CN102182629B - 基于风资源实时监测数据的弃风电量评估方法 - Google Patents

基于风资源实时监测数据的弃风电量评估方法 Download PDF

Info

Publication number
CN102182629B
CN102182629B CN2011100758472A CN201110075847A CN102182629B CN 102182629 B CN102182629 B CN 102182629B CN 2011100758472 A CN2011100758472 A CN 2011100758472A CN 201110075847 A CN201110075847 A CN 201110075847A CN 102182629 B CN102182629 B CN 102182629B
Authority
CN
China
Prior art keywords
wind
power
actual
data
wind power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011100758472A
Other languages
English (en)
Other versions
CN102182629A (zh
Inventor
陈颖
丁宇宇
周海
丁杰
程序
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Electric Power Research Institute
Original Assignee
State Grid Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Electric Power Research Institute filed Critical State Grid Electric Power Research Institute
Priority to CN2011100758472A priority Critical patent/CN102182629B/zh
Publication of CN102182629A publication Critical patent/CN102182629A/zh
Application granted granted Critical
Publication of CN102182629B publication Critical patent/CN102182629B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

本发明属于风电发配电技术领域,涉及一种基于风资源实时监测数据的弃风电量评估方法。结合测风塔历史测量气象数据与风电场全场历史功率数据,统计率定风电场实际功率曲线。再将测风塔实时测量气象数据输入风电场实际功率曲线,计算风电场的理论发电功率,并将其对时间积分输出风电场理论发电量。同时利用EMS系统的实际风电场功率数据对时间积分,计算风电场实际发电量。依据风电场理论发电量与实际发电量的差值,计算风电场弃风电量。电网调度部门与风电场运营公司可以根据该结果,评估电网调度方式与风电场运营管理方式的经济合理性,从而为优化电网调度方式和风电场运营管理方式提供依据。

Description

基于风资源实时监测数据的弃风电量评估方法
技术领域
本发明属于风电发配电技术领域,涉及一种对风电场弃风电量进行评估的方法。
背景技术
弃风是国际上风电发展过程中一种普遍现象,正确和科学认识弃风,最终目的是要利用好风电,减少弃风,最大限度提高风电利用比例。弃风是由于当地电网接纳能力不足、风电场建设工期不匹配、风电不稳定等自身特点、风电场运营管理不科学等原因致使部分风电场风机停机,而无法充分利用风能的现象。科学地评估弃风电量对于分析风电场的运行管理情况、电网经济调度、提高风能利用率具有重要意义。
目前,国内风电行业对弃风电量的评估还没有形成标准。现有的评估方法一般是计算风电场的实际发电量与装机容量的差额,但由于风力的变化,单个风电场实际出力很少能达到装机容量,而多个风电场群的实际出力同时率更是难以达到全体满发的情况,这就造成对弃风电量的高估。本项发明将利用测风塔对实际风能资源的测量,计算风电机组在无弃风条件下的理论发电量,并与实际发电量相比,实现对弃风电量的准确估计。
基于风资源实时监测数据的弃风电量评估方法将为风电场弃风电量的评估提供一种科学的途径,并为风电场运行情况评估和电网调度的经济性评估提供依据。
发明内容
本发明的目的在于提供一种对风电场进行弃风电量评估的方法,提高弃风电量评估的准确性,为风电场运营管理和电网调度方式的经济性评估提供依据。 
本发明提供了结合测风塔气象观测数据与风电场实际发电功率数据进行风电场弃风电量评估的方法,包括以下步骤:
1)分析对应时段的风电场历史输出功率数据、测风塔风速、近地面气温、近地面气压数据,并进行数据质量控制剔除数据集中不合理的奇异点。最终筛选出时间上对应的风速、气温、气压、全场输出功率数据,并剔除风电场限电情况下的数据。
2)根据理想气体状态方程,将测量风速修正为标准大气状态下的同等风速。
风力发电机的输出功率可以表示为:
                                                                                       
Figure 983210DEST_PATH_IMAGE001
                                            (1)
其中,
Figure 761334DEST_PATH_IMAGE002
为通过风机叶片扫掠面积的风功率,
Figure 430213DEST_PATH_IMAGE003
为风机的风能利用系数,A为风机叶片扫掠面积,V为风速,
Figure 239678DEST_PATH_IMAGE004
为风轮直径,
Figure 994007DEST_PATH_IMAGE005
为空气密度。
设测量风速为
Figure 304856DEST_PATH_IMAGE006
,标准大气状态下风机输出功率相等时风速为
Figure 828241DEST_PATH_IMAGE007
,则有:
                                        
Figure 915938DEST_PATH_IMAGE008
                                             (2)
                                                        
Figure 157563DEST_PATH_IMAGE009
                                                            (3)
根据理想气体状态方程:
                                                              
Figure 930352DEST_PATH_IMAGE010
                                                                   (4)
其中P为空气压强,
Figure 573823DEST_PATH_IMAGE005
为空气密度,R为摩尔气体常数,M为平均摩尔质量,可得:
                      
Figure 908990DEST_PATH_IMAGE011
                          (5)
其中,
Figure 217135DEST_PATH_IMAGE012
Figure 295949DEST_PATH_IMAGE013
Figure 451779DEST_PATH_IMAGE014
分别为标准状态下大气密度、温度以及压强。
3)针对不同的风速区间,采用统计方法分别剔除历史全场输出功率中奇异点,并统计平均有效数据,得到风电场实际平均功率曲线。
在数据采集过程中,由于仪器临时故障、外界干扰、风电场限电等原因,有时会出现异常数据,也叫做奇异点。我们使用以标准差为阈值的方法剔除风速-功率数据的奇异点,具体步骤如下:
设测风塔风速数据和风电场功率数据序列分别为
Figure 223426DEST_PATH_IMAGE015
Figure 671730DEST_PATH_IMAGE016
Figure 554235DEST_PATH_IMAGE017
,按0.5m/s风速间隔对以及对应的
Figure 428491DEST_PATH_IMAGE016
进行划分,得到以下数据集合
                       
Figure 868723DEST_PATH_IMAGE019
                           (6)
对每个集合
Figure 341292DEST_PATH_IMAGE018
,计算功率的平均值及标准差:
                                                                                                                             (7)
                                                                                                   (8)
其中
Figure 897467DEST_PATH_IMAGE018
的样本数。将超出
Figure 181818DEST_PATH_IMAGE023
区间的数据剔除出样本集,再次计算每个集合的功率平均值,就得到风电场实际平均功率曲线。
   
Figure 120009DEST_PATH_IMAGE025
                      (9)
5)将测风塔的测量风速带入实际功率曲线,得到风电场理论输出功率,并对时间积分,即得风电场一段时间内的理论发电量:
                                                  
Figure 880815DEST_PATH_IMAGE026
                                                     (10)
其中, 
Figure 70488DEST_PATH_IMAGE027
为理论发电量,t0为初始时刻,T为积分时间,
Figure 628163DEST_PATH_IMAGE028
为实际平均功率。
6)利用EMS系统得到风电场的实际发电功率,计算风电场实际发电功率的时间积分,得到风电场一段时间内的实际发电量。这段时间的理论发电量减去实际发电量,即为风电场弃风电量:
Figure 691939DEST_PATH_IMAGE029
                  (11)
其中,
Figure 993607DEST_PATH_IMAGE028
为实际平均功率,PEMS为风电场的实际发电功率。
附图说明
图1 是算法逻辑流程图。
图2是风电场平均功率曲线参考图。
具体实施方式
本发明由三个环节构成:(1)风电场实际功率曲线的计算;(2)风电场理论发电量、实际发电量的计算和获得;(3)弃风电量的计算。算法流程如图1所示。具体实施方式如下:
1.   风电场实际功率曲线的计算
Step1:收集整理测风塔、风电场功率历史数据,进行数据质量控制,剔除由于停机、限电、检修等原因所带来的不合理数据;
Step2:根据方程(5),将测量风速修正为标准大气状态下的同等风速;
Step3:;按照方程(6)对风速和功率数据进行划分,按照方程(7),(8)计算功率平均值和标准差,剔除发散点,按照方程(9)计算风电场实际平均功率曲线,如图2所示。
2.   风电场理论发电量、实际发电量的计算和获得
Step4:根据方程(9)和(10),将测风塔测量风速带入实际功率曲线,获得风电场理论输出功率,并对其进行时间积分,得到风电场一段时间内的理论发电量;
Step5:利用EMS系统得到风电场的实际发电功率,计算风电场实际发电功率的时间积分,得到风电场一段时间内的实际发电量;
3.   弃风电量的计算
Step6:根据方程(11),风电场理论发电量减去实际发电量,即得弃风电量。

Claims (1)

1.基于风资源实时监测数据的弃风电量评估方法,其特征在于,包括以下步骤:
1)对风电场历史输出功率与对应时间测风塔所测得不同高层的风速、近地面气温、气压资料进行分析和数据质量控制,并筛选出同一时段的风速、气温、气压、全场功率数据;
2)根据理想气体状态方程,将测量风速修正为标准大气状态下的同等风速;
风力发电机的输出功率表示为:
P m = C p P w = 1 2 ρ AV 3 C p = 1 8 πρ D 2 V 3 C p
其中,Pw为通过风机叶片扫掠面积的风功率,Cp为风机的风能利用系数,A为风机叶片扫掠面积,V为风速,D为风轮直径,ρ为空气密度;
设测量风速为V测量,标准大气状态下风机输出功率相等时风速为V修正,则有:
Figure FDA00002096409700012
Figure FDA00002096409700013
根据理想气体状态方程:
P = ρ R M T
其中P为空气压强,ρ为空气密度,R为摩尔气体常数,M为平均摩尔质量,可得:
Figure FDA00002096409700015
其中,ρ0、T0、P0分别为标准状态下大气密度、温度以及压强;
3)对功率数据按照不同风速区间剔除奇异点,并运用统计方法分析风速与功率间的关系,得到风电场实际平均功率曲线;
在数据采集过程中,由于仪器临时故障、外界干扰原因,有时会出现异常数据,也叫做奇异点;使用以标准差为阈值的方法剔除风速-功率数据的奇异点,具体步骤如下:
设测风塔风速数据和风电场功率数据序列分别为Vi、Pi,i=1,2,...,N,按0.5m/s风速间隔对Vi以及对应的Pi进行分类分析,得到以下数据集合Sj
Sj={(Vi,Pi)|Vi∈[m+0.5·(j-1),m+0.5·j)},m=min(Vi),j=1,2…60
对每个集合Sj,分别计算功率的平均值及标准差:
P j ‾ = Σ ( V i , P i ) ∈ S i P i , σ j = 1 N j - 1 Σ ( V i , P i ) ∈ S i ( P i - P j ‾ ) 2
其中Nj为Sj的样本数,将超出
Figure FDA00002096409700022
区间的数据剔除出样本集,再次计算每个集合的功率平均值就得到风电场实际平均功率曲线P实际(V);
Figure FDA00002096409700024
其中V∈[m+0.5·(j-1),m+0.5·j),m=min(Vi),j=1,2…60
5)将测风塔实时测量风速带入实际功率曲线,得到风电场理论出力;计算风电场出力的时间积分,即得风电场一段时间内的理论发电量:
Figure FDA00002096409700025
其中,G理论为理论发电量,t0为初始时刻,T为积分时间,P实际(V(t))为实际平均功率;
6)由EMS系统得到风电场的实际发电功率,计算风电场实际发电功率的时间积分,即得风电场一段时间内的实际发电量;将这段时间的理论发电量减去实际发电量,即为风电场弃风电量:
Figure FDA00002096409700026
其中,P实际(V(t))为实际平均功率,PEMS为风电场的实际发电功率。
CN2011100758472A 2011-03-29 2011-03-29 基于风资源实时监测数据的弃风电量评估方法 Active CN102182629B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100758472A CN102182629B (zh) 2011-03-29 2011-03-29 基于风资源实时监测数据的弃风电量评估方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100758472A CN102182629B (zh) 2011-03-29 2011-03-29 基于风资源实时监测数据的弃风电量评估方法

Publications (2)

Publication Number Publication Date
CN102182629A CN102182629A (zh) 2011-09-14
CN102182629B true CN102182629B (zh) 2013-01-02

Family

ID=44568901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100758472A Active CN102182629B (zh) 2011-03-29 2011-03-29 基于风资源实时监测数据的弃风电量评估方法

Country Status (1)

Country Link
CN (1) CN102182629B (zh)

