CN102168565A - Soil reinforcing method for realizing normal-pressure cabin opening of shield machine - Google Patents

Soil reinforcing method for realizing normal-pressure cabin opening of shield machine Download PDF

Info

Publication number
CN102168565A
CN102168565A CN2011100676364A CN201110067636A CN102168565A CN 102168565 A CN102168565 A CN 102168565A CN 2011100676364 A CN2011100676364 A CN 2011100676364A CN 201110067636 A CN201110067636 A CN 201110067636A CN 102168565 A CN102168565 A CN 102168565A
Authority
CN
China
Prior art keywords
cabin
shield machine
native cabin
soil
native
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100676364A
Other languages
Chinese (zh)
Other versions
CN102168565B (en
Inventor
丁仕辉
阳争荣
王松茂
金永就
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong No 2 Hydropower Engineering Co Ltd
Original Assignee
Guangdong No 2 Hydropower Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong No 2 Hydropower Engineering Co Ltd filed Critical Guangdong No 2 Hydropower Engineering Co Ltd
Priority to CN 201110067636 priority Critical patent/CN102168565B/en
Publication of CN102168565A publication Critical patent/CN102168565A/en
Application granted granted Critical
Publication of CN102168565B publication Critical patent/CN102168565B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a soil consolidation method for realizing normal-pressure cabin opening of a shield machine. The method realizes the soil reinforcement by directly injecting mixed grout at a construction part by a shield machine, and solidifying the mixed grout to be plastic concretion with low intensity and small cohesive force on a construction face so as to finally realize normal-pressure cabin opening. The method can avoid the inconveniences caused by the soil reinforcement realized by constructing downwardly from ground or the soil reinforcement realized by injecting grout to form set cement with high intensity and large cohesive force, is favourable for the reduction of the construction cost effectively. The method is used in the field of engineering construction.

