CN102134859A - Uplift resistance test device for pre-stressed pipe pile - Google Patents

Uplift resistance test device for pre-stressed pipe pile Download PDF

Info

Publication number
CN102134859A
CN102134859A CN201010100725XA CN201010100725A CN102134859A CN 102134859 A CN102134859 A CN 102134859A CN 201010100725X A CN201010100725X A CN 201010100725XA CN 201010100725 A CN201010100725 A CN 201010100725A CN 102134859 A CN102134859 A CN 102134859A
Authority
CN
China
Prior art keywords
pile
straining beam
prestressed pipe
pipe pile
test device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201010100725XA
Other languages
Chinese (zh)
Inventor
徐汉东
卢刚
吴忠新
徐进
王叶平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Architectural Research Institute Co., Ltd.
Original Assignee
CHANGZHOU CONSTRUCTION SCIENCE INST Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU CONSTRUCTION SCIENCE INST Co Ltd filed Critical CHANGZHOU CONSTRUCTION SCIENCE INST Co Ltd
Priority to CN201010100725XA priority Critical patent/CN102134859A/en
Publication of CN102134859A publication Critical patent/CN102134859A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to an uplift resistance test device for a pre-stressed pipe pile, comprising a pile cylinder, an upper pulling beam, a lower pulling beam, a main beam and a lifting jack; the upper pulling beam and the lower pulling beam are fixedly connected by a tension rod; the lower pulling beam is fixedly connected with the beam cylinder; the upper pulling beam and the lower pulling beam are installed at two sides of the main beam; the lifting jack is installed between the upper pulling beam and the lower pulling beam; and the main beam is connected with the ground by a buttress. The uplift resistance test device for the pre-stressed pipe pile, provided by the invention, eliminates defects existed in the background art; the pile cylinder is connected with an end plate by a flange, so that the pre-stressed pipe pile is stressed stably and has no occurrence of eccentric situations; and the uplift resistance test device for the pre-stressed pipe pile has a simple structure, shortened construction period and wide application range, and is firm to connect.

Description

Pile for prestressed pipe resistance to plucking experimental rig
Technical field
The present invention relates to a kind of testing arrangement for building, relate in particular to a kind of pile for prestressed pipe resistance to plucking experimental rig.
Background technology
In the prior art, the resistance to plucking test of pile for prestressed pipe is generally tested by several forms, 1, Type of Welding, with pile crown end plate and draw ring welding, by jack the mode of roof pressure draw ring is tested the uplift resistance of pile tube then, need weld the stake end plate, and not prison welding is leaned on, discontinuity, eccentric easily; In addition, by the form of poured concrete in pile body, this shortcoming is that curing time is longer, the effort of taking a lot of work, and pile body inside occupies dust easily, and behind the fluid concrete, concrete is connected unstable with pile body, easily pour mass is extracted.
Summary of the invention
The technical problem to be solved in the present invention is: the reliable pile for prestressed pipe resistance to plucking of a kind of connection experimental rig is provided.
In order to overcome the defective that exists in the background technology, the technical solution adopted for the present invention to solve the technical problems is: a kind of pile for prestressed pipe resistance to plucking experimental rig, comprise stake tube, last straining beam, following straining beam, girder and jack, the described straining beam of going up is fixedlyed connected by pull bar with following straining beam, following straining beam is fixedlyed connected with the stake tube, last straining beam and following straining beam are positioned at the both sides of girder, are provided with jack between last straining beam and the girder, and girder is connected with ground by buttress.
According to another embodiment of the invention, pile for prestressed pipe resistance to plucking experimental rig comprises that further described stake tube is provided with flange, fixedlys connected with the pile for prestressed pipe end plate by flange.
According to another embodiment of the invention, pile for prestressed pipe resistance to plucking experimental rig comprises that further described stake tube and pile for prestressed pipe are by being threaded.
According to another embodiment of the invention, pile for prestressed pipe resistance to plucking experimental rig further comprises between described stake tube and the flange and is welded with reinforcing rib.
According to another embodiment of the invention, pile for prestressed pipe resistance to plucking experimental rig comprises that further described stake tube is solid cylinder or hollow cylinder.
The invention solves the defective that exists in the background technology, stake tube is connected by flange with end plate, makes the pile for prestressed pipe stability under loading, and phenomenon produces without acceptance of persons, and is simple in structure, be connected firmly, and the duration shortening, applied widely.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is the structural representation of the preferred embodiments of the present invention;
Wherein: 1, stake tube, 2, go up straining beam, 3, straining beam down, 4, girder, 5, jack, 6, buttress, 7, flange, 8, pile tube, 9, pull bar, 10, dial gage.
The specific embodiment
The present invention is further detailed explanation with preferred embodiment in conjunction with the accompanying drawings now.These accompanying drawings are the schematic diagram of simplification, basic structure of the present invention only is described in a schematic way, so it only show the formation relevant with the present invention.
As shown in Figure 1, a kind of pile for prestressed pipe 8 resistance to plucking experimental rigs, comprise stake tube 1, last straining beam 2, following straining beam 3, girder 4 and jack 5, the described straining beam 2 of going up is fixedlyed connected by pull bar 9 with following straining beam 3, following straining beam 3 is fixedlyed connected with stake tube 1, last straining beam 2 and following straining beam 3 are positioned at the both sides of girder 4, are provided with jack 5 between last straining beam 2 and the girder 4, and girder 4 is connected with ground by buttress 6.Preferably be provided with flange 7 on the described stake tube 1, fixedly connected with pile for prestressed pipe 8 end plates 9, make pile for prestressed pipe 8 stability under loading by flange 7.Wherein, stake tube 1 and pile for prestressed pipe 8 are convenient to adjusting by being threaded, and prevent off-centre.Wherein, be connected with dial gage 10 on the flange 7 of stake tube 1.
In addition, be welded with reinforcing rib between stake tube 1 and the flange 7, because the uplift resistance of pile tube 8 is relatively large, the uplift resistance of general pile tube 8 has about 140 tons, adopts above-mentioned the setting to guarantee that flange 7 is not drawn bad.
King-pile tube 1 of the present invention is solid cylinder or hollow cylinder.
The invention process process is as follows:
At first start hydraulic jack 5, be used for straining beam 2 by girder 4 outbreaks, then, last straining beam 2 pullings are straining beam 3 down, following straining beam 3 promotes to pull out on the stake tube 1, thereby promote to pull out on the pile for prestressed pipe 8, adjust hydraulic jack 5 pressure, be controlled at about 140 tons, testing time was generally 40 hours~50 hours, at last, by dial gage 10 check pile for prestressed pipe 8 on pull out distance whether in the resonable degree scope, and implement this experiment and finish.
With above-mentioned foundation desirable embodiment of the present invention is enlightenment, and by above-mentioned description, the related work personnel can carry out various change and modification fully in the scope that does not depart from this invention technological thought.The technical scope of this invention is not limited to the content on the manual, must determine its technical scope according to the claim scope.

Claims (5)

1. pile for prestressed pipe resistance to plucking experimental rig, it is characterized in that: comprise stake tube, last straining beam, following straining beam, girder and jack, the described straining beam of going up is fixedlyed connected by pull bar with following straining beam, following straining beam is fixedlyed connected with the stake tube, last straining beam and following straining beam are positioned at the both sides of girder, be provided with jack between last straining beam and the girder, girder is connected with ground by buttress.
2. pile for prestressed pipe resistance to plucking experimental rig as claimed in claim 1 is characterized in that: described stake tube is provided with flange, fixedlys connected with the pile for prestressed pipe end plate by flange.
3. pile for prestressed pipe resistance to plucking experimental rig as claimed in claim 2 is characterized in that: described stake tube and pile for prestressed pipe are by being threaded.
4. pile for prestressed pipe resistance to plucking experimental rig as claimed in claim 2 is characterized in that: be welded with reinforcing rib between described stake tube and the flange.
5. pile for prestressed pipe resistance to plucking experimental rig as claimed in claim 1 is characterized in that: described stake tube is solid cylinder or hollow cylinder.
CN201010100725XA 2010-01-25 2010-01-25 Uplift resistance test device for pre-stressed pipe pile Pending CN102134859A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010100725XA CN102134859A (en) 2010-01-25 2010-01-25 Uplift resistance test device for pre-stressed pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010100725XA CN102134859A (en) 2010-01-25 2010-01-25 Uplift resistance test device for pre-stressed pipe pile

Publications (1)

Publication Number Publication Date
CN102134859A true CN102134859A (en) 2011-07-27

Family

ID=44294771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010100725XA Pending CN102134859A (en) 2010-01-25 2010-01-25 Uplift resistance test device for pre-stressed pipe pile

Country Status (1)

Country Link
CN (1) CN102134859A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102866057A (en) * 2012-10-12 2013-01-09 清华大学 Loading device for pulling tests of steel-concrete mixed connection and production method
CN103031860A (en) * 2012-12-14 2013-04-10 广东省建筑科学研究院 Pipe pile vertical static load testing connection device, and testing system and method using same
CN103603381A (en) * 2013-12-08 2014-02-26 中铁西北科学研究院有限公司 Detection device and detection method for buttress single-pile vertical uplift static load test
CN103953078A (en) * 2014-05-16 2014-07-30 安徽省建筑工程质量监督检测站 Tubular pile pull-out test device with single dowel bar structure
CN104088307A (en) * 2014-07-21 2014-10-08 张百全 Method for detecting vertical bearing capacity of pile foundation
CN107121247A (en) * 2017-05-19 2017-09-01 甘肃省交通科学研究院有限公司 Unilateral tunnel blower supporting structure loading test apparatus and method
CN110974573A (en) * 2019-12-06 2020-04-10 南通市第一人民医院 Pipe pulling prevention device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1694775A1 (en) * 1988-12-27 1991-11-30 Войсковая Часть 52953 Device for testing soils by static loads
US20020095976A1 (en) * 1999-11-12 2002-07-25 Reinert Gary L. Pile testing reaction anchor apparatus and method
CN101260676A (en) * 2008-04-29 2008-09-10 河南日盛建筑工程检测有限公司 Pipe pile and reaction frame connecting method and single tube pile pressure-resistant static load test method
CN201258494Y (en) * 2008-08-27 2009-06-17 湖南省第六工程有限公司 Loading unit for single-pile vertical anti-pulling static load test
CN201704710U (en) * 2010-01-25 2011-01-12 常州市建筑科学研究院有限公司 Uplift resistance tester for prestressed pipe piles

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1694775A1 (en) * 1988-12-27 1991-11-30 Войсковая Часть 52953 Device for testing soils by static loads
US20020095976A1 (en) * 1999-11-12 2002-07-25 Reinert Gary L. Pile testing reaction anchor apparatus and method
CN101260676A (en) * 2008-04-29 2008-09-10 河南日盛建筑工程检测有限公司 Pipe pile and reaction frame connecting method and single tube pile pressure-resistant static load test method
CN201258494Y (en) * 2008-08-27 2009-06-17 湖南省第六工程有限公司 Loading unit for single-pile vertical anti-pulling static load test
CN201704710U (en) * 2010-01-25 2011-01-12 常州市建筑科学研究院有限公司 Uplift resistance tester for prestressed pipe piles

