Summary of the invention
The purpose of this invention is to provide a kind of steel and mould concrete composite winding pipe material production method, accomplish that the tubing of producing can bear bigger interior pressure, and tensile strength is high, the bend resistance ability is strong.
Production stage of the present invention is following:
1, the plastics strip with designing shape of at first production rolling.
2, adopt spiral Wiring apparatus coiling plastics strip and, or the rim of plastics strip is overlapped bonding formation inner tube wall each other the mutual bonding formation inner tube wall of plastics strip sidewall.
3, with steel coil strip around with embed in the plastics strip draw-in groove, when steel coil strip when embedded length reaches every pipe joint road preseting length, with cutting machine steel band and plastics strip are together cut into joint.
4, constituting on the spiral steel band periphery fixing parallel to an axis steel bar parallel to each other and equally distributed more than 4, parallel to an axis steel bar and each steel band zone circle intersection are welded with the spot welding mode or are affixed with tap bolt; The two ends of two oblique steel bars are intersected respectively be welded on the outer end of per two adjacent parallel to an axis steel bars, promptly the parallel to an axis steel bar is intersected serial connection and constitute netted steel bar with oblique steel bar.
5, on plastics strip, netted steel bar and steel band periphery, cover glue, form plastic layer pipe outer wall.
6, with the past steel band cavity of grouting equipment, cement injection mortar in the common cavity that forms of plastics strip cavity or steel band and plastics strip, the proportioning of slush is a cement: sandstone: water=3: 1: 2.
7, treat that slush is solidified after, obtain finished product.
Compared with present technology, the present invention has following characteristics:
1, because the interconnect function of netted steel bar makes all zone circles of steel band of spirality be fixed into cylindrical shape integral body; Deliquescing is connected to and is rigidly connected; Integrity is strong; Add and be perfused with concrete steel band or the plastics strip has extremely strong rigidity, so the stretch-proof of this composite pipe, bend resistance and impact resistance intensity are high especially, have basically no fracture, phenomenon fractures.The tubing of producing reaches more than 50 years working life.
3, since netted steel bar to the solid effect of increasing of spirality steel band, therefore, the tubing of production can bear bigger interior pressure and external pressure; Using scope is wide; Can be used as water supply, air feed and transport pipe and use, also can do pipe use in advance, be widely used in supply and drain water system, air supply system and Crude Oil Transportation system.
Description of drawings
Fig. 1 is netted steel bar structural drawing, and A is the steel band of spirality among the figure.
Fig. 2 is that the circular steel band steel of real wall is moulded the local tube wall axial, cross-sectional view of concrete composite winding pipe material.
Fig. 3 strengthens circular steel band cross-sectional view.
Fig. 4 is the real wall plastics of a three-flute strip cross-sectional view.
Fig. 5 is that the steel band chamber is filled the single hollow square steel band of concrete formula steel and moulded the local tube wall axial, cross-sectional view of concrete composite winding pipe material.
Fig. 6 is that the strip chamber is filled the single hollow square steel band of concrete formula steel and moulded the local tube wall axial, cross-sectional view of concrete composite winding pipe material.
Fig. 7 strengthens square steel band cross-sectional view.
Fig. 8 is a double flute list hollow plastic strip cross-sectional view.
Fig. 9 is that the steel band chamber is filled the two hollow profile steel band steel of concrete formula and moulded the local tube wall axial, cross-sectional view of concrete composite winding pipe material.
Figure 10 is that the strip chamber is filled the two hollow profile steel band steel of concrete formula and moulded the local tube wall axial, cross-sectional view of concrete composite winding pipe material.
Figure 11 strengthens the profiled strip cross-sectional view.
Figure 12 is two hollow plastic strip B3 cross-sectional views.
Figure 13 is that the steel band chamber is filled concrete formula ripple shaped steel and moulded the local tube wall axial, cross-sectional view of concrete composite winding pipe material.
Figure 14 is that the strip chamber is filled concrete formula ripple shaped steel and moulded the local tube wall axial, cross-sectional view of concrete composite winding pipe material.
Figure 15 strengthens ripple steel band cross-sectional view.
Figure 16 is two hollow plastic strip B4 cross-sectional views.
Figure 17 is that the steel band chamber is filled the single hollow profile steel band of concrete formula steel and moulded the local tube wall axial, cross-sectional view of concrete composite winding pipe material, and 10 is the strip viscose glue among the figure.
Figure 18 is that the strip chamber is filled the single hollow profile steel band of concrete formula steel and moulded the local tube wall axial, cross-sectional view of concrete composite winding pipe material.
Figure 19 is single hollow plastic strip cross-sectional view.
Embodiment
The circular steel band steel of embodiment's one real wall is moulded concrete composite winding pipe material production method
1, the cross section of the at first production rolling real wall plastics of three-flute strip B1 as shown in Figure 4.
2, adopt the real wall plastics strip B1 of spiral Wiring apparatus coiling three-flute and with the mutual bonding formation inner tube wall of the sidewall B0 of plastics strip B1.
3,3 circular steel band A1 are reeled respectively simultaneously and embed in three arc-shaped slots of plastics strip B1.When steel band A1 coiling embedded length reaches every pipe joint road preseting length, with cutting machine with steel band A1 with mould band plate band B1 and together cut into joint.
4, constituting on the spiral steel band A1 fixing parallel to an axis steel bar C parallel to each other and equally distributed more than 4; Weld with the spot welding mode parallel to an axis steel bar C and each steel band zone circle intersection; Two oblique steel bar D two ends are intersected respectively be welded on the outer end of per two adjacent parallel to an axis steel bar C, promptly parallel to an axis steel bar C is intersected serial connection and constitute netted steel bar with oblique steel bar D.
5, on plastics strip B1, netted steel bar and steel band A1 periphery, cover glue, form plastic layer pipe outer wall E.
6, with cement injection mortar in the past steel band A1 cavity of HN20B concrete pump (production of the auspicious opto-mechanical in Henan Science and Technology Ltd.), the proportioning of slush is a cement: sandstone: water=3: 1: 2
7, treat that slush is solidified after, obtain finished product as shown in Figure 2.
Embodiment's two single hollow square steel band steel are moulded concrete composite winding pipe material production method
1, the cross section of at first production rolling double flute list hollow plastic strip B2 as shown in Figure 8.
2, adopt spiral Wiring apparatus coiling double flute list hollow plastic strip B2 and with the mutual bonding formation inner tube wall of the sidewall B0 of plastics strip B2.
3,2 square steel band A2 are reeled respectively simultaneously and embed in two arc-shaped slots of plastics strip B2, cut into band when reaching preseting length.
4, constituting fixing 4 above parallel to an axis steel bar C on the spiral steel band A2; Weld with the spot welding mode parallel to an axis steel bar C and each steel band zone circle intersection; Two oblique steel bar D two ends are intersected respectively be welded on the outer end of per two adjacent parallel to an axis steel bar C, promptly parallel to an axis steel bar C is intersected serial connection and constitute netted steel bar with oblique steel bar D.
5, on plastics strip B2, netted steel bar and steel band A2 periphery, cover glue, form plastic layer pipe outer wall E.
6, with cement injection mortar in the past steel band A2 cavity of concrete pump, the proportioning of slush is a cement: sandstone: water=3: 1: 2.
7, treat that slush is solidified after, obtain finished product as shown in Figure 5.
If, then obtain finished product as shown in Figure 6 toward the interior cement injection mortar of plastics strip B2 cavity.
Three pairs of hollow profile steel bands of embodiment steel is moulded concrete composite winding pipe material production method
1, the cross section of at first production rolling hollow plastic strip B3 shown in figure 12.
2, adopt reel two hollow plastic strip B3 and of spiral Wiring apparatus with the mutual bonding formation inner tube wall of the sidewall B0 of plastics strip B3.
3, with in profiled strip A3 coiling and the embedding plastics strip B3 middle part draw-in groove, cut into joint when reaching preseting length.
4, constituting fixing 4 above parallel to an axis steel bar C on the spiral steel band A3; Parallel to an axis steel bar C and each steel band zone circle intersection are affixed with tap bolt; Two oblique steel bar D two ends are intersected respectively be welded on the outer end of per two adjacent parallel to an axis steel bar C, promptly the parallel to an axis steel bar is intersected serial connection and constitute netted steel bar with oblique steel bar D.
5, on plastics strip B3, netted steel bar and steel band A3 periphery, cover glue, form plastic layer pipe outer wall E.
6, with the cavity interior cement injection mortar of grouting equipment toward steel band A3 and the common formation of plastics strip B3, the proportioning of slush is a cement: sandstone: water=3: 1: 2.
7, treat that slush is solidified after, obtain finished product as shown in Figure 9.
If, then obtain finished product shown in figure 10 toward the interior cement injection mortar of plastics strip B3 cavity.
Embodiment's four ripple shaped steel are moulded concrete composite winding pipe material production method
1, the cross section of at first production rolling two hollow plastic strip B4 shown in figure 16.
2, adopt reel two hollow plastic strip B4 and of spiral Wiring apparatus with the mutual bonding formation inner tube wall of the sidewall B0 of plastics strip B4.
3, with in ripple profiled strip A4 coiling and the embedding plastics strip B4 middle part draw-in groove, cut into joint when reaching preseting length.
4, between each zone circle that constitutes spiral ripple profiled strip A4, weld parallel to an axis steel bar C and oblique steel bar D, constitute netted steel bar by parallel to an axis steel bar and oblique steel bar with the spot welding mode.
5, cover glue moulding on band plate band B4, netted steel bar and the steel band A4 periphery, form plastic layer pipe outer wall E.
6, toward steel band A4 and the interior cement injection mortar of the common cavity that forms of plastics strip B4, the proportioning of slush is a cement: sandstone: water=3: 1: 2.
7, treat that slush is solidified after, obtain finished product shown in figure 13.
If, then obtain finished product shown in figure 14 toward the interior cement injection mortar of plastics strip B4 cavity.
Embodiment's five single hollow profile steel band steel are moulded concrete composite winding pipe material production method
1, the cross section of at first production rolling single hollow plastic strip B5 shown in figure 19.
2, adopt the spiral Wiring apparatus to reel single hollow plastic strip B5 and rim B51, B52 that plastics strip B5 both sides are stretched out outward overlap bonding formation inner tube wall mutually.
3, profiled strip A3 is reeled and embed by plastic board band edge limit B51, B52 and take in the draw-in groove that constitutes after sticking, cut into joint when reaching preseting length.
4, constituting fixing 4 above parallel to an axis steel bar C on the spiral steel band A3; Affixed between parallel to an axis steel bar C and each the steel band zone circle with tap bolt; Two oblique steel bar D two ends are intersected respectively be welded on the outer end of per two adjacent parallel to an axis steel bar C, promptly parallel to an axis steel bar C is intersected serial connection and constitute netted steel bar with oblique steel bar D.
5, on plastics strip B5, netted steel bar and steel band A3 periphery, cover glue, form plastic layer pipe outer wall E.
6, toward steel band A3 and the interior cement injection mortar of the common cavity that forms of plastics strip B5, the proportioning of slush is a cement: sandstone: water=3: 1: 2.
7, treat that slush is solidified after, obtain finished product shown in figure 17.
If, then obtain finished product shown in figure 18 toward the interior cement injection mortar of plastics strip B5 cavity.