CN102146669A - 可搬迁固定式人工岛筒型基础 - Google Patents

可搬迁固定式人工岛筒型基础 Download PDF

Info

Publication number
CN102146669A
CN102146669A CN2010101131308A CN201010113130A CN102146669A CN 102146669 A CN102146669 A CN 102146669A CN 2010101131308 A CN2010101131308 A CN 2010101131308A CN 201010113130 A CN201010113130 A CN 201010113130A CN 102146669 A CN102146669 A CN 102146669A
Authority
CN
China
Prior art keywords
man
made island
suction
bucket foundation
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010101131308A
Other languages
English (en)
Other versions
CN102146669B (zh
Inventor
王翎羽
刘津
宋平娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD.
Original Assignee
HAIWANGXING OCEAN ENGINEERING TECHNOLOGY Co LTD TIANJIN CITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAIWANGXING OCEAN ENGINEERING TECHNOLOGY Co LTD TIANJIN CITY filed Critical HAIWANGXING OCEAN ENGINEERING TECHNOLOGY Co LTD TIANJIN CITY
Priority to CN2010101131308A priority Critical patent/CN102146669B/zh
Publication of CN102146669A publication Critical patent/CN102146669A/zh
Application granted granted Critical
Publication of CN102146669B publication Critical patent/CN102146669B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/0073Details of sea bottom engaging footing
    • E02B2017/0078Suction piles, suction cans

Landscapes

  • Foundations (AREA)

Abstract

可搬迁固定式人工岛筒型基础,由吸力锚、圆弧裙板、环形平板和三角撑板组成。其中6个吸力锚筒型基础均布于一块防海底冲刷的环形平板下方,6块圆弧裙板分别位于相邻两个吸力锚之间,与吸力锚的上部和环形平板相连接,在6个吸力锚的中间位置加有三角撑板,在环形平板上方设置有6个锥台和锥孔。这种可搬迁固定式人工岛筒型基础的有益效果是该结构优化了结构形式,降低了结构重量,在海上安装过程中借助浮吊的作用可以直接进行整体安装;而且该结构形式增加了结构承载力,提高了结构的刚度和水平抗弯力;该结构安装简易,使得海上安装工期缩短,因此可显著降低工程费用;同时该结构可搬迁,达到了重复利用的目的。

Description

可搬迁固定式人工岛筒型基础
技术领域
本发明属于海洋工程领域浅海边际油田固定式人工岛结构形式的创新。
背景技术
随着人们对海洋空间的利用需求和能力的不断增加,人工岛建设的数量和规模在逐年增长。近年来,我国也在逐步摸索建设人工岛的经验,特别是石油工程界,由于人工岛具有接收、处理、储存、转输原油的独特功能,因此,从1991年开始,在渤海埕岛油田动工兴建了第一座先导性试验人工岛,为后来大规模开发浅海石油人工岛提供了经验。另一典型的人工岛是由中国港湾建设总公司承建的澳门国际机场,是在国内软土地基上成功建设的最大型的人工岛工程,面积达1.15km2
就人工岛的工程结构特性而言,尽管已建成的和正在规划设计的用于不同目的的人工岛,曾经和正在面对着设计、施工、使用中的一些特殊技术问题,但从总体分析,人工岛构筑的基本问题仍然未超出海岸工程的基本技术范畴,如:填筑式人工岛岛壁护岸结构型式仍不外于抛石斜坡堤、混合式、重力式、混凝土板桩、地连墙、钢管(板)桩、钢板桩格型围囹,钢筋混凝土大直径圆筒等几类结构型式。此外的桩基式人工岛、着底式人工岛、项开式人工岛、浮式人工岛、半潜式人工岛等多种型式也都是海岸工程中常规结构,但已建成的人工岛中还是以填筑式占多数,在所围成的岛区内吹填(或者回填)就近挖吹海底泥沙或石料、砾石、山皮土等填料形成陆域,并进行地基加固处理,其加固处理的方法更是海岸工程中驾轻就熟的技术。
发明内容
为了缩短浅海边际油田人工岛的海上建造工期,并降低费用,同时为了使人工岛能够搬迁固定,本发明提供一种浅海边际油田可搬迁固定式人工岛筒型基础结构,在一定程度上可以实现人工岛重复利用的功能。该结构由于构造简单、重量轻等特点,可在浮吊的辅助作用下直接实现整体海上安装。本发明优化了结构形式,增加了结构承载力,提高了结构刚度与水平面抗弯能力,在简化海上安装施工程序的同时,达到缩短海上安装工期、降低安装费用的目的。
本发明解决其技术问题所采用的技术方案是:可搬迁固定式人工岛筒型基础由吸力锚、圆弧裙板、环形平板和三角撑板组成。其中6个吸力锚筒型基础均布于一块防海底冲刷的环形平板下方,6块圆弧裙板分别在相邻两个吸力锚之间,与吸力锚的上部和环形平板相连接。为了提高筒型基础的强度和水平面抗弯能力,在6个吸力锚的中间位置加有三角撑板。在环形平板的上面与每个吸力锚中心相对应的位置都有一个锥台,在锥台的中心位置设置有锥孔,以连接人工岛上部基础中的管子,以便机械锁紧连接杆插入。可搬迁固定式人工岛筒型基础是采用整体安装的安装方式,其安装过程是各部分结构均在船坞内建造,人工岛筒型基础在船坞内建造完成后,将船坞开闸充水,下部基础充气浮起,用拖轮将下部基础拖运到施工海域并抛锚定位,在浮吊的扶正下,下部基础依靠自重使吸力锚筒形基础初始入泥,达到桩土密封条件后,通过潜水泵抽取吸力桩筒形基础内的水,使其吸力沉放至设计位置,人工岛筒型基础即安装完成。
本发明的有益效果是,该结构优化了结构形式,降低了结构重量,在海上安装过程中借助浮吊的作用下可以直接进行整体安装;而且该结构形式增加了结构承载力,提高了结构的刚度与水平面抗弯能力;该结构安装简易,在简化海上安装施工程序的同时,使得海上安装工期缩短,因此可显著降低工程费用;同时该结构可搬迁,达到了重复利用的目的。
附图说明
以下结合附图及实施例对本发明作进一步说明。
图1是本发明的总体效果图;
图2是本发明的俯视图;
图3是本发明的侧视图;
图4是本发明的人工岛总体示意图。
其中:1-吸力锚;2-圆弧裙板;3-环形平板;4-三角撑板;5-锥台;6-锥孔;7-人工岛上部组块。
具体实施方式
可搬迁固定式人工岛筒型基础总体结构见图1,该人工岛筒型基础由吸力锚1、圆弧裙板2、环形平板3和三角撑板4组成。其中6个吸力锚1均布于一块防海底冲刷的环形平板3的下方,环形平板3的径向宽度等于相正对两个吸力锚1的直径,6块圆弧裙板2分别在相邻两个吸力锚1之间,与吸力锚的上部和环形平板3连接,在6个吸力锚1筒型基础之间加有三角撑板4,以提高强度和水平面抗弯力。在环形平板3的上面与每个吸力锚1中心相对应的位置都有一个锥台5,在锥台5的中心位置设置有锥孔6,以连接人工岛上部基础中的管子,以便机械锁紧连接杆插入。
本发明的具体施工步骤如下:
人工岛筒型基础在船坞内建造完成后,船坞开闸充水,人工岛筒型基础充气浮起,用拖轮拖出筒型基础,用拖轮拖运到施工海域,抛锚定位后,在浮吊的扶正下,人工岛筒型基础依靠自重使吸力锚1初始入泥,达到桩土密封条件后,通过潜水泵抽取吸力锚筒形基础1内的水,使其吸力沉放至设计位置。然后进行人工岛上部组块就位,上部组块和人工岛筒型基础完成对位并安装。

Claims (5)

1.可搬迁固定式人工岛筒型基础,由吸力锚、圆弧裙板、环形平板和三角撑板组成,其特征在于该结构可搬迁,达到重复利用的效果。
2.根据权利要求1所述的可搬迁固定式人工岛筒型基础,其特征在于所说的圆弧裙板和三角撑板增加了该结构的承载力,提高了结构刚度与水平抗弯能力。
3.根据权利要求1所述的可搬迁固定式人工岛筒型基础,其特征在于该人工岛筒型基础在船坞内建造为一个整体,可在浮吊的扶正下直接进行整体海上安装。
4.根据权利要求1所述的可搬迁固定式人工岛筒型基础,其特性在于在环形平板上与每个吸力锚中心相对应的设置有一个锥台和锥孔,以连接人工岛上部基础中的管子,以便机械锁紧连接杆插入。
5.根据权利要求1所述的可搬迁固定式人工岛筒型基础,其特征在于该安装方式是采用吸力贯入法,完成吸力锚筒形基础的安装。
CN2010101131308A 2010-02-24 2010-02-24 可搬迁固定式人工岛筒型基础 Expired - Fee Related CN102146669B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101131308A CN102146669B (zh) 2010-02-24 2010-02-24 可搬迁固定式人工岛筒型基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101131308A CN102146669B (zh) 2010-02-24 2010-02-24 可搬迁固定式人工岛筒型基础

Publications (2)

Publication Number Publication Date
CN102146669A true CN102146669A (zh) 2011-08-10
CN102146669B CN102146669B (zh) 2012-12-12

Family

ID=44421125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101131308A Expired - Fee Related CN102146669B (zh) 2010-02-24 2010-02-24 可搬迁固定式人工岛筒型基础

Country Status (1)

Country Link
CN (1) CN102146669B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685296A (zh) * 2019-09-17 2020-01-14 广州海洋地质调查局 一种组合式吸力锚及其海底贯入方法
CN110847216A (zh) * 2019-12-18 2020-02-28 长江勘测规划设计研究有限责任公司 带裙板环形群筒海上风电基础
CN111456688A (zh) * 2020-04-08 2020-07-28 中国石油大学(华东) 一种适合于海洋水合物开采的多锚管自适应井口支撑平台

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6149029A (ja) * 1984-08-13 1986-03-10 Nippon Steel Corp 水中基礎固定装置
CN1376626A (zh) * 2001-03-23 2002-10-30 天津海恩海洋工程技术有限公司 桶型基础板壳结构自安装式海上平台
CN201214785Y (zh) * 2007-12-28 2009-04-01 天津港(集团)有限公司 带肋桩的圆筒体可移动箱筒型基础结构件

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6149029A (ja) * 1984-08-13 1986-03-10 Nippon Steel Corp 水中基礎固定装置
CN1376626A (zh) * 2001-03-23 2002-10-30 天津海恩海洋工程技术有限公司 桶型基础板壳结构自安装式海上平台
CN201214785Y (zh) * 2007-12-28 2009-04-01 天津港(集团)有限公司 带肋桩的圆筒体可移动箱筒型基础结构件

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《水道港口》 20061231 孙百顺; 张勇; 王笑难; 别社安 钢箱筒基础结构应用优势及前景 第384-389页 1-5 , 第6期 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685296A (zh) * 2019-09-17 2020-01-14 广州海洋地质调查局 一种组合式吸力锚及其海底贯入方法
CN110685296B (zh) * 2019-09-17 2024-01-12 广州海洋地质调查局 一种组合式吸力锚及其海底贯入方法
CN110847216A (zh) * 2019-12-18 2020-02-28 长江勘测规划设计研究有限责任公司 带裙板环形群筒海上风电基础
CN111456688A (zh) * 2020-04-08 2020-07-28 中国石油大学(华东) 一种适合于海洋水合物开采的多锚管自适应井口支撑平台
CN111456688B (zh) * 2020-04-08 2021-11-09 中国石油大学(华东) 一种适合于海洋水合物开采的多锚管自适应井口支撑平台

Also Published As

Publication number Publication date
CN102146669B (zh) 2012-12-12

Similar Documents

Publication Publication Date Title
CN205000355U (zh) 一种箱型重力式海上风电基础结构
EP2837554A1 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
US20160340852A1 (en) Construction method for fixing hollow column for supporting marine structures and offshore platforms to a seabed
KR101211811B1 (ko) 조립케이슨을 이용한 현장타설말뚝
CN203701127U (zh) 一种水下重力式基础
CN102296629B (zh) 一种适用于海洋工程的塔筒式结构物及其安装方法
CN204608815U (zh) 筏板重力式海上风机基础
CN114033388B (zh) 富水粉砂层地下隧道顶管用竖井施工方法
CN103572770B (zh) 一种桩箱水工结构物及其建造方法
CN103741706A (zh) 一种深水开敞式组合基础码头及其建造方法
CN104975612A (zh) 水上沉井施工新工艺
CN102146669B (zh) 可搬迁固定式人工岛筒型基础
WO2010143976A2 (en) A foundation, a method of manufacturing the foundation, and a method of installing the foundation on a seabed
CN104762942B (zh) 水上建筑海洋固定平台软土地基海底固定安装施工法
AU2012313196B2 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
CN202969333U (zh) 钢桁架嵌岩码头结构
CN204326119U (zh) 一种桩筏基础抗浮结构
CN201738286U (zh) 一种四脚架墩式结构
CN105401564A (zh) 将潮流能发电装置固定于水底的施工方法和潮流发电装置
CN113668531A (zh) 一种用于海洋大直径管桩安装中防溜桩控制装置
CN202208909U (zh) 迁移底盘式自升降平台
CN205776313U (zh) 一种海上风电瓶形重力式基础
CN204898699U (zh) 一种桥梁沉箱基础
KR20150105891A (ko) 반 매립식 해상비행장의 지하시설물
CN202881899U (zh) 一种适用于外海开敞水域的码头结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Movable/fixed man-made island cylindrical foundation

Effective date of registration: 20130724

Granted publication date: 20121212

Pledgee: Bank of Shanghai Limited by Share Ltd Tianjin branch

Pledgor: Tianjin Neptune Marine Engineering Technology Co., Ltd.|Wudi sea hose manufacturing Co., Ltd.

Registration number: 2013990000500

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
C56 Change in the name or address of the patentee

Owner name: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD.

Free format text: FORMER NAME: HAIWANGXING OCEAN ENGINEERING TECHNOLOGY CO., LTD, TIANJIN CITY

CP01 Change in the name or title of a patent holder

Address after: 300384 Tianjin City, Nankai District Huayuan Industrial Park Road No. 1 Industrial Park E block six layer

Patentee after: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD.

Address before: 300384 Tianjin City, Nankai District Huayuan Industrial Park Road No. 1 Industrial Park E block six layer

Patentee before: Haiwangxing Ocean Engineering Technology Co., Ltd, Tianjin City

CP01 Change in the name or title of a patent holder
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20141119

Granted publication date: 20121212

Pledgee: Bank of Shanghai Limited by Share Ltd Tianjin branch

Pledgor: Tianjin City Neptune marine engineering technology Limited by Share Ltd|Wudi loyal hose manufacturing Co., Ltd.

Registration number: 2013990000500

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Movable/fixed man-made island cylindrical foundation

Effective date of registration: 20141120

Granted publication date: 20121212

Pledgee: Bank of Shanghai Limited by Share Ltd Tianjin branch

Pledgor: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD.

Registration number: 2014990000973

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PM01 Change of the registration of the contract for pledge of patent right

Change date: 20141119

Registration number: 2013990000500

Pledgor after: Tianjin City Neptune marine engineering technology Limited by Share Ltd

Pledgor after: Wudi loyal hose manufacturing Co., Ltd.

Pledgor before: Tianjin Neptune Marine Engineering Technology Co., Ltd.

Pledgor before: Wudi sea hose manufacturing Co., Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20160108

Granted publication date: 20121212

Pledgee: Bank of Shanghai Limited by Share Ltd Tianjin branch

Pledgor: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD.

Registration number: 2014990000973

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Movable/fixed man-made island cylindrical foundation

Effective date of registration: 20160125

Granted publication date: 20121212

Pledgee: Bank of Shanghai Limited by Share Ltd Tianjin branch

Pledgor: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD.

Registration number: 2016120000003

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20170527

Granted publication date: 20121212

Pledgee: Bank of Shanghai Limited by Share Ltd Tianjin branch

Pledgor: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD.

Registration number: 2016120000003

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD.

Document name: Notification of Termination of Patent Right