CN102108701B - Method for reinforcing soil at periphery of column by non-pressure grouting - Google Patents

Method for reinforcing soil at periphery of column by non-pressure grouting Download PDF

Info

Publication number
CN102108701B
CN102108701B CN 200910312503 CN200910312503A CN102108701B CN 102108701 B CN102108701 B CN 102108701B CN 200910312503 CN200910312503 CN 200910312503 CN 200910312503 A CN200910312503 A CN 200910312503A CN 102108701 B CN102108701 B CN 102108701B
Authority
CN
China
Prior art keywords
soil
grouting
injected hole
periphery
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200910312503
Other languages
Chinese (zh)
Other versions
CN102108701A (en
Inventor
王晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN 200910312503 priority Critical patent/CN102108701B/en
Publication of CN102108701A publication Critical patent/CN102108701A/en
Application granted granted Critical
Publication of CN102108701B publication Critical patent/CN102108701B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a method for reinforcing soil at the periphery of a column by non-pressure grouting. The method comprises the following steps: firstly drilling grouting holes on soil at the periphery of a pile to be reinforced, and then grouting cement paste into the grouting hole by adopting a non-pressure automatic flow manner, thus the soil at the periphery of the column is reinforced. Compared with the traditional reinforcing method, the method disclosed by the invention is both effective and economic, and cheap cement paste is adopted as a reinforcing material, thus the cost is greatly reduced; the non-pressure automatic flow grouting manner is adopted in the invention, the process and the machines and tools are simpler, and the construction period is only half of the construction period of a high pressure grouting method; and grout slipping and grout overflowing produced in a high pressure injecting process can be reduced. The method disclosed by the invention is applicable to solidification on the soil at the periphery of the pile and is also applicable to reinforcement on other foundation soils.

Description

The method of all soil of no pressure injection slurry reinforced column
Technical field
The present invention relates to a kind of embankment consolidation technology, particularly a kind of method of not having pressure injection slurry reinforced column week soil.
Background technology
At present, embankment consolidation is adopted chemical stabilization and high-pressure slip-casting method usually.Chemical stabilization need adopt the raw materials of industry such as dual liquid type mixed serum of alkali lye or cement and water glass, and cost is higher, but also needs to consider the problem of environmental pollution.The high-pressure slip-casting method occurs race easily and starches, emits phenomenons such as slurry, and result of use is not very desirable.
Summary of the invention
Technical problem to be solved by this invention be to provide a kind of with low cost, technology simple, can reduce all native methods of no pressure injection slurry reinforced column of running slurry and emitting the slurry phenomenon, thereby overcome the deficiencies in the prior art.
For solving the problems of the technologies described above technical scheme of the present invention: the method for all soil of no pressure injection slurry reinforced column.This method is earlier at all earth boring auger injected holes of stake that will reinforce, adopts then and does not have the gravity flow mode of pressure grout injection in injected hole.
Above-mentioned no pressure injection slurry reinforced column week soil method in, the order of boring injected hole is the subdrilling outer ring, then bores inner ring, bores mesosphere at last.
In the method for all soil of aforesaid no pressure injection slurry reinforced column, the injected hole spacing is 1.65m, and the denseness of cement paste is 750kg/m3.
Aforesaid no pressure injection slurry reinforced column week soil method in, in the grout injection process, carry out perfusion at intermittence and irritate for inhaling the big injected hole of slurry amount more, then irritate less inhaling the little injected hole of slurry amount, can see the water level that 1~2m is dark after making each injected hole process slip casting.
For verifying effect of the present invention, the applicant has carried out a large amount of experiments, and the result is as follows:
The large-scale groove jar of one row of experiment one, certain engineering of area, zunyi, guizhou province, its basis is 37 circular cushion caps (diameter 17.2m).Owing in the backfill place, adopt method of the present invention to hole and afterwards do not have the construction of the step of pressure injection slurry, make stake week native fixed according to elder generation.Reinforce existing a year and a half so far, groove jar ground is all right; The reinforcing expense through examine for: 49 yuan of average 1m3 soil costs only are 27% of chemical stabilization (180 yuan of unit prices) expense, also only are 33% of high-pressure slip-casting method (150 yuan of unit prices) expense.
Experiment two, reinforcement experiment are to liking the clump of piles of circular cushion cap.Bore injected hole by method of the present invention, order is probing outer ring earlier, then bores inner ring, bores mesosphere at last.The spacing of wells is determined with reference to standard.Current test, the grouting of still pressurizeing during beginning when pressure reaches 0.2~0.3Mpa, slurry occurs emitting around the grout hole, and promptly automatically unloading is to zero.Analysis occurs emitting the reason of slurry to be: the composition of place backfill is clay, rubble and piece stone, an a large amount of silt particle band that draw water for a long time when constructing stake deeply and are washed away, remainingly in the backfill layer be mostly the skeleton that particle is thicker, void content is big, so that grouting reaches lower pressure and just run the slurry release.Thus, no longer pressurization grouting but carry out large tracts of land and do not have the pressure injection slurry of test.In the slip casting process, send full-time staff's touring observation beyond range of grouting, see that the cement paste of perfusion has other passage of having no way of, crack to flow away.Observe round the clock through 4, do not see the spillage phenomenon, show that cement paste is to be poured in the effective scope.Check after slip casting is finished: excavation sees that obviously fresh cement paste is arranged in the packing course during 1~2m, between soil layer, bond finely between rubble and between stone.And when the slip casting of border, find that most of boring has full slurry phenomenon.Can think that in view of the above no pressure injection slurry has reached the effect of design anticipation.
Beneficial effect of the present invention: compared with prior art, not only effectively but also economical, it adopts cheap cement paste was reinforcement material to method of the present invention, and without alkali lye, also without the dual liquid type mixed serum of cement and water glass, cost reduces greatly.The present invention adopts the grouting way of do not have pressing gravity flow, and technology and facility are simpler, and the construction period has only half of high-pressure mortar spraying method duration, and can reduce race slurry that the high-pressure injection method occurred, emits the slurry phenomenon.The present invention is applicable to that stake week is native fixed, also can be applicable to the reinforcing of other foundation soils.
The present invention is further illustrated below in conjunction with the specific embodiment.
The specific embodiment
Embodiment 1.Elder generation adopts then and does not have the gravity flow mode of pressure grout injection in injected hole at all earth boring auger injected holes of stake that will reinforce, and all soil of stake is reinforced.The order of boring injected hole is the subdrilling outer ring, can control the grouting scope of stake week soil like this, then bores inner ring, with according to actual conditions outer, that inner ring probing finding is grasped the place backfill, bores mesosphere at last.The injected hole spacing determines that with reference to standard be generally 1.0m~2.0m, the bound of numerical value differs greatly, the present invention by actual conditions through scrutinizing preferably 1.65m.The denseness of cement paste is 750kg/m3, i.e. 1m3 cement paste cement 750kg, and (1m3 cement paste cement 620kg) is thicker than high-pressure slip-casting method.In the grout injection process, carry out perfusion at intermittence and irritate more, then irritate less, can see that through after the slip casting the dark water level of 1~2m serves as effective finally to reach each injected hole to inhaling the little injected hole of slurry amount for inhaling the big injected hole of slurry amount.
Embodiments of the present invention are not limited to the foregoing description, and the various variations of making under the prerequisite that does not break away from aim of the present invention all belong within protection scope of the present invention.

Claims (2)

1. a method of not having pressure injection slurry reinforced column week soil is characterized in that: earlier at all earth boring auger injected holes of stake that will reinforce, adopt then and do not have the gravity flow mode of pressure grout injection in injected hole; The order of boring injected hole is the subdrilling outer ring, then bores inner ring, bores mesosphere at last; The injected hole spacing is 1.65m, and the denseness of cement paste is 750kg/ m3.
2. the method for all soil of no pressure injection slurry reinforced column according to claim 1, it is characterized in that: in the grout injection process, carry out perfusion at intermittence and irritate for inhaling the big injected hole of slurry amount more, then irritate less inhaling the little injected hole of slurry amount, make each injected hole can see the water level that 1~2m is dark through after the slip casting.
CN 200910312503 2009-12-29 2009-12-29 Method for reinforcing soil at periphery of column by non-pressure grouting Expired - Fee Related CN102108701B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910312503 CN102108701B (en) 2009-12-29 2009-12-29 Method for reinforcing soil at periphery of column by non-pressure grouting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910312503 CN102108701B (en) 2009-12-29 2009-12-29 Method for reinforcing soil at periphery of column by non-pressure grouting

Publications (2)

Publication Number Publication Date
CN102108701A CN102108701A (en) 2011-06-29
CN102108701B true CN102108701B (en) 2013-07-24

Family

ID=44172973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910312503 Expired - Fee Related CN102108701B (en) 2009-12-29 2009-12-29 Method for reinforcing soil at periphery of column by non-pressure grouting

Country Status (1)

Country Link
CN (1) CN102108701B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362116A (en) * 2013-07-02 2013-10-23 镇江市城乡建设基础工程有限公司 Construction method of foundation compaction grouting
CN106192987B (en) * 2016-08-01 2018-08-10 山西四建集团有限公司 It is a kind of to be crushed the construction method that geology is reinforced to stake periphery
CN108487229A (en) * 2018-03-28 2018-09-04 贵州省地质矿产勘查开发局111地质大队 Artificial pore-forming method after strong rock-soluble foundation pre-grouting treatment
CN110410079B (en) * 2019-08-02 2020-09-18 中煤第三建设(集团)有限责任公司 Non-pressure grouting method based on mine construction

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1500762A (en) * 2002-11-15 2004-06-02 刘茂平 Single plasm glue jointed filling material and using method thereof
CN1629406A (en) * 2004-10-20 2005-06-22 葛扬安 Method for treating depression watertight in hydraulic engineering by employing yellow mud grout
KR20060073731A (en) * 2004-12-24 2006-06-29 한국철도기술연구원 Amethod for solidification of railroad bridge and public works-connection part

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1060879A (en) * 1996-08-19 1998-03-03 Nippon Concrete Ind Co Ltd Building foundation and construction method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1500762A (en) * 2002-11-15 2004-06-02 刘茂平 Single plasm glue jointed filling material and using method thereof
CN1629406A (en) * 2004-10-20 2005-06-22 葛扬安 Method for treating depression watertight in hydraulic engineering by employing yellow mud grout
KR20060073731A (en) * 2004-12-24 2006-06-29 한국철도기술연구원 Amethod for solidification of railroad bridge and public works-connection part

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
灌浆加固地基的实践;贾美珍;《山西建筑》;20050930;第31卷(第17期);第85-86页 *
罗杰华,王勇.砂砾石基础帷幕灌浆防渗在垅港大坝围堰基础防渗中的应用.《江西水利科技》.2008,第34卷第49-50页. *
贾美珍.灌浆加固地基的实践.《山西建筑》.2005,第31卷(第17期),第85-86页.

Also Published As

Publication number Publication date
CN102108701A (en) 2011-06-29

Similar Documents

Publication Publication Date Title
CN105386433B (en) A kind of microorganism soil-fixing CFG pile composite foundations and construction method
US20140314497A1 (en) Polymer grouting method for constructing gravel pile
CN102465524B (en) Double radial mesh-cage sand-gravel pile and construction technology thereof
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN203685203U (en) High speed railway tunnel foundation strengthening structure
CN102888795A (en) Karst roadbed grouting process
CN102493821A (en) Support method for high stress roadway coal-rock mass
CN102108701B (en) Method for reinforcing soil at periphery of column by non-pressure grouting
CN204023578U (en) Retaining Structure with Double-row Piles
CN101498220B (en) Vertical shaft working surface artesian flow sand layer slurry protecting rotary spraying grouting process
CN104328782A (en) Expansive pouring device and method for governing railway roadbed sedimentation and deformation
CN101781991A (en) Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method
CN105239598A (en) Integral sinking construction method for well-type full-automatic stereo garage
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN101749026A (en) Grid reinforcing method of shield receiving or starting end head and shield receiving method
CN104895583B (en) Tunnel surrounding rock control method combining pressure relief and slip-casting reinforcement
CN105839622A (en) Fly ash-based soft soil foundation reinforcing method, fly ash pile and pipe casing for foundation reinforcement
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN103388338A (en) Novel rapid water stopping and soil mass improving method
CN103806433A (en) Foundation backfill reinforcement method
CN105257309B (en) In a kind of layer of sand in balancing earth-pressure shielding machine storehouse slip casting tool changing construction method
CN104790982B (en) Casing material for ultra-deep hole grouting of underground excavated tunnel
CN111424653A (en) Construction method and structure of thin-wall karst cave combined pipe pile
CN111364449A (en) Construction method and structure for penetrating karst cave of precast tubular pile
CN102235008B (en) Engineering pile deviation preventing structure of soft soil foundation and pretreatment method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130724

Termination date: 20141229

EXPY Termination of patent right or utility model