CN102211734B - Progressive gravity center stimulation adjustment device - Google Patents

Progressive gravity center stimulation adjustment device Download PDF

Info

Publication number
CN102211734B
CN102211734B CN 201110160308 CN201110160308A CN102211734B CN 102211734 B CN102211734 B CN 102211734B CN 201110160308 CN201110160308 CN 201110160308 CN 201110160308 A CN201110160308 A CN 201110160308A CN 102211734 B CN102211734 B CN 102211734B
Authority
CN
China
Prior art keywords
steel wire
fixed length
length steel
wire loop
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110160308
Other languages
Chinese (zh)
Other versions
CN102211734A (en
Inventor
任鹏辉
徐东
武文华
吴文滨
廖烜华
杨江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Changqing Technology Engineering Co Ltd
Original Assignee
Xian Changqing Technology Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Changqing Technology Engineering Co Ltd filed Critical Xian Changqing Technology Engineering Co Ltd
Priority to CN 201110160308 priority Critical patent/CN102211734B/en
Publication of CN102211734A publication Critical patent/CN102211734A/en
Application granted granted Critical
Publication of CN102211734B publication Critical patent/CN102211734B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention relates to the field of skid mounted pressurizing integration, in particular to a progressive gravity center stimulation adjustment device. The progressive gravity center stimulation adjustment device is characterized by comprising a steel wire rope sleeve, U-shaped rings, lifting frames, a first fixed length steel wire rope sleeve, an equipment lifting shaft and a second fixed length steel wire rope sleeve; the steel wire rope sleeves are connected with the lifting frames through the U-shaped rings; the lifting frames are connected with the equipment lifting shaft through the first fixed length steel wire rope sleeve and the second fixed length steel wire rope sleeve respectively; skid mounted equipment is arranged on a skid mounted seat of skid mounted equipment; lifting shafts at two ends of the skid mounted equipment have a telescopic structure; and the first fixed length steel wire rope sleeve hangs at one light end of the skid mounted equipment, the second fixed length steel wire rope sleeve hangs at the heavy end of the skid mounted equipment, and fine adjusting is performed by using the penetrating degree of the first fixed length steel wire rope sleeve and the second fixed length steel wire rope sleeve on the equipment lifting shaft to ensure that the equipment is balanced. The invention provides the progressive gravity center stimulation adjustment device which has a simple structure and of which the gravity center is convenient to adjust to solve the defects in the prior art.

Description

A kind of simulation of center of gravity step by step setting device
Technical field
The present invention relates to the Prying supercharging integration field, the particularly a kind of simulation of center of gravity step by step setting device.
Background technology
Sledge dressization, integrated main equipment are applied at present, and the lifting that the thing followed is made the Prying supercharging integrating device just seems even more important.
Because Prying supercharging integrating device buffer zone is light, the heating zone is heavier, thereby forms the inclined to one side side of Prying supercharging integrating device center of gravity.Because equipment is bigger than normal, pressure testing water can not be discharged fully, be difficult to when therefore lifting confirm center of gravity, there are major safety risks.
Summary of the invention
The technical matters that the present invention will solve is just: a kind of simulation of center of gravity step by step setting device of adjustment center of gravity simple in structure, convenient is provided, to solve the defective that exists in the prior art.
Technical scheme of the present invention is: a kind of simulation of center of gravity step by step setting device is characterized in that: comprise steel wire loop, U type ring, suspension bracket, the first fixed length steel wire loop, equipment hanging axis and the second fixed length steel wire loop; Steel wire loop is connected with suspension bracket through U type ring, and suspension bracket is connected with the equipment hanging axis with the second fixed length steel wire loop through the first fixed length steel wire loop respectively again, and the sledge installing is arranged on the sledge installing sledge seat fully fully; The hanging axis at the sledge seat two ends that the sledge installing is equipped with is the telescoping structure.
The described first fixed length steel wire loop hangs the sledge installing and is equipped with a lighter end; The second fixed length steel wire loop hangs the sledge installing and is equipped with a heavier end; Utilize the first fixed length steel wire loop and the go deep into degree of the second fixed length steel wire loop on the equipment hanging axis to carry out fine adjustment, make equipment reach balance.
There is anti-decylization at described equipment hanging axis two ends.
Said suspension bracket is formed by steel plate and I-beam section processing and fabricating.
Technique effect of the present invention is:
1, convenient adjustment center of gravity.The present invention can be suitable for through the selection to U type ring and fixed length steel wire loop, comes to adjust step by step center of gravity, to overcome the defective that can not adjust center of gravity that prior art exists.
2, simple in structure.Parts required for the present invention are simple, and after simple assembling, promptly can be used for practical operation, and are not only simple in structure but also be easy to control.
Description of drawings
Below in conjunction with the embodiment accompanying drawing the present invention is further specified:
Fig. 1 is a structural representation of the present invention.
Reference numeral is following:
Sledge seat, 8-the second fixed length steel wire loop, the installing of 9-sledge that 1-steel wire loop, 2-U type ring, 3-suspension bracket, 4-the first fixed length steel wire loop, 5-equipment hanging axis, 6-anti-decylization, the installing of 7-sledge are equipped with are equipped with.
The specific embodiment
Referring to Fig. 1, the present invention relates to a kind of center of gravity step by step simulation setting device, comprise steel wire loop 1, U type ring 2, suspension bracket 3, the first fixed length steel wire loop 4, equipment hanging axis 5 and the second fixed length steel wire loop 8; The first fixed length steel wire loop 4 is two isometric short rope slings, and the second fixed length steel wire loop 8 is two isometric long rope slings, and the sledge installing is equipped with 9 and is arranged on the equipment hanging axis 5; Steel wire loop 1 is connected with suspension bracket 3 through U type ring 2; Suspension bracket 3 is connected with equipment hanging axis 5 through the first fixed length steel wire loop 4, the second fixed length steel wire loop 8 respectively again; Wherein the first fixed length steel wire loop 4 hangs sledge installing and is equipped with 9 lighter ends, and the second fixed length steel wire loop 8 hangs the sledge installing and is equipped with 9 heavier ends.
Equipment hanging axis 5 can be stretching structure.Equipment hanging axis 5 two ends also can add anti-decylization 6.Suspension bracket 3 is formed by steel plate and I-beam section processing and fabricating, and specifically can adopt I-beam section (No. 30) and thickness is 22 millimeters two-sided full welds of steel plate.U type ring 2 preference rankings are 10 tons or 20 tons.
In order to satisfy the requirement of Prying supercharging integrating device safety lifting, aborning, method of adjustment involved in the present invention capable of using realizes the center of gravity adjustment:
1) steel wire loop (1) on the U type ring (2) of hanging device lifting different brackets;
2) utilize the first fixed length steel wire loop 4 to hang sledge installing and be equipped with 9 lighter ends, the second fixed length steel wire loop 8 hangs the sledge installing and is equipped with 9 heavier ends;
3) utilize the first fixed length steel wire loop 4 and the go deep into degree of the second fixed length steel wire loop 8 on equipment hanging axis 5 to carry out fine adjustment, make equipment reach balance.
In above-mentioned steps 3) in, utilize the second fixed length steel wire loop 8 to carry out fine adjustment near the equipment root near anti-decylization 6, the first fixed length steel wire loops 4.
In last step 3), flexible equipment hanging axis 5 also capable of using carries out fine adjustment.
During lifting, sledge installing is equipped with 9 four jiaos can have the special messenger to hold with rope, is equipped with 9 double swerve with the installing of control sledge.And there is the special messenger to command lifting operation.

Claims (1)

1. a center of gravity simulation setting device step by step is characterized in that: comprise steel wire loop (1), U type ring (2), suspension bracket (3), the first fixed length steel wire loop (4), equipment hanging axis (5) and the second fixed length steel wire loop (8); Steel wire loop (1) is connected with suspension bracket (3) through U type ring (2); Suspension bracket (3) is connected with equipment hanging axis (5) with the second fixed length steel wire loop (8) through the first fixed length steel wire loop (4) respectively again, and the sledge installing is equipped with (9) and is arranged on the sledge installing sledge seat (7) fully; The hanging axis (5) at sledge seat (7) two ends that the sledge installing is equipped with is the telescoping structure; The described first fixed length steel wire loop (4) hangs the sledge installing and is equipped with (9) lighter end; The second fixed length steel wire loop (8) hangs the sledge installing and is equipped with (9) heavier end; Utilize the first fixed length steel wire loop (4) and the go deep into degree of the second fixed length steel wire loop (8) on equipment hanging axis (5) to carry out fine adjustment, make equipment reach balance.
CN 201110160308 2011-06-15 2011-06-15 Progressive gravity center stimulation adjustment device Expired - Fee Related CN102211734B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110160308 CN102211734B (en) 2011-06-15 2011-06-15 Progressive gravity center stimulation adjustment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110160308 CN102211734B (en) 2011-06-15 2011-06-15 Progressive gravity center stimulation adjustment device

Publications (2)

Publication Number Publication Date
CN102211734A CN102211734A (en) 2011-10-12
CN102211734B true CN102211734B (en) 2012-12-05

Family

ID=44743311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110160308 Expired - Fee Related CN102211734B (en) 2011-06-15 2011-06-15 Progressive gravity center stimulation adjustment device

Country Status (1)

Country Link
CN (1) CN102211734B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103964295B (en) * 2014-05-26 2016-06-01 北京卫星环境工程研究所 Based on the special-shaped spacecraft lifting appliance of lever construction
CN108946443A (en) * 2018-07-13 2018-12-07 上海拓璞数控科技股份有限公司 Hanging apparatus and hanging method
CN110046429B (en) * 2019-04-16 2024-03-19 西安长庆科技工程有限责任公司 Hanger for integrated device and design method thereof
CN110550540A (en) * 2019-09-30 2019-12-10 上海公路桥梁(集团)有限公司 Vibration hammer device
CN114014144B (en) * 2021-10-26 2023-12-26 博建建工集团有限公司 Hoisting mechanism and hoisting construction method for prestressed precast pile component

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS49146666U (en) * 1973-04-18 1974-12-18
JPS59100785U (en) * 1982-12-24 1984-07-07 株式会社日立製作所 automatic attitude control balance
JPH11139759A (en) * 1997-11-10 1999-05-25 Takaya Engineering:Kk Hoisting accessory automatically indexing center of gravity
CN101633478B (en) * 2008-07-23 2011-04-13 中国科学院自动化研究所 Cable traction automatic leveling hanger and method thereof

Also Published As

Publication number Publication date
CN102211734A (en) 2011-10-12

Similar Documents

Publication Publication Date Title
CN102211734B (en) Progressive gravity center stimulation adjustment device
CN101320931B (en) Assembling method and device for stator and rotor of generator
CN108116983B (en) A kind of heavy stay column sets main shaft hanging method and lifting auxiliary device
CN206108708U (en) Self -balancing radiant tube installation hoist
CN103818840B (en) A kind of lifting part and hanging method
CN202265308U (en) Combined hoisting device for pipeline steel plate hoisting
CN105735629A (en) Lifting device for building-attached lifting scaffold
CN102874709B (en) A kind of transversely movable double pulleies unit vertical lifting equipment
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN103848362A (en) Variable amplitude pulley block structure for crane and crane with same
CN203959697U (en) The equalizing bar of hoisting platform truss
CN202953690U (en) Hoisting tool used for hoisting locomotive members
JP2013019131A (en) Pile holding apparatus
CN106545170B (en) Rod piece hoisting method
CN101767753B (en) Method for hoisting by lifting belt vertically
CN205346583U (en) Elevator counter weight
CN204528413U (en) bucket elevator
CN103613005A (en) Hoisting equipment, hoisting moving arm system and assembly method of hoisting moving arm system
CN104860209B (en) Movable arm tower crane height space-variant arm method
CN205705816U (en) A kind of book back gluing clamping device
CN205241747U (en) " arm " formula stove roller hoist
CN103879888A (en) Lifting balance device
CN104386599A (en) Balancing weight moving and clamping device for tower crane
CN204823686U (en) A couple for lifting by crane culvert pipe
CN202745743U (en) Short-distance rapid drop hanger of blowout prevention assembly hanging card

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121205

Termination date: 20180615

CF01 Termination of patent right due to non-payment of annual fee