate each time period real component;
The 8th step, convert each component test parameterss such as into actual " electric current ", " voltage ", " power ", " efficient ", make each variable trend graph.
Compared with prior art; Good effect of the present invention is: the data that the present invention obtains when utilizing design of transformer, manufacturing, conventional test; Adopt integration by parts; To be arrived low-pressure side by the electric capacity distribution and the method reduction of voltage distribution integration by each winding of examination transformer, draw the capacitive reactive power component; Consider that perception is idle to the negative function of the asexual component of capacitive and the variation of each trystate real component under each trystate; Set up the physical model that matches with actual conditions; The final computer model that forms; Induced voltage and measurement of partial discharge each pressure period of test in the time of can precomputing range transformer winding and sleeve length; The voltage of high-tension testing apparatus and test specimen various piece point, electric current, frequency, meritorious, reactive power and component are made each variable trend graph, and the error range of calculated value and actual value is controlled in 1%.For test provides actual standard, avoid maloperation and violation operation, ensure the safety of testing equipment and quilt examination transformer.
The present invention has overcome the blindness that the traditional experiment parameter relies on the experimental formula of personal experience and no physics meaning to estimate; Time, voltage and measurement continuity in the time of satisfying the carrying out that GB50150-2006 " electric device installation work electrical equipment commissioning test standard " requires " Transformer Winding is induced voltage and measurement of partial discharge during together with the cover pipe range "; Calculation method of parameters when utilizing variable-frequency power sources to carry out " Transformer Winding is induced voltage and measurement of partial discharge during together with the cover pipe range " based on physical model and computer model establishment a kind of general is applicable to 110kV and above all types of power transformer.
Embodiment
Disclosed all characteristics in this instructions, or the step in disclosed all methods or the process except mutually exclusive characteristic and/or the step, all can make up by any way.
Disclosed arbitrary characteristic in this instructions (comprising any accessory claim, summary and accompanying drawing) is only if special narration all can be replaced by other equivalences or the alternative features with similar purpose.That is, only if special narration, each characteristic is an example in a series of equivalences or the similar characteristics.
A kind of definite method of test parameter of winding and sleeve of power transformer comprises the steps:
The first step, collect, like electric pressure, connect group, each winding over the ground and each other electric capacity, open circuit loss value etc. by examination power transformer technical data;
Second step, utilization are derived and are tried the capacitive reactive power and the lagging reactive power of transformer by the technical data of examination power transformer:
A, use integration by parts,, calculate the capacitive reactive power component of high pressure winding the distributed electrical capacity and the voltage step integration of high pressure winding:
Figure GDA0000020607860000051
Figure GDA0000020607860000052
Simplify promptly
Figure GDA0000020607860000053
In like manner,
Figure GDA0000020607860000054
Again because U Test phase study voltage=2U Non-test phase study voltage,
So
Figure GDA0000020607860000055
In like manner, the capacitive reactive power component of middle pressure winding:
Figure GDA0000020607860000061
The capacitive reactive power component of low pressure winding:
Figure GDA0000020607860000062
All idle components are converted to the capacitive reactive power component of low pressure winding, promptly
Q Electric capacity=Q High pressure+ Q The middle pressure+ Q Low pressure
B, with the parabolic curve fitting process draw by the examination transformer silicon steel sheet the magnetization curve formula, be converted to the lagging reactive power of each pressure period:
Because curve is the decision of siliconized plate characteristic, the siliconized plate of different steel mills, the different trades mark has different magnetization curves, so each magnetization curve all need carry out match.Concrete grammar is: limited a plurality of numerical value on the trade-off curve, carry out parabolic interpolation with the QBasic written program, and just can obtain the fitting formula of curve easily, the interpolation point on the trade-off curve is many more, and the formula that obtains is accurate more.
Convert by following formula, obtain the lagging reactive power of each pressure period:
wherein,
Figure GDA0000020607860000064
I By the no-load current under the examination transformer rated voltageAnd P By examination transformer nominal lossIn the test figure of routine property, obtain; For example, under 1.5 trial voltages,
Figure GDA0000020607860000065
The 3rd goes on foot, confirms each pressure period testing requirements value, selects the mode of connection of testing equipment;
The 4th step, foundation are tried transformer and testing equipment physical model:
Under the mode of connection of confirming; Will be by the capacitive reactive power of examination transformer, lagging reactive power, the lagging reactive power of compensation reactor; Parameter integrations such as the power that the power that step-up transformer provides, efficient, gear, variable-frequency power sources provide, efficient are in same equivalent electrical circuit;
The 5th step, set up computer model: utilize ATPdraw software (world electrician association provides disclosed, free circuit software for calculation), physical model is integrated in the equivalent electrical circuit obtain by examination characteristic of transformer parameter, measurement voltage divider lumped parameter electric capacity is idle, step-up transformer characteristic parameter and variable-frequency power sources characteristic parameter are plotted in the template of ATPdraw software based on physical model;
The 6th step, the principle of pressing complete reactive power compensation calculate each process " optimum frequency ":
Under the different tests state; Frequency changes, and " optimum frequency " is meant provided by variable-frequency power sources one group frequency that changes, through change frequency make by the vector of examination transformer, compensation reactor lagging reactive power and; All the time equal to be tried transformer, measure voltage divider the capacity reactive power vector and; Variable-frequency power sources also only provides active power all the time like this, the minimum of exerting oneself, just " optimum frequency " of whole equivalent electrical circuit.The principle of " optimum frequency " is Q Electric capacity=Q Inductance+ Q Compensation, promptly
Figure GDA0000020607860000071
Figure GDA0000020607860000072
Figure GDA0000020607860000073
Figure GDA0000020607860000074
Figure GDA0000020607860000075
Figure GDA0000020607860000076
Figure GDA0000020607860000077
" optimum frequency "
Figure GDA0000020607860000078
in the following formula wherein
Figure GDA0000020607860000079
is also relevant with
Figure GDA00000206078600000710
, and the magnetization curve fitting formula through siliconized plate obtains a variable.For this equation of higher order, to utilize ATPdraw software frequency to carry out test run and calculate, the frequency step maximum should be made as 0.1Hz;
The 7th step, utilization " optimum frequency " calculate each time period real component, and concrete computing method are: P Meritorious=P The test phase+ 2P Non-test phase
Figure GDA0000020607860000081
Figure GDA0000020607860000082
In like manner,
Figure GDA0000020607860000083
Figure GDA0000020607860000085
Wherein k is by the multiple of examination transformer test voltage and rating operating voltage, P By the specified active loss of examination transformerCan in by examination Transformer Plant Test data, find;
The 8th step, convert each component test parameterss such as into actual " electric current ", " voltage ", " power ", " efficient ", make each variable trend graph:
A, known to each pressure period lagging reactive power of examination transformer, capacitive reactive power, frequency, trial voltage just can obtain test current;
B, known pressure period compensation reactor inductance value, voltage, frequency just can calculate test current;
C, known step-up transformer gear, the voltage of pressure period, frequency just can calculate test current, efficient;
D, the output of known variable-frequency power sources only provide active power under " optimum frequency "; Variable-frequency power sources output voltage, electric current equate with step-up transformer low-pressure side input voltage, electric current, just can calculate variable-frequency power sources output power, efficient and required input three-phase current size.
The present invention is not limited to aforesaid embodiment.The present invention expands to any new feature or any new combination that discloses in this manual, and the arbitrary new method that discloses or step or any new combination of process.

