CN102205397B - Method for casting super-large type semi-gear ring - Google Patents

Method for casting super-large type semi-gear ring Download PDF

Info

Publication number
CN102205397B
CN102205397B CN 201110124006 CN201110124006A CN102205397B CN 102205397 B CN102205397 B CN 102205397B CN 201110124006 CN201110124006 CN 201110124006 CN 201110124006 A CN201110124006 A CN 201110124006A CN 102205397 B CN102205397 B CN 102205397B
Authority
CN
China
Prior art keywords
ring gear
chill
riser
outer rim
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110124006
Other languages
Chinese (zh)
Other versions
CN102205397A (en
Inventor
谢敬佩
王爱琴
王文焱
赵永让
岳宗格
袁海伦
李继文
李洛利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CITIC Heavy Industries Co Ltd
Henan University of Science and Technology
Original Assignee
CITIC Heavy Industries Co Ltd
Henan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CITIC Heavy Industries Co Ltd, Henan University of Science and Technology filed Critical CITIC Heavy Industries Co Ltd
Priority to CN 201110124006 priority Critical patent/CN102205397B/en
Publication of CN102205397A publication Critical patent/CN102205397A/en
Application granted granted Critical
Publication of CN102205397B publication Critical patent/CN102205397B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

The invention discloses a method for casting a super-large type semi-gear ring. An outer rim whole ring open riser and an insulating riser sleeve, inner circle allowance, and external circle chilling block chilling are adopted; and circular insulating blind risers are dispersed on an inner rim and the corresponding bottom is chilled by the chilling block correspondingly so as to obtain semi-gear ring blank. In the method for casting the super-large type semi-gear ring, the outer rim whole ring open riser and the insulating riser sleeve are adopted, so that the feeding capacity of the riser is enhanced and the tissue compactness of the prepared casting is obviously improved, simultaneously floating sand and sundries can float conveniently, and the defects of sand inclusion, air holes and inclusion are reduced; the whole ring inner allowance and sand lining chilling block chilling are adopted; the inner allowance can ensure that an outer rim wall thickness center moves inward; by sand lining chilling block chilling, the tissues of the gear surface and the gear root are densified, and the defect of magnaflux inspection is reduced; and the inner allowance is not removed during further processing, the blank gear surface quality of the semi-gear ring is guaranteed, and the gear surface magnetic powder and ultrasonic flaw detection yield is improved.

Description

A kind of casting method of super-huge half-ring gear
Technical field
The present invention relates to the production technical field of super-huge half-ring gear, be specifically related to a kind of casting method of super-huge half-ring gear.
Background technology
The large gear circle is the crucial drive disk assembly in large-sized rotary kiln, grinding machine and building materials, mine, metallurgy, the electromechanical equipment, the quality of gear ring quality directly has influence on the stationarity of life-span, performance and the transmission of equipment, therefore, how to improve large gear circle quality and just become vital problem.Along with expanding economy and scientific and technological progress, the specification of building materials, the used large gear circle of field of metallurgy is developed into more than present diameter 10000 mm by diameter 4000-6000 mm in the world, specification is increasing, quality requirement is also more and more higher, except requiring good fatigue resistance, high strength, high tenacity, high case hardness, also require dense structure, need carry out magnetic powder inspection and ultrasonic examination, and do not allow the defectiveness soldering.
Owing to being subjected to the restriction of conditions of transportation, when Practical manufacturing large gear circle, generally be that the large gear circle is divided into two, be divided into two half-ring gears and carry out processing and manufacturing, become gear ring to use with the bolt fixed combination two half-ring gears again when to be used.The quality of half-ring gear directly affects the quality of the gear ring that is combined into, and therefore, it is particularly important that the quality of half-ring gear just seems.In manufacture process, in order to prevent the distortion of half-ring gear, usually when casting with two half-ring gear combination shapings, two half-ring gear distance of center circle pull open a little distances, the middle part adds connecting plate, forms whole circle and casts, blank being cut after casting becomes half-ring gear again.
The casting method of half-ring gear is the key technology during super-huge half-ring gear is made.Because the solidification and crystallization wide ranges of super-huge half-ring gear, its coagulating property has determined easily to produce the shrinkage cavity and porosity defective in casting process, particularly in existing casting technique, see shown in the accompanying drawing 1, rising head disperses to be placed on the stud place of inside and outside wheel rim, below the corresponding rising head in the outer rim outside, place subsidy, in the half-ring gear process, because its wheel rim mill teeth degree of depth reaches half of outer rim thickness, casting flaw often occurs at the tooth root place after the machined.In addition, because the half-ring gear diameter is large, the molten steel consumption is large, molten steel and molding sand are long time of contact in the casting process, and sand holes in the production, gas hole defect are more outstanding, often occur the magnetic particle indications that exceeds standard after the magnetic powder inspection, not only affected the quality of product, increased cost, and affect delivery date.
Summary of the invention
The object of the present invention is to provide a kind of casting method of super-huge half-ring gear.
In order to realize above purpose, the technical solution adopted in the present invention is: a kind of casting method of super-huge half-ring gear, adopt the whole circle open riser of outer rim, add insulating riser sleeve, inner circle subsidy, cylindrical iron chill shock chilling; Inner rim disperses circular insulation blind riser, and corresponding bottom iron chill shock chilling obtains the half-ring gear blank.
Further, the casting method of super-huge half-ring gear specifically may further comprise the steps:
(1) makes up mold
Make up two half-ring gears with molding sand, the center of circle of described two half-ring gears is at a distance of 400~500mm, and two half-ring gears form whole circle moulding by being arranged on two connecting plates between the half-ring gear, and described connecting plate is bolted to connection;
Outer rim top along described two half-ring gears arranges whole circle open riser, and described open riser is arranged at the top of described outer rim between two parties, and the open riser outer setting has insulating riser sleeve;
Along the inboard of described two half-ring gear outer rims and top whole circle except described bolt be used to being fixedly connected with connecting plate of being positioned at panels of plane subsidy is set; Along whole circle first Sanded chill of arranged outside of the outer rim of described two half-ring gears, the hanging sand layer thickness of described the first Sanded chill is 20mm, and the chill thickness of the first Sanded chill is 300~400mm, and the chill height is identical with half-ring gear outer rim height;
The inner rim top of described two half-ring gears and stud intersection area scattering device have circular insulation blind riser, and the quantity of circular insulation blind riser is identical with stud quantity, and described circular insulation blind riser top sets out pore; One side in the close center of circle of the inner rim of described two half-ring gears is provided with the second Sanded chill corresponding to the bottom of circular insulation blind riser, the hanging sand layer thickness of described the second Sanded chill is 10mm, the chill thickness of the second Sanded chill is 100~120mm, chill length is 150~160mm, and the chill width is 150~160mm;
(2) molten steel is poured in the mold of step (1) structure, obtains spray, cut afterwards and obtain the half-ring gear blank.
Wherein, described open riser along half-ring gear width radially is: outer rim is along radially width of half-ring gear+(100~130) mm, and the height of open riser is: outer rim height * (70~80) %.
The thickness of described interior subsidy is 60~80mm.
The diameter of described circular insulation blind riser is: inner rim is along radially width of half-ring gear+(50~80) mm.
The preparation method of described molten steel is: choose a kind of raw material as producing super-huge half-ring gear from No. 45 steel, CrMo low-alloy steel and CrNiMo low-alloy steel, these raw material adopt carbon steel, ferrochrome, ferromanganese, ferrosilicon, molybdenum-iron, ferronickel etc., calculate the outfit raw material by material chemical composition ratio requirement, adopt electric arc furnaces just to refine, and then through LF refining and VD processing, get molten steel.
The diameter of described half-ring gear blank is 9000~12000mm.
The casting method of super-huge half-ring gear provided by the invention adopts the whole circle open riser of outer rim, add insulating riser sleeve, strengthened the feeding capacity of rising head, dense structure's property of the foundry goods that makes obviously improves, also be beneficial to simultaneously floating sand and foreign material floating, reduced sand holes, pore and inclusion defect; Adopt subsidy and Sanded chill Quench in the whole circle, interior subsidy can make intracardiac moving in the outer rim wall thickness, by the Sanded chill Quench, make the flank of tooth and tooth root dense structure, reduced magnetic particle inspection defect, and interior subsidy has guaranteed the blank flank of tooth quality of half-ring gear further removing in the machined, has improved flank of tooth magnetic and ultrasonic flaw detection qualification rate.The casting method of super-huge half-ring gear provided by the invention has guaranteed the consecutive solidification of foundry goods and effective feeding of rising head, obtained without defectives such as shrinkage cavity and porosities, dense structure, after magnetic powder inspection and the ultrasonic examination, quality reaches the requirement of GB7233-87 II level, obtains need not the half-ring gear part of rewelding.
Molten steel used in the present invention is processed through advanced smelting technology, namely adopts electric arc furnaces just to refine, and then processes through LF refining and VD, has eliminated gas and the impurity in the molten steel, has improved the degree of purity of molten steel, thereby has guaranteed the quality of the half-ring gear blank that makes.
Description of drawings
Fig. 1 is existing a kind of casting technique schematic diagram;
Fig. 2 is the partial structurtes schematic diagram of a kind of mold technique of providing of the embodiment of the invention.
The specific embodiment
Embodiment 1
A kind of diameter is the casting method of the super-huge half-ring gear of 9400mm, adopts the whole circle open riser of outer rim, adds insulating riser sleeve, inner circle subsidy, cylindrical iron chill shock chilling; Inner rim disperses circular insulation blind riser, and corresponding bottom iron chill shock chilling obtains the half-ring gear blank, specifically may further comprise the steps:
(1) makes up mold
The partial structurtes schematic diagram of the mold technique that is built into is seen shown in the accompanying drawing 2, make up two half-ring gears 11 with molding sand, the center of circle of two half-ring gears 11 is at a distance of 400mm, and two half-ring gears 11 form whole circle moulding by being arranged on two connecting plates between the half-ring gear 11, and connecting plate is bolted to connection;
Outer rim 9 tops along two half-ring gears 11 arrange whole circle open riser 7, open riser 7 is arranged at the top of outer rim 9 between two parties, open riser 7 along half-ring gear 11 width radially is: outer rim 9 is along half-ring gear 11 width+100mm radially, the height of open riser 7 is: outer rim 9 height * 70%, and open riser 7 outer setting have insulating riser sleeve;
Whole circle arranges subsidy 8 except the bolt that is used for being fixedly connected with connecting plate along the inboard of the outer rim 9 of two half-ring gears 11 and the top that is positioned at panels of plane 6, and the thickness of interior subsidy 8 is 60mm; Hanging sand layer thickness along whole circle the first Sanded chill of arranged outside 10, the first Sanded chills 10 of the outer rim 9 of two half-ring gears 11 is 20mm, and the chill thickness of the first Sanded chill 10 is 300mm, and the chill height is highly identical with half-ring gear outer rim 9;
Inner rim 4 tops of two half-ring gears 11 and stud 5 intersection area scattering devices have circular insulation blind riser 2, the diameter of circular insulation blind riser 2 is: inner rim 4 is along half-ring gear 11 width+50mm radially, the quantity of circular insulation blind riser 2 is identical with stud 5 quantity, and circular insulation blind riser 2 tops set out pore 1; One side in the inner rim 4 close centers of circle of two half-ring gears 11 is provided with the second Sanded chill 3 corresponding to the bottom of circular insulation blind riser 2, the hanging sand layer thickness of the second Sanded chill 3 is 10mm, the chill thickness of the second Sanded chill 3 is 100mm, and chill length is 150mm, and the chill width is 150mm;
(2) molten steel is poured in the mold of step (1) structure, obtain spray, cut afterwards and obtain the half-ring gear blank, wherein the preparation method of molten steel is: choose steel No. 45, raw material are calculated and be equipped with to chemical composition proportioning by No. 45 steel, adopt afterwards electric arc furnaces just to refine, and then process through LF refining and VD, get molten steel.
Embodiment 2
A kind of diameter is the casting method of the super-huge half-ring gear of 10160mm, adopts the whole circle open riser of outer rim, adds insulating riser sleeve, inner circle subsidy, cylindrical iron chill shock chilling; Inner rim disperses circular insulation blind riser, and corresponding bottom iron chill shock chilling obtains the half-ring gear blank, specifically may further comprise the steps:
(1) makes up mold
The partial structurtes schematic diagram of the mold technique that is built into is seen shown in the accompanying drawing 2, make up two half-ring gears 11 with molding sand, the center of circle of two half-ring gears 11 is at a distance of 450mm, and two half-ring gears 11 form whole circle moulding by being arranged on two connecting plates between the half-ring gear 11, and connecting plate is bolted to connection;
Outer rim 9 tops along two half-ring gears 11 arrange whole circle open riser 7, open riser 7 is arranged at the top of outer rim 9 between two parties, open riser 7 along half-ring gear 11 width radially is: outer rim 9 is along half-ring gear 11 width+110mm radially, the height of open riser 7 is: outer rim 9 height * 75%, and open riser 7 outer setting have insulating riser sleeve;
Whole circle arranges subsidy 8 except the bolt that is used for being fixedly connected with connecting plate along the inboard of the outer rim 9 of two half-ring gears 11 and the top that is positioned at panels of plane 6, and the thickness of interior subsidy 8 is 70mm; Hanging sand layer thickness along whole circle the first Sanded chill of arranged outside 10, the first Sanded chills 10 of the outer rim 9 of two half-ring gears 11 is 20mm, and the chill thickness of the first Sanded chill 10 is 350mm, and the chill height is highly identical with half-ring gear outer rim 9;
Inner rim 4 tops of two half-ring gears 11 and stud 5 intersection area scattering devices have circular insulation blind riser 2, the diameter of circular insulation blind riser 2 is: inner rim 4 is along half-ring gear 11 width+70mm radially, the quantity of circular insulation blind riser 2 is identical with stud 5 quantity, and circular insulation blind riser 2 tops set out pore 1; One side in the inner rim 4 close centers of circle of two half-ring gears 11 is provided with the second Sanded chill 3 corresponding to the bottom of circular insulation blind riser 2, the hanging sand layer thickness of the second Sanded chill 3 is 10mm, the chill thickness of the second Sanded chill 3 is 110mm, and chill length is 160mm, and the chill width is 160mm;
(2) molten steel is poured in the mold of step (1) structure, obtain spray, cut afterwards and obtain the half-ring gear blank, wherein the preparation method of molten steel is: choose the CrMo steel, raw material are calculated and be equipped with to chemical composition proportioning by the 20CrMo steel, adopt afterwards electric arc furnaces just to refine, and then process through LF refining and VD, get molten steel.
Embodiment 3
A kind of diameter is the casting method of the super-huge half-ring gear of 11630mm, adopts the whole circle open riser of outer rim, adds insulating riser sleeve, inner circle subsidy, cylindrical iron chill shock chilling; Inner rim disperses circular insulation blind riser, and corresponding bottom iron chill shock chilling obtains the half-ring gear blank, specifically may further comprise the steps:
(1) makes up mold
The partial structurtes schematic diagram of the mold technique that is built into is seen shown in the accompanying drawing 2, make up two half-ring gears 11 with molding sand, the center of circle of two half-ring gears 11 is at a distance of 500mm, and two half-ring gears 11 form whole circle moulding by being arranged on two connecting plates between the half-ring gear 11, and connecting plate is bolted to connection;
Outer rim 9 tops along two half-ring gears 11 arrange whole circle open riser 7, open riser 7 is arranged at the top of outer rim 9 between two parties, open riser 7 along half-ring gear 11 width radially is: outer rim 9 is along half-ring gear 11 width+130mm radially, the height of open riser 7 is: outer rim 9 height * 80%, and open riser 7 outer setting have insulating riser sleeve;
Whole circle arranges subsidy 8 except the bolt that is used for being fixedly connected with connecting plate along the inboard of the outer rim 9 of two half-ring gears 11 and the top that is positioned at panels of plane 6, and the thickness of interior subsidy 8 is 80mm; Hanging sand layer thickness along whole circle the first Sanded chill of arranged outside 10, the first Sanded chills 10 of the outer rim 9 of two half-ring gears 11 is 20mm, and the chill thickness of the first Sanded chill 10 is 400mm, and the chill height is highly identical with half-ring gear outer rim 9;
Inner rim 4 tops of two half-ring gears 11 and stud 5 intersection area scattering devices have circular insulation blind riser 2, the diameter of circular insulation blind riser 2 is: inner rim 4 is along half-ring gear 11 width+80mm radially, the quantity of circular insulation blind riser 2 is identical with stud 5 quantity, and circular insulation blind riser 2 tops set out pore 1; One side in the inner rim 4 close centers of circle of two half-ring gears 11 is provided with the second Sanded chill 3 corresponding to the bottom of circular insulation blind riser 2, the hanging sand layer thickness of the second Sanded chill 3 is 10mm, the chill thickness of the second Sanded chill 3 is 120mm, and chill length is 160mm, and the chill width is 160mm;
(2) molten steel is poured in the mold of step (1) structure, obtain spray, cut afterwards and obtain the half-ring gear blank, wherein the preparation method of molten steel is: choose the CrNiMo steel, raw material are calculated and be equipped with to chemical composition proportioning by the 20CrNiMo steel, adopt afterwards electric arc furnaces just to refine, and then process through LF refining and VD, get molten steel.
Three super-huge half-ring gears that embodiment 1-embodiment 3 is obtained carry out ultrasonic examination and magnetic powder inspection detection, and quality reaches the requirement of GB7233-87 II level, and dense structure, without defectives such as shrinkage cavity and porosities, need not rewelding.

Claims (6)

1. the casting method of a super-huge half-ring gear is characterized in that: adopt the whole circle open riser of outer rim, add insulating riser sleeve, inner circle subsidy, cylindrical iron chill shock chilling; Inner rim disperses circular insulation blind riser, and corresponding bottom iron chill shock chilling obtains the half-ring gear blank, and the diameter of described half-ring gear blank is 9000~12000mm.
2. the casting method of super-huge half-ring gear according to claim 1 is characterized in that: specifically may further comprise the steps:
(1) makes up mold
Make up two half-ring gears with molding sand, the center of circle of described two half-ring gears is at a distance of 400~500mm, and two half-ring gears form whole circle moulding by being arranged on two connecting plates between the half-ring gear, and described connecting plate is bolted to connection;
Outer rim top along described two half-ring gears arranges whole circle open riser, and described open riser is arranged at the top of described outer rim between two parties, and the open riser outer setting has insulating riser sleeve;
Along the inboard of described two half-ring gear outer rims and top whole circle except described bolt be used to being fixedly connected with connecting plate of being positioned at panels of plane subsidy is set; Along whole circle first Sanded chill of arranged outside of the outer rim of described two half-ring gears, the hanging sand layer thickness of described the first Sanded chill is 20mm, and the chill thickness of the first Sanded chill is 300~400mm, and the chill height is identical with half-ring gear outer rim height;
The inner rim top of described two half-ring gears and stud intersection area scattering device have circular insulation blind riser, and the quantity of circular insulation blind riser is identical with stud quantity, and described circular insulation blind riser top sets out pore; One side in the close center of circle of the inner rim of described two half-ring gears is provided with the second Sanded chill corresponding to the bottom of circular insulation blind riser, the hanging sand layer thickness of described the second Sanded chill is 10mm, the chill thickness of the second Sanded chill is 100~120mm, chill length is 150~160mm, and the chill width is 150~160mm;
(2) molten steel is poured in the mold of step (1) structure, obtains spray, cut afterwards and obtain the half-ring gear blank.
3. the casting method of super-huge half-ring gear according to claim 2, it is characterized in that: described open riser along half-ring gear width radially is: outer rim is along radially width of half-ring gear+(100~130) mm, and the height of open riser is: outer rim height * (70~80) %.
4. the casting method of super-huge half-ring gear according to claim 2, it is characterized in that: the thickness of described interior subsidy is 60~80mm.
5. the casting method of super-huge half-ring gear according to claim 2, it is characterized in that: the diameter of described circular insulation blind riser is: inner rim is along radially width of half-ring gear+(50~80) mm.
6. the casting method of super-huge half-ring gear according to claim 2, it is characterized in that: the preparation method of described molten steel is: choose a kind of in No. 45 steel, CrMo low-alloy steel and the CrNiMo low-alloy steel and be raw material, adopt electric arc furnaces just to refine, and then process through LF refining and VD, get molten steel.
CN 201110124006 2011-05-14 2011-05-14 Method for casting super-large type semi-gear ring Expired - Fee Related CN102205397B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110124006 CN102205397B (en) 2011-05-14 2011-05-14 Method for casting super-large type semi-gear ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110124006 CN102205397B (en) 2011-05-14 2011-05-14 Method for casting super-large type semi-gear ring

Publications (2)

Publication Number Publication Date
CN102205397A CN102205397A (en) 2011-10-05
CN102205397B true CN102205397B (en) 2013-01-02

Family

ID=44694622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110124006 Expired - Fee Related CN102205397B (en) 2011-05-14 2011-05-14 Method for casting super-large type semi-gear ring

Country Status (1)

Country Link
CN (1) CN102205397B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102441646A (en) * 2011-12-08 2012-05-09 济南重工股份有限公司 Apparatus and method for casting large-scale semi-gear
CN103239811B (en) * 2012-02-10 2016-04-06 东莞市红火安全科技有限公司 Constant speed type descending lifeline
CN103447464A (en) * 2012-05-31 2013-12-18 洛阳洛北重工机械有限公司 Process for preventing deformation of wheel disk of semi-gear rim
CN104014745B (en) * 2014-06-18 2016-05-18 唐山东方华盛优耐高科股份有限公司 The long barrier part feeding technology of large cast steel method
CN104827000B (en) * 2015-05-22 2017-05-31 四川南车共享铸造有限公司 A kind of casting method of gear ring
CN104972069B (en) * 2015-07-23 2017-03-15 乐山天华机械制造有限公司 A kind of labyrinth casing casting mould
CN106541085A (en) * 2017-01-23 2017-03-29 重庆通耀铸锻有限公司 Coupler body casting system
CN108097882A (en) * 2017-12-26 2018-06-01 无锡市蠡湖铸业有限公司 Riser component
CN110090916A (en) * 2018-01-31 2019-08-06 中国科学院金属研究所 The control method of surface defect during one seed nucleus main pump shell cast
CN110842150B (en) * 2019-12-05 2021-11-19 中铁山桥集团有限公司 Assembled frog casting system and method
CN111761025B (en) * 2020-05-26 2022-07-12 洛阳中重铸锻有限责任公司 Anti-deformation casting method for thin-wall curved-surface steel casting
CN112247068A (en) * 2020-08-25 2021-01-22 常熟市虹桥铸钢有限公司 Casting method of upper casting of gearless electric propeller hull

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101069918A (en) * 2007-04-30 2007-11-14 广东省韶铸集团有限公司 Casting technology of casted-steel gear
CN101422816A (en) * 2007-11-02 2009-05-06 中信重工机械股份有限公司 Exposed gear casting no-choke riser-head technique design

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54104443A (en) * 1978-02-06 1979-08-16 Hitachi Metals Ltd Casting method differential gear case

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101069918A (en) * 2007-04-30 2007-11-14 广东省韶铸集团有限公司 Casting technology of casted-steel gear
CN101422816A (en) * 2007-11-02 2009-05-06 中信重工机械股份有限公司 Exposed gear casting no-choke riser-head technique design

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP昭54-104443A 1979.08.16
东富义.铸钢齿轮铸造工艺探讨.《铸造》.2007,第56卷(第7期),761-763. *

Also Published As

Publication number Publication date
CN102205397A (en) 2011-10-05

Similar Documents

Publication Publication Date Title
CN102205397B (en) Method for casting super-large type semi-gear ring
CN106077507B (en) A kind of casting die and casting technique of automobile water-cooling motor casing casting
CN103639363B (en) Preparation method of large abrasion-proof hollow grinding ball
CN100491019C (en) Method for casting large main-bearing seat
CN104128567A (en) Brake disc body and casting method and device for manufacturing same
CN103203432A (en) Cast steel wheel center mold and use method thereof
CN104195448B (en) Casting alloy material and the technique casting ocean platform canine tooth roller box foundry goods with it
CN105821263A (en) Aluminum alloy automobile steering gear case and superspeed casting preparing method thereof
CN103008577B (en) Preparation method and mold for microdefect high-utilization rate high-quality static ingot
CN109773132B (en) Cast nodular cast iron grinding disc and pouring system and production process thereof
CN101491829B (en) Casting technique of grain refined solid manganese steel frog of long life
CN104174819B (en) The climb casting technique of machine third-level planetary frame of a kind of ocean platform
CN109530630A (en) Five spoke barrel casting molds of one kind and five spoke barrel manufacturing methods
CN106111913A (en) A kind of flange casting technique
CN103878322B (en) The casting method of railcar centre of pull steel-casting
CN101323012B (en) Technique and equipment for producing centre spinning composite metal blank
CN102861894A (en) Production method for wind power equipment stator
CN104174820B (en) A kind of ocean platform climbs the casting technique of machine secondary planet frame
CN101229578B (en) Fabricating technology of cylinder barrel for train
CN102417949A (en) Production process of special material for automobile brake component
CN203184610U (en) Steel ingot mold for large-scale and extremely thick slab
CN102274933B (en) Method for effectively eliminating central defect of solidification blank and refining solidification structure
CN110257697B (en) High-wear-resistance and heat-resistance casting for grate plate of grate cooler and casting process of casting
CN108642329B (en) Train gearbox and preparation method thereof
CN101284305B (en) High manganese steel casting grain refinement casting technique

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130102

Termination date: 20150514