CN102191817B - 铅芯橡胶隔震支座 - Google Patents

铅芯橡胶隔震支座 Download PDF

Info

Publication number
CN102191817B
CN102191817B CN2011100867215A CN201110086721A CN102191817B CN 102191817 B CN102191817 B CN 102191817B CN 2011100867215 A CN2011100867215 A CN 2011100867215A CN 201110086721 A CN201110086721 A CN 201110086721A CN 102191817 B CN102191817 B CN 102191817B
Authority
CN
China
Prior art keywords
main
lead
isolating pedestal
shock isolating
subsequent use
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011100867215A
Other languages
English (en)
Other versions
CN102191817A (zh
Inventor
王对山
翁大根
张瑞甫
倪伟波
潘伟峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Darong Construction Group Co ltd
Zhonghe Huafeng Construction Group Co ltd
Original Assignee
DARONG CONSTRUCTION GROUP Co Ltd
HUAFENG CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DARONG CONSTRUCTION GROUP Co Ltd, HUAFENG CONSTRUCTION CO Ltd filed Critical DARONG CONSTRUCTION GROUP Co Ltd
Priority to CN2011100867215A priority Critical patent/CN102191817B/zh
Publication of CN102191817A publication Critical patent/CN102191817A/zh
Application granted granted Critical
Publication of CN102191817B publication Critical patent/CN102191817B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

本发明公开了一种铅芯橡胶隔震支座,它包括主内螺纹套筒(1)、上预埋钢板(3)、上连接钢板(4)、铅芯橡胶隔震支座本体(5)、下连接钢板(6)、下预埋钢板(8)、上扣件(10)、备用内螺纹套筒(11)和主下扣件(12),上扣件(10)与上支墩(2)螺接,上扣件(10)的挂扣(29)与上连接钢板(4)扣紧;下预埋钢板(8)上设有主凸起(17),每个主下扣件(12)的竖板(19)与主凸起(17)螺接,主下扣件(12)的压板(20)压紧在下连接钢板(6)的顶面。该铅芯橡胶隔震支座更换方便。

Description

铅芯橡胶隔震支座
技术领域
本发明涉及建筑物隔震领域,具体讲是一种安装在建筑结构的隔震层中的铅芯橡胶隔震支座。
背景技术
地震会带来巨大破坏,造成人员伤亡和经济损失。为了减缓地震造成的灾害,人们一方面尽可能地增强建筑物的刚度,另一方面人们对建筑物设置隔震设施,用以提高建筑物的抗震、耐震性能。传统的隔震方法一般通过在建筑结构的隔震层中设置铅芯橡胶隔震支座,通过支座中的铅芯吸收、耗散地震能量,阻止地震作用向上传递,以柔克刚,从而达到减弱地震震动的效果。上述的隔震层是指建筑物的上支墩和下支墩之间的空白区域。
现有技术的铅芯橡胶隔震支座是固定在建筑物的上支墩和下支墩之间的,它包括预埋在上支墩内的内螺纹套筒、固定在上支墩底面的上预埋钢板、上连接钢板、铅芯橡胶隔震支座本体、下连接钢板和固定在下支墩顶面的下预埋钢板,上连接钢板、铅芯橡胶隔震支座本体和下连接钢板三者依次固定,上预埋钢板上设有与内螺纹套筒一一对应的上孔,上连接钢板上设有与上孔一一对应的通孔,上连接板通过经通孔、上孔旋合在内螺纹套筒上的竖直向的螺栓(一般为高强度螺栓)与上支墩固定;下支墩顶面设有预留的螺栓孔,下预埋钢板上设有与预留的螺栓孔一一对应的下孔,下连接钢板上设有与下孔一一对应的过孔,下连接板通过经过孔、下孔旋合在预留的螺栓孔上的竖直向的螺栓与下支墩固定。
现有技术的铅芯橡胶隔震支座存在以下缺陷:
一般建筑物的设计年限为五十年甚至五十年以上,而铅芯橡胶隔震支座内的橡胶会逐渐老化,其使用寿命不足五十年,故在建筑物设计年限内,必须更换铅芯橡胶隔震支座,而且,地震也会引起铅芯橡胶隔震支座的损坏,需要对震后建筑物的铅芯橡胶隔震支座进行更换。但由于建筑物的隔震层往往受力不均匀,导致安装在隔震层内的铅芯橡胶隔震支座发生不同程度的变形,进而导致连接隔震支座和上下支墩的竖直向的螺栓弯曲变形,弯曲变形的螺栓会与螺栓孔发生挤压。而一旦螺栓变形,就很难拆卸掉,这就导致铅芯橡胶隔震支座难以更换,螺栓形变严重甚至导致隔震支座无法更换。
发明内容
本发明要解决的技术问题是,提供一种更换方便的铅芯橡胶隔震支座。
本发明的技术解决方案是,提供一种具有以下结构的铅芯橡胶隔震支座,它包括预埋在建筑物的上支墩内的至少四个主内螺纹套筒、固定在上支墩底面的上预埋钢板、上连接钢板、铅芯橡胶隔震支座本体、下连接钢板和固定在建筑物的下支墩顶面的下预埋钢板,上连接钢板、铅芯橡胶隔震支座本体和下连接钢板三者依次固定,上预埋钢板上设有至少四个主上孔,它还包括至少四个上扣件、至少四个预埋在上支墩内的备用内螺纹套筒和至少四个主下扣件,上预埋钢板上还设有至少四个备用上孔,每个上扣件包括一水平板和一挂扣,水平板上设有主通孔,水平板通过经主通孔、主上孔旋合在主内螺纹套筒内的螺栓与上支墩固定,水平板与挂扣连接,挂扣与上连接钢板扣紧;下预埋钢板上设有至少四个主凸起,主凸起上设有水平向的主内孔,每个主下扣件包括一竖板和一压板,压板与竖板连接,竖板上设有水平向的外孔,竖板通过经外孔和主内孔且两端带螺帽的双头螺栓与主凸起固定,压板压紧在下连接钢板的顶面。
采用以上结构后,本发明铅芯橡胶隔震支座与现有技术相比,具有以下优点:
需要更换铅芯橡胶隔震支座时,如果建筑物的隔震层由于受力不均匀,导致安装在隔震层内的铅芯橡胶隔震支座变形,进而导致隔震支座和建筑物的上支墩之间的竖直向的螺栓弯曲变形时,只需要切割掉该螺栓的头部,然后从上往下将上扣件从螺栓的螺杆部滑移出,就能顺利拆卸掉隔震支座和上支墩之间连接;由于水平向的隔震支座和下支墩之间的双头螺栓未变形,故可以正常顺利拆卸掉隔震支座和下支墩之间的连接,这样就完成了整个旧隔震支座的拆卸;再将新的隔震支座与下支墩重新通过双头螺栓连接,再通过经主通孔、备用上孔旋入备用内螺纹套筒的螺栓将隔震支座与上支墩连接,此时就完成了新的隔震支座的安装;综上所述,即使该隔震支座的竖直向螺栓变形,该隔震支座仍能正常更换,故该隔震支座更换方便。
作为改进,每个上扣件包括一水平板、一纵连接板和一横板,水平板、纵连接板和横板依次连接,纵连接板和横板构成挂扣,横板的顶面与上连接钢板的底面抵紧,这样的上扣件能保证与上连接钢板扣紧且该上扣件结构简单,制备方便,节省材料。
作为再改进,上扣接板还包括肋板,肋板位于水平板与纵连接板之间,且肋板、水平板、纵连接板和横板四者为一体,这样,能加大上扣件的强度。
作为进一步改进,每块主下扣件的竖板的顶端与压板的一端连接且竖板和压板为一体,主凸起和下连接钢板之间存在缝隙,这样的主下扣件能保证与下连接钢板扣紧且该主下扣件结构简单,制备方便,节省材料。
作为还改进,预埋在上支墩内的主内螺纹套筒为四个,上预埋钢板上的主上孔为四个,上扣件为四个,这样的结构牢固且简单,制备方便。
作为再进一步改进,备用内螺纹套筒为八个,上预埋钢板上的备用上孔为八个,每个上扣件的水平板上还设有两个备用通孔,这样,更换该隔震支座时,每个上扣件能通过两个经备用通孔、备用上孔旋入备用内螺纹套筒的螺栓固定,故更牢固。
作为还进一步改进,主下扣件为四个,下预埋钢板上的主凸起为四个,这样,能保证隔震支座安装的牢固性且结构简单方便。
作为还再进一步改进,该隔震支座还包括四个与主下扣件结构相同的备用下扣件;下预埋钢板上设有四个备用凸起,每个备用凸起上设有一个水平向的备用内孔,这样,即使出现发生强烈的地震,使得固定隔震支座与下支墩的水平向的双头螺栓也严重变形的情况,只要切割掉主凸起,就能顺利拆卸掉隔震支座和下预埋钢板之间的连接,再将更换好的隔震支座通过备用下扣件与下预埋钢板固定,其中,备用下扣件的竖板通过经备用下扣件的外孔、备用凸起的备用内孔且两端带螺帽的双头螺栓与下预埋钢板的备用凸起固定;综上,即使出现地震导致水平向的双头螺栓严重变形的状况,也仍然能够顺利更换该隔震支座。
最后,上预埋钢板与上连接钢板之间设有一层橡胶垫板,这样,拆卸该隔震支座时,抽出该橡胶垫板后,该隔震支座本体能获得一定的竖直向的移动空间,故拆卸更方便。
附图说明
图1是本发明的铅芯橡胶隔震支座的剖视结构示意图。
图2是图1沿A-A向的剖视结构示意图。
图3是图1沿B-B向的剖视结构示意图。
图4是图1的C部分的放大结构示意图。
图中所示1、主内螺纹套筒,2、上支墩,3、上预埋钢板,4、上连接钢板,5、铅芯橡胶隔震支座本体,6、下连接钢板,7、下支墩,8、下预埋钢板,9、主上孔,10、上扣件,11、备用内螺纹套筒,12、主下扣件,13、备用上孔,14、水平板,15、主通孔,16、螺栓,17、主凸起,18、主内孔,19、竖板,20、压板,21、外孔,22、双头螺栓,23、纵连接板,24、横板,25、肋板,26、备用通孔,27、备用凸起,28、橡胶垫板,29、挂扣,30、备用内孔。
具体实施方式
下面结合附图和具体实施例对本发明作进一步说明。
如图1、图2、图3、图4所示的本发明的铅芯橡胶隔震支座,它包括预埋在建筑物的上支墩2内的四个主内螺纹套筒1、八个预埋在上支墩2内的备用内螺纹套筒11、固定在上支墩2底面的上预埋钢板3、上连接钢板4、铅芯橡胶隔震支座本体5、下连接钢板6、固定在建筑物的下支墩7顶面的下预埋钢板8、四个上扣件10、四个主下扣件12和四个备用下扣件(图中未示出)。上连接钢板4、铅芯橡胶隔震支座本体5和下连接钢板6三者依次固定,上述三者是在工厂中预先焊接固定好的。
上预埋钢板3上设有四个主上孔9和八个备用上孔13。每个上扣件10包括一水平板14和一挂扣29,每个挂扣29由一纵连接板23和一横板24构成。每个水平板14上设有一个主通孔15和两个备用通孔26。水平板14通过经主通孔15、主上孔9旋合在主内螺纹套筒1内的螺栓16与上支墩2固定。水平板14还可以通过经备用通孔26、备用上孔13旋合在备用内螺纹套筒11内的螺栓16与上支墩2固定。水平板14与挂扣29连接,即水平板14、纵连接板23和横板24依次连接。水平板14与纵连接板23之间设有肋板25,且肋板25、水平板14、纵连接板23和横板24四者为一体。挂扣29与上连接钢板4扣紧,即挂扣29的横板24的顶面与上连接钢板4的底面抵紧。
上预埋钢板3与上连接钢板4之间设有一层橡胶垫板28。
下预埋钢板8上设有四个主凸起17和四个备用凸起27。每个主凸起17上设有一个主内孔18;每个备用凸起27上设有一个备用内孔30。每个主下扣件12包括一竖板19和一压板20,压板20与竖板19连接,即竖板19的顶端与压板20的一端连接且竖板19和压板20为一体。竖板19上设有外孔21。竖板19通过经外孔21和主内孔18且两端带螺帽的双头螺栓22与主凸起17固定,压板20压紧在下连接钢板6的顶面。主凸起17和下连接钢板6之间存在缝隙,即主凸起17的内端面和下连接钢板6的侧面之间存在缝隙。
每个备用下扣件与每个主下扣件12结构完全相同,这样,备用下扣件也包括与主下扣件12相同的竖板19和压板20,备用下扣件的竖板19上也设有与主下扣件12相同的外孔。备用下扣件的竖板19能通过经外孔21和备用内孔30且两端带螺帽的双头螺栓22与备用凸起27固定,备用下扣件的压板20能压紧在下连接钢板6的顶面。
本实施例的螺栓16采用高强度螺栓16,本实施例的双头螺栓22采用高强度双头螺栓22。

Claims (9)

1.一种铅芯橡胶隔震支座,它包括预埋在建筑物的上支墩(2)内的至少四个主内螺纹套筒(1)、固定在上支墩(2)底面的上预埋钢板(3)、上连接钢板(4)、铅芯橡胶隔震支座本体(5)、下连接钢板(6)和固定在建筑物的下支墩(7)顶面的下预埋钢板(8),上连接钢板(4)、铅芯橡胶隔震支座本体(5)和下连接钢板(6)三者依次固定,上预埋钢板(3)上设有至少四个主上孔(9),其特征在于:它还包括至少四个上扣件(10)、至少四个预埋在上支墩(2)内的备用内螺纹套筒(11)和至少四个主下扣件(12),上预埋钢板(3)上还设有至少四个备用上孔(13),每个上扣件(10)包括一水平板(14)和一挂扣(29),水平板(14)上设有主通孔(15),水平板(14)通过经主通孔(15)、主上孔(9)旋合在主内螺纹套筒(1)内的螺栓(16)与上支墩(2)固定,水平板(14)与挂扣(29)连接,挂扣(29)与上连接钢板(4)扣紧;下预埋钢板(8)上设有至少四个主凸起(17),主凸起(17)上设有水平向的主内孔(18),每个主下扣件(12)包括一竖板(19)和一压板(20),压板(20)与竖板(19)连接,竖板(19)上设有水平向的外孔(21),竖板(19)通过经外孔(21)和主内孔(18)且两端带螺帽的双头螺栓(22)与主凸起(17)固定,压板(20)压紧在下连接钢板(6)的顶面。
2.根据权利要求1所述的铅芯橡胶隔震支座,其特征在于:每个上扣件(10)包括一水平板(14)、一纵连接板(23)和一横板(24),水平板(14)、纵连接板(23)和横板(24)依次连接,纵连接板(23)和横板(24)构成挂扣(29),横板(24)的顶面与上连接钢板(4)的底面抵紧。
3.根据权利要求2所述的铅芯橡胶隔震支座,其特征在于:上扣件(10)还包括肋板(25),肋板(25)位于水平板(14)与纵连接板(23)之间,且肋板(25)、水平板(14)、纵连接板(23)和横板(24)四者为一体。
4.根据权利要求1所述的铅芯橡胶隔震支座,其特征在于:每块主下扣件(12)的竖板(19)的顶端与压板(20)的一端连接且竖板(19)和压板(20)为一体,主凸起(17)和下连接钢板(6)之间存在缝隙。
5.根据根据权利要求1所述的铅芯橡胶隔震支座,其特征在于:预埋在上支墩(2)内的主内螺纹套筒(1)为四个,上预埋钢板(3)上的主上孔(9)为四个,上扣件(10)为四个。
6.根据根据权利要求1所述的铅芯橡胶隔震支座,其特征在于:预埋在上支墩(2)内的备用内螺纹套筒(11)为八个,上预埋钢板(3)上的备用上孔(13)为八个,每个上扣件(10)的水平板(14)上还设有两个备用通孔(26)。
7.根据根据权利要求1所述的铅芯橡胶隔震支座,其特征在于:主下扣件(12)为四个,下预埋钢板(8)上的主凸起(17)为四个。
8.根据根据权利要求1所述的铅芯橡胶隔震支座,其特征在于:它还包括四个与主下扣件(12)结构相同的备用下扣件;下预埋钢板(8)上还设有四个备用凸起(27),每个备用凸起(27)上设有一个水平向的备用内孔(30)。
9.根据根据权利要求1所述的铅芯橡胶隔震支座,其特征在于:上预埋钢板(3)与上连接钢板(4)之间设有一层橡胶垫板(28)。
CN2011100867215A 2011-03-31 2011-03-31 铅芯橡胶隔震支座 Expired - Fee Related CN102191817B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100867215A CN102191817B (zh) 2011-03-31 2011-03-31 铅芯橡胶隔震支座

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100867215A CN102191817B (zh) 2011-03-31 2011-03-31 铅芯橡胶隔震支座

Publications (2)

Publication Number Publication Date
CN102191817A CN102191817A (zh) 2011-09-21
CN102191817B true CN102191817B (zh) 2012-07-25

Family

ID=44600610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100867215A Expired - Fee Related CN102191817B (zh) 2011-03-31 2011-03-31 铅芯橡胶隔震支座

Country Status (1)

Country Link
CN (1) CN102191817B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174161A (zh) * 2013-03-18 2013-06-26 中天建设集团有限公司 一种基于橡胶混凝土的抗震支墩
CN105443653B (zh) * 2015-11-13 2018-01-19 中国电力科学研究院 一种可拆卸隔震装置
CN110158800A (zh) * 2019-05-23 2019-08-23 福建省方鑫建设工程有限公司 设有泡沫灭火和外展板的节点多重防火构造及其工作方法
CN113982302B (zh) * 2021-10-11 2023-04-18 河北省建筑科学研究院有限公司 一种既有隔震建筑隔震支座无扰动更换施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101603381A (zh) * 2009-02-20 2009-12-16 山东美晨科技股份有限公司 建筑隔震橡胶支座
CN201447661U (zh) * 2009-07-16 2010-05-05 南京工业大学 应用于装配式或预制组装式梁桥的减隔震结构
CN201581345U (zh) * 2009-12-11 2010-09-15 招商局重庆交通科研设计院有限公司 桥梁铅芯橡胶支座滑移组件
CN202023256U (zh) * 2011-03-31 2011-11-02 华丰建设股份有限公司 铅芯橡胶隔震支座

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11324403A (ja) * 1998-05-20 1999-11-26 Taito Kogyo:Kk 免振装置用アンカープレート及びその製造方法
JP4082841B2 (ja) * 2000-01-28 2008-04-30 東海ゴム工業株式会社 ゴム支承体
JP4631274B2 (ja) * 2003-11-28 2011-02-16 オイレス工業株式会社 積層ゴム免震支承装置の取付構造
JP2008014056A (ja) * 2006-07-07 2008-01-24 Nitta Ind Corp 水平支承装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101603381A (zh) * 2009-02-20 2009-12-16 山东美晨科技股份有限公司 建筑隔震橡胶支座
CN201447661U (zh) * 2009-07-16 2010-05-05 南京工业大学 应用于装配式或预制组装式梁桥的减隔震结构
CN201581345U (zh) * 2009-12-11 2010-09-15 招商局重庆交通科研设计院有限公司 桥梁铅芯橡胶支座滑移组件
CN202023256U (zh) * 2011-03-31 2011-11-02 华丰建设股份有限公司 铅芯橡胶隔震支座

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
JP特开2001-208117A 2001.08.03
JP特开2005-163281A 2005.06.23
JP特开2008-14056A 2008.01.24
JP特开平11-324403A 1999.11.26

Also Published As

Publication number Publication date
CN102191817A (zh) 2011-09-21

Similar Documents

Publication Publication Date Title
CN202023256U (zh) 铅芯橡胶隔震支座
US8943777B2 (en) Concrete anchor
CN102191817B (zh) 铅芯橡胶隔震支座
KR20140049413A (ko) 벽체 외장설비
KR101106259B1 (ko) 프리캐스트 콘크리트 패널을 이용한 건물 리모델링 시공 방법 및 프리캐스트 콘크리트 패널 연결구조
CN114482515B (zh) 超高层建筑非标超高楼层的综合附着装置
CN102587529A (zh) 一种用于建筑物抗震的隔振装置
CN114108836A (zh) 一种预埋安装装置及其安装方法
KR101508751B1 (ko) 조적벽체의 보강장치 및 이를 이용한 조적벽체의 보강방법
KR20110007316A (ko) 수평강성이 증대되고 유지보수가 용이한 교좌장치용 앵커부재
CN204282608U (zh) 一种快速安装的楼板结构
CN212001801U (zh) 一种限位组件及预制外墙板的连接结构
CN210459731U (zh) 一种快速安装式组合龙骨
KR101581915B1 (ko) 파스너를 이용한 벽체와 구조물 고정 구조
CN208267159U (zh) 用于连接混凝土墙板的竖向承拉连接组件
US8479460B1 (en) High shear roof deck system
CN206784960U (zh) 下支撑式悬挑卸料平台
KR100818291B1 (ko) 건축용 실내 바닥재
KR20130104946A (ko) 난간 설치용 브래킷
CN201354489Y (zh) 房屋内顶吊棚的固定装置
CN214007724U (zh) 一种锚固件及包含该锚固件的保温结构一体化墙体
CN211421518U (zh) 一种连接组件及包含该组件的预制外墙板的连接结构
CN210032459U (zh) 一种装饰板的锚固组件及锚固结构
JP7432247B2 (ja) 連結具
CN215106079U (zh) 卡扣式连接组件以及装配式连接节点

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20130912

Granted publication date: 20120725

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20140310

Granted publication date: 20120725

RINS Preservation of patent right or utility model and its discharge
PP01 Preservation of patent right

Effective date of registration: 20150511

Granted publication date: 20120725

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20151111

Granted publication date: 20120725

RINS Preservation of patent right or utility model and its discharge
CP03 Change of name, title or address

Address after: Room 2-1004, 558 Danyang Road, Dandong Street, Xiangshan County, Ningbo City, Zhejiang Province

Patentee after: Zhonghe Huafeng Construction Group Co.,Ltd.

Patentee after: DARONG CONSTRUCTION GROUP Co.,Ltd.

Address before: 315709 No.1 Huanhu Road, Dandong Street, Xiangshan County, Ningbo City, Zhejiang Province

Patentee before: ZHONGHE HUAFENG CONSTRUCTION CO.,LTD.

Patentee before: DARONG CONSTRUCTION GROUP Co.,Ltd.

Address after: 315709 No.1 Huanhu Road, Dandong Street, Xiangshan County, Ningbo City, Zhejiang Province

Patentee after: ZHONGHE HUAFENG CONSTRUCTION CO.,LTD.

Patentee after: DARONG CONSTRUCTION GROUP Co.,Ltd.

Address before: No.1017 Jiangnan Road, high tech Zone, Ningbo City, Zhejiang Province

Patentee before: HUAFENG CONSTRUCTION Co.,Ltd.

Patentee before: DARONG CONSTRUCTION GROUP Co.,Ltd.

CP03 Change of name, title or address
CI03 Correction of invention patent

Correction item: Patentee|Address|Patentee

Correct: Huafeng Construction Co.,Ltd.|315040 No. 1017 Jiangnan Road, High-tech Zone, Ningbo City, Zhejiang Province|Darong Construction Group Co.,Ltd.

False: Zhonghe Huafeng Construction Group Co.,Ltd.|315709 Room 2-104, No. 558 Danyang Road, Dandong Street, Xiangshan County, Ningbo City, Zhejiang Province|Darong Construction Group Co.,Ltd.

Number: 09-02

Volume: 37

CI03 Correction of invention patent
TR01 Transfer of patent right

Effective date of registration: 20210330

Address after: Room 2-1004, 558 Danyang Road, Dandong Street, Xiangshan County, Ningbo City, Zhejiang Province

Patentee after: Zhonghe Huafeng Construction Group Co.,Ltd.

Patentee after: DARONG CONSTRUCTION GROUP Co.,Ltd.

Address before: No.1017 Jiangnan Road, high tech Zone, Ningbo City, Zhejiang Province

Patentee before: HUAFENG CONSTRUCTION Co.,Ltd.

Patentee before: DARONG CONSTRUCTION GROUP Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120725

CF01 Termination of patent right due to non-payment of annual fee