CN102107220A - Method for controlling temperature of steel intermediate billet to be rolled for engineering machinery - Google Patents

Method for controlling temperature of steel intermediate billet to be rolled for engineering machinery Download PDF

Info

Publication number
CN102107220A
CN102107220A CN2009102487868A CN200910248786A CN102107220A CN 102107220 A CN102107220 A CN 102107220A CN 2009102487868 A CN2009102487868 A CN 2009102487868A CN 200910248786 A CN200910248786 A CN 200910248786A CN 102107220 A CN102107220 A CN 102107220A
Authority
CN
China
Prior art keywords
temperature
cooling
intermediate blank
rolled
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009102487868A
Other languages
Chinese (zh)
Inventor
李新玲
杨军
李靖年
刘浩岩
张健
王栋
王明林
金宇祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN2009102487868A priority Critical patent/CN102107220A/en
Publication of CN102107220A publication Critical patent/CN102107220A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Metal Rolling (AREA)
  • Control Of Metal Rolling (AREA)

Abstract

The invention provides a method for controlling the temperature of an intermediate billet for steel for engineering machinery to be rolled, which combines water cooling with air cooling for the two-stage rolled intermediate billet, controls the cooling speed and the time for waiting for temperature, carries out spray cooling on the intermediate billet with the thickness of more than or equal to 100mm after rolling to a preset temperature at the cooling rate of 2-5K/s, puts the intermediate billet into the air for waiting for 60-250 s, and sends the intermediate billet into a finishing mill for finish rolling when the temperature difference between the head and the tail is less than or equal to 25 ℃ and the temperature is reduced to the target rolling temperature of the two stages. Thereby accelerating the cooling speed, shortening the cooling time, inhibiting the growth of crystal grains, reducing the size of austenite crystal grains, improving the obdurability of the finished steel plate, and improving the internal quality and the service performance of the steel plate while improving the operating rate and the yield of a rolling mill. The method of the invention is simple, easy to master and operate, and can quickly achieve the effect without adding any equipment and investment.

Description

A kind of engineering machinery is treated the method that temperature control is rolled with the steel intermediate blank
Technical field
The invention belongs to the steel rolling process technical field, relate in particular to a kind of controlled rolling and controlled cooling, shorten the method for engineering machinery with steel intermediate blank time of staying temperature.
Background technology
Appearance along with a series of pulling domestic demands of China, the policy of maintaining fast yet steady economic development and measure, the construction machinery industry materials demand also constantly increases, and drive engineering machinery and significantly increase, thereby constructed the huge platform of an engineering machinery with steel production with the demand of steel.Use in the steel order in engineering machinery, the kind that has the call is the engineering machinery steel of intensity 690MPa, and the quality and the processing serviceability of steel plate also had higher requirement.
At present, the state-of-the-art production method of domestic and international project steel for engineering mechanism purpose is to adopt that TMCP is rolling to be controlled rolling and cooling and steel plate carried out temper, improves the integrated performance indexs such as intensity, toughness and welding of steel plate, to satisfy user's comprehensive instructions for use.
In actual production process, engineering machinery adopts the two-section low-temperature rolling technique mostly with steel, to improve the metallographic structure of steel plate, the combination property and the quality of control steel plate.But, since steel billet finish a stage rolling after, the steel billet cooling a period of time after needing to roll for the uniformity that improves crystal grain is promptly treated the intermediate blank of temperature.At present, what the intermediate blank after in the world a stage being rolled generally adopted is the ground mode of cooling off naturally in air, and the mode of this air cooling needs intermediate blank to treat the chronic of temperature cooling in air, treat the also difference to some extent of warm time according to the thickness difference, but average time of staying temperature will reach about 600s.The production capacity and the operating rate of milling train have not only been had a strong impact on, and because intermediate blank waiting as long at high temperature, making a stage depress the crystal grain that is broken greatly constantly grows up again, directly reduce the intensity and the toughness of finished product steel plate after the finish rolling, influenced the inherent quality of steel plate and user's instructions for use.
Summary of the invention
Purpose of the present invention is exactly at above-mentioned defective, aims to provide a kind of simplely, is convenient to operation, can effectively suppress the intermediate blank grain growth, shortens the intermediate blank time of staying temperature, thereby improves the method for steel plate combination property and operating rate of rolling mill.
For this reason, the technical solution that the present invention taked is:
A kind of engineering machinery is treated the method that temperature control is rolled with the steel intermediate blank, takes cooling fast to combine control cooling velocity and time of staying temperature, zerolling engineering machinery steel intermediate blank with the air cooling.
Its specific embodiment is:
After cold base heating is come out of the stove, through high-pressure water descaling 1 or 3 passages;
Milling train start rolling temperature 〉=1050 ℃, finishing temperature 〉=980 ℃, the single pass heavy deformation in 3 roads, back is 10%~20%;
Set pattern, cooldown rate and the temperature of control cooling; The intermediate blank of outgoing gauge 〉=100mm is sent into accelerate cooling system, slowly cool off with the cooldown rate of 2~5K/s; After steel billet upper surface temperature is cooled to 880~920 ℃, steel billet is shifted out from accelerate cooling system, treat temperature 60~250s time before returning to milling train, promptly reach two-stage target rolling temperature after treating intermediate blank head, the tail temperature difference≤25 ℃ and being cooled to 850~890 ℃, send into finishing mill and carry out two-stage finish rolling.
Beneficial effect of the present invention is:
Owing to intermediate blank is changed into air cooling and is controlled the two-part type of cooling that cooling combines fast by complete air cooling, thereby accelerated cooling velocity, shortened cool time, make the intermediate blank time of staying temperature shorten to 150s by 600s.Simultaneously, improve the operating efficiency of whole rolling line, accelerated rhythm of production, helped the raising of rolling mill yield.Particularly because take to force to cool off, the method for fast cooling, suppressed the speed of grain growth; Shorten cool time in addition, compressed the time of grain growth, thereby reduced austenite grain size, can obviously improve the obdurability of finished product steel plate, improve the inherent quality and the serviceability of steel plate.The inventive method is simple, is easy to grasp and operation, need not increase any equipment and just can speed become effective with investment.The intermediate blank that is particularly useful for thickness 〉=100mm.
Description of drawings
Accompanying drawing is that engineering machinery is treated temperature control rolling method process chart with the steel intermediate blank.
The specific embodiment
Below, the invention will be further described in conjunction with the accompanying drawings and embodiments.
By accompanying drawing as seen, intermediate blank of the present invention treats that the main technique step of temperature control rolling method is five roads, i.e. heating furnace heating-high-pressure water descaling-zerolling-control cooling system spray water-cooled-homogenising air cooling, and the intermediate blank behind the air cooling is sent into finishing mill and is carried out finish rolling.
Embodiment 1:
With specification is that the cold base of 300 * 1900 * 3200mm is sent into heating furnace and heated 1160 ℃ of heating target temperatures;
After heating is come out of the stove, carry out high-pressure water descaling 1 passage;
Steel billet after the de-scaling directly enters milling train and is rolled, 1070 ℃ of start rolling temperatures, and 1000 ℃ of finishing temperatures, the single pass heavy deformation in 3 roads, back is 14%; Rolling back intermediate blank thickness is 130mm;
Intermediate blank after will rolling is sent into accelerate cooling system, sprays water-cooled with the cooldown rate of 4K/s;
After steel billet is cooled to 900 ℃, steel billet is moved out to milling train from accelerate cooling system before, place air to treat warm 120s;
When waiting to be cooled to 880 ℃, be 20 ℃, reach two-stage target rolling temperature, send into finishing mill and be rolled into 50 * 2800 * 13000mm finished product steel plate with pyrometer measurement intermediate blank head, the tail temperature difference.
Embodiment 2:
With specification is that the cold base of 300 * 1900 * 4500mm is sent into heating furnace and heated 1180 ℃ of heating target temperatures;
After heating is come out of the stove, carry out high-pressure water descaling 3 passages;
Steel billet after the de-scaling directly enters milling train and is rolled, 1050 ℃ of start rolling temperatures, and 990 ℃ of finishing temperatures, the single pass heavy deformation in 3 roads, back is 19%; Rolling back intermediate blank thickness is 150mm;
Intermediate blank after will rolling is sent into accelerate cooling system, sprays water-cooled with the cooldown rate of 3K/s;
After steel billet is cooled to 880 ℃, steel billet is moved out to milling train from accelerate cooling system before, place air to treat warm 200s;
When waiting to be cooled to 860 ℃, be 18 ℃, reach two-stage target rolling temperature, send into finishing mill and be rolled into 70 * 2800 * 13000mm finished product steel plate with pyrometer measurement intermediate blank head, the tail temperature difference.

Claims (4)

1. an engineering machinery is treated the method that temperature control is rolled with the steel intermediate blank, it is characterized in that, takes cooling fast to combine control cooling velocity and time of staying temperature, zerolling engineering machinery steel intermediate blank with the air cooling; Specific embodiment is:
After cold base heating is come out of the stove, through high-pressure water descaling 1 or 3 passages;
Milling train start rolling temperature 〉=1050 ℃, finishing temperature 〉=980 ℃, the single pass heavy deformation in 3 roads, back is 10%~20%;
Set pattern, cooldown rate and the temperature of control cooling; The intermediate blank of outgoing gauge 〉=100mm is sent into the cooling that accelerate cooling system carries out slow cooling rate; After steel billet is cooled to 880~920 ℃, steel billet is shifted out from accelerate cooling system, treat temperature a period of time before returning to milling train, treat that the intermediate blank temperature evenly and after being cooled to 850~890 ℃ promptly reaches two-stage target rolling temperature, sends into finishing mill and carries out two-stage finish rolling.
2. engineering machinery according to claim 1 is treated the method that temperature control is rolled with the steel intermediate blank, it is characterized in that, described slow cooling rate is the cooldown rate of 2~5K/s.
3. engineering machinery according to claim 1 is treated the method that temperature control is rolled with the steel intermediate blank, it is characterized in that, described time of staying temperature is 60~250s.
4. engineering machinery according to claim 1 is treated the method that temperature control is rolled with the steel intermediate blank, it is characterized in that, described intermediate blank temperature evenly is meant the head, the tail temperature difference≤25 ℃ of intermediate blank.
CN2009102487868A 2009-12-25 2009-12-25 Method for controlling temperature of steel intermediate billet to be rolled for engineering machinery Pending CN102107220A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102487868A CN102107220A (en) 2009-12-25 2009-12-25 Method for controlling temperature of steel intermediate billet to be rolled for engineering machinery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102487868A CN102107220A (en) 2009-12-25 2009-12-25 Method for controlling temperature of steel intermediate billet to be rolled for engineering machinery

Publications (1)

Publication Number Publication Date
CN102107220A true CN102107220A (en) 2011-06-29

Family

ID=44171566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102487868A Pending CN102107220A (en) 2009-12-25 2009-12-25 Method for controlling temperature of steel intermediate billet to be rolled for engineering machinery

Country Status (1)

Country Link
CN (1) CN102107220A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102527734A (en) * 2012-02-27 2012-07-04 宝山钢铁股份有限公司 Steel plate controlling and rolling method
CN110560486A (en) * 2019-09-04 2019-12-13 中冶赛迪工程技术股份有限公司 hot-rolled strip steel endless rolling intermediate billet connecting device and method
CN115069785A (en) * 2021-03-15 2022-09-20 宝山钢铁股份有限公司 Control method for batch temperature waiting of intermediate blanks

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102527734A (en) * 2012-02-27 2012-07-04 宝山钢铁股份有限公司 Steel plate controlling and rolling method
CN102527734B (en) * 2012-02-27 2014-10-29 宝山钢铁股份有限公司 Steel plate controlling and rolling method
CN110560486A (en) * 2019-09-04 2019-12-13 中冶赛迪工程技术股份有限公司 hot-rolled strip steel endless rolling intermediate billet connecting device and method
CN110560486B (en) * 2019-09-04 2024-02-23 中冶赛迪工程技术股份有限公司 Device and method for connecting endless rolling intermediate billets of hot rolled strip steel
CN115069785A (en) * 2021-03-15 2022-09-20 宝山钢铁股份有限公司 Control method for batch temperature waiting of intermediate blanks

Similar Documents

Publication Publication Date Title
US20220152674A1 (en) Endless hot-rolled strip production device and method for ferrite rolling
CN103572023B (en) Method for producing ultra-fine grains on surface layer of thick/ultra-thick low-alloy steel plate
CN102581008A (en) Processing method for producing low-cost high-formability IF (interstitial-free) steel
CN102417959A (en) Method for producing annealing-free hot rolling S50C plate and strip
CN104084421A (en) Production process for grooveless rolling of 82B wire rod by high-speed wire mill
CN101760603A (en) Manufacture method of composite milling roller with good roller surface rigidity uniformity
CN104056863A (en) Hot-rolled steel plate and preparation method thereof
CN103031489B (en) Production method of Q345B steel plate
CN110153199A (en) A kind of controlled rolling method of large scale rod bar
CN104475460A (en) Method for controlling cold rolling edge crack of high magnetic induction grain-oriented silicon steel after normalizing
CN102029296B (en) Method for fast cooling low-carbon hot-rolling small H-shaped steel
CN102107220A (en) Method for controlling temperature of steel intermediate billet to be rolled for engineering machinery
CN102912091A (en) Method and cooling system for improving comprehensive mechanical property of normalized steel plate
CN102151696A (en) Temperature control rolling method for Q345 steel plate
CN107983771A (en) The high-strength chill volume hot-rolling method of building concrete fixing piece
CN103706645B (en) The method of the intermediate blank time of staying temperature in a kind of shortening heat continuous rolling process
CN104357741B (en) A kind of HRB400E high-strength anti-seismic steel bar valve snail and production method thereof
CN110551880A (en) softening heat treatment process for small-size 22Si2MnCrNi2MoA steel rolled material
CN102974628A (en) Aerial fog cooling device for wire air-cooling line
WO2022174530A1 (en) Free-cutting and non-quenched and tempered steel, and manufacturing method therefor
CN103409686A (en) Production method of Q345D steel plate
CN102343372B (en) Production method for rapidly cooling medium plate after rolling
CN103286147A (en) Hot-rolled board strip production line laminar cooling method
CN105567948A (en) Spheroidizing annealing temperature control process of cold-rolled steel coil
CN110616299A (en) Production method of high-strength steel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110629