CN102189134B - Spiral guide drainage device in cooling after rolling process of ultra-wide ultra-thick hot-rolled plate coil - Google Patents
Spiral guide drainage device in cooling after rolling process of ultra-wide ultra-thick hot-rolled plate coil Download PDFInfo
- Publication number
- CN102189134B CN102189134B CN 201110136069 CN201110136069A CN102189134B CN 102189134 B CN102189134 B CN 102189134B CN 201110136069 CN201110136069 CN 201110136069 CN 201110136069 A CN201110136069 A CN 201110136069A CN 102189134 B CN102189134 B CN 102189134B
- Authority
- CN
- China
- Prior art keywords
- rolled plate
- stream guidance
- spiral stream
- hot rolled
- spiral
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Metal Rolling (AREA)
Abstract
The invention discloses a spiral guide drainage device in the cooling after rolling process of an ultra-wide ultra-thick hot-rolled plate coil. The device comprises a frame, a power part and a drainage part driven by the power part, wherein the drainage part comprises an upper spiral roller which spans a hot-rolled plate, is positioned on the upper surface of the hot-rolled plate and is provided with spiral guide grooves, and a lower flat roller which is positioned on the lower surface of the hot-rolled plate and corresponds to the upper spiral roller; the left and right spiral guide grooves formed on the upper spiral roller are symmetrically distributed along the center of a roller body, and the spiral lines of the spiral guide grooves rotate outwards when the spiral guide grooves move forwards with the hot-rolled plate; the upper spiral roller and the lower flat roller are driven by a motor and a reduction box thereof; the upper part of the upper spiral roller is provided with a hydraulic screw down mechanism for controlling the position of the upper spiral roller; the upper spiral roller and the lower flat roller are driven by the two synchronous same-speed output shafts of the reduction box driven by one motor; and the rotating speeds of the upper spiral roller and the lower flat roller are consistent with the speed of strip steel.
Description
Technical field
The present invention relates to cooling procedure spiral stream guidance drainage arrangement after a kind of super wide super thick hot rolled plate rolling, belong to the hot rolling technical field, particularly the removal technology of coiled sheet remained on surface cooling water after the hot rolled plate rolling.
Background technology
In the production process of hot-rolled sheet coil, obtain higher economic benefit in order to improve the quality of products, obtain excellent mechanical performances, after rolling, generally adopted cooling facility for laminar flow to cool off.But in the cooling procedure of super wide ultra-thick plate volume, because the plate face is super wide super thick, original side-blown method and apparatus can not purge the coiled sheet surface clean, usually can cause super wide ultra-thick plate volume remained on surface that cooling water is arranged.General cooling water segregation produces plate shape and the unequal problem of mechanical property in the middle of the plate face.Particularly hot rolling manufacturing enterprise transforms cooling facility for laminar flow, adopts ultrafast refrigeration technique.Because the application of ultrafast refrigeration technique, the cooling hourly water consumption strengthens.The problems such as it is clean to adopt at present the water discharge method such as side spray purging and device more water residual on the steel plate can not be purged, and the plate shape wooden dipper that brings is bent, the mechanical property uniformity of steel plate is relatively poor are more outstanding.Therefore, the drainage problem of super wide super thick hot-rolled sheet coil remained on surface water is badly in need of solving.
Summary of the invention
The objective of the invention is cooling procedure spiral stream guidance drainage arrangement after a kind of super wide super thick hot rolled plate rolling, solve water discharge methods such as adopting at present the side spray purging and device and water residual on the steel plate can not be purged the problems such as the plate shape wooden dipper that totally bring mechanical property uniformity bent, steel plate is relatively poor.
Technical scheme of the present invention: cooling procedure spiral stream guidance drainage arrangement comprises frame, power section and by the water discharging part of its driving after the super wide super thick hot rolled plate rolling of the present invention, water discharging part comprise across hot rolled plate, be positioned at the hot rolled plate upper surface with the upper propellers of spiral stream guidance groove and be positioned at the hot rolled plate lower surface lower plain-barreled roll corresponding with upper propellers; The left-and-right spiral guiding gutter that has on the upper propellers is symmetric along body of roll center, and when hot rolled strip was carried out drain measure, its helix direction of rotation of spiral stream guidance groove was outside, and the residual water on the hot rolled strip is discharged to the two ends of propellers; The two ends of upper propellers and lower plain-barreled roll are installed on the frame by first pair and second pair of axle bed respectively, and propellers and lower plain-barreled roll are driven by motor and reduction box thereof.
First pair of axle bed periphery of described upper propellers is square frames, and square frame is positioned at the chute of frame, and square frame top is connected with the output of hydraulic mechanism.
The angle β of the axis of described spiral stream guidance groove and upper propellers=30 °~60 °, preferred angle β=45 °.
Described spiral stream guidance groove be width 10~50mm, the degree of depth of spiral stream guidance groove is 10~50mm.
The pitch L of described spiral stream guidance groove is 30~100mm.
Described upper propellers and lower plain-barreled roll are driven by two of a driven by motor reduction box synchronous, synchronized output shafts.The rotating speed of described upper propellers and lower plain-barreled roll is consistent with strip speed.The roll surface speed of namely going up propellers and lower plain-barreled roll equals strip speed.
The selection normal steel casting of the body of roll material of described upper propellers and lower plain-barreled roll.
Advantage of the present invention: the present invention discharges residual water water conservancy diversion on the cooled plate face of hot-rolled sheet coil by suitable groove depth and groove width, can the upper residual a large amount of cooling water water water conservancy diversion of super wide ultra-thick plate volume in the cooling procedure are clean, not only improve the mechanical property of hot-rolled sheet coil, and solved the bent plate shape poor that produces of steel plate wooden dipper that residual water causes.
Upper propellers and lower plain-barreled roll body of roll material can adopt normal steel casting, and the hot rolling slab speed of service of upper propellers and lower plain-barreled roll speed and production is consistent the blemish such as scuffing that can avoid the body of roll and belt steel surface to produce because of relative sliding.
Upper propellers can pass through according to the thickness of the hot-rolled sheet coil of producing the holding-down device of hydraulic on it, the spacing between adjustment and the lower plain-barreled roll.When having detected hot-rolled sheet coil and pass through, holding-down device of hydraulic moves down propellers, makes itself and lower plain-barreled roll closely press hot rolled strip, guarantees that the residual water on the plate face can discharge by helicla flute.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is the A-A view of Fig. 1.
Fig. 3 is that the present invention is at the mounting arrangements schematic diagram of cooling section.
Fig. 4 is that the present invention is at the mounting arrangements schematic diagram of whole cooling section.
Among the figure: 1 is frame; 1a is chute; 2 is upper propellers; 2a is the spiral stream guidance groove; 2b is upper propellers axle bed; 3 is lower plain-barreled roll; 3b is lower plain-barreled roll axle bed; 4 is motor; 5 is reductor; 6 is hydraulic mechanism; 7 is cooling section; 8 is hot rolled heavy plate.
The specific embodiment
Fig. 1, Fig. 2 are structural representations of the present invention:
Cooling procedure spiral stream guidance drainage arrangement comprises frame 1 after the super wide super thick hot rolled plate rolling of the present invention, water discharging part comprise across hot rolled plate, be positioned at the hot rolled plate upper surface with the upper propellers 2 of spiral stream guidance groove and be positioned at the hot rolled plate lower surface lower plain-barreled roll 3 corresponding with upper propellers; The left-and-right spiral guiding gutter 2a that has on the upper propellers 2 is symmetric along body of roll center, and when hot rolled strip was carried out drain measure, its helix direction of rotation of spiral stream guidance groove 2a was outside, and the residual water on the hot rolled strip is discharged to the two ends of propellers; The two ends of upper propellers 2 and lower plain-barreled roll 3 are installed on the frame 1 by upper propellers and lower plain-barreled roll axle bed 2b, 3b respectively, and propellers 2 and lower plain-barreled roll 3 are driven by motor and reduction box thereof.
The angle β of the axis of described spiral stream guidance groove 2a and upper propellers=30 °~60 °; Preferred angle β=45 °.
That described spiral stream guidance groove 2a is width 10~50mm, preferred 30~40mm; The degree of depth of spiral stream guidance groove is 10~50mm, preferred 30~40mm.
The pitch L of described spiral stream guidance groove 2a is 30~100mm.
Described upper propellers and lower plain-barreled roll are driven by two synchronous, synchronized output shafts that a motor 4 drives reduction box 5.
The rotating speed of described upper propellers and lower plain-barreled roll is consistent with strip speed, in order to avoid the hot rolled strip surface is produced cut or scratch.
The upper propellers axle bed 2b of described upper propellers 2 and chute 1a coupling can move up and down in chute 1a.Axle sleeve 2b top is connected with the output of hydraulic mechanism 6.Lower plain-barreled roll axle bed 3b is fixedly mounted on the frame 1.
When the band steel passes through, the thickness signal of the hot-rolled sheet coil that transmits is adjusted signal by the given initial position of given potentiometer, the hydraulic mechanism 6 at the two ends of upper propellers carries out Position Control by hydraulic cylinder, displacement transducer is with the Displacement Feedback of plunger, when displacement reaches set-point, plug stops action, and propellers 2 and lower plain-barreled roll 3 and hot rolled strip are closely pressed.Thickness specification data by the hot rolled strip that transmits is regulated automatically, and upper propellers are mobile adjusting position downward or upward, makes propellers and lower plain-barreled roll closely be pressed against the strip surface, guarantees drainage effect.
The body of roll material of upper propellers 2 and lower plain-barreled roll 3 adopts normal steel casting.Normal steel casting is convenient to processing and manufacturing, and can avoid hot rolled strip surface is produced cut or scratch, and can fully contact hot-rolled coil face, wear-resisting and good hot-cracking resistance arranged.
Cooling procedure spiral stream guidance drainage arrangement is mainly for super wide super thick hot-rolled sheet coil after this super wide super thick hot rolled plate rolling, can the upper residual a large amount of cooling water water water conservancy diversion of super wide ultra-thick plate volume in the cooling procedure are clean, not only improve the mechanical property of hot-rolled sheet coil, and solved the bent plate shape poor that produces of steel plate wooden dipper that residual water causes.
Fig. 3 the present invention is at the mounting arrangements schematic diagram of cooling section:
The spiral stream guidance drainage arrangement is installed in after each cooling section 7, pass through cooling section from the super wide super thick hot-strip 8 of finish rolling end frame outlet, when the super wide ultra-thick plate band of hot rolling passes through the spiral stream guidance drainage arrangement, upper propellers 2 and lower plain-barreled roll 3 with wear close contact with the plate of steel 8, the upper propellers 2 that begin to rotate by motor-driven pass through the spiral stream guidance groove along the middle part to the both sides water conservancy diversion with residual water on the plate face, and the residual water water conservancy diversion is clean.
Fig. 4 is the present invention at the mounting arrangements schematic diagram of whole cooling section:
The spiral stream guidance drainage arrangement is installed in after each cooling section 7, and the spiral stream guidance drainage arrangement is separated the residual water of each cooling section, makes each cooling section give full play to cooling effect, makes cooling evenly, prevents the problem of plate shape and performance inequality.
When adopting ultrafast cold section employing preposition, every section 2~4 spiral stream guidance drainage arrangements can be installed, guarantee to be deposited in plate face center residual water and get rid of clean.2~4 spiral stream guidance drainage arrangements are separated the ultrafast cold section residual water with the laminar flow cooling section, make each cooling section give full play to cooling effect, make cooling evenly, prevent the problem of plate shape and performance inequality; When ultrafast cold section employing is rearmounted, 2~4 spiral stream guidance drainage arrangements will guarantee that a large amount of residual water are not brought coiling machine on the ultrafast cold section strip.
Claims (10)
1. cooling procedure spiral stream guidance drainage arrangement after the super wide super thick hot rolled plate rolling, comprise frame, power section and by the water discharging part of its driving, it is characterized in that: water discharging part comprise across hot rolled plate, be positioned at the hot rolled plate upper surface with the upper propellers (2) of spiral stream guidance groove and be positioned at the hot rolled plate lower surface lower plain-barreled roll (3) corresponding with upper propellers; There is left-and-right spiral guiding gutter (2a) to be symmetric along body of roll center on the upper propellers, when hot rolled strip is carried out drain measure, the helix direction of rotation of spiral stream guidance groove (2a) is outside, and the residual water on the hot rolled strip is discharged to the two ends of propellers; The two ends of upper propellers (2) and lower plain-barreled roll (3) are installed on the frame (1) by first pair and second pair of axle bed (2b, 3b) respectively, and upper propellers (2) and lower plain-barreled roll (3) are driven by motor and reduction box thereof.
2. cooling procedure spiral stream guidance drainage arrangement after the super wide super thick hot rolled plate rolling according to claim 1, it is characterized in that: first pair of axle bed (2b) periphery of described upper propellers (2) is square frame (2b1), square frame (2b1) is positioned at the chute (1a) of frame (1), and square frame (2b1) top is connected with the output of hydraulic mechanism (6).
3. cooling procedure spiral stream guidance drainage arrangement after the super wide super thick hot rolled plate rolling according to claim 1 and 2 is characterized in that: the angle β of the axis of described spiral stream guidance groove (2a) and upper propellers (2)=30 °~60 °.
4. cooling procedure spiral stream guidance drainage arrangement after the super wide super thick hot rolled plate rolling according to claim 1 and 2, it is characterized in that: the width of described spiral stream guidance groove (2a) is 10~50mm, the degree of depth of spiral stream guidance groove is 10~50mm.
5. cooling procedure spiral stream guidance drainage arrangement after the super wide super thick hot rolled plate rolling according to claim 1 and 2, it is characterized in that: the pitch L of described spiral stream guidance groove is 30 ~ 100mm.
6. cooling procedure spiral stream guidance drainage arrangement after the super wide super thick hot rolled plate rolling according to claim 1 and 2 is characterized in that: described upper propellers (2) and lower plain-barreled roll (3) are driven by two of a driven by motor reduction box synchronous, synchronized output shafts.
7. cooling procedure spiral stream guidance drainage arrangement after the super wide super thick hot rolled plate rolling according to claim 1 and 2, it is characterized in that: described upper propellers (2) are consistent with strip speed with the rotating speed of lower plain-barreled roll (3).
8. cooling procedure spiral stream guidance drainage arrangement after the super wide super thick hot rolled plate rolling according to claim 3 is characterized in that: described upper propellers (2) and lower plain-barreled roll (3) are driven by two of a driven by motor reduction box synchronous, synchronized output shafts.
9. cooling procedure spiral stream guidance drainage arrangement after the super wide super thick hot rolled plate rolling according to claim 1 and 2 is characterized in that: the body of roll material selection normal steel casting of upper propellers (2) and lower plain-barreled roll (3).
10. cooling procedure spiral stream guidance drainage arrangement after the super wide super thick hot rolled plate rolling according to claim 1 and 2 is characterized in that: the angle β of the axis of described spiral stream guidance groove (2a) and upper propellers (2)=45 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110136069 CN102189134B (en) | 2011-05-24 | 2011-05-24 | Spiral guide drainage device in cooling after rolling process of ultra-wide ultra-thick hot-rolled plate coil |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110136069 CN102189134B (en) | 2011-05-24 | 2011-05-24 | Spiral guide drainage device in cooling after rolling process of ultra-wide ultra-thick hot-rolled plate coil |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102189134A CN102189134A (en) | 2011-09-21 |
CN102189134B true CN102189134B (en) | 2013-03-13 |
Family
ID=44598509
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110136069 Expired - Fee Related CN102189134B (en) | 2011-05-24 | 2011-05-24 | Spiral guide drainage device in cooling after rolling process of ultra-wide ultra-thick hot-rolled plate coil |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102189134B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105478500A (en) * | 2016-01-06 | 2016-04-13 | 中色科技股份有限公司 | Vacuum drawing oil removing roller |
CN110184431B (en) * | 2018-05-21 | 2024-05-24 | 江阴兴澄特种钢铁有限公司 | Quenching machine roller way arrangement structure capable of avoiding longitudinal quenching strip marks on surface of steel plate |
DE102023105688B3 (en) | 2023-03-08 | 2024-06-06 | Thyssenkrupp Steel Europe Ag | Roll for guiding tapes, method for producing a roll and corresponding use |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4254044B2 (en) * | 2000-10-12 | 2009-04-15 | Jfeスチール株式会社 | Method and apparatus for draining high temperature cooled plate |
JP2007007676A (en) * | 2005-06-29 | 2007-01-18 | Jfe Steel Kk | Method for cooling material to be rolled in slab rolling line and method for rolling slab using the same |
CN100430163C (en) * | 2006-09-30 | 2008-11-05 | 南京钢铁股份有限公司 | Laminated flowing cooling water side-jetting sweeping system after high-strength low-alloy steel being rolled |
CN200954522Y (en) * | 2006-10-08 | 2007-10-03 | 南京钢铁股份有限公司 | Limina-cooling-water side spraying blow-sweeping system for use after rolling high-strength low alloy steel |
CN201760451U (en) * | 2010-06-25 | 2011-03-16 | 鞍钢股份有限公司 | Strip steel surface residual water removing device |
-
2011
- 2011-05-24 CN CN 201110136069 patent/CN102189134B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN102189134A (en) | 2011-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1870172A4 (en) | A continuous casting and rolling method for medium plate | |
CN203292962U (en) | Automatic grinding device for double rolls of abrasion-resistant rubber crusher | |
CN102189134B (en) | Spiral guide drainage device in cooling after rolling process of ultra-wide ultra-thick hot-rolled plate coil | |
CN203526218U (en) | Hot rolling unit rolling mill and coiling machine side guide plate | |
CN201436107U (en) | Double-roller thin-belt continuous casting roller surface cleaning device | |
CN202045551U (en) | Slave polisher | |
CN206500952U (en) | A kind of strip edger unit suitable for the cold rolling production of sheet band steel strip | |
CN202290885U (en) | Straightening machine with seven rolls | |
CN201136046Y (en) | Cleaning plant for double-roller thin band continuous casting roller surface | |
CN101812697B (en) | Method for raising threading steel of push-pull type pickling | |
CN201981260U (en) | Strip steel acid-cleaning wringing roller equipment and strip steel working space position adjusting device thereof | |
CN103433276B (en) | Profile steel rolling production line and production method thereof | |
CN210189359U (en) | Polishing mechanism of copper bar polishing equipment | |
CN106234259B (en) | Comb foundation machine | |
CN110253392B (en) | Copper bar polishing equipment | |
CN101543853B (en) | Non-driven on-line flat steel hot straightening machine | |
CN102189131B (en) | Lower spraying laminar flow cooling device | |
CN101875056A (en) | Magnesium alloy wide plate three-roll casting-rolling mill | |
CN207549268U (en) | A kind of plastic, rubber sheet former | |
CN210172197U (en) | Multi-process strip steel descaling equipment | |
CN110293129B (en) | Continuous rolling process for red copper plate | |
CN202945328U (en) | Horizontal squeezing roller with adjustable axial position | |
CN220761831U (en) | Leveled slitting machine for hot rolled steel coil processing | |
CN102658637A (en) | Method and mechanism for increasing working efficiency and drawing quality of drawing machine | |
CN219357385U (en) | Stainless steel tableware calendering processingequipment with clearance adjustment function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130313 Termination date: 20170524 |