CN102134622B - Bell-less blast furnace distributing device - Google Patents

Bell-less blast furnace distributing device Download PDF

Info

Publication number
CN102134622B
CN102134622B CN201010100735A CN201010100735A CN102134622B CN 102134622 B CN102134622 B CN 102134622B CN 201010100735 A CN201010100735 A CN 201010100735A CN 201010100735 A CN201010100735 A CN 201010100735A CN 102134622 B CN102134622 B CN 102134622B
Authority
CN
China
Prior art keywords
batch
cloth
furnace
gas
distributing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010100735A
Other languages
Chinese (zh)
Other versions
CN102134622A (en
Inventor
周久乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongfang Iron & Steel Co Ltd Shenyang City
Original Assignee
Dongfang Iron & Steel Co Ltd Shenyang City
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongfang Iron & Steel Co Ltd Shenyang City filed Critical Dongfang Iron & Steel Co Ltd Shenyang City
Priority to CN201010100735A priority Critical patent/CN102134622B/en
Publication of CN102134622A publication Critical patent/CN102134622A/en
Application granted granted Critical
Publication of CN102134622B publication Critical patent/CN102134622B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a bell-less blast furnace distributing device which comprises feeding bins, intermediate material tanks, distributing tanks, two gas up takes and a main gas duct, wherein the lower ends of the two gas up takes are connected with a furnace throat, the upper ends of the two gas up takes are communicated with the main gas duct, 4-12 distributing tanks are uniformly distributed on the periphery of the furnace throat, the outlets of the distributing tanks are positioned in the furnace throat, the top and the bottom of each distributing tank are respectively provided with a sealing valve, a gas pressure equalizing valve is arranged at the upper part of each distributing tank, the outlet of each distributing tank is connected with a shunt ring, each intermediate material tank is flexibly connected above the distributing tank, a weighing device is arranged at the upper part of each intermediate material tank, 2-3 feeding bins are vertically arranged above the furnace top, the feeding outlet at the lower part of each feeding bin is connected with a corresponding material tank through a pipeline, feeding devices are arranged on the pipelines between the intermediate material tanks and the feeding bins, and the lower parts of the feeding devices are flexibly communicated with the intermediate material tanks. When the top pressure reaches 1.0 MPa or higher, the bell-less blast furnace distributing device can ensure the sealing performance of the furnace top.

Description

A kind of blast furnace does not have the clock distribution device
Technical field:
The present invention relates to a kind of ironmaking equipment, especially is a kind of distribution device of blast furnace.
Technical background:
The present age, huge blast furnace was generally carried out no clock distribution device; No matter be and jar or string jar no a clock cloth, furnace charge is all managed directly to the discharging of furnace throat center by material, again by the even cloth of the swivel chute of furnace throat central lower below furnace throat; Though this device is than clock cloth good seal performance is arranged; But because the swivel chute of this device is outside stove, to control, if further improve blast furnace top pressure (from 0.25MPa---1.0MPa), boiler roof sealing is just very difficult.
Summary of the invention
For when blast furnace further improves top pressure, can solve the high top pressure operation sealing problem, can guarantee again to realize no clock cloth problem that the present invention provides a kind of blast furnace not have the clock distribution device.
The technical scheme that adopts:
A kind of blast furnace does not have the clock distribution device, comprises awarding feed bin, middle batch can, cloth batch can.Two gas up takes and a gas main, the lower end of two gas up takes is connected with furnace throat, and the upper end of two gas up takes is connected with gas main, and communicates.It is characterized in that described cloth batch can evenly arranges 4-12 at the furnace throat circumferential direction, the outlet of cloth batch can is positioned at furnace throat, looks furnace throat sectional area size and decides, and the furnace throat section area is big, and cloth batch can number is many.The top of each cloth batch can and bottom are equiped with seal valve respectively, and the coal gas pressure-balance valve is installed on cloth batch can top, and the outlet of each cloth batch can is connected with a flow splitter; Described each middle batch can is arranged on the top of cloth batch can, and corresponding one by one with the cloth batch can, connects with the mode that is flexible coupling each other, and middle batch can top is provided with weighing device.Award feed bin and be arranged on the furnace roof top; Be provided with 2-3; Awarding feed bin arranges with vertical direction; What each awarded the feed bin bottom awards material outlet through pipeline and corresponding middle batch can connection, and middle batch can and award on the pipeline between the feed bin setting and award glassware is communicated with middle batch can through the mode that is flexible coupling below awarding glassware.
It is leg-of-mutton flow splitter that the below of above-mentioned each cloth batch can is provided with a section.
Above-mentioned each cloth batch can exit diameter is between Φ 400-Φ 1000mm.
The invention has the advantages that: reach 1.0MPa or 1.0MPa when above in top pressure, can guarantee the sealing property of furnace roof.
Description of drawings
Fig. 1 is the structural representation of an embodiment of the present invention.
Fig. 2 is the vertical view of Fig. 1.
Embodiment
A kind of blast furnace does not have the clock distribution device; Comprise that the lower end of awarding feed bin 1, middle batch can 2,3, two gas up takes 4 of cloth batch can and 5, two gas up takes 4 of a gas main is connected with furnace throat 6; The upper end of two gas up takes 4 is connected with gas main 5; And communicate, cloth batch can 3 is evenly arranged six at furnace throat 6 circumferential directions, and cloth batch can 3 exit diameters are 600mm.The top of each cloth batch can 3 and bottom are equiped with upper sealing valve 7 and lower seal valve 8 respectively, and the top of each cloth batch can is equipped with coal gas pressure-balance valve 9.Middle batch can 2 also is six, and is arranged on the top of cloth batch can 3, and corresponding one by one with cloth batch can 3, connects with the mode that is flexible coupling each other, and middle batch can 2 tops are equipped with weighing device 10.Award feed bin 1 and be arranged on the furnace roof top, layout quantity is two, awards feed bin 1 and arranges with vertical direction, and each is awarded feed bin 1 bottom and awards the material outlet through pipeline and corresponding middle batch can 2 connections.Be equipped with on batch can 2 and the corresponding pipeline of awarding between the feed bin 1 in the middle of each and award glassware 12.
Too high for fear of furnace charge heap point, under cloth batch can 3, to leave seal valve 8 certain distances and establish the annular flow splitter 11 of a circle, the flow splitter cross section is triangular in shape, can reduce the difference of altitude of charge level, improves the cloth uniformity coefficient.
During operation, will award the feed bin furnace charge respectively and be blended into middle batch can, after weighing reaches ratings, stop to award material through vibro-feeder.Close cloth batch can bottom shut off valve and seal valve, treat coal gas pressure release and low-pressure gas jar balance after, open upper sealing valve, load weighted furnace charge is discharged into the cloth batch can by middle batch can; Close upper sealing valve, wait lower seal valve to be opened, seal valve should be opened pressure-balance valve before opening; Make stock gas pressure and batch can internal pressure balance in the blast furnace, behind the ready to balance, control module is opened the lower seal valve; Behind the instruction issuing, open earlier lower seal valve and shut off valve, the furnace charge orientation of fixing a point is distributed in the stove.Then, reciprocal with above-mentioned program loop, six or more cloth batch cans can once be opened one by one, also can open simultaneously in batches.

Claims (3)

1. a blast furnace does not have the clock distribution device, comprises awarding feed bin, middle batch can, cloth batch can, two gas up takes and a gas main, and the lower end of two gas up takes is connected with furnace throat; The upper end of two gas up takes is connected with gas main, and communicates, and it is characterized in that described cloth batch can evenly arranges 4-12 at the furnace throat circumferential direction; Cloth batch can outlet is positioned at furnace throat, looks furnace throat sectional area size and decides, and the furnace throat section area is big; Cloth batch can number is many; The top of each cloth batch can and bottom are equiped with seal valve respectively, and the coal gas pressure-balance valve is installed on cloth batch can top, and the outlet of each cloth batch can is connected with a flow splitter; Described each middle batch can is arranged on the top of cloth batch can, and corresponding one by one with the cloth batch can, connects with the mode that is flexible coupling each other; Middle batch can top is provided with weighing device, awards feed bin and is arranged on the furnace roof top, is provided with 2-3; Awarding feed bin arranges with vertical direction; What each awarded the feed bin bottom awards material outlet through pipeline and corresponding middle batch can connection, and middle batch can and award on the pipeline between the feed bin setting and award glassware is communicated with middle batch can through the mode that is flexible coupling below awarding glassware.
2. a kind of blast furnace according to claim 1 does not have the clock distribution device, and it is leg-of-mutton flow splitter that the below that it is characterized in that described each cloth batch can is provided with a section.
3. a kind of blast furnace according to claim 1 does not have the clock distribution device, it is characterized in that said each cloth batch can exit diameter is between Φ 400-Φ 1000mm.
CN201010100735A 2010-01-26 2010-01-26 Bell-less blast furnace distributing device Active CN102134622B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010100735A CN102134622B (en) 2010-01-26 2010-01-26 Bell-less blast furnace distributing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010100735A CN102134622B (en) 2010-01-26 2010-01-26 Bell-less blast furnace distributing device

Publications (2)

Publication Number Publication Date
CN102134622A CN102134622A (en) 2011-07-27
CN102134622B true CN102134622B (en) 2012-10-10

Family

ID=44294548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010100735A Active CN102134622B (en) 2010-01-26 2010-01-26 Bell-less blast furnace distributing device

Country Status (1)

Country Link
CN (1) CN102134622B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107435935A (en) * 2016-05-27 2017-12-05 深圳市汇清科技股份有限公司 Incinerator
CN109593902B (en) * 2018-12-03 2020-11-24 江苏省沙钢钢铁研究院有限公司 Blast furnace top big and small tank mixed material distribution system and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2034584U (en) * 1988-04-01 1989-03-22 北京钢铁学院 Blast furnace with appliance for distributing burden
CN2628534Y (en) * 2003-06-04 2004-07-28 石家庄三环阀门股份有限公司 Blast furnace non-top bell top charging equipment
CN201678691U (en) * 2010-01-26 2010-12-22 沈阳东方钢铁有限公司 Blast furnace clock-free material distribution device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2034584U (en) * 1988-04-01 1989-03-22 北京钢铁学院 Blast furnace with appliance for distributing burden
CN2628534Y (en) * 2003-06-04 2004-07-28 石家庄三环阀门股份有限公司 Blast furnace non-top bell top charging equipment
CN201678691U (en) * 2010-01-26 2010-12-22 沈阳东方钢铁有限公司 Blast furnace clock-free material distribution device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP昭63-96206A 1988.04.27
JP特开2002-302707A 2002.10.18

Also Published As

Publication number Publication date
CN102134622A (en) 2011-07-27

Similar Documents

Publication Publication Date Title
CN102134622B (en) Bell-less blast furnace distributing device
CN201678691U (en) Blast furnace clock-free material distribution device
CN200952023Y (en) Blast furnace gravity dust removing processing device
CN101709340B (en) Single-bucket serial-bucket charging method applied to bell-free blast furnaces
CN201990692U (en) Automatic air dispensation system of multiple blast furnace blowers
CN102912059A (en) Top charging device of shaft furnace
CN202898446U (en) Top charging device of shaft furnace
CN204307710U (en) A kind of coal slurry uniform distribution device
CN102942064B (en) Pebble coal positive pressure pneumatic conveying method and device
CN105368999A (en) Purging device and technology of blast furnace charging bucket weighing system
CN201364031Y (en) High-uniformity powder coal distributor
CN106399609A (en) Process system and method for blast furnace injection sintering mine returning
CN111996318A (en) Reversing device and reversing method for pulverized coal injected into blast furnace
CN107198993A (en) A kind of system and method for preparing liquid-containing binder
CN103349945B (en) A kind of portable catalyst feeding device and charging process thereof
CN203159642U (en) Air quantity regulation device of blast furnace
CN102250267B (en) Method for filling fluidized bed polyethylene reactor seed bed by gas phase process
CN102212628A (en) Spare pulverized coal supply method and system for blast furnace pulverized coal blowing
CN207159161U (en) A kind of hydrogasification pulverized coal conveying device
CN203625409U (en) High-pressure top charging device
CN212669727U (en) Reversing device for pulverized coal injected into blast furnace
CN211936822U (en) Reation kettle of scour protection material
CN218507819U (en) Coke-spraying pulverized coal pipeline device
CN219409773U (en) Blast furnace coal injection double-distributor control system based on pulverized coal flow regulating valve
CN220503093U (en) Pressure relief control system for intercommunication of pressure relief pipelines of pressure relief partition single machine of blowing tank

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20131204

Granted publication date: 20121010

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20150604

Granted publication date: 20121010

PP01 Preservation of patent right

Effective date of registration: 20150604

Granted publication date: 20121010

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20220602

Granted publication date: 20121010

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20220602

Granted publication date: 20121010

PD01 Discharge of preservation of patent

Date of cancellation: 20221202

Granted publication date: 20121010

PD01 Discharge of preservation of patent
PP01 Preservation of patent right

Effective date of registration: 20221202

Granted publication date: 20121010

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20230602

Granted publication date: 20121010

PD01 Discharge of preservation of patent
PP01 Preservation of patent right

Effective date of registration: 20230602

Granted publication date: 20121010

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20231202

Granted publication date: 20121010

PD01 Discharge of preservation of patent