Claims (1)

1. definite method of a test parameter of winding and sleeve of power transformer is characterized in that: comprise the steps:
The first step, collect, comprising: electric pressure, connect group, each winding over the ground and each other electric capacity, open circuit loss value by examination power transformer technical data;
Second step, utilization are derived and are tried the capacitive reactive power and the lagging reactive power of power transformer by the technical data of examination power transformer:
A, use integration by parts; Distributed electrical capacity and voltage step integration with the high pressure winding; Calculate the capacitive reactive power component of high pressure winding:
Figure 2009103126392100001DEST_PATH_IMAGE002
; Middle capacitive reactive power component of pressing winding:
Figure DEST_PATH_IMAGE004
; The capacitive reactive power component of low pressure winding:
Figure DEST_PATH_IMAGE006
, all idle components are converted to the capacitive reactive power component of low pressure winding:
Figure DEST_PATH_IMAGE008
;
B, draw by the magnetization curve formula of examination power transformer siliconized plate, be converted to the lagging reactive power of each pressure period with the parabolic curve fitting process;
The 3rd goes on foot, confirms each pressure period testing requirements value, selects the mode of connection of testing equipment;
The 4th step, foundation are tried power transformer and testing equipment physical model: under the mode of connection of confirming; Will be by the capacitive reactive power of examination power transformer; Lagging reactive power; The power that the power that the lagging reactive power of compensation reactor, step-up transformer provide, efficient, gear, variable-frequency power sources provide, efficiency parameters are incorporated in the same equivalent electrical circuit;
The 5th step, set up computer model: utilize ATPdraw software, physical model is integrated in the equivalent electrical circuit obtain by examination power transformer characteristic parameter, measurement voltage divider lumped parameter electric capacity is idle, step-up transformer characteristic parameter and variable-frequency power sources characteristic parameter are plotted in the template of ATPdraw software based on physical model;
The 6th step, basis be the principle
Figure DEST_PATH_IMAGE010
of reactive power compensation fully, calculates each process " optimum frequency=
Figure DEST_PATH_IMAGE012
";
The 7th step, utilization " optimum frequency " calculate each time period real component;
The 8th step, convert each component into actual " electric current ", " voltage ", " power ", " efficient " test parameters, make each variable trend graph.
CN2009103126392A 2009-12-30 2009-12-30 Method for determining test parameter of winding and sleeve of power transformer Active CN101806841B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009103126392A CN101806841B (en) 2009-12-30 2009-12-30 Method for determining test parameter of winding and sleeve of power transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009103126392A CN101806841B (en) 2009-12-30 2009-12-30 Method for determining test parameter of winding and sleeve of power transformer

Publications (2)

Publication Number Publication Date
CN101806841A CN101806841A (en) 2010-08-18
CN101806841B true CN101806841B (en) 2012-05-30

Family

ID=42608725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009103126392A Active CN101806841B (en) 2009-12-30 2009-12-30 Method for determining test parameter of winding and sleeve of power transformer

Country Status (1)

Country Link
CN (1) CN101806841B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102735959A (en) * 2012-05-29 2012-10-17 辽宁省电力有限公司 On-line ultrahigh-voltage line power transformer test method
CN103454536A (en) * 2013-09-16 2013-12-18 国网河南省电力公司焦作供电公司 Power transformer test method
CN103543361B (en) * 2013-10-31 2016-04-06 国家电网公司 The extra-high voltage field for Large Transformer no-load test method of frequency conversion voltage adjusting
CN104267298B (en) * 2014-10-23 2017-11-24 上海华群实业股份有限公司 A kind of calculation method of parameters of double winding power transformer
CN110568330A (en) * 2019-09-16 2019-12-13 国网河北省电力有限公司电力科学研究院 Three-phase three-winding transformer induction voltage band partial discharge test parameter estimation method
CN113687154B (en) * 2021-08-05 2024-01-26 南方电网科学研究院有限责任公司 No-load operation state monitoring method, device and equipment of transformer and storage medium

Also Published As

Publication number Publication date
CN101806841A (en) 2010-08-18

Similar Documents

Publication Publication Date Title
CN101806841B (en) Method for determining test parameter of winding and sleeve of power transformer
CN204116545U (en) A kind of equal compression testing device of thyristor unit of converter valve
CN103995165A (en) Automatic adjusting device and adjusting method for multi-transformation ratio current transformer
CN103543361B (en) The extra-high voltage field for Large Transformer no-load test method of frequency conversion voltage adjusting
CN110426667A (en) A kind of system and method for all-fiber current transformator progress wideband verification
CN103884933A (en) Temperature rise test method for large transformer
CN106953353A (en) A kind of maximum under-excitation ability dynamic evaluation system of synchronous generator
CN205301567U (en) Special high tension current transformer calibration system
CN202189115U (en) Portable frequency conversion induction high-voltage tester
CN102708259A (en) Method for modeling generator set excitation system based on frequency-domain method
CN202041606U (en) Frequency tripling transformer load test device
CN104410084A (en) Method for controlling sub-synchronous resonance of wind power station series compensated transmission system
CN106410828A (en) Distribution transformer dynamic intelligent compensation and harmonic treatment method
CN101968995A (en) Loaded voltage-regulating reformation device of power transformer and transformation method thereof
CN110824260A (en) Method for measuring and calculating no-load loss of transformer
CN102269786B (en) Load testing device for triple-frequency transformer
CN104237668B (en) Method and apparatus for determining the electrical characteristics at point of adjustment
CN102427228B (en) Wind power generation system reliability estimating method considering voltage drop of power grid
Sazli et al. A brief review of power quality issues in smart grid and a simple user friendly software
CN202886585U (en) On-line test device for voltage/current transformer
CN104466908B (en) The difference current of self adaptation extra-high voltage adjustable transformer gear regulation calculates method
CN109375047B (en) System and method for testing double-end asynchronous polarity of high-voltage transmission line
CN103076514A (en) Sound level measuring test method for dry-type smoothing reactor
CN207232291U (en) A kind of electrification detection system of power transformer loss
CN107465213B (en) A kind of power station AVC system and its idle real-time regulated quantity calculation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Xianxiu

Inventor after: Zhu Tianyu

Inventor after: Jiang Xuping

Inventor after: Tan Ping

Inventor after: Ding Tao

Inventor after: Yang Guang

Inventor before: Wang Xianxiu

Inventor before: Wang Zhiyong

Inventor before: Jiang Xuping

Inventor before: Tan Ping

Inventor before: Ding Tao

Inventor before: Yang Guang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG XIANXIU WANG ZHIYONG JIANG XUPING TAN PING DING TAO YANG GUANG TO: WANG XIANXIU ZHU TIANYU JIANG XUPING TAN PING DING TAO YANG GUANG