Description

A kind of soil stabilization method that realizes that the shield machine normal pressure opens the cabin
Technical field
The present invention relates to a kind of soil stabilization method, particularly relate to a kind of soil stabilization method that realizes that the shield machine normal pressure opens the cabin.
Background technology
Shield machine also is known as the shield tunnel development machine usually, be a kind of special engineering machinery that is used for tunnel piercing, modern shield excavation machine light harvesting, mechanical, electrical, liquid, sensing, information technology are in one, have functions such as the excavation cutting soil body, conveying soil quarrel, assembly unit tunnel lining, the correction of measurement guiding, and to carry out manufacturing and designing of " cutting the garment according to the figure " formula according to different geology, reliability requirement is high, and shield excavation machine has been widely used in construction of tunnel such as subway, railway, highway, municipal administration, water power.
Carry out that tunnel construction has the automaticity height, saves manpower, speed of application is fast, face sedimentation controllably when cavitation, weatherproof, excavation, reduce the influence of above ground structure and do not influence characteristics such as water surface traffic when excavating under water with shield machine, under the situation long at tunnel hole line, that buried depth is bigger, with the shield machine construction more economical rationality that can seem.
But in the shield-tunneling construction process, in regular meeting needs to enter shield machine soil cabin for some reason, cutter is carried out maintenance overhaul or changes cutter, at these problems, the processing method of prior art roughly has two kinds: the one, and the staff enters shield machine by protection and adds and carry out cutter inspection or replacing in the firming cabin, this method requires high to staff's fitness, the staff need pass through Special Training can be on duty, and the inefficiency of this kind method construction, the operating expenses height; Second kind of processing method reinforced shield machine cutter head of shield machine the place ahead soil body for facing down from ground, behind the soil stabilization, the staff enters under atmospheric pressure state in the shield machine soil cabin and carries out cutter inspection or replacing, the operating expenses height of this kind method, engineering time is long, when meeting road or building and some special locations (as puddle, stream) up, the enforcement of the method is difficulty more.
Summary of the invention
For addressing the above problem, the invention provides the soil stabilization method that a kind of realization shield machine normal pressure that can effectively reduce operating expenses opens the cabin.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of soil stabilization method that realizes that the shield machine normal pressure opens the cabin is characterized in that:
May further comprise the steps:
, stop shield machine driving, the dregs emptying with in the shield machine soil cabin in casting simultaneously, seals native cabin, and native cabin is carried out pneumatic compression;
, after casting is finished in the native cabin, mixed serum is poured in the native cabin, simultaneously exhaust is carried out in native cabin, native cabin is filled to mixed serum;
, discharge the gas pressure in the described native cabin, and simultaneously in native cabin additional mixed serum to reaching predetermined pressure;
, after mixed serum solidifies, finish soil stabilization.
Be further used as the improvement of technical solution of the present invention, step and in mixed serum be that water, cement, flyash and swell soil carry out mixed preparing and form, filling process is by realizing to the soil grout hole grouting on the dividing plate of side soil cabin out of my cabin.
Be further used as the improvement of technical solution of the present invention, step~in, to the sealing in native cabin by soil airtight the finishing of native cabin dividing plate of side out of my cabin.
Be further used as the improvement of technical solution of the present invention, in the step, carry out casting, and in native cabin, inflate pressurization by the steam vent on the dividing plate of native cabin by the screw machine in the shield machine.
Be further used as the improvement of technical solution of the present invention, screw machine is provided with the screw machine safety door that space between screw machine and native cabin can be separated, and after the step casting is finished, closes the screw machine safety door of screw machine.
Be further used as the improvement of technical solution of the present invention, in step and the step, inside, native cabin is being carried out pneumatic compression, and by in the steam vent exhaust process, all observe native cabin internal pressure, control and guarantee that native cabin internal pressure is stable by soil pressure case on the dividing plate of native cabin.
Be further used as the improvement of technical solution of the present invention, when in native cabin, injecting mixed serum, rotate cutter head of shield machine mixed serum is stirred in the described step.
Be further used as the improvement of technical solution of the present invention, make mixed serum enter between the face in cutter head of shield machine face and shoveling space by shrinking the hinged oil cylinder that connects with native cabin dividing plate in the step, form plasticity concrement partition wall one by the opening of cutter head of shield machine and the position, otch annular space crack between the shield body.
Beneficial effect of the present invention: this invention is directly carried out the injection of mixed serum by shield machine in its construction part, and make it to be frozen into the plasticity concrement that intensity is low, adhesion stress is little and realize soil stabilization in working face, thereby realize that normal pressure opens the cabin, this kind job practices can effectively avoid down constructing from ground in the past carry out soil stabilization or adopt grout injection to form the intensity height, cement stone that adhesion stress is big carries out the inconvenience that soil stabilization caused, and helps effectively reducing its operating expenses.
Description of drawings
The invention will be further described below in conjunction with accompanying drawing:
Fig. 1 is a shield machine structural representation of the present invention;
Fig. 2 is an embodiment of the invention work progress view;
Fig. 3 is the present invention's soil cabin diaphragm structure schematic diagram;
Fig. 4 is a cutter head of shield machine structural representation of the present invention.
The specific embodiment
With reference to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the present invention is a kind of soil stabilization method that realizes that the shield machine normal pressure opens the cabin, and it is characterized in that:
May further comprise the steps:
, stop shield machine driving, the dregs emptying with in the shield machine soil cabin 2 in casting simultaneously, seals native cabin 2, and native cabin 2 is carried out pneumatic compression;
, after castings are finished in the native cabin 2, mixed serum is poured in the native cabin 2, simultaneously exhaust is carried out in native cabin 2, native cabin 2 is filled to mixed serum;
, discharge the gas pressure in the native cabin 2, and simultaneously to native cabin 2 in additional mixed serum to reaching predetermined pressure;
, after mixed serum solidifies, finish soil stabilization.
This invention is directly carried out the injection of mixed serum by shield machine in its construction part, and make it to solidify and realize soil stabilization in working face, thereby realize that normal pressure opens the cabin, this kind job practices can effectively avoid down constructing from ground in the past carry out soil stabilization or adopt grout injection to form the intensity height, cement stone that adhesion stress is big carries out the inconvenience that soil stabilization caused, and helps effectively reducing its operating expenses.
As the preferred embodiment of the present invention, step and in mixed serum be that water, cement, flyash and swell soil carry out mixed preparing and form, filling process is realized by grout hole 8 grouting on soil cabin, 2 outsides, native cabin dividing plate 5.
The cost of manufacture of this kind mixed serum is low, and the intensity that is reached after mixed serum solidifies can reach the requirement of the protection soil body, thus can effectively play the effect of soil mass consolidation, and after the shield machine maintenance is finished, also can remove reinforcing wall eaily.
The filling process of mixed serum is undertaken by the some grout holes on the native cabin dividing plate 58, and after hatch door 10 was used to make things convenient for soil stabilization to finish, the maintenance personal entered 2 inside, native cabin, and the cutter on the cutter head of shield machine is changed and overhauled.
As the preferred embodiment of the present invention, step~in, to the sealing in native cabin 2 native cabin dividing plate 5 airtight finishing by 2 outsides, native cabin.
The sealing air pressure that soil cabin dividing plate 5 can effectively guarantee in work progress in native the cabin 2 in separates native cabin 2 with ambient pressure, thereby effectively ensures the required pressure of reinforcing wall of the soil body and mixed serum formation in the soil stabilization engineering
As the preferred embodiment of the present invention, in the step, carry out casting, and in native cabin 2, pressurize by steam vent 3 by the screw machine in the shield machine 1.In work progress, use the facility of shield machine own as far as possible, can effectively save construction cost, and when bringing convenience, effectively improve its efficiency of construction to whole construction course.
As the preferred embodiment of the present invention, screw machine 1 is provided with the screw machine safety door 4 that 2 spaces of screw machine 1 and native cabin can be separated, and after the step casting is finished, closes the screw machine safety door 4 of screw machine 1.After casting is finished, close screw machine safety door 4 and can prevent effectively that mixed serum flows in the screw machine 1 when follow-up grouting.
As the preferred embodiment of the present invention, in step and the step, 2 inside, native cabin are being carried out pneumatic compression, and by in steam vent 3 exhaust processes, all observe native cabin 2 internal pressures by the soil pressure case on the native cabin dividing plate 59, and make total pressure balance in the native cabin 2 by control inflation pressurization or exhaust pressing speed, to guarantee the safety of work progress.
As the preferred embodiment of the present invention, be provided with cutter head of shield machine 6 in the native cabin 2, when in native cabin 2, injecting mixed serum, rotate 6 pairs of mixed serums of cutter head of shield machine and stir in the step.
After finishing the casting process by screw machine 1, also have the satholith slags in the native cabin 2, stir by rotating 6 pairs of mixed serums of cutter head of shield machine, mixed serum and native slag can be mixed, effectively improve the fastness of mixed serum after fixed.
When after mixed serum condenses, reaching the required design strength of soil stabilization, need to open the hatch door 10 in native cabin 2, and the slurries concrement in the shield machine soil cabin is excavated in layering from top to bottom.
After finishing the slurries removing of condensing, before cutter head of shield machine 6 is keeped in repair, need cutter head of shield machine 6 openings of shield machine and the position, otch annular space crack between cutter head of shield machine 6 and the shield body are carried out supporting, prevent slurries concrement slump under the effect of outside scall soil pressure and water pressure at this position.
After slurries concrement in the soil cabin 2 is all excavated,, finally provide a shield machine soil underdeck operation environment that the maintenance and inspection personnel can enter safely under atmospheric pressure state through secure authentication.
As the preferred embodiment of the present invention, make mixed serum enter between the face in cutter head of shield machine face and shoveling space by shrinking the hinged oil cylinder 7 that connects with native cabin dividing plate 5 in the step by the opening of cutter head of shield machine 6 and the position, otch annular space crack between the shield body, form plasticity concrement partition wall one, thereby finish soil stabilization.
Can realize separating of native cabin dividing plate 5 and native cabin 2 by shrinking hinged oil cylinder 7, thereby discharge the gas in the native cabin 2, realize step-down in the cabin.
Certainly, the invention is not limited to above-mentioned embodiment, those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite of spirit of the present invention, modification that these are equal to or replacement all are included in the application's claim institute restricted portion.

Claims (8)

1. soil stabilization method that realizes that the shield machine normal pressure opens the cabin is characterized in that:
May further comprise the steps:
Figure 2011100676364100001DEST_PATH_IMAGE002
, stop shield machine driving, with the dregs emptying in the shield machine soil cabin (2), in casting simultaneously, seal described native cabin (2), described native cabin (2) is carried out pneumatic compression;
Figure 2011100676364100001DEST_PATH_IMAGE004
, after the interior casting in described native cabin (2) finishes, mixed serum is poured in the described native cabin (2), simultaneously exhaust is carried out in described native cabin (2), described native cabin (2) is filled to mixed serum;
Figure 2011100676364100001DEST_PATH_IMAGE006
, discharge the gas pressure in the described native cabin (2), and simultaneously to described native cabin (2) in additional mixed serum to reaching predetermined pressure;
Figure 2011100676364100001DEST_PATH_IMAGE008
, after mixed serum solidifies, finish soil stabilization.
2. the soil stabilization method that realization shield machine normal pressure according to claim 1 opens the cabin is characterized in that: described step
Figure 7045DEST_PATH_IMAGE004
With
Figure 949594DEST_PATH_IMAGE008
In mixed serum be that water, cement, flyash and swell soil carry out mixed preparing and form, filling process is realized by the grouting of the grout hole (8) on described native cabin (2) outside native cabin dividing plate (5).
3. the soil stabilization method that realization shield machine normal pressure according to claim 1 and 2 opens the cabin is characterized in that: in described step
Figure 325211DEST_PATH_IMAGE002
Figure 683511DEST_PATH_IMAGE008
In, to the sealing in described native cabin (2) airtight the finishing of native cabin dividing plate (5) by native cabin (2) outside.
4. the soil stabilization method that realization shield machine normal pressure according to claim 3 opens the cabin is characterized in that: described step
Figure 93764DEST_PATH_IMAGE002
In, carry out casting by the screw machine in the shield machine (1), and in native cabin (2), inflate pressurization by the steam vent (3) on the described native cabin dividing plate (5).
5. the soil stabilization method that realization shield machine normal pressure according to claim 3 opens the cabin is characterized in that: described step
Figure 207214DEST_PATH_IMAGE002
After casting is finished, close the screw machine safety door (4) of described screw machine (1).
6. the soil stabilization method that realization shield machine normal pressure according to claim 3 opens the cabin is characterized in that: described step
Figure 70128DEST_PATH_IMAGE002
And step
Figure 229189DEST_PATH_IMAGE004
In, inside, native cabin (2) is being carried out pneumatic compression, and, all observing native cabin (2) internal pressure by the soil pressure case (9) on the described native cabin dividing plate (5) by in steam vent (3) exhaust process, control and guarantee that described native cabin (2) internal pressure stablizes.
7. the soil stabilization method that realization shield machine normal pressure according to claim 3 opens the cabin is characterized in that: described step
Figure 290686DEST_PATH_IMAGE004
In when in native cabin (2), injecting mixed serum, rotate cutter head of shield machine (6) mixed serum stirred.
8. the soil stabilization method that realization shield machine normal pressure according to claim 3 opens the cabin is characterized in that: described step
Figure 512720DEST_PATH_IMAGE006
In make mixed serum pass through the opening of cutter head of shield machine (6) and the position, otch annular space crack between the shield body enters between the face in cutter head of shield machine face and shoveling space by shrinking the hinged oil cylinder (7) connect with native cabin dividing plate (5), form plasticity concrement partition wall one.
CN 201110067636 2011-03-21 2011-03-21 Soil reinforcing method for realizing normal-pressure cabin opening of shield machine Expired - Fee Related CN102168565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110067636 CN102168565B (en) 2011-03-21 2011-03-21 Soil reinforcing method for realizing normal-pressure cabin opening of shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110067636 CN102168565B (en) 2011-03-21 2011-03-21 Soil reinforcing method for realizing normal-pressure cabin opening of shield machine

Publications (2)

Publication Number Publication Date
CN102168565A true CN102168565A (en) 2011-08-31
CN102168565B CN102168565B (en) 2013-01-23

Family

ID=44489864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110067636 Expired - Fee Related CN102168565B (en) 2011-03-21 2011-03-21 Soil reinforcing method for realizing normal-pressure cabin opening of shield machine

Country Status (1)

Country Link
CN (1) CN102168565B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425425A (en) * 2011-12-26 2012-04-25 中铁四局集团有限公司 Working face reinforcing structure in shield machine cabin as well as construction method and equipment thereof
CN103967498A (en) * 2014-04-21 2014-08-06 河海大学 Under-pressure chamber opening method for shield tunneling machine in coarse-grain soil stratum
CN104005769A (en) * 2014-03-25 2014-08-27 中铁十六局集团地铁工程有限公司 Waterless sandy cobble stratum shield cabin-opening tool changing method
CN105257309A (en) * 2015-10-30 2016-01-20 上海交通大学 Tool changing construction method for in-chamber grouting of earth pressure balance shield machine in sand bed
CN105257306A (en) * 2015-10-30 2016-01-20 上海交通大学 Reinforced warehouse-filling cutter-replacement construction method in shield tunneling machine warehouse
CN105545315A (en) * 2015-12-29 2016-05-04 上海市基础工程集团有限公司 Normal pressure tool replacing method for reinforcing excavation face soil layer in shield tunnel construction
CN105569665A (en) * 2015-10-30 2016-05-11 中铁十六局集团北京轨道交通工程建设有限公司 Tool changing construction method realizing soil mass reinforcement from outside of soil room for earth pressure balance shield machine in sand layer
CN106907157A (en) * 2017-02-09 2017-06-30 广东水电二局股份有限公司 A kind of shield machine normal pressure opens the cabin operation construction method
CN107201905A (en) * 2017-06-06 2017-09-26 中铁十九局集团轨道交通工程有限公司 Shield center girff renovation technique at ambient pressure in upper-soft lower-hard ground
CN108643922A (en) * 2018-04-18 2018-10-12 中铁十四局集团有限公司 A kind of highly permeable soil rock compound stratum major diameter slurry shield synthesis driving method
CN110436836A (en) * 2019-08-21 2019-11-12 河海大学 SCAP formula earth pressure balanced shield, EPBS opens the cabin with mud and its preparation method
CN110924965A (en) * 2019-12-18 2020-03-27 沈阳市政集团有限公司 Construction method for solving shield cutter head stall by grouting reinforcement and internal support method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07229391A (en) * 1994-02-18 1995-08-29 Taisei Corp Shield machine and shield driving method
JP2006028979A (en) * 2004-07-21 2006-02-02 Jfe Engineering Kk Chemical injecting device for shield machine
CN101566063A (en) * 2009-06-04 2009-10-28 上海交通大学 Method of reinforcing soil body for inlet and outlet cave mouths of tunnel shield
CN201606081U (en) * 2009-12-25 2010-10-13 上海市基础工程有限公司 Double-circular shield machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07229391A (en) * 1994-02-18 1995-08-29 Taisei Corp Shield machine and shield driving method
JP2006028979A (en) * 2004-07-21 2006-02-02 Jfe Engineering Kk Chemical injecting device for shield machine
CN101566063A (en) * 2009-06-04 2009-10-28 上海交通大学 Method of reinforcing soil body for inlet and outlet cave mouths of tunnel shield
CN201606081U (en) * 2009-12-25 2010-10-13 上海市基础工程有限公司 Double-circular shield machine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王海涛等: "浅谈无水砂卵石地层下土压平衡盾构机常压开舱施工", 《隧道与地下工程》 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425425B (en) * 2011-12-26 2014-07-23 中铁四局集团有限公司 Working face reinforcing structure in shield machine cabin as well as construction method and equipment thereof
CN103993888A (en) * 2011-12-26 2014-08-20 中铁四局集团有限公司 Improved structure of shield tunneling machine used for reinforcement construction of tunnel face inside cabin of shield tunneling machine
CN102425425A (en) * 2011-12-26 2012-04-25 中铁四局集团有限公司 Working face reinforcing structure in shield machine cabin as well as construction method and equipment thereof
CN103993888B (en) * 2011-12-26 2016-02-10 中铁四局集团有限公司 A kind of shield machine modified node method for solidifying of the working face construction in shield machine cabin
CN104005769A (en) * 2014-03-25 2014-08-27 中铁十六局集团地铁工程有限公司 Waterless sandy cobble stratum shield cabin-opening tool changing method
CN104005769B (en) * 2014-03-25 2016-05-04 中铁十六局集团地铁工程有限公司 A kind of the open the cabin method of tool changing of shield in sandy cobble with no water
CN103967498B (en) * 2014-04-21 2016-03-23 河海大学 A kind of method of opening the cabin with pressure of shield machine in coarse-grained soil stratum
CN103967498A (en) * 2014-04-21 2014-08-06 河海大学 Under-pressure chamber opening method for shield tunneling machine in coarse-grain soil stratum
CN105257309A (en) * 2015-10-30 2016-01-20 上海交通大学 Tool changing construction method for in-chamber grouting of earth pressure balance shield machine in sand bed
CN105257306A (en) * 2015-10-30 2016-01-20 上海交通大学 Reinforced warehouse-filling cutter-replacement construction method in shield tunneling machine warehouse
CN105569665A (en) * 2015-10-30 2016-05-11 中铁十六局集团北京轨道交通工程建设有限公司 Tool changing construction method realizing soil mass reinforcement from outside of soil room for earth pressure balance shield machine in sand layer
CN105257306B (en) * 2015-10-30 2018-02-09 上海交通大学 A kind of tool changing construction method of filling in barn reinforced in shield cabin
CN105545315A (en) * 2015-12-29 2016-05-04 上海市基础工程集团有限公司 Normal pressure tool replacing method for reinforcing excavation face soil layer in shield tunnel construction
CN106907157A (en) * 2017-02-09 2017-06-30 广东水电二局股份有限公司 A kind of shield machine normal pressure opens the cabin operation construction method
CN106907157B (en) * 2017-02-09 2019-01-04 广东水电二局股份有限公司 A kind of shield machine normal pressure opens the cabin operation construction method
CN107201905A (en) * 2017-06-06 2017-09-26 中铁十九局集团轨道交通工程有限公司 Shield center girff renovation technique at ambient pressure in upper-soft lower-hard ground
CN108643922A (en) * 2018-04-18 2018-10-12 中铁十四局集团有限公司 A kind of highly permeable soil rock compound stratum major diameter slurry shield synthesis driving method
CN108643922B (en) * 2018-04-18 2020-06-05 中铁十四局集团有限公司 Large-diameter slurry shield comprehensive tunneling method for highly permeable soil-rock composite stratum
CN110436836A (en) * 2019-08-21 2019-11-12 河海大学 SCAP formula earth pressure balanced shield, EPBS opens the cabin with mud and its preparation method
CN110436836B (en) * 2019-08-21 2021-10-15 河海大学 Slurry for SCAP type earth pressure balance shield cabin opening and preparation method thereof
CN110924965A (en) * 2019-12-18 2020-03-27 沈阳市政集团有限公司 Construction method for solving shield cutter head stall by grouting reinforcement and internal support method

Also Published As

Publication number Publication date
CN102168565B (en) 2013-01-23

Similar Documents

Publication Publication Date Title
CN102168565B (en) Soil reinforcing method for realizing normal-pressure cabin opening of shield machine
CN102536253B (en) Construction method of earth cabin back filling and cabin entering operation during earth pressure shielding
CN108691550B (en) Vertical shaft shield machine for underground upward construction and construction method thereof
CN102182468B (en) Method and device for solidifying water-filling cracking surrounding rocks of tunnel by adopting high-pressure air water-dispelling grouting
CN107130656B (en) Integrated mining loader with functions of underground drilling, anchoring and rock breaking
CN208280207U (en) A kind of Novel tunnel reparation driving loading machine
CN201826302U (en) Boring device for large-diameter cast-in-situ thin-walled concrete composite pile
CN106089245B (en) One kind postpones grouting method after being used for single shield TBM walls
CN208650855U (en) A kind of shield machine sealing grease filling system
CN202001024U (en) Engineering van capable of rapidly repairing tunnel defects
CN102677657B (en) Townhouse waters the construction treating methods of knot thin-walled concrete composite pile wall
CN203531028U (en) Multifunctional auxiliary loading device integrating crushing and excavation
CN203698069U (en) Underground granular explosive loading device
CN202323934U (en) Hole forming device for cast-in-situ triangular composite foundation pile
CN108625873A (en) A kind of slurry balance pipe-jacking tunneling machine
CN101725355A (en) Palisade structure for underground architectural shaft and shield machine cutting construction method thereof
CN202645576U (en) Open shield sealing device
CN2789717Y (en) Mine bore hole tamping machine
CN203809009U (en) Triple tube rotary jet grouting reinforcement system
CN208748658U (en) A kind of pneumatic machine-carried type dabbing machine
CN102733813A (en) Opened shield sealing device
CN207295806U (en) A kind of civil engineering digging machine bucket
KR100997373B1 (en) Dredging plant equipment
CN212716640U (en) Thick mud type rectangular pipe jacking machine
CN109339815B (en) Method for disassembling and assembling screw machine in shield tunneling process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130123

CF01 Termination of patent right due to non-payment of annual fee