CN102238020A CN2010101565881A CN201010156588A CN102238020A CN 102238020 A CN102238020 A CN 102238020A CN 2010101565881 A CN2010101565881 A CN 2010101565881A CN 201010156588 A CN201010156588 A CN 201010156588A CN 102238020 A CN102238020 A CN 102238020A
Authority
CN
China
Prior art keywords
switch
convergence switch
convergence
control device
access switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010101565881A
Other languages
Chinese (zh)
Inventor
朱仕银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou H3C Technologies Co Ltd
Original Assignee
Hangzhou H3C Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou H3C Technologies Co Ltd filed Critical Hangzhou H3C Technologies Co Ltd
Priority to CN2010101565881A priority Critical patent/CN102238020A/en
Publication of CN102238020A publication Critical patent/CN102238020A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention provides a method for realizing the unified management of a plurality of pieces of equipment, a convergence switch and an access switch. A master control distributed model is adopted, the convergence switch is taken as master control equipment, the access switch is taken as a line card, and the convergence switch and the access switch are logically virtualized to form master control distributed equipment by transmitting an initiator from the convergence switch to the access switch and registering the access switch in the convergence switch to realize the once configuration and software update operation of the convergence switch and the access switch.

Description

Realize method, convergence switch and the access switch of the unified management of many equipment
Technical field
The present invention relates to device management techniques, refer to a kind of method, convergence switch and access switch of realizing the unified management of many equipment especially.
Background technology
In the application scenario of Ethernet switch, typical networking structure comprises three levels, i.e. Access Layer, convergence-level and core layer as shown in Figure 1.Because each equipment of Access Layer and convergence-level is separate, solely is a management domain separately, so the upgrading of the configuration of each equipment and software version all needs independently to carry out, and is unfavorable for that the manager effectively manages.
In order to solve the problem of management of access switch and convergence switch, common way is to move cluster protocol between access switch and convergence switch, be access switch C, D and E, and convergence switch A and B be in a cluster, and then reach the purpose of unified management.Though, use cluster protocol to manage other equipment in the cluster by management equipment, this solution does not equally reach unified configuration yet and software version is unified purpose of upgrading.
Shown in Figure 1B to Fig. 1 D, when System Administrator Management, configuration and software release upgrade, at first need to log on the management equipment of appointment in the cluster, and then switch to the operation of carrying out management, configuration and software release upgrade on other equipment successively by management equipment.This shows that the essence that is in the switch of cluster management remains independently, can't realize the operation of disposable configuration and software upgrading.
Summary of the invention
In view of this, main purpose of the present invention is to provide a kind of method, convergence switch and access switch of realizing the unified management of many equipment, uses technical scheme of the present invention and can realize unified management to convergence switch and access switch.
For achieving the above object, technical scheme of the present invention is achieved in that
A kind of method that realizes the unified management of many equipment is applied to many access switch and two network environments that convergence switch carries out unified management at the most, and this method comprises:
Storage primary control program and ply-yarn drill program on convergence switch is used for by primary control program convergence switch as main control device, by the ply-yarn drill program with access switch as ply-yarn drill equipment, and then invent an equipment and manage;
Described convergence switch powers on the back by moving the primary control program startup of self storing;
When described convergence switch is used main control device as the master, receive the load request that access switch sends, and the ply-yarn drill program is sent to access switch, start for access switch; Receive the log-on message that sends in the access switch start-up course;
Described convergence switch receives the log-on message that sends in the access switch start-up course during as standby main control device.
A kind of convergence switch, this convergence switch comprises control unit and memory cell;
Described memory cell is used to preserve primary control program and ply-yarn drill program, be used for by primary control program convergence switch as main control device, by the ply-yarn drill program with access switch as ply-yarn drill equipment, and then invent an equipment and manage;
Described control unit after being used to control convergence switch and powering on, starts according to the primary control program of the preservation in the described memory cell; When using main control device as the master, receive the load request that access switch sends, and the ply-yarn drill program is sent to access switch, start for access switch; Receive the log-on message that sends in the access switch start-up course; As standby main control device the time, receive the log-on message that sends in the access switch start-up course.
A kind of access switch, this access switch comprises transmitting element and processing unit;
Described transmitting element after being used for the place access switch and powering on, sends load request to the convergence switch that is connected; And the ply-yarn drill program that convergence switch is received is sent to processing unit;
Described processing unit is used for basis from the ply-yarn drill program start place access switch that described transmitting element is received, and sends the log-on message of place access switch in start-up course to the described convergence switch that connects.
Method, convergence switch and the access switch of many equipment of realization provided by the present invention unified management, by adopting the master control distributed model, with convergence switch as main control device, access switch as ply-yarn drill, issue start-up routine by convergence switch to access switch, access switch is registered to convergence switch, convergence switch and access switch are logically invented a master control distributed apparatus, realized compiling disposable configuration of switch and access switch and software upgrading operation.
Description of drawings
Figure 1A is the classical group web frame schematic diagram of access switch and convergence switch in the prior art;
Figure 1B is the system management process schematic diagram of access switch and convergence switch in the prior art;
Fig. 1 C is the switch configuration process schematic diagram of access switch and convergence switch in the prior art;
Fig. 1 D is access switch and a convergence switch software release upgrade process schematic diagram in the prior art;
Fig. 2 is the exemplary process diagram of the inventive method;
The dual master control distributed apparatus of Fig. 3 for adopting technical solution of the present invention to fictionalize;
Fig. 4 is the structural representation of convergence switch provided by the invention;
Fig. 5 is the structural representation of access switch provided by the invention;
Fig. 6 is the flow chart of the embodiment of the invention.
Embodiment
In the detailed description of this part, only, illustrate and described preferred embodiment of the present invention by to implementing the example of the desired best mode of inventor of the present invention.It will be appreciated that and not deviate under the prerequisite of the present invention, it is made amendment with regard to each conspicuous aspect.Correspondingly, it is exemplary in itself that drawing and description should be regarded as, rather than restrictive.
Technical scheme of the present invention can adopt master control distributed model of the prior art, with convergence switch as main control device, access switch as ply-yarn drill, issue start-up routine by convergence switch to access switch, access switch is registered to convergence switch, convergence switch and access switch are logically invented a master control distributed apparatus, and then can realize the operation of disposable configuration and software upgrading.As shown in Figure 1, under the situation that two convergence switches are arranged, wherein one is that the master uses main control device, and another is standby main control device then, and what fictionalize is dual master control equipment.If have only a convergence switch in the network, what then fictionalize is single main control device.
Referring to Fig. 2, Fig. 2 is the exemplary process diagram of the inventive method.This method is applied to many access switch and two network environments that convergence switch carries out unified management at the most, this method comprises: in step 201, storage primary control program and ply-yarn drill program on convergence switch, be used for by primary control program convergence switch as main control device, by the ply-yarn drill program with access switch as ply-yarn drill equipment, and then invent an equipment and manage; In step 202, convergence switch powers on the back by moving the primary control program startup of self storing; In step 203, when described convergence switch is used main control device as the master, receive the load request that access switch sends, and the ply-yarn drill program is sent to access switch, start for access switch; Receive the log-on message that sends in the access switch start-up course; Described convergence switch receives the log-on message that sends in the access switch start-up course during as standby main control device.
Referring to Fig. 3, the logical schematic of the dual master control distributed apparatus that Fig. 3 fictionalizes for network environment shown in Figure 1.
When there are two convergence switches in network environment, then can connect by interprocess communication (IPC, Inter-Process Communication) link between the convergence switch.This connected mode can provide efficiently to two convergence switches, transmission reliably.
Wherein, this method further comprises: after described convergence switch powers on, judge whether to exist the opposite end convergence switch, if exist, judge again whether the opposite end convergence switch starts with main control device as the master in the virtual unit, if self then starts according to standby main control device according to primary control program; Otherwise self then starts with main control device according to main according to primary control program; If there is no, then start with main control device according to main according to primary control program.Here, can be by judging whether to exist the opposite end convergence switch to judge in the current network environment and be to exist a convergence switch, or two convergence switches.Wherein, described judging whether exists the opposite end convergence switch to comprise: judge whether the IPC link that is connected with the opposite end convergence switch is available, if available, then has the opposite end convergence switch; If unavailable, then do not deposit the opposite end convergence switch.
Because master control distributed mode of the prior art is only supported single main control device and dual master control equipment, so the inventive method is only carried out virtual to the network that has one or two convergence switch.In some big network environments, may there be the convergence switch more than three or three.In this case, can fictionalize the virtual unit of a plurality of single main control devices and/or dual master control equipment according to the actual needs, and then many virtual units that this fictionalizes are piled up and then realize whole Network Management.That is, the equipment of inventing and one or more equipment that adopts same procedure to invent are piled up, thereby carry out unified management being stacked into an equipment.
For example, when in the current network environment, having four convergence switches, can invent a dual master control distributed apparatus in twos, and then these two dual master control distributed apparatus are piled up; When in the current network environment, having three convergence switches, can invent a single master control distributed apparatus by a convergence switch, other two invent a dual master control distributed apparatus, then at single master control distributed apparatus that will fictionalize with dual master control is distributed piles up.In the process that constitutes virtual unit, the quantity of access switch is unrestricted.
Referring to Fig. 4, Fig. 4 is a kind of convergence switch provided by the invention, is clear description technical scheme of the present invention here, and the existing capability unit in the convergence switch is not shown.This convergence switch comprises control unit and memory cell.Wherein, described memory cell is used to preserve primary control program and ply-yarn drill program; Described control unit after being used to control convergence switch and powering on, starts according to the primary control program of the preservation in the described memory cell; When using main control device as the master, receive the load request that access switch sends, and the ply-yarn drill program is sent to access switch, start for access switch; Receive the log-on message that sends in the access switch start-up course; As standby main control device the time, receive the log-on message that sends in the access switch start-up course.
Wherein, described control unit, when having the opposite end convergence switch, this control unit is connected with the opposite end convergence switch by the IPC link.
Wherein, described control unit, be further used for after convergence switch powers on, judge whether to exist the opposite end convergence switch, if exist, judge again whether the opposite end convergence switch starts with main control device as the master in the virtual unit, if self then starts according to standby main control device according to primary control program; Otherwise self then starts with main control device according to main according to primary control program; If there is no, then start with main control device according to main according to primary control program.Described control unit judges whether the IPC link that is connected with the opposite end convergence switch is available, if available, then has the opposite end convergence switch when judging whether to have the opposite end convergence switch; If unavailable, then do not deposit the opposite end convergence switch.
Referring to Fig. 5, Fig. 5 is a kind of access switch provided by the invention, is clear description technical scheme of the present invention here, and the existing capability unit in the access switch is not shown.This access switch comprises transmitting element and processing unit.Described transmitting element after being used for the place access switch and powering on, sends load request to the convergence switch that is connected; And the ply-yarn drill program that convergence switch is received is sent to processing unit; Described processing unit is used for basis from the ply-yarn drill program start place access switch that described transmitting element is received, and sends the log-on message of place access switch in start-up course to the described convergence switch that connects.
Below by introducing embodiment technical scheme of the present invention is further described in detail.Be that example is introduced with application scenarios shown in Figure 1 in the present embodiment, and the IPC link that passes through between two convergence switches connect.Idiographic flow can be that main body is introduced with convergence switch A referring to Fig. 6 here, and the processing procedure of convergence switch B is identical with convergence switch A.And after access switch one powers on, will send load request message, request ply-yarn drill program to the convergence switch of its connection.In addition, when having two convergence switches in network, access switch can send the administrative messag that all is used for system management to two convergence switches, and just the convergence switch as standby main control device can not respond the message that access switch sends.
In step 601, convergence switch A powers on.
Store primary control program and ply-yarn drill program on the convergence switch, these two programs can be stored in after overcompression in the non-volatile carrier of convergence switch, such as Flash.
In step 602, convergence switch A judges whether the IPC link that self is connected with the opposite end can be used, if available, shows to have the opposite end convergence switch, execution in step 603; Otherwise execution in step 604 starts with main control device as main.
In step 603, judge whether the opposite end convergence switch starts with main control device as main, if execution in step 610 starts as standby main control device; Otherwise execution in step 604 starts with main control device as main.
According to step 602~603, convergence switch A just can determine that current master uses main control device.Can recognize that according to this step in the present embodiment, the convergence switch that powers on earlier is the main main control device of using, after the convergence switch that powers on be standby main control device.As for other consult to determine main method with main control device in the prior art,, be not described in detail in this such as priority, weight etc.
In step 604, convergence switch A starts with main control device by main according to primary control program.
In step 605, convergence switch A judges whether the port that links to each other with access switch is available, if available, execution in step 606; Otherwise, there is not access switch to connect, convergence switch A starts end.
When network startup, on convergence switch A, be provided with the port that is connected with access switch.
In step 606, judge whether to have received the load request of access switch, if then execution in step 607 from port; Otherwise, put the access switch status error.
In step 607, convergence switch A sends the ply-yarn drill program to access switch, starts for access switch.
In step 608, convergence switch A receives the log-on message that access switch sends in start-up course.The hardware that comprises access switch in the log-on message is formed and the hardware relevant information, just can grasp each building block of access switch by the log-on message convergence switch, and then access switch is effectively managed.
In step 609, convergence switch A judges whether access switch normally starts, if finish current handling process; Otherwise, put the access switch status error, finish current handling process.
Step 606~609 for convergence switch A at the operation of an access switch that available port connected, when convergence switch all executed operation as step 606~609 at each available port after, the start-up course of then current convergence switch A finished.
In step 610, convergence switch A starts by standby main control device according to primary control program.
In step 611, convergence switch A judges whether the port that links to each other with access switch is available, if available, execution in step 612; Otherwise, there is not access switch to connect, convergence switch A starts end.
In step 612, convergence switch A receives access switch from port and send log-on message start-up course.
After convergence switch starts as standby main control device, can receive the message that access switch sends, but not respond the load request message that access switch sends.
In step 613, convergence switch A judges whether access switch normally starts, if finish current handling process; Otherwise, put the access switch status error, finish current handling process.
Step 612~613 for convergence switch A at the operation of an access switch that available port connected, when convergence switch all executed operation as step 612~613 at each available port after, the start-up course of then current convergence switch A finished.
Through above processing, convergence switch has just become an equipment in logic with access switch.Like this, just can realize this Network Management is comprised two convergence switches and Duo Tai access switch with the convergence switch of main control device as main.
Like this, when carrying out equipment disposition, the configuration of this logical device is just easy.Because loading, the registration process of access switch, cause all hardware that can see all access switch on leading with the order line of main control device to be formed, just can directly directly be configured each access switch on leading with the convergence switch of main control device this moment.Needn't the image set group manage equally, switch on the respective switch and be configured, really realized centralized management at a switch.
In addition, because the start-up routine of access switch all obtains with main control device from main, therefore in software upgrading, only need sign in to as main with on the convergence switch of main control device, will the upgrading software version be saved to and mainly use main control device, a whole then virtual unit to restart to get final product.
Technical scheme of the present invention is except realizing the unified management of a plurality of autonomous devices, when there are two convergence switches in network environment, can also realize the double copies of management plane and Forwarding plane, be that main control device and standby main control device are backups mutually, in case main control device fault, standby main control device are taken over original master and used main control device at once, become the new main main control device of using, eliminate the Single Point of Faliure under the cluster management mode, improved reliability.In addition, with respect to the cluster management mode, be independently on Forwarding plane owing to be in the switch of cluster management, need to prevent that by STP double-layer loop from producing that three layers of forwarding then need VRRP to do load balancing and fault-tolerant processing.Because technical scheme of the present invention has invented an equipment with convergence switch and access switch, it is the same therefore not need the image set group to manage, and operation STP or VRRP agreement realize redundancy.
The above only is preferred embodiment of the present invention, and is in order to restriction the present invention, within the spirit and principles in the present invention not all, any modification of being made, is equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a method that realizes the unified management of many equipment is characterized in that, is applied to many access switch and two network environments that convergence switch carries out unified management at the most, and this method comprises:
Storage primary control program and ply-yarn drill program on convergence switch is used for by primary control program convergence switch as main control device, by the ply-yarn drill program with access switch as ply-yarn drill equipment, and then invent an equipment and manage;
Described convergence switch powers on the back by moving the primary control program startup of self storing;
When described convergence switch is used main control device as the master, receive the load request that access switch sends, and the ply-yarn drill program is sent to access switch, start for access switch; Receive the log-on message that sends in the access switch start-up course;
Described convergence switch receives the log-on message that sends in the access switch start-up course during as standby main control device.
2. method according to claim 1 is characterized in that,
When there are two convergence switches in described network environment, connect by interprocess communication IPC link between the convergence switch.
3. method according to claim 2 is characterized in that, this method further comprises: after described convergence switch powers on, judge whether to exist the opposite end convergence switch,
If exist, judge again whether the opposite end convergence switch starts with main control device as the master in the virtual unit, if self then starts according to standby main control device according to primary control program; Otherwise self then starts with main control device according to main according to primary control program;
If there is no, then start with main control device according to main according to primary control program.
4. method according to claim 3 is characterized in that, describedly judges whether to exist the opposite end convergence switch to comprise:
Judge whether the IPC link that is connected with the opposite end convergence switch is available, if available, then has the opposite end convergence switch; If unavailable, then do not deposit the opposite end convergence switch.
5. according to the described method of arbitrary claim in the claim 1~4, it is characterized in that this method further comprises:
The equipment of inventing and one or more equipment that adopts same procedure to invent are piled up, thereby manage being stacked into an equipment.
6. a convergence switch is characterized in that, this convergence switch comprises control unit and memory cell;
Described memory cell is used to preserve primary control program and ply-yarn drill program, be used for by primary control program convergence switch as main control device, by the ply-yarn drill program with access switch as ply-yarn drill equipment, and then invent an equipment and manage;
Described control unit after being used to control convergence switch and powering on, starts according to the primary control program of the preservation in the described memory cell; When using main control device as the master, receive the load request that access switch sends, and the ply-yarn drill program is sent to access switch, start for access switch; Receive the log-on message that sends in the access switch start-up course; As standby main control device the time, receive the log-on message that sends in the access switch start-up course.
7. convergence switch according to claim 6 is characterized in that,
Described control unit is used for when having the opposite end convergence switch, is connected with the opposite end convergence switch by interprocess communication IPC link.
8. convergence switch according to claim 7 is characterized in that,
Described control unit, be further used for after convergence switch powers on, judge whether to exist the opposite end convergence switch, if exist, judge again whether the opposite end convergence switch starts with main control device as the master in the virtual unit, if self then starts according to standby main control device according to primary control program; Otherwise self then starts with main control device according to main according to primary control program; If there is no, then start with main control device according to main according to primary control program.
9. convergence switch according to claim 8 is characterized in that,
Described control unit judges whether the IPC link that is connected with the opposite end convergence switch is available, if available, then has the opposite end convergence switch when judging whether to have the opposite end convergence switch; If unavailable, then do not deposit the opposite end convergence switch.
10. an access switch is characterized in that, this access switch comprises transmitting element and processing unit;
Described transmitting element after being used for the place access switch and powering on, sends load request to the convergence switch that is connected; And the ply-yarn drill program that convergence switch is received is sent to processing unit;
Described processing unit is used for basis from the ply-yarn drill program start place access switch that described transmitting element is received, and sends the log-on message of place access switch in start-up course to the described convergence switch that connects.
CN2010101565881A 2010-04-21 2010-04-21 Method for realizing unified management of equipment, convergence switch and access switch Pending CN102238020A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101565881A CN102238020A (en) 2010-04-21 2010-04-21 Method for realizing unified management of equipment, convergence switch and access switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101565881A CN102238020A (en) 2010-04-21 2010-04-21 Method for realizing unified management of equipment, convergence switch and access switch

Publications (1)

Publication Number Publication Date
CN102238020A true CN102238020A (en) 2011-11-09

Family

ID=44888271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101565881A Pending CN102238020A (en) 2010-04-21 2010-04-21 Method for realizing unified management of equipment, convergence switch and access switch

Country Status (1)

Country Link
CN (1) CN102238020A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104737519A (en) * 2012-10-22 2015-06-24 华为技术有限公司 System and apparatus of generalized network controller for a software defined network (SDN)
CN106255140A (en) * 2016-08-29 2016-12-21 京信通信技术(广州)有限公司 A kind of novel base station extended pattern monitoring system and monitoring method thereof
CN108462588A (en) * 2017-02-20 2018-08-28 华为技术有限公司 A kind of data processing method and equipment
CN111756565A (en) * 2019-03-27 2020-10-09 瞻博网络公司 Managing satellite devices within a branch network
CN113126881A (en) * 2019-12-30 2021-07-16 阿里巴巴集团控股有限公司 System configuration method, device, equipment, readable storage medium and distributed storage system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1812332A (en) * 2005-01-26 2006-08-02 华为技术有限公司 Method for assurng conformity of exchanger various monoboard software edition
CN1815972A (en) * 2005-01-31 2006-08-09 华为技术有限公司 Method for obtaining configuration data of business plate in distribution type management system
CN1960281A (en) * 2005-11-02 2007-05-09 盛科网络有限公司 Virtual internet exchanging system having virtual line card
CN101114941A (en) * 2007-06-28 2008-01-30 中兴通讯股份有限公司 Method for slave equipment to configuration data in master-salve equipments
CN101483576A (en) * 2008-01-11 2009-07-15 上海博达数据通信有限公司 Version management implementing method in distributed system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1812332A (en) * 2005-01-26 2006-08-02 华为技术有限公司 Method for assurng conformity of exchanger various monoboard software edition
CN1815972A (en) * 2005-01-31 2006-08-09 华为技术有限公司 Method for obtaining configuration data of business plate in distribution type management system
CN1960281A (en) * 2005-11-02 2007-05-09 盛科网络有限公司 Virtual internet exchanging system having virtual line card
CN101114941A (en) * 2007-06-28 2008-01-30 中兴通讯股份有限公司 Method for slave equipment to configuration data in master-salve equipments
CN101483576A (en) * 2008-01-11 2009-07-15 上海博达数据通信有限公司 Version management implementing method in distributed system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104737519A (en) * 2012-10-22 2015-06-24 华为技术有限公司 System and apparatus of generalized network controller for a software defined network (SDN)
CN104737519B (en) * 2012-10-22 2018-04-20 华为技术有限公司 System and equipment for the general network controller of software defined network (SDN)
CN106255140A (en) * 2016-08-29 2016-12-21 京信通信技术(广州)有限公司 A kind of novel base station extended pattern monitoring system and monitoring method thereof
CN106255140B (en) * 2016-08-29 2019-11-15 京信通信系统(中国)有限公司 A kind of novel base station extended pattern monitoring system and its monitoring method
CN108462588A (en) * 2017-02-20 2018-08-28 华为技术有限公司 A kind of data processing method and equipment
CN108462588B (en) * 2017-02-20 2021-01-29 华为技术有限公司 Data processing method and equipment
CN111756565A (en) * 2019-03-27 2020-10-09 瞻博网络公司 Managing satellite devices within a branch network
CN111756565B (en) * 2019-03-27 2023-11-24 瞻博网络公司 Managing satellite devices within a branched network
US11923963B2 (en) 2019-03-27 2024-03-05 Juniper Networks, Inc. Managing satellite devices within a branch network
CN113126881A (en) * 2019-12-30 2021-07-16 阿里巴巴集团控股有限公司 System configuration method, device, equipment, readable storage medium and distributed storage system
CN113126881B (en) * 2019-12-30 2024-05-31 阿里巴巴集团控股有限公司 System configuration method, device, equipment, readable storage medium and distributed storage system

Similar Documents

Publication Publication Date Title
CN102355369B (en) Virtual clustered system as well as processing method and processing device thereof
US10205603B2 (en) System and method for using a packet process proxy to support a flooding mechanism in a middleware machine environment
US11294699B2 (en) Dynamically scaled hyperconverged system establishing minimum supported interoperable communication protocol between clusters in a cluster group
CN108200124B (en) High-availability application program architecture and construction method
US6760859B1 (en) Fault tolerant local area network connectivity
CN104935672B (en) Load balancing service high availability implementation method and equipment
WO2016206456A1 (en) Physical machine upgrading method, service migration method and apparatus
CN104579732B (en) Virtualize management method, the device and system of network function network element
US8381017B2 (en) Automated node fencing integrated within a quorum service of a cluster infrastructure
CN105760214A (en) Equipment state and resource information monitoring method, related equipment and system
CN102594861A (en) Cloud storage system with balanced multi-server load
US10331472B2 (en) Virtual machine service availability
CN104408071A (en) Distributive database high-availability method and system based on cluster manager
CN109313564A (en) For supporting the server computer management system of the highly usable virtual desktop of multiple and different tenants
CN101807985B (en) Datacenter centralization control switching method and system
CN105159798A (en) Dual-machine hot-standby method for virtual machines, dual-machine hot-standby management server and system
CN102238020A (en) Method for realizing unified management of equipment, convergence switch and access switch
CN103414712A (en) Management system and method of distributed virtual desktop
CN102081540A (en) Distributed dual-master control network equipment software updating method and device
EP3213441B1 (en) Redundancy for port extender chains
CN104158707A (en) Method and device of detecting and processing brain split in cluster
CN109565447A (en) Network function processing method and relevant device
CN106911597B (en) Cross-board forwarding method and device
CN113515408A (en) Data disaster tolerance method, device, equipment and medium
CN113709220A (en) High-availability realization method and system of virtual load balancer and electronic equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111109