CN102267545A - Ship form for semi-submersible type hoisting pipe-laying ship - Google Patents

Ship form for semi-submersible type hoisting pipe-laying ship Download PDF

Info

Publication number
CN102267545A
CN102267545A CN2011101076998A CN201110107699A CN102267545A CN 102267545 A CN102267545 A CN 102267545A CN 2011101076998 A CN2011101076998 A CN 2011101076998A CN 201110107699 A CN201110107699 A CN 201110107699A CN 102267545 A CN102267545 A CN 102267545A
Authority
CN
China
Prior art keywords
column
row
ship
mounting plate
size
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101076998A
Other languages
Chinese (zh)
Other versions
CN102267545B (en
Inventor
张松甫
钟文军
周健
康为夏
刘菊娥
何宁
王琮
罗超
毛建辉
戴菁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA MARINE ENGINEERING DESIGN RESEARCH INSTITUTE
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Original Assignee
CHINA MARINE ENGINEERING DESIGN RESEARCH INSTITUTE
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA MARINE ENGINEERING DESIGN RESEARCH INSTITUTE, China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd filed Critical CHINA MARINE ENGINEERING DESIGN RESEARCH INSTITUTE
Priority to CN2011101076998A priority Critical patent/CN102267545B/en
Publication of CN102267545A publication Critical patent/CN102267545A/en
Application granted granted Critical
Publication of CN102267545B publication Critical patent/CN102267545B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a ship form for a semi-submersible type hoisting pipe-laying ship. A ship body comprises an upper platform, a plurality of upright columns and two lower floaters, wherein the upright columns are fixed at the two sides under the upper platform and are arrayed in parallel; the lower floaters are fixed at two sides, are arrayed in parallel and are connected to the upright columns; and a crane is fixed on the tail part of the upper platform. The ship form is characterized in that a centrum structure expanding outwards from bottom to top is formed by the joints of the upper parts of the upright columns on the stem and the upper platform; the outer sides of the lower edges of the upright columns are matched with the deck molded lines of the lower floaters; the upper sides of the upper edges of the upright columns are aligned with the side boundaries of the upper platform; the joints between the bottoms of the upright columns and the lower floaters are in bulbous bow arch-shaped natural transition; and after being connected in such a manner, the ship form of the stem is of a streamline structure. The ship form for the semi-submersible type hoisting pipe-laying ship can be used for maximally reducing the water resistance and improving the routing speed of the pipe-laying ship under the condition of ensuring the structural strength and buoyancy of the ship body.

Description

The ship type of semisubmersible lifting pipelaying vessel
Technical field
The present invention relates to pipelaying vessel, relate in particular to a kind of ship type of semisubmersible lifting pipelaying vessel.Belong to marine oil engineering field.
Background technology
At sea in the petroleum development engineering, usually,, oil gas is carried by submerged pipeline laying submerged pipeline between the oil production platform or between oil production platform and the land.Undersea pipe-laying is an important component part of deep-sea oil gas field development ﹠ construction, and aspects such as exploitation, production and the product of offshore oil and gas field be defeated are outward played crucial effect.
The laying of submerged pipeline is normally carried out on the piping work ship, on the ship type of hull, roughly can be divided into: barge formula, common ship pattern and semisubmersible.
Barge type pipelaying vessel is with respect to other type pipelaying vessel, and its stability is less relatively, and it is more steady generally to be used for environment, the marine site that the depth of water is more shallow relatively.Barge formula pipelaying vessel displacement is bigger, and draft is less relatively, and therefore, the pipelaying vessel that majority is used for sea, beach and simple sea is the barge type.
Common ship type pipelaying vessel draft is darker relatively, is fit to that needs carrying is reseted fully or uses during high lifting force.
Semisubmersible lifting pipelaying vessel is a kind of ship type of large-scale marine lifting pipelaying vessel.Semisubmersible lay vessel ship type is huge, and operating line is arranged on the central authorities of ship more, and its maximum characteristics are exactly that stability is strong, can be in rugged environment relatively and marine site, deep-sea construction operation.Owing to have good wind resistance seakeeping performance, positioning performance, possess the ability of operation under deep water and severe sea condition, hoisting capacity huge (maximum 2 * 7100t), satisfy the various needs that marine oil and gas exploitation and large-scale marine engineering construct and extensively be subjected to the favor in market.
The semisubmersible lifting pipelaying vessel overwhelming majority is used on drilling platform, production of hydrocarbons platform, it and conventional boats and ships maximum be not both its outer shape, be called the ship type in the industry.The ship type that it is different from barge type and common ship type ship oceangoing ship is a buoyancy aid, but is made up of several buoyancy aids.
As Fig. 1, shown in Figure 2, the hull of representative type semisubmersible lifting pipelaying vessel comprises: upper mounting plate 1, be fixed on several columns 2 of both sides arrangement in parallel below the upper mounting plate 1 and be fixed on the both sides arrangement in parallel and with two following buoyancy aids 3 of several column 2 bonded assemblys, the afterbody of upper mounting plate 1 is fixed with hoisting crane 4; Required buoyancy when following buoyancy aid 3 provides towage and operation.Column 2 is mainly used in and connects buoyancy aid 3 and upper mounting plate 1 down, and its cross section is generally rectangle, also has certain buoyancy.During operation, the part submerged of following buoyancy aid 3 and column 2, floating line is in the column cross section.Formed the small-waterplane-area phenomenon, reduced wave relevant and stream greatly and acted on load on the platform with waterplane area, and its bigger moment of inertia of waterplane required stability when the platform operation is provided.Upper mounting plate 1 is the main place that equipment is deposited, personnel live work.On the structure and function of its hull of semisubmersible lifting pipelaying vessel, column 2 is most characteristic and is crucial structure that the quantity of column 2, shape, layout are the key factors that influences semisubmersible lifting pipelaying vessel route speed.
Because it is rectangle that rectangle or bottom are adopted in column 2 its cross sections of existing semisubmersible lifting pipelaying vessel more, top is near outwards expanding to trapezoidal with upper mounting plate 1 junction, the bow that buoyancy aid 3 and upper mounting plate 1 back are constituted under connecting is also for trapezoidal, though guaranteed reserve buoyance, but, because column 2 length own are bigger, during navigation, it is bigger to be subjected to resistance to water-flow, is difficult to guarantee the rapidity of pipelaying vessel navigation.
Summary of the invention
Main purpose of the present invention is to overcome the above-mentioned shortcoming that prior art exists, and provide a kind of ship type of improved semisubmersible lifting pipelaying vessel, it can reduce resistance to water-flow to greatest extent under the condition that guarantees hull structural strength and buoyancy, improve the route speed of pipelaying vessel.
The objective of the invention is to realize by following technical scheme:
A kind of ship type of semisubmersible lifting pipelaying vessel, hull comprises: upper mounting plate, be fixed on several columns of both sides arrangement in parallel below the upper mounting plate and be fixed on the both sides arrangement in parallel and with two following buoyancy aids of several column bonded assemblys, the afterbody of upper mounting plate is fixed with hoisting crane; It is characterized in that: be positioned at the shape top of several columns of bow and the upper mounting plate junction abducent vertebral body structure that makes progress of serving as reasons down, the column lower edge outside matches with following buoyancy aid molded deck line, the upper limb upside is mutually neat with the upper mounting plate sideline, the column bottom is the transition of the first circular arc nature of ball nose with following buoyancy aid junction, and the ship type of the bow portion after above-mentioned connection is a streamlined structure.
Described column adopts the different cross section setting, be arranged in being shaped as of several columns at bow rear portion: the first half and upper mounting plate junction are from bottom to top chamfer trapezium structure, be about 60 degree oblique angles more than the inboard 25m waterline in bench section, lower part is the rectangular configuration of foursquare arc with following buoyancy aid junction.
Described column adopts different spacing to arrange, column is set to 5 rows, and per 2 symmetric arrangement become a row; Wherein, second series and the 3rd row's column are measure-alike; The size of second series and the 3rd row's column is less than the size of the 4th row and the 5th row's column; And the size of the 4th row's column is less than the size of the 5th row's column.
Second series and the 3rd row's column specifically are of a size of: long 25.2m, following bottom width 24.1m, last bottom width 30m, high 19.5m; Specifically being of a size of of the 4th row's column: long 25.2m, following bottom width 30m, last bottom width 34.5m, high 19.5m; Specifically being of a size of of the 5th row's column: 39.2m, following bottom width 30m, last bottom width 34.5m, high 19.5m; Wherein, the 5th row's column 2 promptly: tail end column medial and lateral are asymmetric shape, and the outside adopts great circle arc to align with following buoyancy aid and upper mounting plate, and the inboard is that 60 degree chamfers are trapezoidal.
Described specifically being of a size of of buoyancy aid down: long 223.6m, width are 30m, and height is 15m, and spacing is 30m between twice buoyancy aids.
Described several column sides that are positioned at bow are irregular trapezoidal according to the bow line style, specifically are of a size of: the long 34.6m of upper base, going to the bottom is about 26.4m, wide 30m, high 19.5m.
Described length of hull 225m, beam 90m, moldeed depth 47m, the height of floating downward degree 15m, the high 19.5m of column, the high 12.5m of upper mounting plate.
Beneficial effect of the present invention:, the present invention is owing to adopt technique scheme, and it can reduce resistance to water-flow to greatest extent under the condition that guarantees hull structural strength and buoyancy, improve the route speed of pipelaying vessel.
Description of drawings:
Fig. 1 is a prior art bow construction scheme drawing.
Fig. 2 is the prior art structural representation.
Fig. 3 is the prior art cross-sectional side view.
Fig. 4 is a bow construction scheme drawing of the present invention.
Fig. 5 is a bow pillar construction scheme drawing of the present invention.
Fig. 6 looks scheme drawing for integral structure master of the present invention.
Fig. 7 is the whole pillar construction birds-eye view of the present invention.
Fig. 8 is float structure scheme drawing under the present invention.
Major label description in figure:
1 upper mounting plate, 2 columns, 3 times buoyancy aids, 4 hoisting cranes.
The specific embodiment
As Fig. 4-shown in Figure 8, hull of the present invention comprises: upper mounting plate 1, be fixed on several columns 2 of both sides arrangement in parallel below the upper mounting plate 1 and be fixed on below several columns 2 of both sides arrangement in parallel and with two following buoyancy aids 2 of several column 2 bonded assemblys, hoisting crane 4 is fixed on the afterbody of upper mounting plate 1; Wherein, be positioned at the shape top of several columns 2 of bow and the upper mounting plate 1 junction abducent subtriangular vertebral body structure that makes progress of serving as reasons down, column 2 bottoms are and the transition of the first circular arc nature of ball nose that the ship type of the bow portion after above-mentioned connection is a streamlined structure with following buoyancy aid 3 junctions.Resistance to water-flow during this kind structure can reduce to advance simultaneously, under the condition that guarantees structural strength and buoyancy, reduces resistance to water-flow to greatest extent.
The whole captain 225m of present embodiment, beam 90m, moldeed depth 47m, the height of floating downward degree 15m, the high 19.5m of column, the high 12.5m of upper mounting plate.
Specifically being of a size of of following buoyancy aid: long 223.6m, width are 30m, and height is 15m, and spacing is 30m between twice buoyancy aids, and purpose is to reduce the wave interference resistance.
Embodiment: according to the requirement of platform floading condition and stability, the present invention adopts the pillar construction of 5 row's different cross sections, different spacing, and two side of a ship symmetric arrangement are each one about column 2 every rows, totally 10 columns 2.
Column adopts the different cross section setting, be arranged in being shaped as of several columns at bow rear portion: the first half and upper mounting plate junction are from bottom to top chamfer trapezium structure, be about 60 degree oblique angles more than the inboard 25m waterline in bench section, lower part is the rectangular configuration of foursquare arc with following buoyancy aid junction.
From bow, the 1st row column 2 sides are irregular trapezoidal according to the bow line style, and the long 34.6m of upper base, going to the bottom is about 26.4m, wide 30m, high 19.5m.
Be arranged in being shaped as of back eight columns 2 at bow rear portion: the first half and upper mounting plate junction are from bottom to top chamfer trapezium structure, be about 60 degree oblique angles more than the inboard 25m waterline in bench section, lower part is the rectangular configuration of foursquare arc with following buoyancy aid junction.
Column 2 is set to 5 rows, and per 2 symmetric arrangement become a row; Wherein, second series and the 3rd row's column are measure-alike; Its concrete size: long 25.2m, following bottom width 24.1m, last bottom width 30m, high 19.5m.
The size of second series and the 3rd row's column 2 is less than the size of the 4th row and the 5th row's column 2; Its concrete size: the long 25.2m of the 4th row's column, following bottom width 30m, last bottom width 34.5m, high 19.5m.
And the size of the 4th row's column is less than the size of the 5th row's column; Its concrete size: the 5th row's column 2 is maximum, 39.2m, following bottom width 30m, last bottom width 34.5m, high 19.5m.Wherein, the 5th row's column 2-promptly: asymmetric shape design is adopted in the outside in the tail end column 2, and the outside adopts great circle arc to align with following buoyancy aid 3 and upper mounting plate 1, the transmission that effective outboard hangs distance and Crane Load when helping increasing the crane rotation lifting; The inboard is that 60 degree chamfers are trapezoidal.
The purpose of above-mentioned setting is to move after making the centre of buoyancy, has guaranteed the buoyancy and the rapidity of hull.
Another embodiment: several column 2 sides that are positioned at bow are irregular trapezoidal according to the bow line style, specifically are of a size of: the long 34.6m of upper base, going to the bottom is about 26.4m, wide 30m, high 19.5m.
The above, it only is preferred embodiment of the present invention, be not that the present invention is done any pro forma restriction, every foundation technical spirit of the present invention all still belongs in the scope of technical solution of the present invention any simple modification, equivalent variations and modification that above embodiment did.

Claims (7)

1. the ship type of a semisubmersible lifting pipelaying vessel, hull comprises: upper mounting plate, be fixed on several columns of both sides arrangement in parallel below the upper mounting plate and be fixed on the both sides arrangement in parallel and with two following buoyancy aids of several column bonded assemblys, the afterbody of upper mounting plate is fixed with hoisting crane; It is characterized in that: be positioned at the shape top of several columns of bow and the upper mounting plate junction abducent vertebral body structure that makes progress of serving as reasons down, the column lower edge outside matches with following buoyancy aid molded deck line, the upper limb upside is mutually neat with the upper mounting plate sideline, the column bottom is the transition of the first circular arc nature of ball nose with following buoyancy aid junction, and the ship type of the bow portion after above-mentioned connection is a streamlined structure.
2. the ship type of semisubmersible lifting pipelaying vessel according to claim 1, it is characterized in that: described column adopts the different cross section setting, be arranged in being shaped as of several columns at bow rear portion: the first half and upper mounting plate junction are from bottom to top chamfer trapezium structure, be about 60 degree oblique angles more than the inboard 25m waterline in bench section, lower part is the rectangular configuration of foursquare arc with following buoyancy aid junction.
3. the ship type of semisubmersible lifting pipelaying vessel according to claim 1 and 2 is characterized in that: described column adopts different spacing to arrange, column is set to 5 rows, and per 2 symmetric arrangement become a row; Wherein, second series and the 3rd row's column are measure-alike; The size of second series and the 3rd row's column is less than the size of the 4th row and the 5th row's column; And the size of the 4th row's column is less than the size of the 5th row's column.
4. the ship type of semisubmersible lifting pipelaying vessel according to claim 3 is characterized in that: described second series and the 3rd row's column specifically are of a size of: long 25.2m, following bottom width 24.1m, last bottom width 30m, high 19.5m; Specifically being of a size of of the 4th row's column: long 25.2m, following bottom width 30m, last bottom width 34.5m, high 19.5m; Specifically being of a size of of the 5th row's column: 39.2m, following bottom width 30m, last bottom width 34.5m, high 19.5m; Wherein, the 5th row's column 2 promptly: tail end column medial and lateral are asymmetric shape, and the outside adopts great circle arc to align with following buoyancy aid and upper mounting plate, and the inboard is that 60 degree chamfers are trapezoidal.
5. the ship type of semisubmersible lifting pipelaying vessel according to claim 1 is characterized in that: described specifically being of a size of of buoyancy aid down: long 223.6m, width are 30m, and height is 15m, and spacing is 30m between twice buoyancy aids.
6. the ship type of semisubmersible lifting pipelaying vessel according to claim 1 is characterized in that: described several column sides that are positioned at bow are irregular trapezoidal according to the bow line style, specifically are of a size of: the long 34.6m of upper base, going to the bottom is about 26.4m, wide 30m, high 19.5m.
7. the ship type of semisubmersible lifting pipelaying vessel according to claim 1 is characterized in that: described length of hull 225m, beam 90m, moldeed depth 47m, the height of floating downward degree 15m, the high 19.5m of column, the high 12.5m of upper mounting plate.
CN2011101076998A 2011-04-28 2011-04-28 Ship form for semi-submersible type hoisting pipe-laying ship Expired - Fee Related CN102267545B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101076998A CN102267545B (en) 2011-04-28 2011-04-28 Ship form for semi-submersible type hoisting pipe-laying ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101076998A CN102267545B (en) 2011-04-28 2011-04-28 Ship form for semi-submersible type hoisting pipe-laying ship

Publications (2)

Publication Number Publication Date
CN102267545A true CN102267545A (en) 2011-12-07
CN102267545B CN102267545B (en) 2013-12-04

Family

ID=45050044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101076998A Expired - Fee Related CN102267545B (en) 2011-04-28 2011-04-28 Ship form for semi-submersible type hoisting pipe-laying ship

Country Status (1)

Country Link
CN (1) CN102267545B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103407554A (en) * 2013-08-20 2013-11-27 中国海洋石油总公司 Ship form of semi-submersible type pipe-laying floating crane
CN109969337A (en) * 2019-04-18 2019-07-05 中国船舶及海洋工程设计研究院(中国船舶工业集团公司第七0八研究所) A kind of new concept ship type
CN113320655A (en) * 2021-06-07 2021-08-31 上海交通大学 Buoyancy tank at bottom of semi-submersible platform and design method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62111299U (en) * 1985-12-30 1987-07-15
NL8802461A (en) * 1988-10-07 1990-05-01 Dock Express Shipping Bv Undersea pipeline layering method - comprises driving supply lighter into hold after partial submersion of laying ship
CN1109835A (en) * 1993-12-29 1995-10-11 麦克德莫特国际公司 Apparatus for near vertical laying of pipeline
CN1350499A (en) * 1998-12-23 2002-05-22 布伊坦戴克控股公司 Working ship
CN201545175U (en) * 2009-07-09 2010-08-11 上海佳豪船舶工程设计股份有限公司 Lifting pipe laying vessel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62111299U (en) * 1985-12-30 1987-07-15
NL8802461A (en) * 1988-10-07 1990-05-01 Dock Express Shipping Bv Undersea pipeline layering method - comprises driving supply lighter into hold after partial submersion of laying ship
CN1109835A (en) * 1993-12-29 1995-10-11 麦克德莫特国际公司 Apparatus for near vertical laying of pipeline
CN1350499A (en) * 1998-12-23 2002-05-22 布伊坦戴克控股公司 Working ship
CN201545175U (en) * 2009-07-09 2010-08-11 上海佳豪船舶工程设计股份有限公司 Lifting pipe laying vessel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103407554A (en) * 2013-08-20 2013-11-27 中国海洋石油总公司 Ship form of semi-submersible type pipe-laying floating crane
CN103407554B (en) * 2013-08-20 2015-12-23 中国海洋石油总公司 The ship type of semisubmersible pipe laying crane ship
CN109969337A (en) * 2019-04-18 2019-07-05 中国船舶及海洋工程设计研究院(中国船舶工业集团公司第七0八研究所) A kind of new concept ship type
CN109969337B (en) * 2019-04-18 2022-04-01 中国船舶及海洋工程设计研究院(中国船舶工业集团公司第七0八研究所) New concept ship type
CN113320655A (en) * 2021-06-07 2021-08-31 上海交通大学 Buoyancy tank at bottom of semi-submersible platform and design method thereof

Also Published As

Publication number Publication date
CN102267545B (en) 2013-12-04

Similar Documents

Publication Publication Date Title
CN101331054B (en) Anti-sloshing device in moon pool
CN204527559U (en) Semi-submersible offshore platform
CN203381779U (en) Mobile offshore drilling unit
EP4143079A1 (en) Floating wind semi-submersible with t-shaped pontoon
CN103171743B (en) Dock eight shuttle table type Floating Production oil storage systems
CN103085946B (en) Docking circular table Floating Production oil storage system
CN103085947B (en) hourglass type ocean engineering floating structure
US9802683B2 (en) Sandglass type ocean engineering floating structure
CN102114899A (en) Extra-large float installation barge and design method thereof
CN102267545B (en) Ship form for semi-submersible type hoisting pipe-laying ship
CN202847986U (en) Butt joint octagonal frustum type floating type oil production storage system
CN204623784U (en) A kind of three-back-shaped multi-functional semisubmersible platform
CN103407554B (en) The ship type of semisubmersible pipe laying crane ship
CN201999177U (en) Super-large barge for float-over installation
US9802682B2 (en) Butt joint octagonal frustum type floating production storage and offloading system
CN202863709U (en) Catamaran
CN110395364A (en) The construction method on offshore floating type island, offshore floating type island group and offshore floating type island
CN105644705A (en) Small water plane twin-hull platform
CN214648906U (en) Offshore floating island and offshore floating island group
CN202863728U (en) Butt joint circular truncated cone type floating production storage system
KR20120107377A (en) Vessel for installing offshore facility
CN112278173A (en) Offshore floating island, offshore floating island group and offshore floating island construction method
CN109159853B (en) Self-adaptive mooring device for offshore shallow water area
CN104590480B (en) Hull with three bow thrusters and low resistance for super U-shaped waterline
KR20010079920A (en) Sea-going vessel and hull for sea-going vessel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: Offshore Oil Engineering Co., Ltd.

Patentee after: China Offshore Oil Group Co., Ltd.

Co-patentee after: China Marine Engineering Design Research Institute

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: Offshore Oil Engineering Co., Ltd.

Patentee before: China National Offshore Oil Corporation

Co-patentee before: China Marine Engineering Design Research Institute

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131204

Termination date: 20200428