Families Citing this family (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102588210B (zh) * 2011-12-21 2014-02-12 中能电力科技开发有限公司 一种用于功率曲线拟合数据预处理的滤波方法
CN102542162B (zh) * 2011-12-26 2014-10-01 成都阜特科技股份有限公司 一种基于有效风速的风能评估方法
CN102609611B (zh) * 2011-12-26 2016-04-13 成都阜特科技股份有限公司 一种基于有效风速的风能评估方法
CN102495972B (zh) * 2011-12-26 2014-12-03 成都阜特科技股份有限公司 一种基于有效风速的风能评估方法
CN102693457A (zh) * 2012-06-05 2012-09-26 北京岳能科技有限公司 风功率评估方法
CN103150473A (zh) * 2013-03-01 2013-06-12 风脉(武汉)可再生能源技术有限责任公司 一种风电机组发电效率实时监控诊断方法及装置
CN103206343B (zh) * 2013-04-18 2015-12-16 内蒙古电力勘测设计院有限责任公司 比较风电机组选型优劣的系统和方法
CN103279649B (zh) * 2013-05-09 2016-07-06 国家电网公司 基于实时光资源监测网络的光伏基地弃光电量评估方法
CN103277250B (zh) * 2013-05-09 2015-10-28 国家电网公司 基于标杆机组的大型风电基地弃风电量的评估方法
CN103324829B (zh) * 2013-05-09 2016-05-11 国家电网公司 基于标杆光伏组件的大型光伏发电基地弃光电量评估方法
CN103291544B (zh) * 2013-06-21 2016-01-13 华北电力大学 数字化风电机组功率曲线绘制方法
CN103475021B (zh) * 2013-08-22 2015-04-01 国家电网公司 一种基于统计模型的风电场弃风电量确定方法
CN103699804B (zh) * 2013-12-31 2017-02-08 西安西热电站信息技术有限公司 一种实时监测风电机组运行时的功率出力偏差的方法
CN103696913B (zh) * 2013-12-31 2016-06-01 西安西热电站信息技术有限公司 一种实时监测风电机组运行时的风能利用偏差的方法
JP2015151889A (ja) * 2014-02-12 2015-08-24 Ntn株式会社 風力発電装置の状態検出装置
CN104074687B (zh) * 2014-06-24 2017-01-25 南车株洲电力机车研究所有限公司 一种用于兆瓦级风电机组的载荷及性能测试方法及装置
CN104123456A (zh) * 2014-07-21 2014-10-29 北京中科伏瑞电气技术有限公司 一种风电场弃风电量分类统计方法及系统
CN104112241A (zh) * 2014-07-28 2014-10-22 国家电网公司 基于机头风速法的风电场理论功率计算方法
CN104156575B (zh) * 2014-07-28 2017-09-05 国家电网公司 基于测风塔数据外推法的风电场理论功率计算方法
CN104124685A (zh) * 2014-07-28 2014-10-29 国家电网公司 基于样板风机法的风电场理论功率计算方法
CN105048444B (zh) * 2014-08-14 2018-03-30 国家电网公司 一种基于测风塔测风数据的风电场弃风电量确定方法
CN104809556A (zh) * 2015-04-22 2015-07-29 中国大唐集团新能源股份有限公司 风电机组损失电量计算方法
CN105160602A (zh) * 2015-09-29 2015-12-16 国网甘肃省电力公司 基于标杆风电场的风电集群弃风电量计算方法
CN105205564A (zh) * 2015-09-29 2015-12-30 沈阳工程学院 基于测风塔神经网络的风电场弃风电量统计系统及方法
CN105356452B (zh) * 2015-10-29 2018-12-11 中国电力科学研究院 一种电采暖储热容量及加热功率的设计方法
CN105545590B (zh) * 2015-12-19 2018-03-20 湘电风能有限公司 一种风力发电机组的控制方法
CN105787810A (zh) * 2016-03-14 2016-07-20 上海电气集团股份有限公司 一种评估风力发电机发电能力的方法
CN106779377B (zh) * 2016-12-05 2020-10-23 国能日新科技股份有限公司 风电消纳过程评估方法
CN106839082B (zh) * 2016-12-23 2019-09-17 北京天诚同创电气有限公司 风电供暖调控系统及调控方法
CN108590968B (zh) * 2017-08-14 2023-07-21 中国大唐集团科学技术研究院有限公司 风机塔筒储氢节能系统及方法
CN107947163B (zh) * 2017-11-30 2021-06-29 广东电网有限责任公司电力调度控制中心 关于燃煤机组变负荷性能评测方法及其系统
CN108171400A (zh) * 2017-12-06 2018-06-15 浙江大学 一种基于异常点及离群点检测的风机功率曲线数据预处理方法
CN109034607B (zh) * 2018-07-24 2022-05-27 南方电网科学研究院有限责任公司 弃风弃光电量评估方法、系统、装置及可读存储介质
CN109139366B (zh) * 2018-09-26 2020-05-05 北京金风科创风电设备有限公司 风电场的控制系统
CN109345146A (zh) * 2018-11-23 2019-02-15 华北电力科学研究院有限责任公司 风电机组弃风电量的计算方法、装置、设备及存储介质
CN109636162B (zh) * 2018-12-03 2021-04-20 清华大学 风电弃风电量的计算方法、装置、计算机设备和存储介质
CN112131703A (zh) * 2020-08-13 2020-12-25 国网新源张家口风光储示范电站有限公司 一种基于matlab功能模块的风机运行特性分析系统
CN112529383B (zh) * 2020-12-04 2023-10-24 西安西热电站信息技术有限公司 一种优化风场能量可利用率指标的方法
CN115935114B (zh) * 2022-11-29 2023-10-03 光大环境科技(中国)有限公司 一种风电场内电网故障损失电量计算方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101592538A (zh) * 2009-06-18 2009-12-02 东北电力大学 一种基于实测数据风电场稳态输出功率的计算方法
CN101710710A (zh) * 2009-12-03 2010-05-19 天津理工大学 一种风电场功率输出平衡系统及其工作方法
CN101710703A (zh) * 2009-11-20 2010-05-19 东北电力大学 风电场群功率汇聚外送输电容量静态优化方法
CN101764413A (zh) * 2009-11-25 2010-06-30 中国电力科学研究院 一种大规模风电集中接入电网的系统仿真方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7484363B2 (en) * 2005-10-20 2009-02-03 Michael Reidy Wind energy harnessing apparatuses, systems, methods, and improvements

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101592538A (zh) * 2009-06-18 2009-12-02 东北电力大学 一种基于实测数据风电场稳态输出功率的计算方法
CN101710703A (zh) * 2009-11-20 2010-05-19 东北电力大学 风电场群功率汇聚外送输电容量静态优化方法
CN101764413A (zh) * 2009-11-25 2010-06-30 中国电力科学研究院 一种大规模风电集中接入电网的系统仿真方法
CN101710710A (zh) * 2009-12-03 2010-05-19 天津理工大学 一种风电场功率输出平衡系统及其工作方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
雷亚洲等.一种静态安全约束下确定电力系统风电准入功率极限的优化方法.《中国电机工程学报》.2001,第21卷(第06期),全文. *

Also Published As

Publication number Publication date
CN102182629A (zh) 2011-09-14

Similar Documents

Publication Publication Date Title
CN102182629B (zh) 基于风资源实时监测数据的弃风电量评估方法
Wan et al. Development of an equivalent wind plant power-curve
CN103778340B (zh) 大规模新能源发电特性的统计方法
CN104123456A (zh) 一种风电场弃风电量分类统计方法及系统
CN103475021B (zh) 一种基于统计模型的风电场弃风电量确定方法
CN105894391B (zh) 基于scada运行数据提取的风电机组转矩控制性能评估方法
CN101727538A (zh) 一种考虑风向影响的风电机组输入风速等效方法
US20170328348A1 (en) System and method for validating optimization of a wind farm
CN104091209A (zh) 基于bp神经网络的风电机组功率特性评估方法
CN103996079B (zh) 一种基于条件概率的风电功率加权预测方法
CN105022909A (zh) 一种基于机舱风速功率曲线的风电场理论功率评估方法
CN102682197A (zh) 对单设备能源消耗变化趋势实时预测的监测方法及装置
CN107422180A (zh) 一种基于云监控的光伏电站的功率预测系统
CN114033617B (zh) 一种控制参量自适应调整的可控风力发电方法及系统
CN105429184A (zh) 一种风电优先调度评价的全过程量化评估方法
Hadžiahmetović et al. Statistical analysis and assessment of wind energy potential in Sarajevo, Bosnia and Herzegovina
CN115898787A (zh) 一种风电机组静态偏航误差动态识别方法及装置
CN111738556B (zh) 一种基于机头微气候评估风机发电能力的方法
CN109066791B (zh) 一种风电模拟弃风序列的确定方法和装置
CN110942218B (zh) 计算风电场上网电量的方法、装置以及系统
CN105160602A (zh) 基于标杆风电场的风电集群弃风电量计算方法
CN102542162B (zh) 一种基于有效风速的风能评估方法
CN106296459A (zh) 一种评估风电场运维水平的方法
Yildiz et al. Considering air density effect on modelling wind farm power curve using site measurements
Ping et al. Offshore wind resouce assessment based on WRF model

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant