CN102200494B - Sampling method for large undisturbed soil, and sampling equipment thereof - Google Patents

Sampling method for large undisturbed soil, and sampling equipment thereof Download PDF

Info

Publication number
CN102200494B
CN102200494B CN201110073919A CN201110073919A CN102200494B CN 102200494 B CN102200494 B CN 102200494B CN 201110073919 A CN201110073919 A CN 201110073919A CN 201110073919 A CN201110073919 A CN 201110073919A CN 102200494 B CN102200494 B CN 102200494B
Authority
CN
China
Prior art keywords
soil sample
base plate
hydraulic pressure
soil
pull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110073919A
Other languages
Chinese (zh)
Other versions
CN102200494A (en
Inventor
陈焱国
李志国
秦红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAOYUAN STATION OF AGRO-ECOSYSTEM RESEARCH CAS
Original Assignee
TAOYUAN STATION OF AGRO-ECOSYSTEM RESEARCH CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAOYUAN STATION OF AGRO-ECOSYSTEM RESEARCH CAS filed Critical TAOYUAN STATION OF AGRO-ECOSYSTEM RESEARCH CAS
Priority to CN201110073919A priority Critical patent/CN102200494B/en
Publication of CN102200494A publication Critical patent/CN102200494A/en
Application granted granted Critical
Publication of CN102200494B publication Critical patent/CN102200494B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to a sampling method for large undisturbed soil, and sampling equipment thereof, and belongs to the ecological research fields of soil science and environmental science. The sampling equipment for the large undisturbed soil comprises a soil sample fixing machine, a tool face separating base plate, a latch, a gradient support and a hydraumatic push-pull apparatus. Tracks in a lower portion of the soil sample fixing machine are snapped with grooves on the tool face separating base plate. The latch is sleeved on outer side of the soil sample fixing machine and is connected with the gradient support. The hydraumatic push-pull apparatus is provided on the gradient support. One end of the hydraumatic push-pull apparatus hooks a sleeving hook of the tool face separating base plate, and the other end of the hydraumatic push-pull apparatus rests against a moving rod. Beckets are provided above four corners of the soil sample fixing machine. The sampling method is performed based on the sampling equipment for the large undisturbed soil. According to the method and the equipment provided by the present invention, soil disturbance is reduced, original layers of the soil are maintained through in situ sampling, such that authenticity of the sampling is ensured; the large undisturbed soil with different size can be sampled according to different requirements of science research; labor is saved due to adopting the hydraumatic push-pull apparatus.

Description

Large-scale original-state soil sampling method and sampling equipment thereof
Technical field
The present invention relates to large-scale original-state soil sampling method and sampling equipment thereof, belong to ecological study fields such as pedology, environmental science.
Background technology
Soil is the basis of agricultural production; There are a lot of differences in the soil property and the fertility level of different weather conditions in different regions and different parent material developments; And the difficulty that on the different soils of different regions, conducts a research simultaneously is very big, carries out scientific research so the original-state soil that subject researchers such as agronomy, pedology and ecology grow the different soil parent materials in different regions is moved under the same ecological environmental condition.
Soil sampling is the important means of subjects such as agronomy, pedology and ecology research, and the destructive method of excavating is adopted in the collection of present pedotheque more, havoc the former of soil have levels and structure; Bring a lot of difficulties to scientific research; And existing soil sample equipment or sampling is few, can't satisfy the requirement of original-state soil micro-plot experiment, or take a sample with hole knockout; Cause compacting and soil texture to destroy inevitably; These method and apparatus mainly are to less soil sample sample collecting, and the sampling difficulty of volume more than 1 cubic metre, the large-scale original-state soil of weight more than 2 tons is big, does not also have corresponding apparatus and technology at present.
Summary of the invention
To the deficiency of above-mentioned existence, the present invention aim to provide a kind of can collect volume more than 1 cubic metre,
The large-scale original-state soil sampling method and the sampling equipment thereof of the whole soil block sample of weight more than 2 tons.Adopt sampling method of the present invention and sampling equipment thereof can make the pedotheque that collects keep original soil layer, guaranteed the authenticity of sampling.
Large-scale original-state soil sampling method of the present invention specifically may further comprise the steps:
(1), choosing of soil: the needs of the test that rests on a scientific basis are chosen soil arbitrarily;
(2), shoveling appearance: take soil sample according to the scientific experimentation needs;
(3), fixing soil sample:, be enclosed within from top to down on the soil sample of digging with the soil sample fixator;
(4), place knife face and separate base plate: the knife face that knife face separates on the base plate is aimed at the soil sample parting plane that will separate, and road groove and the slide rail on the soil sample fixator that knife face is separated on the base plate interlock;
(5), locking soil sample fixator:, be enclosed within the soil sample fixator outside from top to down with lock;
(6), connect lock and gradient scaffolding: gradient scaffolding is connected with lock, both are become one;
(7), separate soil sample: the hydraulic pressure load push-pull is installed on the gradient scaffolding; Hydraulic pressure load push-pull front end withstands knife face and separates the base plate rear, and electricity starts the hydraulic pressure load push-pull, pushes ahead knife face and separates base plate; Distance according to each hydraulic pressure propelling; Repeat 2-3 times on gradient scaffolding, the move forward position of hydraulic pressure load push-pull, accomplishes the soil sample mask work;
(8), unload the hydraulic pressure load push-pull, unload gradient scaffolding and lock;
(9), lifting soil sample: separate the floor below cable with wirerope from knife face and live whole soil sample, with the whole soil sample of slinging of the crane more than 15 tons;
(10), entrucking transportation: whole soil sample is placed on the large-scale haulage vehicle, fixes with hawser, is transported to the test place at place;
(11), hang down soil sample: soil sample is lifted by crane the test site from haulage vehicle;
(12), extracting knife face out separates base plate: lock is enclosed within the soil sample fixator outside once more, and gradient scaffolding links to each other with lock and becomes one, and the hydraulic pressure load push-pull is installed on the gradient scaffolding; Hydraulic pressure load push-pull front end hooks knife face and separates base plate rear cover hook, and electricity starts the hydraulic pressure load push-pull, pulls out knife face backward and separates base plate; The distance that the each hydraulic pressure of foundation is pulled out; On gradient scaffolding, move the hydraulic pressure load push-pull backward, repeat 2-3 times, accomplish the extraction that knife face separates base plate;
(13), the soil sample of slinging fixator: unload hydraulic pressure load push-pull, gradient scaffolding and lock again, wirerope is tied up on the latch closure of four jiaos of soil sample fixator tops, start the crane soil sample fixator of slowly slinging, all accomplish the whole sampling work of native soils to this.
The sampling equipment that in large-scale original-state soil sampling method, uses comprises that soil sample fixator, knife face separate base plate, lock, gradient scaffolding, hydraulic pressure pushing device, seal and above and below opening shape around the soil sample fixator is; The road groove that the slide rail of soil sample retainer bottom separates with knife face on the base plate interlocks; Knife face separates on the base plate has the cover hook, and lock is enclosed within the outside of soil sample fixator from top to down, and gradient scaffolding is connected with lock; Hydraulic pressure pushing device places on the gradient scaffolding; Hydraulic pressure load push-pull one end hook is lived the cover hook that knife face separates base plate, and the hydraulic pressure load push-pull other end leans against and moves on the pole, and soil sample fixator top is equipped with latch closure for four jiaos.
The present invention adopts technique scheme, has the following advantages: 1, less to the disturbance of soil, in-situ sampling has kept the former of soil to have levels, and guarantees the authenticity of sampling; 2, can gather the large-scale original-state soil sample of different sizes according to the different needs of scientific research; 3, adopt the hydraulic pressure load push-pull, saved the labour.
Description of drawings
Fig. 1 is the structure vertical view of large-scale original-state soil sampling equipment according to the invention.
Fig. 2 is the texture edge view of large-scale original-state soil sampling equipment according to the invention.
Embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is at length explained, but do not limit the present invention in any form.
Like Fig. 1, shown in Figure 2; Large-scale original-state soil sampling equipment according to the invention comprises that soil sample fixator 1, knife face separate base plate 2, lock 3, gradient scaffolding 4, hydraulic pressure pushing device 5, seal and above and below opening shape around soil sample fixator 1 is; The road groove 7 that the slide rail 6 of soil sample fixator 1 bottom separates with knife face on the base plate 2 interlocks; Knife face separates has cover hook 8 on the base plate 2, lock 3 is enclosed within the outside of soil sample fixator 1 from top to down, and gradient scaffolding 4 is connected with lock 3; Hydraulic pressure pushing device 5 places on the gradient scaffolding 4; Hydraulic pressure load push-pull 5 one end hooks are lived the cover hook 8 that knife face separates base plate 2, and hydraulic pressure load push-pull 5 other ends lean against and move on the pole 9, and soil sample fixator top is equipped with latch closure 10 for four jiaos.
The method of taking based on large-scale original-state soil sampling equipment specifically may further comprise the steps:
(1), choosing of soil: the needs of the test that rests on a scientific basis can be chosen arbitrarily;
(2), shoveling appearance: accurately take required soil sample size;
(3), fixing soil sample:, be enclosed within from top to down on the soil sample of digging with soil sample fixator 1;
(4), place knife face and separate base plate 2: the knife face that knife face separates on the base plate 2 is aimed at the soil sample parting plane that will separate, knife face is separated on the base plate on 2 road groove 7 and the soil sample fixator 1 slide rail 6 and interlock;
(5), locking soil sample fixator 1:, be enclosed within soil sample fixator 1 outside from top to down with lock 3;
(6), connect lock 3 and gradient scaffolding 4: gradient scaffolding 4 is connected with lock 3, both are become one;
(7), separate soil sample: hydraulic pressure load push-pull 5 is installed on the gradient scaffolding 4; Hydraulic pressure load push-pull 5 front ends hook knife face and separate base plate 2 rears cover hook 8, and electricity starts hydraulic pressure load push-pull 5, pushes ahead knife face and separates base plate 2; Distance according to each hydraulic pressure propelling; Repeat 3 times on gradient scaffolding 4, the move forward position of hydraulic pressure load push-pull 5, accomplishes the soil sample mask work;
(8), unload hydraulic pressure load push-pull 5, unload gradient scaffolding 4 and lock 3;
(9), lifting soil sample: separate base plate 2 below cables with wirerope from knife face and live whole soil sample, with the whole soil sample of slinging of the crane more than 15 tons;
(10), entrucking transportation: whole soil sample is placed on the large-scale haulage vehicle, fixes with hawser, is transported to the test place at place;
(11), hang down soil sample: soil sample is lifted by crane the test site from haulage vehicle;
(12), extract knife face out and separate base plate 2: lock 3 is enclosed within soil sample fixator 1 outside once more, and gradient scaffolding 4 links to each other with lock 3 and becomes one, and hydraulic pressure load push-pull 5 is installed on the gradient scaffolding 4; Hydraulic pressure load push-pull 5 front ends hook knife face and separate base plate rear cover hook 8, and electricity starts hydraulic pressure load push-pull 5, pulls out knife face backward and separates base plate 2; The distance that the each hydraulic pressure of foundation is pulled out; On gradient scaffolding 4, move hydraulic pressure load push-pull 5 backward, repeat 3 times, accomplish the extraction that knife face separates base plate 2;
(13), the soil sample fixator of slinging: unload hydraulic pressure load push-pull 5, gradient scaffolding 4 and lock 3 again; Wirerope is tied up on the latch closure 10 of four jiaos of soil sample fixator 1 tops; Start the crane soil sample fixator 1 of slowly slinging, all accomplish the whole sampling work of native soils to this.

Claims (4)

1. large-scale original-state soil sampling method is characterized in that comprising the steps:
Choosing of I, soil: the needs of the test that rests on a scientific basis are chosen soil arbitrarily;
II, shoveling appearance: the needs according to scientific experimentation take soil sample;
III, fixing soil sample:, be enclosed within from top to down on the soil sample of digging with soil sample fixator (1);
IV, place knife face and separate base plate (2): the knife face that will separate on the base plate (2) is aimed at the soil sample parting plane that will separate, and the slide rail (6) that will separate (1) on road groove (7) and the soil sample fixator of (2) on the base plate interlocks;
V, locking soil sample fixator (1): lock (3) is enclosed within soil sample fixator (1) outside from top to down;
VI, connect lock (3) and gradient scaffolding (4): gradient scaffolding (4) is connected with lock (3), both are become one;
VII, separation soil sample: hydraulic pressure load push-pull (5) is installed on the gradient scaffolding (4); Hydraulic pressure load push-pull (5) front end hooks knife face and separates base plate (2) rear cover hook (8), and electricity starts hydraulic pressure load push-pull (5), pushes ahead knife face and separates base plate (2); Distance according to each hydraulic pressure propelling; Repeat 2-3 times on gradient scaffolding (4), the move forward position of hydraulic pressure load push-pull (5), accomplishes the soil sample mask work;
VIII, unload hydraulic pressure load push-pull (5), unload gradient scaffolding (4) and lock (3);
IX, lifting soil sample: separate base plate (2) below cable with wirerope from knife face and live whole soil sample, with the whole soil sample of slinging of the crane more than 15 tons;
X, entrucking transportation: whole soil sample is placed on the large-scale haulage vehicle, fixes with hawser, is transported to the test place at place;
XI, hang down soil sample: soil sample is lifted by crane the test site from haulage vehicle;
XII, extraction knife face separate base plate (2): lock (3) is enclosed within soil sample fixator (1) outside once more; Gradient scaffolding (4) links to each other with lock (3) and becomes one, and hydraulic pressure load push-pull (5) is installed on the gradient scaffolding (4), and hydraulic pressure load push-pull (5) front end hooks knife face and separates base plate rear cover hook (8); Electricity starts hydraulic pressure load push-pull (5); Pull out knife face backward and separate base plate (2), the distance according to each hydraulic pressure is pulled out moves hydraulic pressure load push-pull (5) backward on gradient scaffolding (4); Repeat 2-3 times, accomplish the extraction that knife face separates base plate (2);
XIII, the soil sample of slinging fixator: unload hydraulic pressure load push-pull (5), gradient scaffolding (4) and lock (3) again; Wirerope is tied up on the latch closure (10) of four jiaos of soil sample fixator (1) tops; Start the crane soil sample fixator (1) of slowly slinging, all accomplish the whole sampling work of original-state soils to this.
2. the sampling equipment that in the described large-scale original-state soil sampling method of claim 1, uses; It is characterized in that: comprise that soil sample fixator (1), knife face separate base plate (2), lock (3), gradient scaffolding (4), hydraulic pressure pushing device (5); The road groove (7) that the slide rail (6) of soil sample fixator (1) bottom separates with knife face on the base plate (2) interlocks; Knife face separates on the base plate (2) has cover hook (8); Lock (3) is enclosed within the outside of soil sample fixator (1), and gradient scaffolding (4) is connected with lock (3), and hydraulic pressure pushing device (5) places on the gradient scaffolding (4); Hydraulic pressure load push-pull (5) one end hooks are lived the cover hook (8) that knife face separates base plate (2), and hydraulic pressure load push-pull (5) other end leans against and moves on the pole (9).
3. sampling equipment according to claim 2 is characterized in that: soil sample fixator (1) top is equipped with latch closure (10) for four jiaos.
4. sampling equipment according to claim 2 is characterized in that: seal and above and below opening shape around soil sample fixator (1) is.
CN201110073919A 2011-03-25 2011-03-25 Sampling method for large undisturbed soil, and sampling equipment thereof Expired - Fee Related CN102200494B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110073919A CN102200494B (en) 2011-03-25 2011-03-25 Sampling method for large undisturbed soil, and sampling equipment thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110073919A CN102200494B (en) 2011-03-25 2011-03-25 Sampling method for large undisturbed soil, and sampling equipment thereof

Publications (2)

Publication Number Publication Date
CN102200494A CN102200494A (en) 2011-09-28
CN102200494B true CN102200494B (en) 2012-10-10

Family

ID=44661340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110073919A Expired - Fee Related CN102200494B (en) 2011-03-25 2011-03-25 Sampling method for large undisturbed soil, and sampling equipment thereof

Country Status (1)

Country Link
CN (1) CN102200494B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102419267B (en) * 2011-12-15 2013-11-27 南京大学 Indoor model test soil borrowing device based on micro-structure analysis and soil borrowing method
CN103528852B (en) * 2013-10-31 2015-07-08 南京大学 Undisturbed sampling method capable of effectively preventing coarse-grained soil from leaking through side wall
CN103967483B (en) * 2014-04-25 2018-02-23 水利部牧区水利科学研究所 Biological breadcrust undisturbed soil sampling device and sampling method for simulated rainfall experiment
CN110320066A (en) * 2019-08-09 2019-10-11 中国科学院新疆生态与地理研究所 Original-state soil collecting cassette and the method for original-state soil acquisition

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3812721B2 (en) * 2001-06-25 2006-08-23 独立行政法人科学技術振興機構 Formation sample collection apparatus and method
CN201535724U (en) * 2009-12-04 2010-07-28 山东农业大学 Earth-taking drill for field soil original cut plane earth column
CN101832883A (en) * 2010-06-02 2010-09-15 中国科学院遗传与发育生物学研究所 Soil layering scraping sampler
CN201716211U (en) * 2010-07-26 2011-01-19 四川农业大学 Undisturbed soil sampling device
CN202002818U (en) * 2011-03-25 2011-10-05 中国科学院桃源农业生态试验站 Large undisturbed-soil sampling equipment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004278147A (en) * 2003-03-17 2004-10-07 Toa Grout Kk Sampling method and sampling device of soil

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3812721B2 (en) * 2001-06-25 2006-08-23 独立行政法人科学技術振興機構 Formation sample collection apparatus and method
CN201535724U (en) * 2009-12-04 2010-07-28 山东农业大学 Earth-taking drill for field soil original cut plane earth column
CN101832883A (en) * 2010-06-02 2010-09-15 中国科学院遗传与发育生物学研究所 Soil layering scraping sampler
CN201716211U (en) * 2010-07-26 2011-01-19 四川农业大学 Undisturbed soil sampling device
CN202002818U (en) * 2011-03-25 2011-10-05 中国科学院桃源农业生态试验站 Large undisturbed-soil sampling equipment

Also Published As

Publication number Publication date
CN102200494A (en) 2011-09-28

Similar Documents

Publication Publication Date Title
CN102200494B (en) Sampling method for large undisturbed soil, and sampling equipment thereof
CN101922292B (en) Coal mine gob-side entry retaining roadside segment bearing unequal strength support principle and application
CN205557532U (en) Combine secretly section of burying construction city deep tunnel's interim construction passageway of speciality open cut
CN201432842Y (en) Non-drainage undisturbed soil transfer device
CN202002818U (en) Large undisturbed-soil sampling equipment
CN102828531B (en) System and construction method for realizing digging and measuring of diaphragm wall trench in geotechnical centrifugal model test
CN104213559B (en) Intertidal zone beam lower carriage steel pipe pile extracts the method for pulling out of equipment
CN1766951A (en) Combined type geomechanics model test stand device
CN105840216A (en) Underground space exploitation excavation construction method
CN101531262B (en) Plot movement device for maintaining undisturbed soil free from loss, and method for plot movement using device
CN102720374A (en) Method for removing masonry-concrete structure wall
CN105645037B (en) It is a kind of mechanically to mention mine device
CN106157792B (en) Device and method for simulating spanning of mining rock mass of iron ore open-air transfer well
CN201355313Y (en) Deep layer profile soil sampler
CN205404176U (en) Superficial deposit thing sample thief
CN210797573U (en) Underground structure internal transportation system based on under-board sliding groove
CN218546170U (en) Visit groove soil layering and get native normal position recovery unit
Ivanov et al. Structure modeling of mining machinery systems for production of raw peat materials
CN205555271U (en) Ore device is carried to mechanical type
CN204317188U (en) A kind of transplanting tree car digging system
CN107882161B (en) Fracturing soft tank and construction method thereof
CN204940381U (en) A kind of power shovel
CN103306271B (en) Adopt the large area of rigidity well point pipe network low-pressure drainage system deep domestic sludge substep vacuum drainage consolidation processing methods
CN220644543U (en) Integral rainwater drainage well convenient for removing sundries in well
CN110295906A (en) A kind of marble cave adopts the method exploited downwards

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121010

Termination date: 20140325