CN102108704B - Vibration balancing anchor device - Google Patents
Vibration balancing anchor device Download PDFInfo
- Publication number
- CN102108704B CN102108704B CN 201010595161 CN201010595161A CN102108704B CN 102108704 B CN102108704 B CN 102108704B CN 201010595161 CN201010595161 CN 201010595161 CN 201010595161 A CN201010595161 A CN 201010595161A CN 102108704 B CN102108704 B CN 102108704B
- Authority
- CN
- China
- Prior art keywords
- anchor
- top board
- pedestal
- rubber disc
- formula rubber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The invention belongs to the technical field of rock-soil anchor, and relates to a vibration balancing anchor device. A base (6) of which the upper part is provided with a circular column sleeve (5) is arranged; a top plate (4) having a hollow cylinder structure is arranged; a half rubber disk is arranged in a cavity formed by the circular column sleeve (5) and the top plate (4); a prestressed adjusting bolt (9) passes through the center holes of the half rubber disk (11) and the base (6); and the lower end of the prestressed adjusting bolt (9) is provided with a tightening nut (8) for applying pretightening force to the half rubber disk (11) through the base (6). Through the superelastic deformation capacity of the half rubber disk, the damage of stress caused by sudden load change or vibration to an anchor rod is buffered, the capacity of the anchor rod of balancing the damage of an anchor rod and anchor cable system caused by sudden stress change due to sudden load change is improved, and the safety and reliability of an anchor support system are effectively improved.
Description
Technical field
The invention belongs to the ground anchorage technical field, relate to a kind of vibration balancing anchor device.
Background technology
Anchor pole, anchor cable are widely used in the anchoring engineering of side slope, underground chamber, tunnel and the foundation ditch of major workss such as railway, highway, mine, water conservancy and civilian construction.In these engineerings, there is one type of problem comparatively outstanding.Be to have such as locomotive vibration, mine in the anchoring system working range to adopt or construction blasting; The existence of these vibration sources can make anchoring system receive the effect of the load that moves in circles for a long time, the perhaps effect of transient peak stress; Cause the excessive ess-strain loss of anchor cable; Produce over-large displacement, even moment stress breakthrough anchor cable ultimate load, the anchoring failure damage caused.Jeopardize locomotive operation security, equipment, personnel's life security.
Current anchoring generally adopts anchor dish, intermediate plate and anchor cable matching and fixing paying the waist rail that protects on the soil body in advance or connecting beam and loaded plate is worked simultaneously, to reach the purpose of soil mass consolidation.Concrete sequence of construction is following:
1. set anchor hole.
2. insert anchor cable and slip casting.
3. the company's of setting beam and loaded plate are provided with hole so that pass anchor cable in the middle of the loaded plate.
4. work as the slip casting slurry and reach setting intensity; Anchor cable is passed anchor dish corresponding perforations one by one, and use intermediate plate to clamp in the hole on the anchor cable mooring anchor dish, use anchor pole stretch-draw jack; Apply certain prestressing force; And the locking intermediate plate, make intermediate plate clamp anchor cable, intermediate plate is fixed in the corresponding hole of anchor dish.
5. finish, the anchor pole system is started working, and the soil body obtains reinforcing.
This type of anchoring process receives under the vibration condition at the soil body elastic deformation takes place, through the elasticity volume expansion with shrink anchor head generation effect; Soil expansion increases the anchor head load, its moment peak stress possibly destroy anchor head (anchor cable), cause anchoring to be lost efficacy; Cause security incident, or destroy intermediate plate and produce loss of prestress, soil body elastic shrinkage can reduce anchor head prestressing force moment; This effect that continues repeatedly can destroy anchor head or cause its loss of prestress, jeopardizes engineering safety.
Summary of the invention
The objective of the invention is to propose a kind of vibration balancing anchor device, vibration controlling structure is combined with anchor cable, increase the whole shock resistance of anchor device anchor system, the cushion load sudden change improves safety, the reliability of support system to the influence of anchoring system.
The present invention accomplishes the technical scheme that its invention task taked:
A kind of vibration balancing anchor device; Be fixedly connected with pedestal connecting on the loaded plate that beam or waist rail connect firmly with prop; The top of said pedestal is the annular column sleeve of cavity structure; Being provided with top board and said top board is the cavity cylindrical structure, the annular column sleeve of said pedestal upper cavity structure be positioned at top board and relatively top board move axially; In the cavity that the annular column sleeve of pedestal combines with top board to constitute, be provided with Hough formula rubber disc; Said anchor dish fits tightly on the top board top; Described top board has and the tight adjusting bolt of giving of its one; Be positioned at the centre bore that the tight adjusting bolt of giving of top board cavity center passes pedestal, Hough formula rubber disc, have and regulate the clamp nut that bolt thread cooperates, through pedestal Hough formula rubber disc is applied pretightning force giving tight adjusting bolt lower end; Have the anchor cable hole that supplies anchor cable to pass through on the said anchor dish, an end is anchored at anchor cable in the soil layer and passes on loaded plate, pedestal, Hough formula rubber disc, the top board corresponding anchor cable hole successively and be fixedly clamped on the anchor dish by the intermediate plate in the anchor cable hole on the anchor dish.
Between the upper surface of pedestal, annular column sleeve, Hough formula rubber disc, be respectively arranged with locating ring between top board and the Hough formula rubber disc upper surface, move radially in order to prevent Hough formula rubber disc.
Said Hough formula rubber disc can be one or more.
A kind of vibration balancing anchor device that the present invention proposes; Utilize Hough formula rubber super-elasticity deformability; Cushioned the stress that causes by load sudden change or vibration destruction, adopted this vibration balancing anchor device, accomplished reinforcing supporting Foundation Treatment rock-soil layer to anchor pole; Increase the anchor pole balance because the ess-strain sudden change that the load sudden change causes causes the ability of anchor shaft anchor cable system destruction thereby reach, effectively raise safety, the reliability of bolt support system.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 is the vertical view of Fig. 1.
Fig. 3 is the structural representation of pedestal among the present invention.
Fig. 4 is the structural representation of top board among the present invention.
The structural representation of Hough formula rubber disc among Fig. 5 the present invention.
Among the figure: 1, anchor cable, 2, intermediate plate, 3, the anchor dish, 4, top board, 5, annular column sleeve, 6, pedestal, 7, loaded plate, 8, clamp nut, 9, pretension regulates bolt, 10,12, locating ring, 11, Hough formula rubber disc.
The specific embodiment
In conjunction with accompanying drawing and embodiment the present invention is further specified:
Like Fig. 1, shown in Figure 2; And with reference to Fig. 3, Fig. 4, Fig. 5; A kind of vibration balancing anchor device is fixedly connected with pedestal 6 connecting on the loaded plate 7 that beam or waist rail connect firmly with prop, and the top of pedestal 6 is the annular column sleeve 5 of cavity structure; Be provided with the top board 4 of cavity cylindrical structure, the annular column sleeve 5 of cavity structure be positioned at top board 4 and relatively top board move axially; In the cavity that the annular column sleeve 5 of pedestal combines with top board 4 to constitute, be provided with Hough formula rubber disc 11; Said Hough formula rubber disc can be one or more; Among this embodiment be two; Anchor dish 3 fits tightly with top board 4; Described top board 4 has and the tight adjusting bolt 9 of giving of its one; Be positioned at the centre bore that the tight adjusting bolt 9 of giving of top board cavity center passes pedestal 6, Hough formula rubber disc 11, have the clamp nut 8 that applies pretightning force with the adjusting screw(rod) threaded engagement, through 6 pairs of Hough formulas of pedestal rubber disc giving tight adjusting bolt lower end; The clamp nut 8 of screwing applies certain pretightning force through 6 pairs of Hough formulas of pedestal rubber disc.Have the anchor cable hole that supplies anchor cable to pass through on the said anchor dish 3, an end is anchored at anchor cable 1 in the soil layer and passes on loaded plate 7, pedestal 6, Hough formula rubber disc 11, the top board 4 corresponding anchor cable hole successively and be fixedly clamped on the anchor dish by the intermediate plate in the anchor cable hole on the anchor dish 2.Anchor cable hole number on said loaded plate 7, pedestal 6, Hough formula rubber disc 11, top board 4, the anchor dish 3 and size are by set anchor cable decision.Between the upper surface of pedestal 6, annular column sleeve 5, Hough formula rubber disc 11, be provided with locating ring 10,12 between top board 4 and the Hough formula rubber disc upper surface, move radially in order to prevent Hough formula rubber disc; Locating ring 10,12 and annular column sleeve 5 are matched in clearance.
The assembling of apparatus of the present invention:
In the annular column sleeve 5 of pedestal, put into locating ring 10; Hough formula rubber disc 11 is put into the annular column sleeve 5 of pedestal; Placement positioning ring 12 on Hough formula rubber disc 11 is enclosed within top board 4 on the annular column sleeve 5 of pedestal, makes to give the centre bore that tight adjusting bolt 9 passes Hough formula rubber disc 11, pedestal 6; The clamp nut 8 of tight adjusting bolt 8 lower ends is given in turn, applies pretightning force through 6 pairs of Hough formulas of pedestal rubber disc; Assembled, and guarantee that anchor dish 3, top board 4, Hough formula rubber disc 11, pedestal 6 all anchor cable holes align.Adopt bolt with on the loaded plate 7 that device is fixed on even beam or waist rail connect firmly.
Device uses:
One end is anchored at anchor cable 1 in the soil layer to be passed on loaded plate 7, pedestal 6, Hough formula rubber disc 11, the top board 4 corresponding anchor cable hole successively and is fixedly clamped on the anchor dish by the intermediate plate in the anchor cable hole on the anchor dish 2; Apply prestressing force through the stretch-draw jack, and the banding intermediate plate.
Each assembly relative motion mode
Claims (3)
1. vibration balancing anchor device; It is characterized in that: be fixedly connected with pedestal (6) connecting on the loaded plate (7) that beam or waist rail connect firmly with prop; The top of said pedestal (6) is the annular column sleeve (5) of cavity structure; Annular column sleeve (5) is provided with top board (4) and said top board is the cavity cylindrical structure, the annular column sleeve (5) of said pedestal upper cavity structure be positioned at top board and relatively top board (4) move axially; In the cavity that the annular column sleeve (5) of pedestal combines with top board (4) to constitute, be provided with Hough formula rubber disc (11); Described top board (4) has with the pretension of its one regulates bolt (9); The pretension that is positioned at the top board cavity center is regulated the centre bore that bolt (9) passes Hough formula rubber disc (11), pedestal (6), regulates bolt (9) lower end at pretension and has the clamp nut (8) that cooperates, through pedestal (6) Hough formula rubber disc is applied pretightning force with the adjusting bolt thread; Anchor dish (3) fits tightly on the top board top; Have the anchor cable hole through supplying anchor cable to pass through on the said anchor dish (3), an end is anchored at anchor cable (1) in the soil layer and passes loaded plate (7), pedestal (6), Hough formula rubber disc (11), top board (4) successively and go up corresponding anchor cable hole and be fixedly clamped on anchor dish (3) by the intermediate plate in the anchor cable hole on the anchor dish (2).
2. vibration balancing anchor device according to claim 1 is characterized in that: said Hough formula rubber disc (11) is for one or more.
3. vibration balancing anchor device according to claim 1; It is characterized in that: between the upper surface of pedestal (6), annular column sleeve (5), Hough formula rubber disc (11), be provided with locating ring (10,12) between the upper surface of top board (4) and Hough formula rubber disc (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010595161 CN102108704B (en) | 2010-12-20 | 2010-12-20 | Vibration balancing anchor device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010595161 CN102108704B (en) | 2010-12-20 | 2010-12-20 | Vibration balancing anchor device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102108704A CN102108704A (en) | 2011-06-29 |
CN102108704B true CN102108704B (en) | 2012-08-15 |
Family
ID=44172976
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010595161 Active CN102108704B (en) | 2010-12-20 | 2010-12-20 | Vibration balancing anchor device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102108704B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103572970B (en) * | 2013-11-12 | 2016-02-24 | 中建三局建设工程股份有限公司 | The stopping means of automatic adjustment intermediate plate stroke and using method thereof |
CN109295974A (en) * | 2018-09-27 | 2019-02-01 | 中国人民解放军军事科学院国防工程研究院 | A kind of dynamic load modular controllable displacement prestress anchorage cable head elasticity system and method |
CN109356629B (en) * | 2018-11-09 | 2020-06-19 | 成都理工大学 | Application method of large-deformation pressure-relief impact-resistant anchor rod |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4432472A1 (en) * | 1994-09-13 | 1996-03-14 | Reburg Patentverwertungs Gmbh | Method of setting a rock bolt and adapter part for use in such a method |
CN2318264Y (en) * | 1997-11-07 | 1999-05-12 | 中国人民解放军工程兵工程学院企业管理局 | Quickly adjustable prestressing ground tackle |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09137415A (en) * | 1995-11-10 | 1997-05-27 | S Ii:Kk | Anchorage device of rockfall prevention retaining wall stabilizing anchor |
JPH11350477A (en) * | 1999-06-01 | 1999-12-21 | Kurosawa Construction Co Ltd | Ground surface side fixing device for ground anchor |
CN202007405U (en) * | 2010-12-20 | 2011-10-12 | 中铁隧道集团有限公司 | Vibration balancing anchoring device |
-
2010
- 2010-12-20 CN CN 201010595161 patent/CN102108704B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4432472A1 (en) * | 1994-09-13 | 1996-03-14 | Reburg Patentverwertungs Gmbh | Method of setting a rock bolt and adapter part for use in such a method |
CN2318264Y (en) * | 1997-11-07 | 1999-05-12 | 中国人民解放军工程兵工程学院企业管理局 | Quickly adjustable prestressing ground tackle |
Non-Patent Citations (2)
Title |
---|
JP特开平11-350477A 1999.12.21 |
JP特开平9-137415A 1997.05.27 |
Also Published As
Publication number | Publication date |
---|---|
CN102108704A (en) | 2011-06-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102108703B (en) | Adjustable prestressed anchoring device | |
CN101484643B (en) | A tower construction | |
CN102108704B (en) | Vibration balancing anchor device | |
CN106223186B (en) | A kind of bridge earthquake resistance structure of additional wire connection damper device | |
CN201627139U (en) | Cantilever-beam type shock-absorbing tenon structure for railway simply supported beam bridge | |
CN202007405U (en) | Vibration balancing anchoring device | |
CN104532834A (en) | Energy-dissipation self-adaptive anti-seismic anchor rope structure and implementation method thereof | |
KR101062220B1 (en) | A rubber bearing damper shoe structure for bridge | |
CN101725364A (en) | Displacement release type anchor head device | |
CN110344408A (en) | A kind of method of energy-absorbing damping at anchor pole anchor head | |
US20160251818A1 (en) | Apparatus for securing, in particular remediating, the foundation of a wind turbine, as well as foundation and method for remediating | |
CN104047287A (en) | Prestressed sleeve self-lock anchor rod | |
CN103696520A (en) | CFRP (carbon fiber reinforced plastic) cable connecting joint of cable supported structure | |
CN203114315U (en) | Yielding anchor rod capable of monitoring prestress by itself | |
CN104712354A (en) | Mining impingement prevention anchor rod and mounting method thereof | |
CN209523218U (en) | Prestress anchorage cable fan foundation structure for Rock Region | |
CN101581225A (en) | Compressible increasing resistance anchor rod prestressed control component | |
CN110173538A (en) | A kind of shock-damping structure of energy saving and environment friendly oil exploitation drilling platforms | |
CN2830644Y (en) | Controllable prestressed super-strength anchor arm | |
CN106382318B (en) | A kind of coiled spring damper of adjustable early stage rigidity | |
CN102031981B (en) | Anchoring method of extensible anchor rod | |
CN113958459A (en) | Assembled antidetonation wind power tower cylinder | |
CN109371994B (en) | Civil engineering side slope anchoring device | |
CN202787061U (en) | Limiting rubber shock-isolation support | |
CN110344409A (en) | A kind of anchor pole anchor head assembly of energy-absorbing damping |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |