CN102190219A - Elevator group management control method and elevator group management control device - Google Patents

Elevator group management control method and elevator group management control device Download PDF

Info

Publication number
CN102190219A
CN102190219A CN2010106232589A CN201010623258A CN102190219A CN 102190219 A CN102190219 A CN 102190219A CN 2010106232589 A CN2010106232589 A CN 2010106232589A CN 201010623258 A CN201010623258 A CN 201010623258A CN 102190219 A CN102190219 A CN 102190219A
Authority
CN
China
Prior art keywords
elevator
mentioned
old
new
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010106232589A
Other languages
Chinese (zh)
Inventor
石村准一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Publication of CN102190219A publication Critical patent/CN102190219A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Elevator Control (AREA)

Abstract

The invention provides an elevator group management control method and an elevator group management control device. The elevator group management control device includes: an old group management control device (2) for managing old elevators; a new group management control device (1) for managing new elevators; and a new/old group management call response control device (3) which assigns boarding-place registering instructions for the new group management control device (1) and the old group management control device (2) according to the service floors of a building set to accept the boarding-place call input of the new elevators or the boarding-place call input of the old elevators, thereby operating the new elevators and the old elevators in different groups, and which, when any one of the new elevators and the old elevators is separated from group management, changes the service layers shared by the separated elevator to be shared by any one of the new elevators and the old elevators other than the separated elevator.

Description

Lift group management control method and controlling apparatus for elevator group manage
Technical field
The present invention relates to group's management control method of operation of the group management control apparatus and the elevator of elevator, specifically, relate in for example renewal construction period of the elevator of group's management, call out the group management control method of the elevator of registering interlock and group's management control rotating device of elevator with using escalator place of many new and old elevators.
Background technology
Have in the cluster management system of many elevators, upgrading construction period, become the state of newly establishing elevator (hereinafter referred to as new elevator) and existing elevator (being called old elevator) mixing existence.Patent documentation 1 discloses the method for many so new and old elevators of control that turn round.
In the patent documentation 1, when newly the using escalator place call button of elevator side is operated,, judges whether and to respond from new group's management-side, and distribute new elevator according to the information of sharing that new group manages the new elevator of sharing the region setting part setting.In addition, when the using escalator place call button of old elevator side is operated,, judges whether and to respond from old group's management-side, and distribute old elevator according to the information of sharing that old group manages the old elevator of sharing the region setting part setting.Thereby, existing elevator cluster management system is not carried out the special transformation and/or the change of processing, be implemented in new and old elevator and mix effective running under the state that exists.
In addition, during in the morning working, the specific crowded occasion of layer of lunch break and quitting time etc., accept the to make a fresh start calling input of using escalator place call button of the using escalator place call button of elevator side or old elevator side, according in advance by the information of sharing that region setting part is set of sharing of each new and old group management control apparatus, give using escalator place calling registering instruction to new group management control apparatus and old group management control apparatus, at certain specified time or according to from exterior switching signal, the running of the new and old elevator of Jiang Duotai switches to the runnings of cutting apart that service layer are divided into 2 group runnings.
Patent documentation 1: TOHKEMY 2006-188296 communique.
Summary of the invention
But traditional many new and old elevators mix in the elevator cluster management system that exists, and owing to dedicated operation (independent operation), the maintenance maintenance of elevator, fault, have number machine of managing separation from the group.This occasion has been set the service that can not accept to manage from the group number machine of separation from the service layer that the group manages number machine of separation by sharing region setting part, the situation that exists the carrying capacity of user in this service layer to reduce.
The present invention proposes in view of the above problems, its objective is the lift group management control method and the controlling apparatus for elevator group manage that provide such, exist when the group manages number machine of separation, change is set by the new elevator of new group management control apparatus operation management or by the zone of sharing of the old elevator of old group management control apparatus operation management, to share other numbers machine from the service layer that the group manages number machine of separation, thereby user's carrying capacity is not significantly turned round with reducing.
Lift group management control method of the present invention carries out group's management control by elevator control gear to the new elevator of newly establishing elevator as the old elevator and the conduct of original elevator,
Above-mentioned elevator control gear possesses: the old group management control apparatus of managing above-mentioned old elevator; Manage the new group management control apparatus of above-mentioned new elevator; And new and old group's administer calls response control apparatus, the service layer that imports the building of setting is called out in its using escalator place of calling out input or above-mentioned old elevator according to using escalator place of accepting above-mentioned new elevator, give using escalator place registering instruction to above-mentioned new group management control apparatus and above-mentioned old group management control apparatus, with above-mentioned new elevator and above-mentioned old elevator group running;
Above-mentioned lift group management control method is characterised in that,
In above-mentioned new elevator and above-mentioned old elevator arbitrary manage when separating from the group, the above-mentioned service layer that the above-mentioned elevator of above-mentioned separation is shared changes to by above-mentioned new elevator beyond the above-mentioned elevator of above-mentioned separation and arbitrary of above-mentioned old elevator and shares.
Controlling apparatus for elevator group manage of the present invention is characterized in that, possesses:
Old group management control apparatus, its management is as the old elevator of original elevator;
New group management control apparatus, its management is as the new elevator of newly establishing elevator; And
New and old group's administer calls response control apparatus, the service layer that imports the building of setting is called out in its using escalator place of calling out input or above-mentioned old elevator according to using escalator place of accepting above-mentioned new elevator, give using escalator place registering instruction to above-mentioned new group management control apparatus and above-mentioned old group management control apparatus, with above-mentioned new elevator and above-mentioned old elevator group running, in above-mentioned new elevator and above-mentioned old elevator arbitrary manage when separating from the group, the above-mentioned service layer that the above-mentioned elevator of above-mentioned separation is shared changes to by above-mentioned new elevator beyond the above-mentioned elevator of above-mentioned separation and arbitrary of above-mentioned old elevator and shares.
According to the present invention, such lift group management control method and controlling apparatus for elevator group manage can be provided, exist when the group manages number machine of separation, change is set by the new elevator of new group management control apparatus operation management or by the zone of sharing of the old elevator of old group management control apparatus operation management, to share other numbers machine from the service layer that the group manages number machine of separation, thereby can make user's carrying capacity significantly not reduce the ground running.
Description of drawings
Fig. 1 is the diagrammatic sketch of example of controlling apparatus for elevator group manage that is used to implement the embodiment 1 of lift group management control method of the present invention.
Fig. 2 is that the diagrammatic sketch of the example of sharing layer of registration is called out by the elevator hall when usual in the embodiment of the invention 1.
Fig. 3 is the diagrammatic sketch of service layer's example of sharing layer after changing in the embodiment of the invention 1.
Fig. 4 is the diagrammatic sketch of example of controlling apparatus for elevator group manage that is used to implement the embodiment 2 of lift group management control method of the present invention.
Fig. 5 is that the diagrammatic sketch of the example of sharing layer of registration is called out by the elevator hall when usual in the embodiment of the invention 2.
Fig. 6 is the diagrammatic sketch of service layer's example of sharing layer after changing in the embodiment of the invention 2.
Fig. 7 is the diagrammatic sketch of example of controlling apparatus for elevator group manage that is used to implement the embodiment 3 of lift group management control method of the present invention.
Fig. 8 is that the diagrammatic sketch of the example of sharing layer of registration is called out by the elevator hall when usual in the embodiment of the invention 3.
Fig. 9 is the diagrammatic sketch of service layer's example of sharing layer after changing in the embodiment of the invention 3.
Label declaration:
1 new group management control apparatus
2 old group management control apparatus
3 new and old groups of administer calls response control apparatus
4 cut apart running switching signal generating unit
5,5B, 5C controlling apparatus for elevator group manage
6 new elevator A machine control desks
7 new elevator B machine control desks
8 old elevator C machine control desks
9 cut apart the running switching signal
10 elevator hall's calling new buttons as using escalator place button
11 call out old button as the elevator hall of using escalator place button
12, registering instruction is called out in 13 using escalator place
The specific embodiment
With reference to the description of drawings embodiment of the invention.
(embodiment 1)
Fig. 1 represents to be used to implement the example of controlling apparatus for elevator group manage of the embodiment 1 of lift group management control method of the present invention.
As shown in Figure 1, controlling apparatus for elevator group manage 5 possesses new group management control apparatus 1, old group management control apparatus 2, new and old group's administer calls response control apparatus 3 and cuts apart running switching signal generating unit 4.
New group management control apparatus 1, old group management control apparatus 2 and cut apart running switching signal generating unit 4 and be electrically connected with new and old group's administer calls response control apparatus 3.The running control of new elevator is carried out by new group management control apparatus 1.The running control of old elevator is carried out by old group management control apparatus 2.That is, among the embodiment 1 of Fig. 1, for example 2 new elevator A machine control desks 6 and new elevator B machine control desk 7 are controlled to be the calling of the new group management control apparatus 1 of response, and 1 Geju City elevator C machine control desk 8 is controlled to be the calling of the old group management control apparatus 2 of response.In addition, Fig. 1 " EL " expression elevator.
The running switching signal generating unit 4 of cutting apart shown in Figure 1, the automatically switching operation that can be undertaken by for example timer, the rush hours at certain specific elevator, when being specially the working in morning for example, lunch break, the period when coming off duty etc., give to new and old group's administer calls response control apparatus 3 and to cut apart running switching signal 9.Perhaps, cut apart running switching signal generating unit 4 can by for example building gerentocratic manually carry out arbitrarily from exterior blocked operation, when the working in for example morning, lunch break, when the elevator when coming off duty etc. is crowded, gives to new and old group's administer calls response control apparatus 3 and to cut apart running switching signal 9.
As shown in Figure 1, new group management control apparatus 1 with call out new button 10 as the elevator hall (hall) of using escalator place (take advantage of) button and be electrically connected.Old group management control apparatus 2 with call out old button 11 as the elevator hall of using escalator place button and be electrically connected.Call out elevator hall's calling incoming signal of new button 10 and import new group management control apparatus 1 elevator hall of elevator, and import new and old group's administer calls response control apparatus 3.In addition, call out elevator hall's calling incoming signal of old button 11 and import old group management control apparatus 2 elevator hall, and import new and old group's administer calls response control apparatus 3.In addition, the elevator hall is also referred to as using escalator place, and for example call out and is also referred to as using escalator place calling the elevator hall.
Incoming signal is called out by the elevator hall that sends the using escalator place button of the using escalator place button of the elevator of making a fresh start or old elevator the user, undertaken after the elevator hall calls out registration by the user, new and old group's administer calls response control apparatus 3 switches to send that registering instruction 12 is called out in using escalator place and switch to old group management control apparatus 2 to new group management control apparatus 1 to be sent using escalator place and calls out registering instruction 13.Like this, the service layer that new and old group's administer calls response control apparatus 3 makes any response of new and old group's administer calls response control apparatus 3 interior predefined new elevators or old elevator or new and old elevator two sides carry out elevator hall's calling registration to elevator, at above-mentioned certain specified time or according to the switching signal 9 that turns round of cutting apart, switch to the action of turning round of cutting apart that the above-mentioned new and old elevator of Jiang Duotai is divided into 2 group runnings from exterior switching.
The example of sharing layer of registration is called out by elevator hall when Fig. 2 represents the embodiment of the invention 1 usual.
Among Fig. 2, when 3 new and old elevators of total of having represented 5 pairs of new elevator A machine control desks 6 of controlling apparatus for elevator group manage shown in Figure 1, new elevator B machine control desk 7 and old elevator C machine control desk 8 carried out group management control, the example of sharing layer of registration was called out by the elevator hall when usual.Be meant when this is usual, except a large amount of users utilize crowded the time, for example morning working the time, lunch break, elevator when coming off duty etc. be crowded crowded period, the period that fewer user utilizes.
Fig. 2 has represented elevator hall's calling registration figure example, after the registration of carrying out calling out input in this elevator hall import elevator hall's calling by the user, make arbitrary of two sides of predefined new elevators in the new and old group administer calls response control apparatus 3 or old elevator or new and old elevator, response has carried out calling out the service layer of registration to elevator.Leg-of-mutton mark up and down shown in Figure 2 represents whether certain new and old elevator responds the layer of sharing that registration is called out by the elevator hall.▲ mark is represented the calling of the escalator up Room,
Figure BSA00000412629300061
Mark is represented the calling of the descending elevator Room.Also use among other each embodiment of explanation after leg-of-mutton being marked at up and down.
Building shown in Figure 2 is 1 layer to 20 layers a high-rise, and call out the old elevator C machine control desk 8 of calling out old button 11 in the new elevator A machine control desk 6 of new button 10, new elevator B machine control desk 7 and elevator hall and carries out the elevator hall and call out registration and share the elevator hall.
As shown in Figure 2,1 layer, 10 layers and 20 layers is all layers of response of new and old elevator.2 floor~9 floor and 11 floor~16 floor are layers of new elevator A machine control desk 6 and new elevator B machine control desk 7 responses.17 floor~19 floor are layers of old elevator C machine control desk 8 responses.
For example, in 1 layer, press the elevator hall and call out new button 10, press the elevator hall and call out old button 11, all can make new and old elevator is that new elevator A machine control desk 6, new elevator B machine control desk 7 and old elevator C machine control desk 8 arbitrary responds and make car (taking car) come 1 layer.This situation 10 layers and 20 layers too.
In 6 layers, press the elevator hall and call out old button 11, press the elevator hall and call out new button 10, all can make new elevator A machine control desk 6 and 7 responses of new elevator B machine control desk, make car come 6 layers.This situation 2 layers~9 layers and 11 layers~16 layers too.
In 19 layers, press the elevator hall and call out new button 10, press the elevator hall and call out old button 11, all can make old elevator C machine control desk 8 responses, make car come 19 layers.This situation 17 layers and 18 layers too.
Then, with reference to Fig. 1~Fig. 3, the lift group management control method of controlling apparatus for elevator group manage 5 is described.
Explanation is called out the occasion that registration is shared in elevator hall when usual shown in Figure 2, and for example the old elevator C machine control desk 8 of Fig. 1 becomes the situation of managing the state of separation from the group because of the mainteinance repair and/or the fault of dedicated operation (being also referred to as independent operation), elevator.Under this situation, 17 floor~19 floor are service layers of old elevator C machine control desk 8, and therefore, even call out the registration elevator hall, new elevator A machine control desk 6 and new elevator B machine control desk 7 do not respond yet, so user's carrying capacity reduces.
Thereby, for the reduction of the carrying capacity that prevents the user in above-mentioned 17 layers~19 layers,, sets the service layer that old group manages as by the data beyond the service layer that shares new group's management that region setting part sets of new group management control apparatus 1.
The old elevator C machine control desk 8 of old group management control apparatus 2 management of Fig. 1 becomes the mainteinance repair of dedicated operation (independent operation), elevator, the occasion of fault, by the group being managed the separation signal 14 new group management control apparatus 1 of input and new and old group's administer calls response control apparatus 3, to new group management control apparatus 1 and the new and old group of situations that administer calls response control apparatus 3 notifies old elevator C machine control desk 8 to separate from controlling apparatus for elevator group manage 5 by old elevator C machine control desk 8.
The registration figure is called out by Fig. 3 presentation services layer elevator hall after changing.After the new group management control apparatus 1 of Fig. 1 and the new and old group's administer calls response control apparatus 3 input group management separation signals 14, as shown in Figure 3, according in advance by the data of sharing the zone of sharing the old group management control apparatus 2 that region setting part sets of new group management control apparatus 1, change the service layer of new elevator B machine control desk 7, share by new elevator B machine control desk 7 so that the service layer of old elevator C machine control desk 8 is 17 floor~19 floor.Like this, service layer shown in Figure 3 calls out elevator hall after changing in the registration figure, and new elevator B machine control desk 7 continuation are called out regional i.e. 17 layers~19 layers the elevator hall of sharing of old elevator C machine control desk 8 and responded.
Among the invention described above embodiment 1, even old elevator C machine control desk 8 is from controlling apparatus for elevator group manage 5 separation and can't respond the service layer that old elevator C machine control desk 8 is shared, also can respond by replacing old elevator C machine control desk 8 by new elevator B machine control desk 7, the carrying capacity ground that can significantly not reduce the user turns round.
In addition, as mentioned above, the service layer that old elevator C machine control desk 8 is shared is shared by new elevator B machine control desk 7, is still shared also by new elevator A machine control desk 6 obtaining same effect.
Then, with reference to Fig. 4~Fig. 9 other embodiment 2 and embodiment 3 of the present invention is described.When the inscape of controlling apparatus for elevator group manage 5B, the 5C of these embodiment 2,3 and the inscape of controlling apparatus for elevator group manage shown in Figure 15 are same, use same numeral and adopt its explanation.
(embodiment 2)
The embodiment 2 of lift group management control method of the present invention then, is described with reference to Fig. 4~Fig. 6.
Fig. 4 represents to be used to implement the example of controlling apparatus for elevator group manage of the embodiment 2 of lift group management control method of the present invention.Fig. 5 represents in the embodiment of the invention 2 that the elevator hall when usual calls out the example of sharing layer of registration.Fig. 6 represents the service layer's example of sharing layer after changing in the embodiment of the invention 2.
Fig. 4 represents controlling apparatus for elevator group manage 5B, 2 Geju City elevator A machine control desks 16 and old elevator B machine control desk 17 are controlled to be the calling of the old group management control apparatus 2 of response controlling apparatus for elevator group manage 5B, and a new elevator C machine control desk 18 is controlled to be the calling of the new group management control apparatus 1 of response controlling apparatus for elevator group manage 5B.Old group management control apparatus 2 is called out old button 11 and 2 Geju City elevator A machine control desks 16 and old elevator B machine control desk 17 with the elevator hall and is electrically connected, and new group management control apparatus 1 calls out new button 10 with the elevator hall and 1 new elevator C machine control desk 18 is electrically connected.Like this, it is corresponding that old button 11 is called out by 2 old elevators and elevator hall, and it is corresponding that new button 10 is called out by 1 new elevator and elevator hall.
In embodiment illustrated in fig. 42, after new elevator C machine control desk 18 is managed the state of separation because of dedicated operation (independent operation), the mainteinance repair of elevator, fault become from the group, as shown in Figure 5,17 floor~19 floor are service layers of new elevator C machine control desk 18, even therefore call out user's registration elevator hall, 2 Geju City elevator A machine control desks 16 and old elevator B machine control desk 17 do not respond yet, so user's carrying capacity reduces.
Thereby, reduction for the carrying capacity that prevents the user in 17 layers~19 layers, new elevator C machine control desk 18 at Fig. 4 becomes the mainteinance repair of dedicated operation (independent operation), elevator, the occasion of fault, by the group being managed the separation signal 14 old group management control apparatus 2 of input and new and old group's administer calls response control apparatus 3, to old group management control apparatus 2 and the new and old group of situations that administer calls response control apparatus 3 notifies new elevator C machine control desk 18 to separate from controlling apparatus for elevator group manage 5 by new elevator C machine control desk 18.
After new and old group's administer calls response control apparatus 3 input group management separation signals 14, according to the data of sharing the zone of sharing the new group management control apparatus 1 that region setting part sets by new and old group administer calls response control apparatus 3, change the service layer of new elevator C machine control desk 18, to be state after changing shown in Figure 6, so that the service layer of new elevator C machine control desk 18 shares old elevator B machine control desk 17 from the Status Change when usual shown in Figure 5.Like this, in the service layer shown in Figure 6 example of sharing layer after changing, call out and respond the elevator hall that old elevator B machine control desk 17 continuation are called out new button 10 to regional i.e. 17 layers~19 layers the elevator hall of sharing of new elevator C machine control desk 18.
Among the invention described above embodiment 2, even new elevator C machine control desk 18 is from controlling apparatus for elevator group manage 5 separation and can't respond the service layer that new elevator C machine control desk 18 is shared, also can respond, turn round in the mode that can significantly not reduce user's carrying capacity by replacing new elevator C machine control desk 18 by old elevator B machine control desk 17.
In addition, as mentioned above, the service layer that new elevator C machine control desk 18 is shared is shared by old elevator B machine control desk 17, is still shared also by old elevator A machine control desk 16 obtaining same effect.
(embodiment 3)
Then, with reference to Fig. 7~Fig. 9 the embodiment of the invention 3 is described.
Fig. 7 is the example of controlling apparatus for elevator group manage that is used to implement the embodiment 3 of lift group management control method of the present invention.Fig. 8 represents in the embodiment of the invention 3 that the elevator hall when usual calls out the example of sharing layer of registration.Fig. 9 represents the service layer's example of sharing layer after changing in the embodiment of the invention 3.
Fig. 7 has represented controlling apparatus for elevator group manage 5C, and expression has been updated to not shown old elevator A machine control desk from the formation of initial 3 old elevators the state of new elevator A machine control desk 25.Finally, be new elevator further according to the order update all of old elevator B machine control desk 26, old elevator C machine control desk 27.
Old elevator separation signal 28 shown in Figure 7 is connected electrically to old group management control apparatus 2 and new and old group's administer calls response control apparatus 3 from old elevator B machine control desk 26.Old elevator separation signal 28 old elevator B machine control desk 26 not from controlling apparatus for elevator group manage 5C separate common the time voltage is arranged, but under the state that separates from controlling apparatus for elevator group manage 5C, becoming no-voltage signal.
Set according to the new elevator of controlling apparatus for elevator group manage 5C management and the definite elevator hall's calling registration figure of platform percentage of old elevator at new and old group's administer calls response control apparatus 3 of Fig. 7.The platform percentage of new elevator and old elevator changes in the renewal process of implementing new elevator.In the state of Fig. 7, the platform percentage of new elevator and old elevator is 1: 2, is 2: 1 then, is changed to 3: 0 again.
Thereby, at new and old group's administer calls response control apparatus 3,, preestablish Fig. 8 and a plurality of elevator halies' calling registration figures shown in Figure 9 according to the assembly drawing figurate number of new elevator and old elevator in the reproducting periods.
As shown in Figure 7, old elevator separation signal 28 is connected to new and old group's administer calls response control apparatus 3 from old elevator B machine control desk 26.By old elevator B machine control desk 26 is updated to new elevator, this old elevator separation signal 28 is removed, and becomes no-voltage.Like this, new and old group's administer calls response control apparatus 3 has not had the input of old elevator separation signal 28, thereby, judge that old elevator B machine control desk 26 upgrades for new elevator, identify new and old group's administer calls response control apparatus 3 and constitute by 2 new elevators and 1 old elevator.
And, new and old group's administer calls response control apparatus 3 can be according to the platform percentage of these 2 new elevators and 1 old elevator, select predefined a plurality of elevator halies to call out the registration figure, with sharing of the service layer of new elevator and old elevator from the Status Change of Fig. 8 state for Fig. 9.
Promptly, 1 occasion that is updated to new elevator in 3 formations, form the new elevator A machine control desk 25 that upgrades by new group management control apparatus 1 control old elevator B machine control desk 26 and old elevator C machine control desk 27 by the situation of old group management control apparatus 2 controls.Therefore new elevator A machine control desk 25, is compared with other old elevator B machine control desks 26 and old elevator C machine control desk 27 with 1 isolated operation, can effectively move the few side of distribution that call out the elevator hall.Therefore, new elevator is 1 a occasion, is redefined for to distribute few elevator hall to call out the registration figure.Call out to the more elevator hall of old allocation of elevators that forms the group's management formation that effectively to move 2.
After old elevator B machine control desk 26 is updated to new elevator, new elevator becomes group's management formation of 2, therefore move control as Fig. 9, call out the registration figure in the mode of calling out from a plurality of elevator halies of registration in advance and select to the many elevator halies of new allocation of elevators.
In the above-mentioned example, 3 formation has been described, but in 4 formations under the such state of 2 new elevators and 2 old elevators, compare with old group management control apparatus 2, new group management control apparatus 1 can more effectively move by development of technology in general, therefore, be set to the many elevator hall's callings of the new allocation of elevators of new group management control apparatus 1 control.
Among the invention described above embodiment 3, even be updated to the situation of carrying out of new elevator owing to old elevator the platform percentage of new elevator and old elevator is changed, also needn't change in new and old group's administer calls response control apparatus 3 predefined elevator halies and call out the registration figure, the registration figure is called out by the elevator hall automatically becomes optimum figure according to the situation of carrying out of upgrading construction, and has realized the efficient activity of constructing operation.
Lift group management control method of the present invention, by possessing the existing elevator of management is the old group management control apparatus of old elevator, manage and newly establish new group management control apparatus that elevator is new elevator and the service layer that imports the building of setting according to the using escalator place calling of the using escalator place calling input of accepting above-mentioned new elevator or above-mentioned old elevator, give using escalator place registering instruction to above-mentioned new group management control apparatus and above-mentioned old group management control apparatus, elevator control gear with new and old group's administer calls response control apparatus of above-mentioned new elevator and the running of above-mentioned old elevator group, above-mentioned new elevator and above-mentioned old elevator are carried out group's management control, it is characterized in that, in above-mentioned new elevator and above-mentioned old elevator arbitrary manage when separating from the group, the above-mentioned service layer that the above-mentioned elevator of above-mentioned separation is shared changes to by above-mentioned new elevator beyond the above-mentioned elevator of above-mentioned separation and arbitrary of above-mentioned old elevator and shares.By above-mentioned formation, there is the occasion of managing number machine of separation from the group, change is set by the zone of sharing of the old elevator of the new elevator of new group management control apparatus operation management or old group management control apparatus operation management, make from the service layer that the group manages number machine of separation and share, thereby the carrying capacity ground that can not can significantly reduces the user turns round by other numbers machine.
In the lift group management control method of the present invention, 1 of above-mentioned old elevator or many manage when separating from the group, and 1 or many of changing to by above-mentioned new elevator of the above-mentioned service layer that the above-mentioned old elevator of above-mentioned separation is shared shares.By above-mentioned formation, in upgrading construction, when old elevator was managed separation from the group, the service layer that this old elevator is shared was shared by new elevator, and the carrying capacity ground that therefore can not can significantly reduces the user turns round.
In the lift group management control method of the present invention, 1 of above-mentioned new elevator or many manage when separating from the group, and 1 or many of changing to by above-mentioned old elevator of the above-mentioned service layer that the above-mentioned new elevator of above-mentioned separation is shared shares.By above-mentioned formation, in upgrading construction, new elevator is managed when separating from the group, and the service layer that this new elevator is shared can be shared by old elevator, and the carrying capacity ground that therefore can not can significantly reduces the user turns round.
In the lift group management control method of the present invention, when above-mentioned old elevator separates, separation signal according to the above-mentioned new and old group's administer calls response control apparatus of input, judge the platform percentage of above-mentioned new elevator and above-mentioned old elevator, according to above-mentioned percentage, call out the above-mentioned service layer that registration above-mentioned new elevator of figure selecting and above-mentioned old elevator are shared from a plurality of elevator halies that set at above-mentioned new and old group's administer calls response control apparatus.By above-mentioned formation, in upgrading construction, can share service layer according to the platform percentage of new elevator and old elevator, the carrying capacity ground that therefore can not can significantly reduces the user turns round.
Controlling apparatus for elevator group manage of the present invention is characterized in that, possesses: the existing elevator of management is the old group management control apparatus of old elevator; The new group management control apparatus that elevator is new elevator is newly established in management; And new and old group's administer calls response control apparatus, the service layer that imports the building of setting is called out in its using escalator place of calling out input or above-mentioned old elevator according to using escalator place of accepting above-mentioned new elevator, give using escalator place registering instruction to above-mentioned new group management control apparatus and above-mentioned old group management control apparatus, with above-mentioned new elevator and above-mentioned old elevator group running, in above-mentioned new elevator and above-mentioned old elevator arbitrary manage when separating from the group, the above-mentioned service layer that the above-mentioned elevator of above-mentioned separation is shared changes to by above-mentioned new elevator beyond the above-mentioned elevator of above-mentioned separation and arbitrary of above-mentioned old elevator and shares.By above-mentioned formation, there is the occasion of managing number machine of separation from the group, change is set by the zone of sharing of the old elevator of the new elevator of new group management control apparatus operation management or old group management control apparatus operation management, make from the service layer that the group manages number machine of separation and share, thereby the carrying capacity ground that can not can significantly reduces the user turns round by other numbers machine.
The invention is not restricted to the foregoing description.
In the illustrated example, having illustrated that elevator group control device of the present invention is the example of 3 new and old elevators, but be not limited thereto, for example, also can be the situation with the new and old elevator more than 4.
And, can form various inventions by the disclosed a plurality of inscapes of the suitable combination embodiment of the invention.For example, also can delete several inscapes from whole inscapes of embodiment of the invention explanation.And the inscape of different embodiment also can suit to make up.

Claims (5)

1. a lift group management control method carries out group's management control by elevator control gear to the new elevator of newly establishing elevator as the old elevator and the conduct of original elevator,
Above-mentioned elevator control gear possesses: the old group management control apparatus of managing above-mentioned old elevator; Manage the new group management control apparatus of above-mentioned new elevator; And new and old group's administer calls response control apparatus, the service layer that imports the building of setting is called out in its using escalator place of calling out input or above-mentioned old elevator according to using escalator place of accepting above-mentioned new elevator, give using escalator place registering instruction to above-mentioned new group management control apparatus and above-mentioned old group management control apparatus, with above-mentioned new elevator and above-mentioned old elevator group running;
Above-mentioned lift group management control method is characterised in that,
In above-mentioned new elevator and above-mentioned old elevator arbitrary manage when separating from the group, the above-mentioned service layer that the above-mentioned elevator of above-mentioned separation is shared changes to by above-mentioned new elevator beyond the above-mentioned elevator of above-mentioned separation and arbitrary of above-mentioned old elevator and shares.
2. the described lift group management control method of claim 1 is characterized in that,
Manage when separating from the group 1 of above-mentioned old elevator or many, 1 or many of changing to by above-mentioned new elevator of the above-mentioned service layer that the above-mentioned old elevator of above-mentioned separation is shared shares.
3. the described lift group management control method of claim 1 is characterized in that,
Manage when separating from the group 1 of above-mentioned new elevator or many, 1 or many of changing to by above-mentioned old elevator of the above-mentioned service layer that the above-mentioned new elevator of above-mentioned separation is shared shares.
4. the described lift group management control method of claim 1 is characterized in that,
When above-mentioned old elevator separates, separation signal according to the above-mentioned new and old group's administer calls response control apparatus of input, judge the platform percentage of above-mentioned new elevator and above-mentioned old elevator, according to above-mentioned percentage, call out the above-mentioned service layer that registration above-mentioned new elevator of figure selecting and above-mentioned old elevator are shared from a plurality of elevator halies that set at above-mentioned new and old group's administer calls response control apparatus.
5. controlling apparatus for elevator group manage is characterized in that possessing:
Old group management control apparatus, its management is as the old elevator of original elevator;
New group management control apparatus, its management is as the new elevator of newly establishing elevator; And
New and old group's administer calls response control apparatus, the service layer that imports the building of setting is called out in its using escalator place of calling out input or above-mentioned old elevator according to using escalator place of accepting above-mentioned new elevator, give using escalator place registering instruction to above-mentioned new group management control apparatus and above-mentioned old group management control apparatus, with above-mentioned new elevator and above-mentioned old elevator group running, in above-mentioned new elevator and above-mentioned old elevator arbitrary manage when separating from the group, the above-mentioned service layer that the above-mentioned elevator of above-mentioned separation is shared changes to by above-mentioned new elevator beyond the above-mentioned elevator of above-mentioned separation and arbitrary of above-mentioned old elevator and shares.
CN2010106232589A 2010-03-17 2010-12-28 Elevator group management control method and elevator group management control device Pending CN102190219A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP060383/2010 2010-03-17
JP2010060383A JP2011195209A (en) 2010-03-17 2010-03-17 Method and device for group supervisory control of elevators

Publications (1)

Publication Number Publication Date
CN102190219A true CN102190219A (en) 2011-09-21

Family

ID=44599242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010106232589A Pending CN102190219A (en) 2010-03-17 2010-12-28 Elevator group management control method and elevator group management control device

Country Status (2)

Country Link
JP (1) JP2011195209A (en)
CN (1) CN102190219A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107055233A (en) * 2015-09-25 2017-08-18 奥的斯电梯公司 Elevator assemblies separate guarantee system and operating method
CN113795449A (en) * 2019-05-14 2021-12-14 三菱电机株式会社 Elevator renovating method and car equipment controller

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6958978B2 (en) * 2019-12-09 2021-11-02 東芝エレベータ株式会社 Elevator control device and elevator control method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04266368A (en) * 1990-12-21 1992-09-22 Mitsubishi Electric Corp Control of group management elevator
JP2001019288A (en) * 1999-07-07 2001-01-23 Mitsubishi Electric Building Techno Service Co Ltd Renewal system for elevator of group supervisory operation system
JP2005247569A (en) * 2004-03-08 2005-09-15 Toshiba Elevator Co Ltd Group supervision renewal operation control system
JP2006188296A (en) * 2004-12-28 2006-07-20 Toshiba Elevator Co Ltd Elevator group supervisory control system
JP2006264844A (en) * 2005-03-23 2006-10-05 Toshiba Elevator Co Ltd Group supervisory operation system for elevator
JP2006264888A (en) * 2005-03-24 2006-10-05 Toshiba Elevator Co Ltd Elevator group control system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5874474A (en) * 1981-10-26 1983-05-04 株式会社東芝 Controller for elevator

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04266368A (en) * 1990-12-21 1992-09-22 Mitsubishi Electric Corp Control of group management elevator
JP2001019288A (en) * 1999-07-07 2001-01-23 Mitsubishi Electric Building Techno Service Co Ltd Renewal system for elevator of group supervisory operation system
JP2005247569A (en) * 2004-03-08 2005-09-15 Toshiba Elevator Co Ltd Group supervision renewal operation control system
JP2006188296A (en) * 2004-12-28 2006-07-20 Toshiba Elevator Co Ltd Elevator group supervisory control system
JP2006264844A (en) * 2005-03-23 2006-10-05 Toshiba Elevator Co Ltd Group supervisory operation system for elevator
JP2006264888A (en) * 2005-03-24 2006-10-05 Toshiba Elevator Co Ltd Elevator group control system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107055233A (en) * 2015-09-25 2017-08-18 奥的斯电梯公司 Elevator assemblies separate guarantee system and operating method
CN113795449A (en) * 2019-05-14 2021-12-14 三菱电机株式会社 Elevator renovating method and car equipment controller
CN113795449B (en) * 2019-05-14 2023-03-31 三菱电机株式会社 Elevator renovating method and car equipment controller

Also Published As

Publication number Publication date
JP2011195209A (en) 2011-10-06

Similar Documents

Publication Publication Date Title
CN103935850B (en) Elevator group controlling partition method, elevator multiple control device and system
CN102190219A (en) Elevator group management control method and elevator group management control device
CN100482559C (en) Building with multi-deck elevator, control system therefor, and multi-deck elevator
CN105392725B (en) Calling allocation method, group controller, elevator group and executable application
CA2472532A1 (en) Method for controlling an elevator installation operated with zoning and an elevator installation
CN102126652A (en) Group management control device of elevator with disaster escaping operation function in fire disaster and method thereof
WO2013012406A1 (en) Elevator system fixtures and server for controlling the fixtures
US20180257906A1 (en) Control method for an elevator control system
CN106348111A (en) Target storey management system and control method
JP2008024413A (en) Elevator group supervisory controller
DE112013007440T5 (en) winder
DE112015006603T5 (en) Elevator control device
CN103338239A (en) Distributed call-center system and seat control method thereof
CN103534189B (en) Elevator control device
JP2005247569A (en) Group supervision renewal operation control system
JP6434115B1 (en) Platform operation panel and control method
CN106185501A (en) Elevator device
JP2010195532A (en) Group supervisory control device for elevator and group supervisory control operating method for elevator
CN104030114A (en) Group management and control device of elevator
CN104512775B (en) Elevator group management apparatus and eleva-tor bank management control method
CN107265211A (en) Lift facility
JP2639265B2 (en) Multi-group control system for elevators
CN101844714A (en) Interconnecting cluster control system of elevator
JPH02117571A (en) Renewal method for group management elevator
KR20110032031A (en) In-house colling button of elevator group control system and control method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110921