CN102151936A - Grind shoe manufacture method and tool - Google Patents

Grind shoe manufacture method and tool Download PDF

Info

Publication number
CN102151936A
CN102151936A CN2011100415504A CN201110041550A CN102151936A CN 102151936 A CN102151936 A CN 102151936A CN 2011100415504 A CN2011100415504 A CN 2011100415504A CN 201110041550 A CN201110041550 A CN 201110041550A CN 102151936 A CN102151936 A CN 102151936A
Authority
CN
China
Prior art keywords
welding
junk mill
frock
welding tooling
manufacture method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100415504A
Other languages
Chinese (zh)
Other versions
CN102151936B (en
Inventor
梅宗斌
梅宗清
王永充
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LUZHOU CHUANYOU DRILING EQUIPMENT CO Ltd
Original Assignee
LUZHOU CHUANYOU DRILING EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LUZHOU CHUANYOU DRILING EQUIPMENT CO Ltd filed Critical LUZHOU CHUANYOU DRILING EQUIPMENT CO Ltd
Priority to CN2011100415504A priority Critical patent/CN102151936B/en
Publication of CN102151936A publication Critical patent/CN102151936A/en
Application granted granted Critical
Publication of CN102151936B publication Critical patent/CN102151936B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a grind shoe manufacture method which comprises the steps as follows: a grind shoe body is manufactured by carbon steel or tungsten carbide; a surfacing layer on the grind shoe body is arranged at a downward welding position; a workpiece is preheated by flame firstly; then a welding tool is mounted to clamp the grind shoe body; austenite stainless steel or copper alloy is selected as the material of the surface of the welding tooling contacted with the grind shoe body and the surfacing layer; YD hard alloy welding rods are used for implementing resurfacing welding on the grind shoe body; after the welding is completed, an inner blocker is loosened to take off the welding tool. According to the grind shoe manufacture method, the welding is convenient, and the resurfacing welding forming is good; and the grind shoe become a finished product without secondary processing after the welding is completed.

Description

Junk mill manufacture method and frock
Technical field
The present invention relates to the preparation method of oil exploitation underground work workpiece, specifically a kind of manufacture method that is used for the junk mill of down-hole grinding, and the frock that is used for this method.
Background technology
Junk mill belongs to a kind of workover tool, is made of body and carbide alloy section, and the carbide alloy section is welded on bodies top, has the high advantage of grinding efficiency.The method of making has following two kinds: a kind of is the body of just reserving one section tubbiness when the junk mill body is made, external mold as pile-up welding hard alloy, this section external mold has just connected together with the alloy of built-up welding after welding is finished, and the effect when junk mill uses has just descended greatly like this; Another kind method is to add a frock in order to built-up welding in the junk mill periphery after the junk mill body is finished, and removes frock with cutting working method again after welding is finished, and has so not only bothered but also uneconomical.
Summary of the invention
The junk mill manufacture method and the frock thereof that the purpose of this invention is to provide a kind of handling ease.
Technical scheme of the present invention is as follows:
A kind of junk mill manufacture method comprises the steps:
A, make the junk mill body with carbon steel or tungsten carbide;
B, make the overlay cladding on the junk mill body be in the downhand position, at first with the pre-heated work pieces of flame, load onto welding tooling then and clamp the junk mill body, and it is identical with the outer side clearance of junk mill bodies top to regulate the built-up welding contact layer that makes the frock inboard, this welding tooling comprises can be enclosed within this external frock body of junk mill, has the interior card that is used to clamp the junk mill body in the frock body, interior cartoon crosses screw rod and nut is installed on the frock body, the holding screw of regulating the welding tooling position also is installed on the frock body, and welding tooling is austenitic stainless steel or copper alloy with the material of the face that the junk mill body contacts with overlay cladding;
C, on the junk mill body, carry out built-up welding, unclamp interior card after welding is finished, take off welding tooling and get final product with YD type carbide electrode.
The invention has the beneficial effects as follows: because the welding of YD type hard alloy composite material surfacing welding belongs to gas brazing, the tyre body alloy of this welding rod has good wellability to carbon steel and tungsten carbide particle at a certain temperature, tyre body alloy is relatively poor to the wellability of austenitic stainless steel under same temperature, and is relatively poor to the wellability of copper alloy.Therefore, utilize this difference, the material that the material of choose reasonable junk mill body and frock contact with overlay cladding, make alloy welding deposit and junk mill body firm welding can not connect together with frock again, convenient welding, built-up welding are shaped, after built-up welding is finished, frock unclamped to take off get final product, be finished product after junk mill has welded and need not secondary operations, improved the junk mill working (machining) efficiency, reduced production cost.
Description of drawings
The present invention will illustrate by example and with reference to the mode of accompanying drawing, wherein:
Fig. 1 be the embodiment of the invention in weld deposit process, the installation diagram of junk mill body and welding tooling.
Fig. 2 is the schematic diagram of the welding tooling that uses of the present invention.
The specific embodiment
Specific embodiments of the invention 1, a kind of junk mill manufacture method comprises the steps:
One, material is prepared:
1, uses steel alloy 35C RM OOr tungsten carbide is made junk mill body 9;
2, prepare welding tooling, this frock comprises the frock body 2 that can be enclosed within outside the junk mill body 9, and frock body 2 is made of jointly three block parts, and forms a ring-type integral body.Have 3 (or a plurality of) the interior card 3 and the wild card 4 that are used to clamp junk mill body 9 in the frock body of trisection, interior card 3 is used to tighten the junk mill body, in this example wild card 4 be mainly used in three block parts connect do as a whole, and as the location benchmark of interior card 3; Interior card 3 and wild card 4 are installed on the frock body 2 by screw rod 6 and nut 5, and the holding screw 1 of regulating the welding tooling position also is installed on frock body 2, and the material of the built-up welding contact layer 7 of frock body inboard is an austenitic stainless steel;
Two, welding:
As shown in Figure 1, the first step is horizontal junk mill body 9 tops; Second step was preheated to about 600 ℃ junk mill body 9 tops with flame, was used to obtain better built-up welding effect, and produced excessive stress when avoiding installing additional the laggard windrow weldering of frock; The 3rd step was placed in frock on the junk mill body 9, with holding screw 1 frock was fixed on the junk mill body 9, and regulated holding screw 1 and make the built-up welding contact layer 7 of frock inboard identical with junk mill body 9 top outer gaps, and the thin and thick of assurance overlay cladding is even; In the 4th step, on the junk mill body, carry out built-up welding with YD type hard alloy composite material surfacing welding; The 5th step, after finishing, welding unclamps interior card, take off welding tooling.Finish welding.
Tool structure in the foregoing description as shown in Figure 2, frock body 2 usefulness carbon steels are made, built-up welding contact layer 7 is>the austenitic stainless steel overlay cladding of 5mm, car evenly was cut into trisection along axis 12 with body with wire cutting method after built-up welding was finished after finishing after given size, boring, tapping are finished, and with interior card 3, wild card 4, screw rod 6 and nut 5 body of trisection was combined into round frock body 2.Card 3 position in can regulating by the cooperation of screw rod 6 and nut 5, interior card 3 usefulness austenitic stainless steels are made.On frock body 2, also have holding screw 1, be used to adjust the relative position of frock body 2 and junk mill body 9.

Claims (2)

1. a junk mill manufacture method comprises the steps:
Make the junk mill body with carbon steel or tungsten carbide;
Make the overlay cladding on the junk mill body be in the downhand position, at first with the pre-heated work pieces of flame, load onto welding tooling then and clamp the junk mill body, and it is identical with the outer side clearance of junk mill bodies top to regulate the built-up welding contact layer that makes the frock inboard, this welding tooling comprises can be enclosed within this external frock body of junk mill, has the interior card that is used to clamp the junk mill body in the frock body, interior cartoon crosses screw rod and nut is installed on the frock body, the holding screw of regulating the welding tooling position also is installed on the frock body, and welding tooling is austenitic stainless steel or copper alloy with the material of the face that the junk mill body contacts with overlay cladding;
On the junk mill body, carry out built-up welding, unclamp interior card after welding is finished, take off welding tooling and get final product with YD type carbide electrode.
2. the frock of using in the described junk mill manufacture method of claim 1, it is characterized in that: this welding tooling comprises can be enclosed within this external frock body of junk mill, has the interior card that is used to clamp the junk mill body in the frock body, interior cartoon crosses screw rod and nut is installed on the frock body, the holding screw of regulating the welding tooling position also is installed on the frock body, and welding tooling is austenitic stainless steel or copper alloy with the material of the face that the junk mill body contacts with overlay cladding.
CN2011100415504A 2011-02-21 2011-02-21 Grind shoe manufacture method and tool Active CN102151936B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100415504A CN102151936B (en) 2011-02-21 2011-02-21 Grind shoe manufacture method and tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100415504A CN102151936B (en) 2011-02-21 2011-02-21 Grind shoe manufacture method and tool

Publications (2)

Publication Number Publication Date
CN102151936A true CN102151936A (en) 2011-08-17
CN102151936B CN102151936B (en) 2013-11-20

Family

ID=44433793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100415504A Active CN102151936B (en) 2011-02-21 2011-02-21 Grind shoe manufacture method and tool

Country Status (1)

Country Link
CN (1) CN102151936B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104259709A (en) * 2014-09-23 2015-01-07 菏泽市恒大石油机械配件厂 Production method of grinding shoes, milling shoes or milling drums
CN104439589A (en) * 2014-10-31 2015-03-25 中国石油化工股份有限公司 Shoe milling tool and manufacturing process thereof
CN106041257A (en) * 2016-07-05 2016-10-26 邵元龙 Manufacturing process of grinding, casing milling and well repairing tool and mold

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002156484A (en) * 2000-11-21 2002-05-31 Ishikawajima Harima Heavy Ind Co Ltd Manufacturing and installing method for base plate
CN200985757Y (en) * 2006-07-20 2007-12-05 范伟光 Milling shoe
CN101780582A (en) * 2009-01-20 2010-07-21 机械科学研究院哈尔滨焊接研究所 Automatic surfacing device of inner wall anticorrosion layer of 90-degree bent pipe and automatic surfacing method thereof
CN201960303U (en) * 2011-02-21 2011-09-07 泸州川油钻采工具有限公司 Manufacture of tooling wear shoes

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002156484A (en) * 2000-11-21 2002-05-31 Ishikawajima Harima Heavy Ind Co Ltd Manufacturing and installing method for base plate
CN200985757Y (en) * 2006-07-20 2007-12-05 范伟光 Milling shoe
CN101780582A (en) * 2009-01-20 2010-07-21 机械科学研究院哈尔滨焊接研究所 Automatic surfacing device of inner wall anticorrosion layer of 90-degree bent pipe and automatic surfacing method thereof
CN201960303U (en) * 2011-02-21 2011-09-07 泸州川油钻采工具有限公司 Manufacture of tooling wear shoes

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周全兴: "《钻采工具手册》", 31 January 2007, article "钻采工具手册" *
郝荣明等: "NEM-8型高效磨鞋的研制", 《石油钻探技术》, vol. 30, no. 2, 31 August 2002 (2002-08-31) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104259709A (en) * 2014-09-23 2015-01-07 菏泽市恒大石油机械配件厂 Production method of grinding shoes, milling shoes or milling drums
CN104259709B (en) * 2014-09-23 2016-02-03 菏泽市恒大石油机械配件厂 The manufacture method of a kind of junk mill, milling shoe or casing section mill
CN104439589A (en) * 2014-10-31 2015-03-25 中国石油化工股份有限公司 Shoe milling tool and manufacturing process thereof
CN104439589B (en) * 2014-10-31 2018-01-19 中国石油化工股份有限公司 A kind of junk mill frock and its manufacturing process
CN106041257A (en) * 2016-07-05 2016-10-26 邵元龙 Manufacturing process of grinding, casing milling and well repairing tool and mold

Also Published As

Publication number Publication date
CN102151936B (en) 2013-11-20

Similar Documents

Publication Publication Date Title
CN101382072B (en) Diamond cast-in pick and making process thereof
CN101804709A (en) Wearing resistant structure of wear resistant piece and repair machining process thereof
CN104014922B (en) A kind of hard alloy and the quick diffusion welding method of steel
CN103231203A (en) Connecting method for aluminum-steel dissimilar materials
CN102151936B (en) Grind shoe manufacture method and tool
CN105458641A (en) Manufacturing method for integral PCD cutters applied to small-diameter hole manufacturing
CN103624490A (en) Method for machining bimetal composite single-weld-seam bend
CN201960303U (en) Manufacture of tooling wear shoes
CN101537559B (en) Manufacturing method for diamond tool
CN104057269A (en) Machining technology of punch of hard alloy holding-up hammer forming die
CN106312152A (en) Method for machining thin-walled components
CN201645924U (en) Wear-resistant structure of wear-resistant part
CN102581587A (en) Method for manufacturing high-efficiency diamond geological drills
CN104439589B (en) A kind of junk mill frock and its manufacturing process
CN203696170U (en) Built-up jig for machining main body and sleeve of lathe wrench
CN101850495B (en) Processing method of composite copper nuts
CN111482609B (en) Method for manufacturing radial centralizing sliding bearing moving ring
EP3346167B1 (en) Processing method for high performance titanium connecting sealing ring for deep-sea oil drilling and production device
CN205189866U (en) Novel coal mining machine cutting pick
CN103737332A (en) Producing method for hard high-speed wire roller collar
CN105798537B (en) A kind of processing method of high-precision isomery pressure ring
CN110509010A (en) A kind of heavy wheel seat ring processing technology
CN103706905B (en) The main body of lathe for machining spanner and the built-up jig of sleeve and method
CN201684961U (en) Split type drill
CN217453549U (en) Hard alloy and high-speed steel grinding are with diamond grinding wheel of brazing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 646006 No. 78 North madder Road, Sichuan, Luzhou

Applicant after: SICHUAN HWAYOO PETROLEUM DRILLING & PRODUCTION CO., LTD.

Address before: 646006 No. 78 North madder Road, Sichuan, Luzhou

Applicant before: Luzhou Chuanyou Driling Equipment Co.,Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: LUZHOU CHUANYOU DRILL + PRODUCTION EQUIPMENT CO., LTD. TO: SICHUAN HUAYU PETROLEUM DRILLING EQUIPMENT CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant