CN102134967B - 一种煤层底板注浆加固水平定向钻孔的施工方法 - Google Patents
一种煤层底板注浆加固水平定向钻孔的施工方法 Download PDFInfo
- Publication number
- CN102134967B CN102134967B CN 201110026900 CN201110026900A CN102134967B CN 102134967 B CN102134967 B CN 102134967B CN 201110026900 CN201110026900 CN 201110026900 CN 201110026900 A CN201110026900 A CN 201110026900A CN 102134967 B CN102134967 B CN 102134967B
- Authority
- CN
- China
- Prior art keywords
- drilling
- hole
- boring
- sleeve pipe
- seat earth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Earth Drilling (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110026900 CN102134967B (zh) | 2011-01-25 | 2011-01-25 | 一种煤层底板注浆加固水平定向钻孔的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110026900 CN102134967B (zh) | 2011-01-25 | 2011-01-25 | 一种煤层底板注浆加固水平定向钻孔的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102134967A CN102134967A (zh) | 2011-07-27 |
CN102134967B true CN102134967B (zh) | 2012-01-18 |
Family
ID=44294875
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110026900 Active CN102134967B (zh) | 2011-01-25 | 2011-01-25 | 一种煤层底板注浆加固水平定向钻孔的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102134967B (zh) |
Families Citing this family (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102337858B (zh) * | 2011-08-31 | 2014-04-09 | 中国地质大学(武汉) | 一种煤层松散段随钻注浆工具 |
CN102877884B (zh) * | 2012-09-13 | 2016-03-16 | 山东能源集团有限公司 | 一种基于千米定向钻探技术的矿井奥灰顶部改造及施工方法 |
CN103104289B (zh) * | 2013-02-05 | 2015-09-09 | 神华集团有限责任公司 | 一种矿井水害治理方法 |
CN103233699A (zh) * | 2013-04-24 | 2013-08-07 | 张新立 | 一种井筒地面预注浆多工作面平行作业工艺 |
CN103527092B (zh) * | 2013-10-25 | 2015-10-14 | 中国地质大学(武汉) | 水平定向钻孔内射吸排屑扩孔方法 |
CN103643918B (zh) * | 2013-12-20 | 2016-01-20 | 北京大地高科煤层气工程技术研究院 | 一种针对奥陶系灰岩矿区的寻找及防止矿井渗水的方法 |
CN104141470B (zh) * | 2014-07-01 | 2016-09-28 | 中煤科工集团西安研究院有限公司 | 煤矿井下水力压裂钻孔套管段的成孔封固方法 |
CN105888549B (zh) * | 2015-06-26 | 2018-01-19 | 山东科技大学 | 一种千米深l型地面预注浆钻孔用钻具组合及钻孔工艺 |
CN106948843B (zh) * | 2017-03-21 | 2018-11-23 | 山东省邱集煤矿 | 一种双层多分支顺层钻孔注浆改造顶底板双重灰岩含水层方法 |
CN106869791A (zh) * | 2017-03-24 | 2017-06-20 | 中煤科工集团西安研究院有限公司 | 煤矿井下空气螺杆马达定向成孔钻具组合与施工方法 |
CN108798589B (zh) * | 2018-04-28 | 2020-07-28 | 安徽建筑大学 | 一种含水层改性方法 |
CN109322621B (zh) * | 2018-11-15 | 2020-11-24 | 淮南矿业(集团)有限责任公司 | 一种破碎层固管注浆方法 |
CN109488370B (zh) * | 2018-11-26 | 2020-11-10 | 淮南矿业(集团)有限责任公司 | 一种井下灰岩探放水钻孔施工方法 |
CN110984857B (zh) * | 2019-01-08 | 2021-01-29 | 青岛地质工程勘察院(青岛地质勘查开发局) | 一种可双向调节的注浆加固用钻孔装置 |
CN109854297B (zh) * | 2019-02-22 | 2021-01-29 | 中煤科工集团西安研究院有限公司 | 一种基于定向钻探工艺的小煤窑采空区注浆方法 |
CN111042831A (zh) * | 2019-08-20 | 2020-04-21 | 北京龙软科技股份有限公司 | 一种煤层底板灰岩承压含水层注浆加固改造方法 |
CN110566118B (zh) * | 2019-09-09 | 2021-03-26 | 中煤科工集团西安研究院有限公司 | 煤矿井下深埋含水层底板组合定向孔超前注浆改造方法 |
CN110486022B (zh) * | 2019-09-11 | 2020-12-22 | 中煤科工集团西安研究院有限公司 | 煤层底板含水层超前区域治理模式分类确定方法 |
CN111677447A (zh) * | 2020-06-17 | 2020-09-18 | 平安煤炭开采工程技术研究院有限责任公司 | 上向岩石爬坡段定向钻孔的方法 |
CN111810162B (zh) * | 2020-07-10 | 2022-03-15 | 中勘资源勘探科技股份有限公司 | 一种煤矿地面钻孔精准透巷的施工方法 |
CN112282651A (zh) * | 2020-11-12 | 2021-01-29 | 淮南矿业(集团)有限责任公司 | 一种井下钻孔封孔工具及疏放水施工方法 |
CN112761677A (zh) * | 2020-12-09 | 2021-05-07 | 中国矿业大学 | 一种采用机械掘槽施工灌浆隔水层的煤矿井下防治水方法 |
CN112709534B (zh) * | 2021-01-06 | 2024-08-27 | 永煤集团股份有限公司顺和煤矿 | 一种矿用防偏钻头及钻孔方法 |
CN113009570B (zh) * | 2021-02-08 | 2021-11-23 | 中国科学院地理科学与资源研究所 | 一种地质异常点探测方法及装置 |
CN114033382A (zh) * | 2021-08-17 | 2022-02-11 | 国家能源投资集团有限责任公司 | 一种基于含水层改造的保水露采工艺 |
CN114856688B (zh) * | 2022-04-13 | 2023-03-24 | 华北科技学院 | 一种井下注浆浆液充填套管控制煤层底板岩层变形的方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2903137C3 (de) * | 1979-01-27 | 1982-02-18 | Bergwerksverband Gmbh, 4300 Essen | Rohrförmiger verlorener Bohrlochverschluß |
DE3841577A1 (de) * | 1988-12-09 | 1990-06-13 | Fischer Artur Werke Gmbh | Injektionsadapter mit einem befestigungselement und verfahren zum anbringen eines korrosionsschutzes |
CN101294500B (zh) * | 2008-05-12 | 2010-09-08 | 淮南矿业(集团)有限责任公司 | 大直径抽采钻孔高压注浆封孔方法 |
CN101749005B (zh) * | 2010-03-17 | 2013-01-30 | 新奥气化采煤有限公司 | 地下钻孔保护工艺 |
CN101839140B (zh) * | 2010-03-31 | 2012-05-23 | 中国矿业大学 | 一种巷道底板注浆加固方法 |
-
2011
- 2011-01-25 CN CN 201110026900 patent/CN102134967B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN102134967A (zh) | 2011-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102134967B (zh) | 一种煤层底板注浆加固水平定向钻孔的施工方法 | |
CN103867229B (zh) | 一种煤矿大采深与下组煤开采防治水综合治理方法 | |
CN102817619B (zh) | 隧道内探测无水和有水溶腔的组合超前钻探方法 | |
CN103643918B (zh) | 一种针对奥陶系灰岩矿区的寻找及防止矿井渗水的方法 | |
CN113622913B (zh) | 一种全垮落法开采下井上下一体化隧道围岩变形控制方法 | |
CN106979012A (zh) | 立井井筒冻结孔内隐蔽导水通道综合处治方法 | |
CN105652311A (zh) | 一种监测底板突水的微震监测方法 | |
Loew et al. | Engineering geology of Alpine tunnels: Past, present and future | |
WO2024078506A1 (zh) | 一种煤矿瓦斯深孔区域化抽采方法与装置 | |
CN106285776A (zh) | 一种基于定向钻进技术的顶板水疏放方法 | |
CN103032083A (zh) | 一种隔水壳再造方法 | |
CN109779634B (zh) | 煤矿地面垂直井压裂坚硬顶板位置确定方法 | |
CN104989330A (zh) | 煤层气开采方法 | |
CN116122774B (zh) | 极近距离煤层井上下联合作业合层瓦斯抽采区域防突方法 | |
CN104315251B (zh) | 土石组合地质条件下人工顶管施工方法 | |
CN210464435U (zh) | 一种砂卵石地层盾构掘进强扰动区变形监测系统 | |
CN110004913A (zh) | 一种近接地铁车站的深层沉降地基加固施工方法 | |
CN217270242U (zh) | 一种对采掘工作面煤层底板注浆止水的钻孔结构 | |
Linde-Arias et al. | Depressurisation for the excavation of Stepney Green cavern | |
Wu et al. | Grouting Treatment and Parameters Optimization in Watery Karst Areas of High Speed Railway Tunnel Based on Comprehensive Geological Forecast: A Case Study | |
Liu et al. | Research and application of drilling technology for grouting transformation in coal mine strata——Taking Huainan Zhangji Mine as an example | |
CN117145575A (zh) | 煤矿井下固废浆液充填方法及系统 | |
Gurpersaud et al. | Jet grouting for seepage control at Lac Des Iles (LDI) water management facility | |
Ho | Jet grouting field trial in Manhattan soil deposits, New York | |
CN116877023A (zh) | 煤矿斜井井筒涌水治理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: CHINA COAL TECHNOLOGY + ENGINEERING GROUP XI AN RE Free format text: FORMER NAME: SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE |
|
CP03 | Change of name, title or address |
Address after: 710075 Xi'an high tech Industrial Development Zone, Shaanxi, Jin Jin Road, No. 82 Patentee after: China Coal Technology & Engineering Group Xi'an Research Institute Address before: 710054 No. 52, Yanta Road, Xi'an, Shaanxi Patentee before: Sian Branch Of China Coal Research Institute |
|
C56 | Change in the name or address of the patentee |
Owner name: XI AN RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY Free format text: FORMER NAME: CHINA COAL TECHNOLOGY + ENGINEERING GROUP XI AN RESEARCH INSTITUTE |
|
CP01 | Change in the name or title of a patent holder |
Address after: 710075 Xi'an high tech Industrial Development Zone, Shaanxi, Jin Jin Road, No. 82 Patentee after: Xi'an Research Institute, CCTEG Address before: 710075 Xi'an high tech Industrial Development Zone, Shaanxi, Jin Jin Road, No. 82 Patentee before: China Coal Technology & Engineering Group Xi'an Research Institute |