CN102129618A - 一种工作流系统实现流程实例合并拆分的方法 - Google Patents
一种工作流系统实现流程实例合并拆分的方法 Download PDFInfo
- Publication number
- CN102129618A CN102129618A CN2011100519749A CN201110051974A CN102129618A CN 102129618 A CN102129618 A CN 102129618A CN 2011100519749 A CN2011100519749 A CN 2011100519749A CN 201110051974 A CN201110051974 A CN 201110051974A CN 102129618 A CN102129618 A CN 102129618A
- Authority
- CN
- China
- Prior art keywords
- flow
- original
- flow instance
- next link
- driven
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 53
- 238000012217 deletion Methods 0.000 claims description 3
- 230000037430 deletion Effects 0.000 claims description 3
- 238000005194 fractionation Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 claims description 2
- 239000000725 suspension Substances 0.000 abstract 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Stored Programmes (AREA)
Abstract
本发明提供一种工作流系统实现流程实例合并拆分的方法,工作流引擎处理合并时,首先把要合并的多个流程实例继续驱动到下一环节,驱动到下一环节后,把这些流程实例都挂起;同时,创建新的流程实例,表示是合并生成的新流程实例,并驱动到下一环节;再把合并生成的新流程实例与原有的各流程实例建立对应关系。这样,用户在待办任务中只能看到一条合并生成的新流程实例的任务,流程实例合并完成。拆分时,工作流引擎根据合并生成的新流程实例与原有的各流程实例之间的对应关系,找到原有的各流程实例,把各流程实例恢复挂起,再驱动到下一环节,不再挂起;同时,删除合并生成的新流程实例。通过上述方法,能有效解决流程实例的合并拆分问题。
Description
技术领域
本发明涉及一种计算机应用技术领域,具体地说是一种工作流系统实现流程实例合并拆分的方法。
背景技术
随着工作流技术的不断发展,工作流已广泛应用在办公、电子政务、电子商务等领域,越来越多的应用系统已经把工作流系统作为基础平台,处理内部办公、政务或企业的业务流程。
工作流技术关注的是流程从起始到结束这样一个完整的运行过程,一般是以一个流程实例作为关注对象。
在现实应用中,流程在运行过程中,需要把多个运行的流程实例在某个环节进行合并,合并成一个实例进行处理,处理完之后,再把合并的实例分开,继续按原来多个流程实例走。
如下面药品GMP证书核发流程所示:
接受登记->技术审查->现场检查->专家会审->综合审评->办结转处室
其中,专家会审是流程实例合并拆分环节,它具体又包含以下几个环节:制定会审方案->科长审评->中心领导审评
其中,制定会审方案是合并环节,它会把运行到该环节的多个流程实例合并成一个,然后制定出一个会审方案,再由科长审批、中心领导审批。
中心领导审批是拆分环节,中心领导审批通过后,原来合并的多个流程实例又拆分开来,各自走各自的。
发明内容
本发明的目的是提供一种工作流系统实现流程实例合并拆分的方法。包括工作流系统实现流程实例的合并或拆分,其中:
合并时,工作流引擎把要合并的多个流程实例继续驱动到下一环节后,把这些流程实例都挂起;同时,创建新的流程实例,表示是合并生成的新流程实例,并驱动到下一环节;再把合并生成的新流程实例与原有的各流程实例建立对应关系,这样,用户在待办任务中只能看到一条合并生成的新流程实例的任务,流程实例合并完成;合并后的任务,再提交时,工作流引擎根据合并生成的新流程实例与原有的各流程实例之间的对应关系,找到原有的各流程实例,把各流程实例恢复挂起,再驱动到下一环节,并再挂起;同时,把合并生成的新流程实例驱动到下一环节;
拆分时,工作流引擎根据合并生成的新流程实例与原有的各流程实例之间的对应关系,找到原有的各流程实例,把各流程实例恢复挂起,再驱动到下一环节,不再挂起;同时,删除合并生成的新流程实例。
本发明的有益效果
实现流程实例的合并拆分,满足这种较特殊的业务需求。
具体实施方式
本发明的目的是按以下方式实现的,工作流系统实现流程实例合并拆分的方案如下:
1)用户在合并环节选择多个流程实例进行合并并提交
d.工作流引擎把要合并的多个流程实例继续驱动到下一环节,驱动到下一环节后,把这些流程实例都挂起。
e.工作流引擎创建新的流程实例,表示是合并生成的新流程实例,并驱动到下一环节。
f.把合并生成的新流程实例与原有的各流程实例建立对应关系。
挂起原有的各流程实例,作用是用户在待办任务中只能看到一条合并生成的新流程实例的任务。
这样,流程实例合并完成。
2)合并后的任务,用户处理后,再提交
c.工作流引擎根据合并生成的新流程实例与原有的各流程实例之间的对应关系,找到原有的各流程实例,把各流程实例恢复挂起,再驱动到下一环节,并再挂起。
d.工作流引擎把合并生成的新流程实例驱动到下一环节。
3)在拆分环节,用户处理完任务,提交
c.工作流引擎根据合并生成的新流程实例与原有的各流程实例之间的对应关系,找到原有的各流程实例,把各流程实例恢复挂起,再驱动到下一环节,不再挂起。
d.工作流引擎删除合并生成的新流程实例
这样,流程实例拆分完成。
Claims (1)
1.一种工作流系统实现流程实例合并拆分的方法,其特征在于,包括工作流系统实现流程实例的合并或拆分,流程步骤如下:
1)用户在合并环节,选择多个流程实例进行合并并提交:
a.工作流引擎把要合并的多个流程实例继续驱动到下一环节,驱动到下一环节后,把这些流程实例都挂起;
b.工作流引擎创建新的流程实例,表示是合并生成的新流程实例,并驱动到下一环节;
c.把合并生成的新流程实例与原有的各流程实例建立对应关系;
挂起原有的各流程实例,作用是用户在待办任务中只能看到一条合并生成的新流程实例的任务,这样,流程实例合并完成;
2)合并后的任务,用户处理后,再提交
a.工作流引擎根据合并生成的新流程实例与原有的各流程实例之间的对应关系,找到原有的各流程实例,把各流程实例恢复挂起,再驱动到下一环节,并再挂起;
b.工作流引擎把合并生成的新流程实例驱动到下一环节;
3)在拆分环节,用户处理完任务,提交;
a.工作流引擎根据合并生成的新流程实例与原有的各流程实例之间的对应关系,找到原有的各流程实例,把各流程实例恢复挂起,再驱动到下一环节,不再挂起;
b.工作流引擎删除合并生成的新流程实例,这样,流程实例拆分完成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110051974.9A CN102129618B (zh) | 2011-03-04 | 2011-03-04 | 一种工作流系统实现流程实例合并拆分的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110051974.9A CN102129618B (zh) | 2011-03-04 | 2011-03-04 | 一种工作流系统实现流程实例合并拆分的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102129618A true CN102129618A (zh) | 2011-07-20 |
CN102129618B CN102129618B (zh) | 2016-02-03 |
Family
ID=44267696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110051974.9A Active CN102129618B (zh) | 2011-03-04 | 2011-03-04 | 一种工作流系统实现流程实例合并拆分的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102129618B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103778511A (zh) * | 2014-01-27 | 2014-05-07 | 北京荣之联科技股份有限公司 | 跨系统监控流程的方法及装置 |
CN104091222A (zh) * | 2014-05-08 | 2014-10-08 | 武大吉奥信息技术有限公司 | 一种支持多模式驱动的工作流引擎 |
CN111028051A (zh) * | 2019-11-26 | 2020-04-17 | 泰康保险集团股份有限公司 | 基于流程引擎系统的订单合并自动处理方法、装置和系统 |
CN115170057A (zh) * | 2022-06-06 | 2022-10-11 | 无锡喔趣信息科技有限公司 | 一种基于机器学习的oa审批控制系统及方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050027585A1 (en) * | 2003-05-07 | 2005-02-03 | Sap Ag | End user oriented workflow approach including structured processing of ad hoc workflows with a collaborative process engine |
US20050159968A1 (en) * | 2004-01-21 | 2005-07-21 | Stephen Cozzolino | Organizationally interactive task management and commitment management system in a matrix based organizational environment |
CN101038635A (zh) * | 2006-03-15 | 2007-09-19 | 北大方正集团有限公司 | 一种工作流管理系统流程权限控制系统及其实现方法 |
CN101261724A (zh) * | 2008-03-28 | 2008-09-10 | 山东浪潮齐鲁软件产业股份有限公司 | 基于方案的流程管理方法 |
-
2011
- 2011-03-04 CN CN201110051974.9A patent/CN102129618B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050027585A1 (en) * | 2003-05-07 | 2005-02-03 | Sap Ag | End user oriented workflow approach including structured processing of ad hoc workflows with a collaborative process engine |
US20050159968A1 (en) * | 2004-01-21 | 2005-07-21 | Stephen Cozzolino | Organizationally interactive task management and commitment management system in a matrix based organizational environment |
CN101038635A (zh) * | 2006-03-15 | 2007-09-19 | 北大方正集团有限公司 | 一种工作流管理系统流程权限控制系统及其实现方法 |
CN101261724A (zh) * | 2008-03-28 | 2008-09-10 | 山东浪潮齐鲁软件产业股份有限公司 | 基于方案的流程管理方法 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103778511A (zh) * | 2014-01-27 | 2014-05-07 | 北京荣之联科技股份有限公司 | 跨系统监控流程的方法及装置 |
CN104091222A (zh) * | 2014-05-08 | 2014-10-08 | 武大吉奥信息技术有限公司 | 一种支持多模式驱动的工作流引擎 |
CN104091222B (zh) * | 2014-05-08 | 2017-07-04 | 武大吉奥信息技术有限公司 | 一种支持多模式驱动的工作流引擎 |
CN111028051A (zh) * | 2019-11-26 | 2020-04-17 | 泰康保险集团股份有限公司 | 基于流程引擎系统的订单合并自动处理方法、装置和系统 |
CN111028051B (zh) * | 2019-11-26 | 2023-08-15 | 泰康保险集团股份有限公司 | 基于流程引擎系统的订单合并自动处理方法、装置和系统 |
CN115170057A (zh) * | 2022-06-06 | 2022-10-11 | 无锡喔趣信息科技有限公司 | 一种基于机器学习的oa审批控制系统及方法 |
CN115170057B (zh) * | 2022-06-06 | 2023-08-22 | 无锡喔趣信息科技有限公司 | 一种基于机器学习的oa审批控制系统及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102129618B (zh) | 2016-02-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhou et al. | Toward new-generation intelligent manufacturing | |
US20150242483A1 (en) | Elastic execution of continuous mapreduce jobs over data streams | |
CN102129618A (zh) | 一种工作流系统实现流程实例合并拆分的方法 | |
Vax et al. | Distributed Agile: Growing a practice together | |
CN102681894A (zh) | 一种多任务并发调度方法及系统 | |
Denny et al. | Chat Overflow: Artificially Intelligent Models for Computing Education-renAIssance or apocAIypse? | |
Kiradoo | Exploring the Opportunities and Challenges for Entrepreneurs in Industry 4.0 | |
Zhu et al. | Multitasking scheduling problems with deterioration effect | |
Bozorgirad et al. | Developing tight lower bounds for hybrid flow shop scheduling problems | |
Bautista et al. | A bounded dynamic programming algorithm for the MMSP-W considering workstation dependencies and unrestricted interruption of the operations | |
Seidgar et al. | A new mathematical model for scheduling flexible flow shop problem with learning and forgetting effects of workers | |
Oliveira et al. | Applying co-creation principles to requirement elicitation in manufacturing | |
Ambika et al. | Branch and bound technique in flow shop scheduling using fuzzy processing times | |
MX2022004130A (es) | Algoritmo genetico con logica determinista. | |
ZHUANG et al. | An Improved Discrete Krill Herd Algorithm for Complex Product Assembly Scheduling Problem | |
CN104751276A (zh) | 一种基于数据库的工作流程管理方法 | |
Oh et al. | The virtual environment for force-feedback experiment of excavator using a novel designed haptic device | |
Ma et al. | Parallel-machine scheduling with delivery times and deteriorating maintenance | |
Wang et al. | An adaptive immune algorithm based on the endocrine regulation mechanism for scheduling problems of flow shop with zero wait | |
Chen et al. | Scheduling position-based deteriorating jobs with multiple rate-modifying activities and past-sequence-dependent delivery times | |
Crawford et al. | The role of knowledge management in agile software development | |
Narain Singh | SasCsvToolkit--A versatile parallel'bag-of-tasks' job submission application on heterogeneous and homogeneous platforms for Big Data Analytics such as for Biomedical Informatics | |
Hsu | Single-machine scheduling with aging effects and optional maintenance activity considerations | |
Gu et al. | Defnet: Deconstructed fabric folding strategy based on latent space roadmap and flow-based policy | |
Sharon et al. | Implementation of Industry 4.0: Influence of Digital Natives and Agility of employees |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 250100 Ji'nan high tech Zone, Shandong, No. 1036 wave road Applicant after: Tide software incorporated company Address before: 250014 Shandong Province, Ji'nan City hi tech Development Zone, Nga Road No. 1036 Applicant before: Langchao Qilu Software Industry Co., Ltd., Shandong |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |