CN102127962A - 改进的附着升降脚手架的双向受力基础节 - Google Patents
改进的附着升降脚手架的双向受力基础节 Download PDFInfo
- Publication number
- CN102127962A CN102127962A CN2011100080479A CN201110008047A CN102127962A CN 102127962 A CN102127962 A CN 102127962A CN 2011100080479 A CN2011100080479 A CN 2011100080479A CN 201110008047 A CN201110008047 A CN 201110008047A CN 102127962 A CN102127962 A CN 102127962A
- Authority
- CN
- China
- Prior art keywords
- rod
- vertical
- base section
- attached lift
- lift scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 claims abstract description 33
- 230000002457 bidirectional effect Effects 0.000 claims abstract description 23
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 238000005452 bending Methods 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract description 2
- 239000000725 suspension Substances 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 238000003466 welding Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 239000011438 cord wood Substances 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Landscapes
- Ladders (AREA)
- Movable Scaffolding (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110008047.9A CN102127962B (zh) | 2011-01-15 | 2011-01-15 | 改进的附着升降脚手架的双向受力基础节 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110008047.9A CN102127962B (zh) | 2011-01-15 | 2011-01-15 | 改进的附着升降脚手架的双向受力基础节 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102127962A true CN102127962A (zh) | 2011-07-20 |
CN102127962B CN102127962B (zh) | 2015-09-23 |
Family
ID=44266215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110008047.9A Active CN102127962B (zh) | 2011-01-15 | 2011-01-15 | 改进的附着升降脚手架的双向受力基础节 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102127962B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102758521A (zh) * | 2012-07-20 | 2012-10-31 | 桂林电子科技大学 | 导轨式附着升降脚手架的组装架体结构 |
CN111762657A (zh) * | 2020-06-10 | 2020-10-13 | 刘�英 | 一种防侧倾坍塌施工电梯支架标准节 |
CN113175203A (zh) * | 2021-05-07 | 2021-07-27 | 苏茂兵 | 附着式升降脚手架中起重动力设备的设置方法 |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2727307Y (zh) * | 2004-07-24 | 2005-09-21 | 范先至 | 一种积木式建筑脚手架 |
CN201116395Y (zh) * | 2007-09-13 | 2008-09-17 | 江苏通州四建集团有限公司 | 叠加式升降脚手架 |
WO2009017354A2 (en) * | 2007-07-30 | 2009-02-05 | Baro Construction Key-Technology Co., Ltd. | Multi-horizontal structure member forming method |
CN201212251Y (zh) * | 2008-04-21 | 2009-03-25 | 浙江环宇建设集团有限公司 | 方塔式脚手架的可调装置 |
CN201326268Y (zh) * | 2008-09-09 | 2009-10-14 | 陕西建工集团总公司 | 一种组合脚手架 |
CN201546439U (zh) * | 2009-11-11 | 2010-08-11 | 贺昌义 | 附着升降脚手架 |
JP2010229700A (ja) * | 2009-03-27 | 2010-10-14 | Alinco Inc | 妻側先行手摺り |
CN201671314U (zh) * | 2010-05-25 | 2010-12-15 | 中建七局第三建筑有限公司 | 结构改良的附着式升降脚手架的导向系统 |
CN101942901A (zh) * | 2010-09-10 | 2011-01-12 | 刘辉 | 一种支撑架或脚手架及其施工方法 |
CN201835515U (zh) * | 2010-11-08 | 2011-05-18 | 四川华山建筑有限公司 | 附着升降脚手架的双向受力基础节 |
CN201915616U (zh) * | 2011-01-15 | 2011-08-03 | 四川华山建筑有限公司 | 改进的附着升降脚手架的双向受力基础节 |
-
2011
- 2011-01-15 CN CN201110008047.9A patent/CN102127962B/zh active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2727307Y (zh) * | 2004-07-24 | 2005-09-21 | 范先至 | 一种积木式建筑脚手架 |
WO2009017354A2 (en) * | 2007-07-30 | 2009-02-05 | Baro Construction Key-Technology Co., Ltd. | Multi-horizontal structure member forming method |
CN201116395Y (zh) * | 2007-09-13 | 2008-09-17 | 江苏通州四建集团有限公司 | 叠加式升降脚手架 |
CN201212251Y (zh) * | 2008-04-21 | 2009-03-25 | 浙江环宇建设集团有限公司 | 方塔式脚手架的可调装置 |
CN201326268Y (zh) * | 2008-09-09 | 2009-10-14 | 陕西建工集团总公司 | 一种组合脚手架 |
JP2010229700A (ja) * | 2009-03-27 | 2010-10-14 | Alinco Inc | 妻側先行手摺り |
CN201546439U (zh) * | 2009-11-11 | 2010-08-11 | 贺昌义 | 附着升降脚手架 |
CN201671314U (zh) * | 2010-05-25 | 2010-12-15 | 中建七局第三建筑有限公司 | 结构改良的附着式升降脚手架的导向系统 |
CN101942901A (zh) * | 2010-09-10 | 2011-01-12 | 刘辉 | 一种支撑架或脚手架及其施工方法 |
CN201835515U (zh) * | 2010-11-08 | 2011-05-18 | 四川华山建筑有限公司 | 附着升降脚手架的双向受力基础节 |
CN201915616U (zh) * | 2011-01-15 | 2011-08-03 | 四川华山建筑有限公司 | 改进的附着升降脚手架的双向受力基础节 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102758521A (zh) * | 2012-07-20 | 2012-10-31 | 桂林电子科技大学 | 导轨式附着升降脚手架的组装架体结构 |
CN102758521B (zh) * | 2012-07-20 | 2014-09-24 | 桂林电子科技大学 | 导轨式附着升降脚手架的组装架体结构 |
CN111762657A (zh) * | 2020-06-10 | 2020-10-13 | 刘�英 | 一种防侧倾坍塌施工电梯支架标准节 |
CN113175203A (zh) * | 2021-05-07 | 2021-07-27 | 苏茂兵 | 附着式升降脚手架中起重动力设备的设置方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102127962B (zh) | 2015-09-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2012503116A5 (zh) | ||
CN203462764U (zh) | 一种大悬挑提升反力架 | |
CN104389419A (zh) | 悬挑支模平台安装结构及施工方法 | |
CN104863271A (zh) | 一种钢管混凝土柱-钢筋混凝土梁节点连接方法 | |
CN201437612U (zh) | 一种带腰型孔的活动屋面幕墙节点 | |
CN101503908B (zh) | 空间悬索结构式模板支撑平台的施工方法 | |
CN104196163A (zh) | 一种双向预应力混凝土预制空心板及其制造方法 | |
CN102454218A (zh) | 钢筋混凝土核心筒与装配整体式空间钢网格的筒中筒结构 | |
CN102127962A (zh) | 改进的附着升降脚手架的双向受力基础节 | |
CN102777050B (zh) | 大跨度管桁架屋面梁的组拼胎架 | |
CN201835515U (zh) | 附着升降脚手架的双向受力基础节 | |
CN204282803U (zh) | 悬挑支模平台安装结构 | |
CN201915616U (zh) | 改进的附着升降脚手架的双向受力基础节 | |
CN204645343U (zh) | 预制装配式混凝土外挂墙板固定装置 | |
CN101845853A (zh) | 一种带腰型孔的活动屋面幕墙节点 | |
CN104787687A (zh) | 一种综合体建筑塔吊附着装置 | |
CN204299147U (zh) | 一种施工成本低的烟囱顶部操作平台 | |
CN217897363U (zh) | 一种建筑施工安全防护装置 | |
CN201915615U (zh) | 附着升降脚手架水平支撑桁架标准节的单元构件 | |
CN102071794B (zh) | 附着升降脚手架水平支撑桁架标准节的单元构件 | |
CN204299146U (zh) | 一种烟囱顶部操作平台 | |
CN104895214A (zh) | 一种钢筋区域分散型防屈曲支撑及其施工方法 | |
CN213014697U (zh) | 一种转角悬挑结构及建筑结构 | |
CN213572930U (zh) | 自锁铰接电梯井施工平台装置 | |
CN212835012U (zh) | 一种桥梁施工用防坠落安全绳支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: SU MAOBING Free format text: FORMER OWNER: SICHUAN HUASHAN CONSTRUCTION CO., LTD. Effective date: 20140707 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 610041 CHENGDU, SICHUAN PROVINCE TO: 610051 CHENGDU, SICHUAN PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20140707 Address after: 610051 No. seven, No. 10, No. two, two East Ring Road, Chengdu, Sichuan, 12 Applicant after: Su Maobing Address before: 610041 Sichuan province Chengdu city two ring road south of three No. 1 Xiang Fuk East Building Room 1408 Applicant before: Sichuan Huashan Construction Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20110720 Assignee: Yibin Xulong Energy Saving Technology Co.,Ltd.|Yibin Shunhui Construction Machinery Co.,Ltd. Assignor: SICHUAN HUASHAN CONSTRUCTION Co.,Ltd.|Su Maobing|Su Quanyun|Su Siyue Contract record no.: X2021510000018 Denomination of invention: Improved two way stress foundation section of attached lifting scaffold Granted publication date: 20150923 License type: Common License Record date: 20210611 |