Summary of the invention
For addressing the above problem, the object of the present invention is to provide a kind of energy recovery efficient height, the boiler of long service life effluxes vapour-recovery unit.
For achieving the above object, technical scheme of the present invention is: a kind of boiler effluxes vapour-recovery unit, comprise the water storage degassing tank, described water storage degassing tank is provided with on-condensible gas floss hole and degassing tank discharge outlet, also comprise blender, described blender be provided with pressure pump, with boiler original fixed/the blender air intake that platoon flash vessel steam drain is connected, the blender water inlet that is connected with described pressure pump water side, and the blender delivery port that is connected with the inlet of described water storage degassing tank.
Preferably, described blender also is provided with nozzle, and described nozzle is connected with described blender water inlet and places described internal mixer.
Preferably, described nozzle is provided with two inlets and is connected with the blender water inlet with described blender air intake respectively.
Preferably, a kind of in the drainpipe that coagulates pump, chemical workshop that is provided with of the water inlet end of described pressure pump and Steam Turbine and the tap water pipe line or several are connected.
Preferably, the oxygen-eliminating device that is provided with of the discharge outlet of described water storage degassing tank and boiler low adds inlet pipeline, hot water storage tank, domestic hot-water's pipeline, produces a kind of among the hot water line or several are connected.
Preferably, described water storage degassing tank also is provided with high-order overflow pipe.
Preferably, the interior bore of described blender air intake be equal to or greater than described fixed/the interior bore of platoon flash vessel steam drain.
Preferably, the interior bore of described on-condensible gas floss hole be equal to or greater than described fixed/the interior bore of platoon flash vessel steam drain.
A kind of boiler effluxes the Steam Recovery method, may further comprise the steps,
The first step need be arranged steam with boiler and be imported fixed/platoon flash vessel by the flash vessel air intake, and the sewage that condenses is got rid of by fixed/platoon flash vessel bottom discharge mouth, and steam enters blender by the flash vessel steam drain through the blender air intake;
Second step sprayed into blender with cooling water by the blender water inlet, fully mixed with steam and carried out heat exchange, made steam be condensed into water, entered the water storage degassing tank together with on-condensible gas through the blender delivery port;
The 3rd step, condensed water is delivered in hot water user's the pipeline after the pressurization of degassing tank force (forcing) pump through the degassing tank delivery port again, and the on-condensible gas that aqueous vapor is separated in the water storage degassing tank emits through the on-condensible gas floss hole, if the liquid level in the water storage degassing tank surpasses warning line, then get rid of through high-order overflow pipe.
Preferably, second step was to have additional pressure pump between blender water inlet and the cooling water pipeline, internal mixer is set up nozzle, the blender air intake is connected in the throat of nozzle, cooling water is sprayed into blender through the pressurization back by the blender water inlet, the negative pressure of its formation sucks steam from the blender air intake, spray through nozzle 2 together with running water then and enter blender, fully mix with steam and to carry out heat exchange, make steam be condensed into water, enter the water storage degassing tank through the blender delivery port together with on-condensible gas.
Adopt the beneficial effect of the technical program to be: to provide a kind of boiler to efflux Steam Recovery method and retracting device thereof, adopt this method to make entire equipment not establish any safety valve and pressure-detecting device, pipeline is unimpeded fully, avoided the security incident that may cause because of safety valve and pressure-detecting device fault, adopt the heat exchanging process of water spray acceleration and steam, improve the heat exchange rule, equipment is simple and reliable, long service life.
The specific embodiment
The present invention is further detailed explanation below in conjunction with the drawings and specific embodiments.
Embodiment 1, as shown in Figure 1, a kind of boiler effluxes vapour-recovery unit, comprise water storage degassing tank 3, water storage degassing tank 3 is provided with on-condensible gas floss hole 31 and degassing tank discharge outlet 32, also comprise blender 2, blender 2 be provided with boiler original fixed/the blender air intake 21 that the flash vessel steam drain 12 of platoon flash vessel 1 is connected, the blender water inlet 22 that is connected with tap water pipe line, and the blender delivery port 23 that is connected with the inlet of water storage degassing tank 3.The annexation of whole device is, the flash vessel air intake 11 of fixed/platoon flash vessel 1 is connected with the steam drain of boiler, the flash vessel steam drain 12 original outlet valves that it is provided with are closed, other establishes passage and is connected with the blender air intake 21 of blender 2, the blender water inlet 22 of blender 2 is connected with tap water pipe line, the blender delivery port 23 of blender 2 is connected with the inlet of water storage degassing tank 3, and water storage degassing tank 3 is provided with high-order overflow pipe 33, on-condensible gas floss hole 31 and degassing tank discharge outlet 32.
Operation principle is, boiler need be arranged steam and enter fixed/platoon flash vessel 1 by flash vessel air intake 11, the sewage that condenses is got rid of by fixed/platoon flash vessel 1 bottom discharge mouth, steam enters blender 2 by flash vessel steam drain 12 through blender air intake 21, running water sprays into blender 2 by blender water inlet 22, fully mix with steam and to carry out heat exchange, make steam be condensed into water, enter water storage degassing tank 3 together with on-condensible gas through blender delivery port 23, condensed water is delivered in hot water user's the pipeline after 34 pressurizations of degassing tank force (forcing) pump through the degassing tank delivery port again, and the on-condensible gas that aqueous vapor is separated in water storage degassing tank 3 emits through on-condensible gas floss hole 31, if the liquid level in the water storage degassing tank 3 surpasses warning line, then get rid of through high-order overflow pipe, to guarantee the equipment security of operation, entire equipment is not established any safety valve and pressure-detecting device, pipeline is unimpeded fully, avoided the security incident that may cause because of safety valve and pressure-detecting device fault, entire equipment rate of heat exchange height, safe and reliable to operation, long service life.
Embodiment 2, as shown in Figure 2, all the other are identical with embodiment 1, difference is, also have additional pressure pump 25 between blender water inlet 22 and the tap water pipe line, nozzle 24 is set up in blender 2 inside, blender air intake 21 is connected in the throat of nozzle 24, like this, when through the running water after pressure pump 25 pressurization when nozzle 24 is spurted into blender 2, can form negative pressure in the throat of nozzle 2, this negative pressure sucks steam from blender air intake 21, enter blender 2 through nozzle 2 injections together with running water then, so just reached 1 better heat exchange effect than embodiment.
Cooling water that the blender water inlet pipe 22 of embodiment 1 and embodiment 2 is connected source can also be the production water that the drainpipe of coagulating of being provided with of Steam Turbine condensed water that pump produces or chemical workshop is got rid of.
Embodiment 3, as shown in Figure 3, all the other are identical with embodiment 2, difference is, the water inlet of pressure pump 25 connects the production water lines that comes from chemical workshop, and the condensation hot water after degassing tank force (forcing) pump 34 pressurization enters low 5 pipelines that add that are connected with oxygen-eliminating device 4, makes full use of the heat energy in the condensation hot water.
Embodiment 4, and as shown in Figure 4, all the other are identical with embodiment 3, and difference is that the water inlet of pressure pump 25 connects come from that steam turbine 6 is provided with coagulate pump 61 and extract and coagulate the condensed water that pump 61 produces.
Embodiment 5, and as shown in Figure 5, all the other are identical with embodiment 2, and difference is, delivers to hot water storage tank 7 after the condensation hot water that degassing tank force (forcing) pump 34 produces water storage degassing tank 3 pressurizes, and then flows to each hot water user 8.
In the foregoing description, the interior bore of blender air intake 21 be equal to or greater than described fixed/the interior bore of platoon flash vessel steam drain 12, the interior bore of on-condensible gas floss hole 31 be equal to or greater than described fixed/the interior bore of platoon flash vessel steam drain 12, can reach the purpose of normal pressure discharging like this, further reduce the internal pressure of each device, guarantee the equipment security of operation.
A kind of boiler effluxes the Steam Recovery method, may further comprise the steps,
The first step need be arranged steam with boiler and be imported fixed/platoon flash vessel by the flash vessel air intake, and the sewage that condenses is got rid of by fixed/platoon flash vessel bottom discharge mouth, and steam enters blender by the flash vessel steam drain through the blender air intake;
Second step sprayed into blender with cooling water by the blender water inlet, fully mixed with steam and carried out heat exchange, made steam be condensed into water, entered the water storage degassing tank together with on-condensible gas through the blender delivery port;
The 3rd step, condensed water is delivered in hot water user's the pipeline after the pressurization of degassing tank force (forcing) pump through the degassing tank delivery port again, and the on-condensible gas that aqueous vapor is separated in the water storage degassing tank emits through the on-condensible gas floss hole, if the liquid level in the water storage degassing tank surpasses warning line, then get rid of through high-order overflow pipe.
Wherein, second step can change into and will have additional pressure pump between blender water inlet and the cooling water pipeline, internal mixer is set up nozzle, the blender air intake is connected in the throat of nozzle, cooling water is sprayed into blender through the pressurization back by the blender water inlet, the negative pressure of its formation sucks steam from the blender air intake, spray through nozzle 2 together with running water then and enter blender, fully mix with steam and to carry out heat exchange, make steam be condensed into water, enter the water storage degassing tank together with on-condensible gas through the blender delivery port, make the heat exchange between steam and the cooling water more abundant like this.
Adopt the beneficial effect of the technical program to be: to provide a kind of boiler to efflux Steam Recovery method and retracting device thereof, adopt this method to make entire equipment not establish any safety valve and pressure-detecting device, pipeline is unimpeded fully, avoided the security incident that may cause because of safety valve and pressure-detecting device fault, adopt the heat exchanging process of acceleration of pressure pump water spray and steam, improve the heat exchange rule, equipment is simple and reliable, long service life.
Above-described only is preferred implementation of the present invention, should be pointed out that for the person of ordinary skill of the art, under the prerequisite that does not break away from the invention design, can also make some distortion and improvement, and these all belong to protection scope of the present invention.