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102866057A (en) * 2012-10-12 2013-01-09 清华大学 Loading device for pulling tests of steel-concrete mixed connection and production method
CN103031860A (en) * 2012-12-14 2013-04-10 广东省建筑科学研究院 Pipe pile vertical static load testing connection device, and testing system and method using same
CN103031860B (en) * 2012-12-14 2015-01-07 广东省建筑科学研究院 Pipe pile vertical static load testing connection device, and testing system and method using same
CN103603381A (en) * 2013-12-08 2014-02-26 中铁西北科学研究院有限公司 Detection device and detection method for buttress single-pile vertical uplift static load test
CN103953078A (en) * 2014-05-16 2014-07-30 安徽省建筑工程质量监督检测站 Tubular pile pull-out test device with single dowel bar structure
CN103953078B (en) * 2014-05-16 2015-12-09 安徽省建筑工程质量监督检测站 Pile tube resistance to plucking single pole power transmission experimental rig
CN104088307A (en) * 2014-07-21 2014-10-08 张百全 Method for detecting vertical bearing capacity of pile foundation
CN107121247A (en) * 2017-05-19 2017-09-01 甘肃省交通科学研究院有限公司 Unilateral tunnel blower supporting structure loading test apparatus and method
CN110974573A (en) * 2019-12-06 2020-04-10 南通市第一人民医院 Pipe pulling prevention device
CN110974573B (en) * 2019-12-06 2021-03-16 南通市第一人民医院 Pipe pulling prevention device
CN112933375A (en) * 2019-12-06 2021-06-11 南通市第一人民医院 Prevent tube drawing device with insulating layer
CN112933375B (en) * 2019-12-06 2022-06-03 南通市第一人民医院 Prevent tube drawing device with insulating layer

Similar Documents

Publication Publication Date Title
CN102134859A (en) Uplift resistance test device for pre-stressed pipe pile
CN203705266U (en) Static load testing device for testing engineering pile
CN103590414B (en) A kind of attachment structure of concrete tubular pile and cushion cap
CN103953078B (en) Pile tube resistance to plucking single pole power transmission experimental rig
CN203569582U (en) Connecting structure of concrete pipe pile and bearing platform
WO2021004417A1 (en) Anchoring assembly for transversely bonded prestressed steel rod for bridge tower and construction method
CN204849607U (en) A continuous beam string basket pre -compaction device for bridge construction
CN113585360A (en) Anti-floating anchor rod device and construction method
CN109403366A (en) A kind of assembly concrete-filled steel tube pile foundation and its construction method
CN201704710U (en) Uplift resistance tester for prestressed pipe piles
CN209669688U (en) A kind of half assembled thin-wall piers
CN106049291B (en) Hollow force snesor bite type tensioning system and method built in bridge
CN101838986B (en) Disassembling tool type lattice column and construction method thereof
CN207078903U (en) It is a kind of to be used to lift the lower spreader assembly of large span arc multilayer steel truss and lower sling system
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device
CN211773604U (en) Pile sealing device for water gushing pile position hole on anchor rod static pressure pile
CN202644531U (en) Pressure-preloading pile sealing device for static pressure pile of anchor rod
CN108678767B (en) Excavation and yielding-rigid combined supporting construction method for extruded large-deformation surrounding rock tunnel
CN208379655U (en) A kind of static load pullout tests quick-fitting device
CN108505449B (en) The construction method of bracket lifting system in a kind of CFST Arch Bridge water
CN201347590Y (en) Quick connection and calibration clamp for steel column joint
CN102493431B (en) Real time monitoring strengthening method preventing pile foundation from descending
CN114718313A (en) High-throwing self-compacting vibration-free construction method for inclined steel pipe concrete column with spherical steel structure
CN110700102B (en) Construction method of pre-stress steel structure front-pull rear-lock cast-in-situ platform
CN204940283U (en) Gate base plate steel lining uphill running concrete construction platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: CHANGZHOU ARCHITECTURAL RESEARCH INSTITUTE CO., LT

Free format text: FORMER OWNER: CHANGZHOU CONSTRUCTION SCIENCE INST. CO., LTD.

Effective date: 20110915

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20110915

Address after: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Applicant after: Changzhou Architectural Research Institute Co., Ltd.

Address before: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Applicant before: Changzhou Construction Science Inst. Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110727