CN102134910B - Method for constructing barrel-shaped concrete structure by adopting reverse moulds - Google Patents

Method for constructing barrel-shaped concrete structure by adopting reverse moulds Download PDF

Info

Publication number
CN102134910B
CN102134910B CN2011100506679A CN201110050667A CN102134910B CN 102134910 B CN102134910 B CN 102134910B CN 2011100506679 A CN2011100506679 A CN 2011100506679A CN 201110050667 A CN201110050667 A CN 201110050667A CN 102134910 B CN102134910 B CN 102134910B
Authority
CN
China
Prior art keywords
section
concrete
construction
section concrete
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011100506679A
Other languages
Chinese (zh)
Other versions
CN102134910A (en
Inventor
李敏红
张世伦
姜典僧
张彦芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN2011100506679A priority Critical patent/CN102134910B/en
Publication of CN102134910A publication Critical patent/CN102134910A/en
Application granted granted Critical
Publication of CN102134910B publication Critical patent/CN102134910B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for constructing a barrel-shaped concrete structure by adopting reverse moulds. The method comprises the following steps: I) constructing the first section concrete; II) constructing the second section concrete; III) constructing the third section concrete; IV) constructing the fourth section concrete: dismantling the template and construction platform used during construction of the first section concrete, using the template as the fourth section template and then constructing the fourth section concrete according to the construction method of the second section concrete; and V) constructing the more than fourth section concrete: circularly constructing the concrete in the above sections according to the construction methods of the first-fourth section concrete, namely turning over and using the templates and construction platforms used during construction of the first-third section concrete until the barrel-shaped concrete structure reaches the design height. The method has the following advantages that: only three sets of templates are used for turnover; the construction efficiency is improved; and the construction cost is lowered.

Description

A kind of tubular concrete structure reverse mould construction method
Technical field
The present invention relates to a kind of tubular concrete structure construction method, particularly a kind of tubular concrete structure reverse mould construction method.
Background technology
Large diameter tubular concrete structure slding form operation method generally adopts in practice of construction in recent years, and it is little that it improves construction greatly with respect to original entire body template construction method, also reduces engineering cost to a certain extent; But; Because sliding form apparatus initial stage equipment input cost is higher; Difficulty is born for general construction enterprises; Simultaneously adopt the cover template turnover of sliding because slip form construction device is general, construction period is longer when the bigger tubular concrete structure of construction height, improves engineering cost indirectly.
Summary of the invention
Technical problem to be solved by this invention provides a kind of tubular concrete structure reverse mould construction method, and it not only can effectively improve tubular concrete structure construction efficient, can also reduce construction cost.
For solving the problems of the technologies described above, the technical scheme that the present invention adopted is: a kind of tubular concrete structure reverse mould construction method may further comprise the steps:
One) first section concrete construction
1) assembling reinforcement
Connect first section reinforcing bar of batch colligation tubular concrete structure at the concrete foundation top;
2) install template and erection construction platform, with standard punching block assembly unit internal mold and external mold, on external mold and internal mold, wear the radially split bolt of two-layer level at basic top; On the inwall of the outer wall of external mold and internal mold, fixedly install annular operation platform by means of split bolt; The wire rope that is provided with flower basket bolt is installed between annular operation platform and concrete foundation;
3) in the first section annular template that installs, build first section concrete of tubular concrete structure;
Two) second section concrete construction
After the first section concrete final set, according to the first section concrete job practices, second section concrete of constructing, wherein employed wire rope end is installed on the operation platform that is provided with on first section annular template at its top;
Three) the 3rd section concrete construction
After the second section concrete final set, at its top according to the second section concrete job practices the 3rd section concrete of constructing;
Four) the 4th section concrete construction
Remove the template and the operation platform that use in the construction of first section concrete, and it is used as the 4th section template, carry out the construction of the 4th section concrete according to the second section concrete job practices then;
Five) concrete construction more than the 4th section
According to first section to above each section concrete of the 4th section concrete job practices circulation construction, be about to first section template of using to the construction of the 3rd section concrete and have enough to meet the need use with operation platform, reach design height until the tubular concrete structure.
Said operation platform comprise by means of split bolt be fixedly mounted on the external mold outer wall with the internal mold inwall on annular anchor ear and by means of split bolt vertically be fixedly mounted on the internal mold inwall with the external mold outer wall on A-frame; The said A-frame that is installed on the internal mold inwall is identical with the quantity of individual layer split bolt with the quantity of A-frame on being installed in the external mold outer wall; Fixedly mount scaffold floor between said adjacent two A-frame horizon bars; Said A-frame end also is fixed with guard rail, and on said guard rail, encloses and hang little safety net.
When each section constructed more than second section concrete, on the horizon bar of stripping layer last layer A-frame and brace, hang the form removable frame; Between the end of the A-frame horizon bar of the upper former of stripping and form removable frame bottom, safety net is set.
Said annular anchor ear comprises two annular angle steel to the limb welding; Said two to the diameter of the distance between the annular angle steel solder side of limb welding greater than split bolt.
Adopt the beneficial effect that technique scheme produced to be: to use the reverse mould construction method; In work progress, only need utilize three cover templates and corollary apparatus to have enough to meet the need use; All the time use one section template in the end and corollary apparatus as a top section template; Improve efficiency of construction greatly, and employed template and corollary apparatus cost reduce construction cost to a certain extent well below sliding formwork.
Description of drawings
Fig. 1 is that the present invention first is to the 3rd layer of template mounting structure sketch map;
Fig. 2 for the 4th layer of the present invention with cope match-plate pattern mounting structure sketch map;
1, A-frame; 2, wire rope; 3, flower basket bolt; 4, external mold; 5, concrete foundation; 6, annular anchor ear; 7, split bolt; 8, internal mold; 9, safety net; 10, security guardrail; 11, form removable frame; Further the present invention is carried out detailed description below in conjunction with accompanying drawing.
The specific embodiment
The invention discloses a kind of tubular concrete structure reverse mould construction method, may further comprise the steps:
One) first section concrete construction
1) assembling reinforcement
Connect first section reinforcing bar of batch colligation tubular concrete structure at the concrete foundation top;
2) install template and erection construction platform, with standard punching block assembly unit internal mold 8 and external mold 4, on external mold 4 and internal mold 8, wear the radially split bolt 7 of two-layer level at basic top; On the inwall of the outer wall of external mold 4 and internal mold 8, fixedly install annular operation platform by means of split bolt 7; The wire rope 2 that is provided with flower basket bolt 3 is installed between annular operation platform and concrete foundation 5;
3) in the first section annular template that installs, build first section concrete of tubular concrete structure;
Two) second section concrete construction
After the first section concrete final set, according to the first section concrete job practices, second section concrete of constructing, wherein employed wire rope end is installed on the operation platform that is provided with on first section annular template at its top;
Three) the 3rd section concrete construction
After the second section concrete final set, at its top according to the second section concrete job practices the 3rd section concrete of constructing;
Four) the 4th section concrete construction
Remove the template and the operation platform that use in the construction of first section concrete, and it is used as the 4th section template, carry out the construction of the 4th section concrete according to the second section concrete job practices then;
Five) concrete construction more than the 4th section
According to first section to above each section concrete of the 4th section concrete job practices circulation construction, be about to first section template of using to the construction of the 3rd section concrete and have enough to meet the need use with operation platform, reach design height until the tubular concrete structure.
Said operation platform comprise by means of split bolt 7 be fixedly mounted on external mold 4 outer walls with internal mold 8 inwalls on annular anchor ear 6 and by means of split bolt 7 vertically be fixedly mounted on internal mold 8 inwalls with external mold 4 outer walls on A-frame 1; The said A-frame 1 that is installed on internal mold 8 inwalls is identical with the quantity of individual layer split bolt 7 with the quantity of A-frame 1 on being installed in external mold 4 outer walls; Fixedly mount scaffold floor between said adjacent two A-frame 1 horizon bars; Said A-frame 1 end also is fixed with guard rail 10, and on said guard rail 10, encloses and hang little safety net.
When each section constructed more than second section concrete, on the horizon bar of stripping layer last layer A-frame 1 and brace, hang form removable frame 11; Between the end of A-frame 1 horizon bar of the upper former of stripping and form removable frame 11 bottoms, safety net 9 is set.
Said annular anchor ear 6 comprises two annular angle steel to the limb welding; Said two to the diameter of the distance between the annular angle steel solder side of limb welding greater than split bolt 7.
Internal mold and external mold all adopt 3015 and 1015 standard steel template assemblies in concrete application process; Two 3015 punching block center fixed connect one 1015 punching block and form a junior unit; Then the junior unit of being formed is surrounded integral ring-shaped internal mold and external mold, at 1015 punching blocks split bolt is set all up and down and passes the hole, 1015 punching blocks of internal mold and external mold are corresponding to be provided with; Split bolt is fixedly mounted on 1015 punching blocks; After the internal mold of the intact annular of assembly unit and the external mold with split bolt with annular anchor ear be fixedly mounted on respectively on the internal mold inwall with the external mold outer wall on, annular anchor ear uses angle steel to bend and forms, annular anchor ear 6 comprises two annular angle steel that limb is welded; Said two to the diameter of the distance between the annular angle steel solder side of limb welding greater than split bolt; Every annular angle steel all uses the angle steel of many velamens embowment to be made; The triangular steel plate of perforate in the middle of every section arc angle steel end all is welded with; When two sections arc angle steel connect; Bolt is passed the triangular steel plate that its link is provided with get final product, split bolt passes the annular anchor ear in inboard and the outside, and the A-frame of 1015 punching blocks correspondence in every annular template; The corresponding middle part of each A-frame is equipped with the wire rope of flower basket bolt; The wire rope other end of first section annular template is fixedly mounted on the concrete foundation end face, and the corresponding wire rope of annular template more than second section is fixedly mounted on the A-frame end of the annular template of next section, and the effect of wire rope is to adjust annular template verticality with respect to the horizontal plane; In concrete work progress in order to ensure construction safety; Set up scaffold floor in adjacent two A-frame lateral parts;, its end vertical portion hangs little safety net between dividing; When removing the annular template of turnover and corollary apparatus, use dedicated templates dismounting frame, on the horizon bar of the A-frame 1 of the upper former of stripping and brace, hang form removable frame 11.
In concrete work progress; First section is used a cover template to carry out section construction when the 3rd section concrete is constructed respectively; The template of when carrying out the 4th section concrete construction, using in first section concrete is removed later as the 4th section template and operation platform with operation platform; The template of this section concrete of being used as under will the form removable of end of the end one in each section construction more than the 4th section constructing is used; Each section recycles template and the operation platform that uses in the construction of first to the 3rd section concrete, reaches design height until the tubular concrete structure.
The corollary apparatus that uses in a kind of tubular concrete structure reverse mould construction method disclosed by the invention is simple in structure; Go for the construction of tubular concrete structures such as cement silo, chimney; Reduce the construction equipment input cost greatly; And three the cover template can realize turnover construction, when reducing construction cost, improve efficiency of construction greatly.

Claims (4)

1. tubular concrete structure reverse mould construction method may further comprise the steps:
One) first section concrete construction
1) assembling reinforcement
Connect first section reinforcing bar of batch colligation tubular concrete structure at the concrete foundation top;
2) install template and erection construction platform, with standard punching block assembly unit internal mold (8) and external mold (4), on external mold (4) and internal mold (8), wear the radially split bolt (7) of two-layer level at basic top; On the inwall of the outer wall of external mold (4) and internal mold (8), fixedly install annular operation platform by means of split bolt (7); The wire rope (2) that is provided with flower basket bolt (3) is installed between annular operation platform and concrete foundation (5);
3) in the first section annular template that installs, build first section concrete of tubular concrete structure;
Two) second section concrete construction
After the first section concrete final set, according to the first section concrete job practices, second section concrete of constructing, wherein employed wire rope end is installed on the operation platform that is provided with on first section annular template at its top;
Three) the 3rd section concrete construction
After the second section concrete final set, at its top according to the second section concrete job practices the 3rd section concrete of constructing;
Four) the 4th section concrete construction
Remove the template and the operation platform that use in the construction of first section concrete, and it is used as the 4th section template, carry out the construction of the 4th section concrete according to the second section concrete job practices then;
Five) concrete construction more than the 4th section
According to first section to the 4th section concrete job practices circulation construction each section concrete more than the 4th section, be about to first section template and operation platform turnover use of using to the construction of the 3rd section concrete, reach design height until the tubular concrete structure.
2. a kind of tubular concrete structure reverse mould construction method according to claim 1 is characterized in that: said operation platform comprises and is fixedly mounted on external mold (4) outer wall and the annular anchor ear (6) on internal mold (8) inwall and vertically be fixedly mounted on internal mold (8) inwall and the A-frame (1) on external mold (4) outer wall by means of split bolt (7) by means of split bolt (7); The said A-frame (1) that is installed on internal mold (8) inwall is identical with the quantity of individual layer split bolt (7) with the quantity of A-frame (1) on being installed in external mold (4) outer wall; Fixedly mount scaffold floor between said adjacent two A-frames (1) horizon bar; Said A-frame (1) end also is fixed with guard rail (10), and on said guard rail (10), encloses and hang little safety net.
3. a kind of tubular concrete structure reverse mould construction method according to claim 2; It is characterized in that: when each section constructed more than second section concrete, on the horizon bar of stripping layer last layer A-frame (1) and brace, hang form removable frame (11); Between the end of A-frame (1) horizon bar of the upper former of stripping and form removable frame (11) bottom, safety net (9) is set.
4. a kind of tubular concrete structure reverse mould construction method according to claim 3 is characterized in that: said annular anchor ear (6) comprises two annular angle steel to the limb welding; Said two to the diameter of the distance between the annular angle steel solder side of limb welding greater than split bolt (7).
CN2011100506679A 2011-03-03 2011-03-03 Method for constructing barrel-shaped concrete structure by adopting reverse moulds Expired - Fee Related CN102134910B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100506679A CN102134910B (en) 2011-03-03 2011-03-03 Method for constructing barrel-shaped concrete structure by adopting reverse moulds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100506679A CN102134910B (en) 2011-03-03 2011-03-03 Method for constructing barrel-shaped concrete structure by adopting reverse moulds

Publications (2)

Publication Number Publication Date
CN102134910A CN102134910A (en) 2011-07-27
CN102134910B true CN102134910B (en) 2012-04-18

Family

ID=44294820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100506679A Expired - Fee Related CN102134910B (en) 2011-03-03 2011-03-03 Method for constructing barrel-shaped concrete structure by adopting reverse moulds

Country Status (1)

Country Link
CN (1) CN102134910B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102661038B (en) * 2012-05-21 2014-04-09 中冶建工集团有限公司 Template supporting structure for cast-in-situ limestone flour chamber
CN103790376B (en) * 2014-03-04 2016-05-25 上海建工二建集团有限公司 For the wall mould base of hyperboloid architecture construction and the construction method of body of wall
CN104563515B (en) * 2014-12-22 2016-08-17 中国建筑第八工程局有限公司 The formwork erection structure of superelevation shear wall and construction method
CN105178594B (en) * 2015-09-01 2017-07-28 山东电力建设第一工程公司 A kind of hollow column template and its construction method for exempting from scaffold construction
CN107299760A (en) * 2016-11-21 2017-10-27 中材建设有限公司 Cement clinker library concrete reverse mould construction method
CN107386623A (en) * 2017-08-08 2017-11-24 中国电建集团贵州工程公司 A kind of suspension type tripod foot hand cradle and its template construction technique
CN112343330A (en) * 2020-11-11 2021-02-09 广西建工集团冶金建设有限公司 Cylinder wall construction method and cylinder wall template structure of large-diameter reinforced concrete cylinder
CN114033153A (en) * 2021-12-14 2022-02-11 中国核工业二四建设有限公司 Mobile platform for template support and use method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2749474B2 (en) * 1991-12-26 1998-05-13 株式会社フジタ Reverse construction method for underground structures
CN1352345A (en) * 2000-11-07 2002-06-05 中国人民武装警察部队水电第二总队 Single side slide frame reverse mold construction process and apparatus for thin wall concrete structure
JP2002356863A (en) * 2001-06-01 2002-12-13 Toda Constr Co Ltd First floor preconstruction method in reverse construction method
JP4204950B2 (en) * 2003-11-10 2009-01-07 株式会社奥村組 Column and beam construction method and hollow precast concrete column formwork
CN100346047C (en) * 2006-04-26 2007-10-31 中国建筑第二工程局 Moulding equipment with electric claming frame and synchronous climbing control method thereof
CN101696604B (en) * 2009-09-24 2013-01-09 东北电业管理局烟塔工程公司 Construction method for chimney wall and special electric jacking flat bridge

Also Published As

Publication number Publication date
CN102134910A (en) 2011-07-27

Similar Documents

Publication Publication Date Title
CN102134910B (en) Method for constructing barrel-shaped concrete structure by adopting reverse moulds
CN106120563B (en) Construction method based on Combined movable mould bases cast-in-situ box girder
CN102677889A (en) System for alternatively supporting whole lifting steel platform formwork by steel column casing rack and construction method
CN104727223B (en) A kind of hoop platform for bridge pier column construction and construction method
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
CN105297635B (en) Assembled lifting type construction platform for pier column construction and construction method thereof
CN105839543B (en) Bridge High-pier rises outrigger over-form construction technique certainly
CN209482679U (en) Tub brace type integral steel platform suitable for sloping core construction
CN109594479A (en) A kind of parallel overpass center anticollision barrier of double width while construct mould bases and method
CN102505640B (en) Method for constructing pier column
CN204753397U (en) Gallows is installed to steel case bridge temporarily
CN202451040U (en) Perpendicular high-altitude crawling ladder
CN113833263A (en) Integral lantern type support circulating hoisting construction method for frame column
CN112160247B (en) Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group
CN213804905U (en) Bailey beam suspension structure
CN103419279A (en) Overall dismantling and longitudinal slipping construction method of T beam formwork
CN205975365U (en) Cast -in -situ box girder combined type moving die carrier
CN102286927A (en) Integral mounting construction method of bridge pier column bent cap reinforcement cage
CN211229458U (en) A operation platform for cylinder mound concrete placement construction
CN105951599B (en) High column mould bases integrated construction technique
CN206052780U (en) Modular system drops in a kind of contrary sequence method
CN106168036B (en) A kind of contrary sequence method drop modular system and drop mould method
CN204475183U (en) A kind of hoop platform for bridge pier column construction
CN102154989A (en) Steel-concrete structure hanging box and dismantling method thereof
JP2006118245A (en) Construction method of large scaled high-rise tower structure by moving stage mounting heavy equipment thereon

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120418

Termination date: 20130303