CN102268854A - New FRP (fiber reinforce plastic)-epoxy gravel-asphalt concrete steel bridge deck paving structure - Google Patents

New FRP (fiber reinforce plastic)-epoxy gravel-asphalt concrete steel bridge deck paving structure Download PDF

Info

Publication number
CN102268854A
CN102268854A CN2011100715250A CN201110071525A CN102268854A CN 102268854 A CN102268854 A CN 102268854A CN 2011100715250 A CN2011100715250 A CN 2011100715250A CN 201110071525 A CN201110071525 A CN 201110071525A CN 102268854 A CN102268854 A CN 102268854A
Authority
CN
China
Prior art keywords
paving
layer
frp
bridge deck
steel bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100715250A
Other languages
Chinese (zh)
Inventor
张锡祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011100715250A priority Critical patent/CN102268854A/en
Publication of CN102268854A publication Critical patent/CN102268854A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a new FRP-epoxy gravel-asphalt concrete steel bridge deck paving structure. The new structure is a heterogeneous three-layer paving structure with an FRP paving lower layer, an epoxy gravel paving middle layer and an asphalt concrete paving upper layer. The FRP paving lower layer of the new structure connects with a steel bridge deck in an interface bonding connection way with materials having intermolecular attractive forces and interlayer structure reinforce. The FRP paving lower layer connects with the epoxy gravel paving middle layer in an interface bonding connection way including rough surface bonding and material self-adhesive. The epoxy gravel paving middle layer connects with the asphalt concrete paving upper layer in an occlusion type interface connection way, wherein an asphalt mixture of the asphalt concrete paving upper layer embeds in gaps among gravels of the epoxy gravel paving middle layer and grips the gravels. The FRP paving lower layer is a lower bearing layer and a rigidity transition layer of the paving structure, and also a water proof layer and a bonding layer of the steel bridge deck. The epoxy gravel paving middle layer is a middle bearing layer and a rigidity transition layer of the paving structure, and also a interface connection reinforce layer and a construction high temperature buffer layer of the asphalt concrete paving upper layer. The paving structure is equipped with no extra water proof layer or bonding layer, and has substantially improved more reasonable structure mode and more perfect structure function.

Description

FRP-epoxy gravel-bituminous concrete paving steel bridge deck new construction
(1) technical field
The invention belongs to the deck installation structure technical field of bridge engineering.The present invention relates to a kind of paving steel bridge deck new construction, especially relate to a kind of by fibre reinforced composites (Fiber Reinforced Polymer, FRP) lower floor, the epoxy gravel heterogeneous compound steel deck paving new construction that middle level and asphalt concrete pavement upper strata form of mating formation of mating formation abbreviates FRP-epoxy gravel-asphalt concrete steel deck installation structure as.
(2) background technology
Paving steel bridge deck from initial cement concrete paving steel bridge deck structural development to the asphalt concrete steel deck installation structure of bridge design specification recommends now, has brought the technical and economic performance of paving steel bridge deck structure to promote and engineering construction develops [1-2]Since the asphalt concrete steel deck installation structure from last century the eighties release the three big world property technical barriers that solve not yet so far (1. the two interface shear stress of causing of bituminous concrete and steel bridge deck material property great disparity be bigger; 2. the waterproofing course of steel bridge deck and destroy easily with the adhesive linkage of asphalt concrete pavement; 3. paving structure poor durability) having restricted it further develops, impel bridge engineering teacher and design, researcher to seek to adopt new material and new construction that the asphalt concrete steel deck installation structure is undergone technological transformation and technological innovation, thereby release the paving steel bridge deck new construction of " form of structure is more reasonable " and " structure function is more perfect " [3-5]The present invention uses composite structure " compound " thought, carry out traditional asphalt concrete pavement structure and new FRP paving structure and the epoxy gravel paving structure of introducing in the paving steel bridge deck structure compound, release FRP the mat formation paving steel bridge deck structure of middle level, the heterogeneous three layer construction form in asphalt concrete pavement upper strata of lower floor, epoxy gravel of mating formation, three big world property technical barriers of asphalt concrete steel deck installation structure are effectively solved, and can make new paving structure have the progress of the matter of " form of structure is more reasonable " and " structure function is more perfect ".
(3) summary of the invention
Summary of the invention of the present invention is the form of structure and the connected mode of FRP-epoxy gravel-bituminous concrete paving steel bridge deck new construction.
Technical scheme of the present invention is as follows: in the middle of material property great disparity, interface connect more weak steel bridge deck and asphalt concrete pavement layer, but add not only can realize the two material stiffness transition, but also the interface connect the FRP that strengthens layer and the epoxy gravel layer of mating formation of mating formation, constitute FRP the mat formation paving steel bridge deck structure of middle level, the heterogeneous three layer construction form in asphalt concrete pavement upper strata of lower floor, epoxy gravel of mating formation.The mat formation form of structure of lower floor of FRP is glass fiber (GF) and carbon fiber (CF) reinforced epoxy (ER) and bonding FRP solid slab or the hollowcore slab structure that is connected on the steel bridge deck; The mat formation form of structure in middle level of epoxy gravel is for ER mixes and stirs granite, basalt gravel mat formation the solid slab structure in the lower floor of compacting and the bonding FRP of being connected that paves of gathering materials; The form of structure on asphalt concrete pavement upper strata is the solid slab structure of bituminous mixture laying compacting on epoxy gravel is mated formation the middle level of routine.The mat formation interface connected mode of lower floor and steel bridge deck of FRP, boundary layer is had the bonding of structural re-enforcement be connected for the matrix resin ER of FRP material and steel have inter-molecular attraction and FRP material fortifying fibre GF, CF, guarantee the two interfacial structure one and stressed survivable.FRP the mat formation interface connected mode in middle level of lower floor and epoxy gravel of mating formation, be identical being connected certainly and the bonding connection of exasperate of the two rough interfaces of the two material matrix resin, the interface bonding strength that guarantees the two is not less than the mat formation interface bonding strength of lower floor and steel bridge deck of FRP, thereby provides firm durable mat formation bearing layer and power transmission layer for the asphalt concrete pavement upper strata.The mat formation interface connected mode on middle level and asphalt concrete pavement upper strata of epoxy gravel, for the bituminous mixture on asphalt concrete pavement upper strata embeds mat formation space between the gravel in middle level and bond the biting connecions interface that gravel constitutes and connect of epoxy gravel, guarantee that the area that is connected that the two interface connects by its firm gravel basic unit and increase is strengthened, thereby significantly improve the interface shear strength on asphalt concrete pavement upper strata.
(4) beneficial effect
FRP-epoxy gravel-bituminous concrete paving steel bridge deck new construction has following beneficial effect:
1. form of structure is more reasonable
FRP-epoxy gravel-bituminous concrete paving steel bridge deck new construction is a heterogeneous three layer construction worthy of the name, establishes adhesive linkage between each layer no longer in addition, does not also need the water layer of setting up defences in addition again on the steel bridge deck.The FRP lower floor of mating formation is the following bearing layer and the rigidity transition zone of paving structure, is again the waterproofing course and the adhesive linkage of steel bridge deck; The epoxy gravel middle level of mating formation, be the middle bearing layer and the rigidity transition zone of paving structure, the interface that is the asphalt concrete pavement upper strata again connects enhancement layer and construction high temperature buffer layer, thereby the form of structure that makes paving structure is simpler and more reasonable, and makes each layer of paving structure can both be with the length of its material property.
2. structure function is more perfect
FRP-epoxy gravel-bituminous concrete paving steel bridge deck new construction, one can utilize FRP mat formation the light material advantage and the special structure form of lower floor, alleviate dead load (the bituminous concrete paving steel bridge deck that for example 60mm is thick of paving steel bridge deck, the FRP hollow slab type lower floor of mating formation is replaced by in the lower floor of mating formation that its 30mm is thick, can make paving structure loss of weight about 1/3); Two can utilize the FRP overall structure that high-strength, long-acting interface connects and composes between lower floor and steel bridge deck of mating formation, (the FRP hollow slab type that for example 30mm the is thick lower floor of mating formation can increase the direction across bridge bending rigidity about 50% of the thick steel bridge deck of 12mm to increase the rigidity of steel bridge deck, be equivalent to increase indirectly the about 3mm of steel bridge deck thickness), reduce the deflection deformation and the amplitude of steel bridge deck; Three can be by mat formation self high powerful feature of lower floor and to the rigidity contribution of whole paving structure of FRP, on the interface of neutral axis that makes the cross section of mating formation under the prerequisite of self not destroying earlier and asphalt concrete pavement layer, move, thereby reduce the stress of steel bridge deck and asphalt concrete layer and distortion (25mm asphalt concrete pavement upper strata+7mm epoxy gravel middle level+25mmFRP hollow slab type thick steel bridge deck paving structure of lower floor+12mm of mating formation of mating formation for example, with respect to the thick steel bridge deck paving structure of the thick asphalt concrete pavement layer+12mm of 57mm, it is about 15% that the maximum of steel bridge deck reduces, and asphalt concrete pavement layer interface shear stress reduces about 30%); Four can mat formation by FRP, and subsurface material is anti-to rupture, tired and acidproof, alkali, the salt medium corrosion is better than steel and bituminous concrete, waterproof, adhesive effect is better than existing paving steel bridge deck structure, and all are bonding, waterproofing materials, can be in-30~70 ℃ of scopes operate as normal, the excellent properties of aging life-span 〉=40 year, increase the durability of new paving structure, guaranteeing that FRP mats formation application life of lower floor is not less than 30 years, epoxy gravel is mated formation and application life in middle level is not less than 15 years, be not less than 10 years the application life on asphalt concrete pavement upper strata, thereby make the structure function of paving steel bridge deck structure more perfect, the technological progress and the great development that bring the paving steel bridge deck engineering to use.
List of references
[1] Huang is defended. Steel Bridge Pavement design [J]. and civil engineering journal, 2007,40 (9): 65-77.
[2] The Ministry of Communications of the People's Republic of China, MOC. highway bridge and culvert design general specification [S]. Beijing: People's Transportation Press, 2004,10.
[3] Zhang Yong, Qian Zhendong, Luo Sang. the application [J] of homemade epoxy asphalt mixture in paving steel bridge deck. Shanghai highway, 2008, (2): 23-26.
[4] Liu Muyu, Cao Yugui, Ding Qingjun. the mechanics property analysis of novel paving steel bridge deck structure [J]. Central China University of Science and Technology's journal: urban science version, 2008,25 (4): 23-26.
[5] Yang Zhong, Zhang Xixiang, all .FRP-asphalt concrete steel deck installation structure Research on Technological Innovation [C] of old bodyguard. bridge and Chongqing, international symposium, city 2009 collections of thesis: 169-176.

Claims (4)

1. FRP-epoxy gravel-bituminous concrete paving steel bridge deck new construction.It is characterized in that: the form of structure of this paving structure is FRP mat formation lower floor, epoxy gravel mat formation middle level, the heterogeneous three layers of paving structure in asphalt concrete pavement upper strata.
2. paving steel bridge deck structure as claimed in claim 1, it is characterized in that: the mat formation interface connected mode of lower floor and steel bridge deck of FRP has the bonding of structural re-enforcement to boundary layer and is connected for the matrix resin ER and the steel of FRP material have inter-molecular attraction and FRP material fortifying fibre GF, CF.
3. paving steel bridge deck structure as claimed in claim 1, FRP the mat formation interface connected mode in middle level of lower floor and epoxy gravel of mating formation, what have for the matrix resin ER of the two material is identical is connected and the bonding connection of exasperate of the two rough interfaces certainly.
4. paving steel bridge deck structure as claimed in claim 1, it is characterized in that: the mat formation interface connected mode on middle level and asphalt concrete pavement upper strata of epoxy gravel, for the bituminous mixture on asphalt concrete pavement upper strata embeds mat formation space between the gravel in middle level and bond the biting connecions interface that gravel constitutes and connect of epoxy gravel.
CN2011100715250A 2011-03-19 2011-03-19 New FRP (fiber reinforce plastic)-epoxy gravel-asphalt concrete steel bridge deck paving structure Pending CN102268854A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100715250A CN102268854A (en) 2011-03-19 2011-03-19 New FRP (fiber reinforce plastic)-epoxy gravel-asphalt concrete steel bridge deck paving structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100715250A CN102268854A (en) 2011-03-19 2011-03-19 New FRP (fiber reinforce plastic)-epoxy gravel-asphalt concrete steel bridge deck paving structure

Publications (1)

Publication Number Publication Date
CN102268854A true CN102268854A (en) 2011-12-07

Family

ID=45051286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100715250A Pending CN102268854A (en) 2011-03-19 2011-03-19 New FRP (fiber reinforce plastic)-epoxy gravel-asphalt concrete steel bridge deck paving structure

Country Status (1)

Country Link
CN (1) CN102268854A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103122608A (en) * 2012-10-12 2013-05-29 中交第三公路工程局有限公司 Steel bridge deck paving structure and construction technology
CN108086088A (en) * 2017-11-29 2018-05-29 中科联化有限公司 A kind of environment friendly pervious Road System of new type colorful

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003176508A (en) * 2001-12-10 2003-06-24 Mitsubishi Kagaku Sanshi Corp Frp reinforcing construction method for concrete structure
US20080078038A1 (en) * 2006-09-28 2008-04-03 Hossein Borazghi Fiber reinforced thermoplastic composite panel
CN101514537A (en) * 2009-02-16 2009-08-26 张锡祥 FRP structural layer integrating adhesion, waterproof and stress buffer layers as a whole used for steel bridge deck paving layer
CN101660294A (en) * 2009-09-15 2010-03-03 宁波天意钢桥面铺装技术有限公司 Steel bridge deck pavement structure and pavement method thereof
CN101781875A (en) * 2010-03-02 2010-07-21 张锡祥 FRP-bituminous concrete and FRP-epoxy gravel paving steel bridge deck new construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003176508A (en) * 2001-12-10 2003-06-24 Mitsubishi Kagaku Sanshi Corp Frp reinforcing construction method for concrete structure
US20080078038A1 (en) * 2006-09-28 2008-04-03 Hossein Borazghi Fiber reinforced thermoplastic composite panel
CN101514537A (en) * 2009-02-16 2009-08-26 张锡祥 FRP structural layer integrating adhesion, waterproof and stress buffer layers as a whole used for steel bridge deck paving layer
CN101660294A (en) * 2009-09-15 2010-03-03 宁波天意钢桥面铺装技术有限公司 Steel bridge deck pavement structure and pavement method thereof
CN101781875A (en) * 2010-03-02 2010-07-21 张锡祥 FRP-bituminous concrete and FRP-epoxy gravel paving steel bridge deck new construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103122608A (en) * 2012-10-12 2013-05-29 中交第三公路工程局有限公司 Steel bridge deck paving structure and construction technology
CN103122608B (en) * 2012-10-12 2016-01-20 中交第三公路工程局有限公司 Bridge deck pavement structure and construction technology
CN108086088A (en) * 2017-11-29 2018-05-29 中科联化有限公司 A kind of environment friendly pervious Road System of new type colorful

Similar Documents

Publication Publication Date Title
US9783940B2 (en) Structure and method of pavement on steel deck bridge
CN101781875A (en) FRP-bituminous concrete and FRP-epoxy gravel paving steel bridge deck new construction
CN201704626U (en) Steel and ultra-high-property-concrete integrated bridge deck structure
CN204370308U (en) The ultra-thin composite paved Rotating fields of a kind of Steel Bridge Deck polymer
CN107217597A (en) A kind of prestressed concrete bridge face is seamlessly connected the construction method of plate
CN202766969U (en) Steel and wood combination bridge deck pavement structure with shear keys
CN104631318A (en) Bridge deck slab transverse unequal-strength steel-concrete combined bridge deck system and construction method thereof
CN103696366B (en) Pavement structure and pavement method of combined steel bridge deck
CN203546588U (en) FES (FRP (Fiber Reinforced Polymer)-EBM (Epoxy Bond Metal)-SMA (Stone Matrix Asphalt)) steel bridge floor pavement structure
CN204185768U (en) Based on the steel-ultra-high performance concrete combined bridge deck plated construction of connector of steel tube
CN102268854A (en) New FRP (fiber reinforce plastic)-epoxy gravel-asphalt concrete steel bridge deck paving structure
CN204626187U (en) A kind of tunnel skid resistance pavement
CN203007833U (en) Steel bridge deck compound paving structure based on PBL (Perfobond Leiste) connecting pieces
CN204139061U (en) Based on the steel-ultra-high performance concrete combined bridge deck plated construction of steel channel connector
CN209082285U (en) A kind of pavement structure having fiber mixture
CN205617223U (en) Basalt continuous fibers bridge
CN102561143A (en) Pavement structure of concrete highway in alpine region
CN101514537A (en) FRP structural layer integrating adhesion, waterproof and stress buffer layers as a whole used for steel bridge deck paving layer
Li et al. An overview of the study and application of rubberized portland cement concrete
CN202380397U (en) Combined bridge deck structure adopting assembly fiber concrete
CN212077523U (en) Interface enhancement layer cloth-type steel fiber fast repairing concrete structure
CN207919274U (en) A kind of anti-crack concrete layer structure
CN207846844U (en) A kind of composite material enhancing wooden frame wallboard
CN217579565U (en) Permanent road surface structure and road surface based on flip-chip formula infrastructure
CN213867140U (en) Urban road surface base layer structure of underpass high-speed railway bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20111207