A kind of electric power line pole tower electronic recognition with step on bar personnel automatic station-keeping system
Technical field
The present invention relates to a kind of electric power line pole tower operation safe monitoring system, specifically relate to a kind of electric power line pole tower electronic recognition based on GIS and step on bar personnel automatic station-keeping system.
Background technology
At present, electric power enterprise is in the electric power line pole tower operation, and for preventing operating personnel's fault rod climbing tower, the precautionary measures mainly contain: the one, for the operating personnel distributes the task list, the operating personnel arrives the target shaft tower of operating area according to the task list distributed, and according to the action evolutionary operation; The 2nd, arrange on-the-spot tour personnel, the operation process of stepping on the bar operating personnel is carried out the scene supervision, so that in time find and prevent the violation operation behaviour of stepping on the bar operating personnel.It is bigger that the above-mentioned precautionary measures are influenced by human factor, because the accident that personnel's carelessness causes still happens occasionally.In addition, aforesaid way can not be carried out the remote monitoring of electric power line pole tower operation, and the long-range task of distributing, and is unfavorable for increasing substantially of electric power line pole tower operating efficiency.
Summary of the invention
Task of the present invention is to solve the existing technological deficiency of electric power line pole tower operating type in the prior art, a kind of electric power line pole tower electronic recognition is provided and steps on bar personnel automatic station-keeping system.
Its technical solution is:
A kind of electric power line pole tower electronic recognition with step on bar personnel automatic station-keeping system, comprise: master station computer, some technical grade PDA and some electronic tags, master station computer is provided with GIS, master station computer connects each technical grade PDA by cordless communication network, and technical grade PDA is connected with electronic tag by RF-wise; Above-mentioned master station computer with technical grade PDA with step on the bar operating personnel and bind one by one, above-mentioned electronic tag is corresponding one by one with shaft tower in the power circuit, and is arranged on each self-corresponding shaft tower; Master station computer is used for distributing mission bit stream to each technical grade PDA transmission, this distributes position and coded data that mission bit stream comprises the task shaft tower, respectively step on the technical grade PDA that uses before the bar operating personnel sets out with its binding and download the task of distributing from master station computer, and carry this technical grade PDA and arrive the specified operating area, when preparing to climb the target shaft tower, use technical grade PDA to read the data message that the electronic tag on this target shaft tower is put down in writing, technical grade PDA confirms according to the data message that is read whether this target shaft tower is the task shaft tower of distributing in the task, and be prompted to and step on the bar operating personnel, meanwhile, this technical grade PDA sends to master station computer with the data message that is read automatically, and demonstrates the position at this target shaft tower place on the electronic chart of master station computer.
Above-mentioned master station computer is provided with first order acoustooptic alarm system, and each technical grade PDA is provided with second level acoustooptic alarm system; First order acoustooptic alarm system is made sound and light alarm in target shaft tower and the position of task shaft tower on electronic chart when inconsistent, simultaneously, alarm command is sent to corresponding technical grade PDA, makes sound and light alarm at the construction field (site) by second level acoustooptic alarm system; Above-mentioned each technical grade PDA also is provided with the green indicating lamp of indication normal operating conditions.
Above-mentioned technical grade PDA is provided with the operation push-button that can manually send lower beam information.
Above-mentioned electric power line pole tower electronic recognition with step on bar personnel automatic station-keeping system, also comprise: plurality of client end computing machine, client computer connects master station computer by the national grid intercommunication network.
The present invention has following useful technique effect:
The present invention can carry out the remote monitoring of electric power line pole tower operation, and the long-range task of distributing, and not only can improve the safety work level, stops the generation of security incident preferably, also is particularly conducive to increasing substantially of electric power line pole tower operating efficiency.
Description of drawings
The invention will be further described below in conjunction with accompanying drawing and embodiment:
Fig. 1 is the structural principle synoptic diagram of one embodiment of the present invention.
Embodiment
Referring to Fig. 1, a kind of electric power line pole tower electronic recognition with step on bar personnel automatic station-keeping system, comprising: master station computer 1, some technical grade PDA2 and some electronic tags 3; Master station computer 1 is provided with GIS, and master station computer 1 connects each technical grade PDA2 by cordless communication network, and technical grade PDA2 is connected with electronic tag 3 by RF-wise.Above-mentioned master station computer 1 with technical grade PDA2 with step on bar operating personnel 4 and bind one by one, above-mentioned electronic tag 3 is corresponding one by one with shaft tower in the power circuit, and is arranged on each self-corresponding shaft tower.
Above-mentioned master station computer is used for distributing mission bit stream to each technical grade PDA transmission, this distributes position and coded data that mission bit stream comprises the task shaft tower, respectively step on the technical grade PDA that uses before the bar operating personnel sets out with its binding and download the task of distributing from master station computer, and carry this technical grade PDA and arrive the specified operating area, when preparing to climb the target shaft tower, use technical grade PDA to read the data message that the electronic tag on this target shaft tower is put down in writing, technical grade PDA confirms according to the data message that is read whether this target shaft tower is the task shaft tower of distributing in the task, and be prompted to and step on the bar operating personnel, meanwhile, this technical grade PDA sends to master station computer with the data message that is read automatically, and demonstrates the position at this target shaft tower place on the electronic chart of master station computer.
Above-mentioned master station computer is provided with first order acoustooptic alarm system, and each technical grade PDA is provided with second level acoustooptic alarm system; First order acoustooptic alarm system is made sound and light alarm in target shaft tower and the position of task shaft tower on electronic chart when inconsistent, simultaneously, alarm command is sent to corresponding technical grade PDA, makes sound and light alarm at the construction field (site) by second level acoustooptic alarm system; Above-mentioned each technical grade PDA also is provided with the green indicating lamp of indication normal operating conditions.Above-mentioned technical grade PDA is provided with the operation push-button that can manually send lower beam information.
In addition, above-mentioned electric power line pole tower electronic recognition with step on bar personnel automatic station-keeping system and also comprise: plurality of client end computing machine 5, client computer 5 connects master station computer by the national grid intercommunication network.
Electronic tag in the aforesaid way can use adhesive sticker to be pasted on the shaft tower, and electronic tag adopts RFID high frequency anti-metal tag, and chip adopts the former cartridge chip of NXP, reads highly sensitive.Technical grade PDA in the aforesaid way has functions such as radio-frequency card reads, GPRS communication, and supports secondary development; The Window CE5.0 that PDA operating system can adopt MS to produce, this system performance set is at the environment of end-to-end exploitation, and comprised equipment for customizing needed all, and system stability; Main effect is: step on before the bar operating personnel sets out, task is downloaded on the PDA, carry out task browse, inquiry, brush radio-frequency card, the prompting of mistake upper boom and with the master station computer communication etc. by PDA; Communication module can adopt the Socket technology to realize, when upper boom, step on the bar operating personnel if with PDA facing to (distance can not above 10 centimetres) electronic tag, by a scanning button, promptly finish upper boom and operate, whether PDA can inquire the target shaft tower is appointment shaft tower in the task, and be prompted to and step on the bar operating personnel, background program is sent to master station computer with data message, the lower beam process simultaneously, need not swipe the card once more, only need press the operation push-button that sends lower beam information and get final product.Wireless communication networks in the aforesaid way, can adopt the China Mobile GPRS network, this mobile network's coverage rate is wide, live effect good, be deployed to VPN (Virtual Private Network virtual private networks) by China Mobile between GPRS network and the national grid ethernet local area network, each technical grade PDA just can become a VLAN with the national grid Intranet like this, realizes intercommunication mutually.The software of above-mentioned master station computer comprises Communications service program, database and client-side program etc.; Communications service program and database are placed in the national grid machine room server, and the Communications service program is opened all the time, constantly receive and handle from the infomational message of fore device and with command message to be sent to fore device; Client-side program adopts GIS (Geographic Information System Geographic Information System) technological development to form, and can accurately locate electric power facilities such as shaft tower, transformer station on electronic chart; Client comprises super-ordinate right and common authority, and super-ordinate right is used by the responsible official, can carry out operations such as task generation, MIS management; Common authority can only be carried out browse operation; Client can be presented at field staff's the bar state of stepping on the screen, and carries out auditory tone cues.
The technology contents of not addressing in the aforesaid way is taked or is used for reference prior art and can realize.
Need to prove, any equivalent way that those skilled in the art have done under the instruction of this instructions, or obviously variant all should be in protection scope of the present invention.