CN102103712A - Power supply configuration method and device - Google Patents

Power supply configuration method and device Download PDF

Info

Publication number
CN102103712A
CN102103712A CN2009102593369A CN200910259336A CN102103712A CN 102103712 A CN102103712 A CN 102103712A CN 2009102593369 A CN2009102593369 A CN 2009102593369A CN 200910259336 A CN200910259336 A CN 200910259336A CN 102103712 A CN102103712 A CN 102103712A
Authority
CN
China
Prior art keywords
power supply
amc
power
module
subcard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009102593369A
Other languages
Chinese (zh)
Other versions
CN102103712B (en
Inventor
王健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN2009102593369A priority Critical patent/CN102103712B/en
Publication of CN102103712A publication Critical patent/CN102103712A/en
Application granted granted Critical
Publication of CN102103712B publication Critical patent/CN102103712B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector

Abstract

The invention discloses a power supply configuration method and a power supply configuration device. The method comprises the following steps of: acquiring preset rated power of each advanced mezzanine card (AMC) and valid load of each power supply module for supplying power to the AMC from a database; determining and storing a power supply mapping relationship between the AMC and the power supply module based on predetermined rules according to the rated power and the valid load; and switching on a power supply switch between the AMC and the power supply module according to the stored power supply mapping relationship. By means of the technical scheme of the embodiment, the power supply module can ensure that each power supply channel is driven by enough power supply power before being enabled, the power supply module can realize intelligent power supply management of an AMC single board, the power supply module is ensured to supply as much power as possible to the AMC under maximum supplied power, the power supply module is ensured not to overload, the energy is saved, the method and the device are environmentally-friendly, and meanwhile, the service life of a power supply is prolonged.

Description

Power supply collocation method and device
Technical field
The present invention relates to light access communications technical field, particularly relate to a kind of power supply collocation method and device.
Background technology
Miniature communication computer framework (Micro Telecom Computing Architecture, abbreviate MicroTCA as) be by international peripheral element extension interface (Pedpherd Component Interconnect, abbreviate PCI as) industrial computer manufacturing tissue (PCI Industrial Computer Manufacturers Group, abbreviate PICMG as) standard released, communication computer framework (Advanced Telecom Computing Architecture with the advanced person, abbreviate ATCA as) for basic, can reduce the cost and the physical dimension of application apparatus, improve reliability and dirigibility, and shorten the development time.
The MicroTCA standard is mainly used in the platform of telecommunications and enterprise computer network equipment, its objective is fusion for each equipment producer that can reach inter-module, that is to say, need not the equipment set buying, the assembly type buying can be selected by operator, assembles when disposing, thereby makes an equipment that meets the MicroTCA standard to be made up of the assembly of a plurality of producers, can reduce cost, and reach optimized combination.
The high bandwidth of ATCA, redundancy, high capacity integrated circuit board and high power capacity make that it is very suitable on a large scale, the telecommunication system of high reliability, for example, and equipment of the core network etc.And the cheaper cost of MicroTCA, littler physical form, modular nature and high flexibility are selected its ideal that becomes the wireless base station.
Advanced embedding subcard (Advanced Mezzanine Card abbreviates AMC as) is the senior subcard standard that PICMG organizes to set up.The AMC module is to support the minimum plug-in module of ATCA system, and big AMC module and PCI subcard (PCI Mezzanine Card abbreviates PMC as) module are closely similar.The AMC module that possesses hot-swapping function and front panel plug function, no matter be to be used in ATCA, MicroTCA or the proprietary system, all be field-replaceable unit (Field Replace Unit minimum in the telecommunication apparatus of future generation, abbreviate FRU as), compare with FRU in the past, standard option more flexibly can be provided.
Fig. 1 is based on the frame result schematic diagram of MicroTCA standard in the prior art, as shown in Figure 1, in the prior art, a MicroTCA system generally comprises 12 AMC modules, 1 or 2 support plate network service center (MicroTCA Carrier Hub, abbreviating MCH as) module, power module and refrigeration system (Cool Unit abbreviates CU as), backboard connects at a high speed and physical construction such as pedestal.Comprise support plate Management Controller (MicroTCA Carrier Management Control in the MCH module, abbreviate MCMC as), the IPMI (Intelligent Platform Management Interface abbreviates IPMI as) that is connected on the AMC module of utilizing MCMC realizes control and the management to support plate.The MCH module also is used for the generation and the distribution of universal timepiece, and each AMC module has three the whole network synchronous clocks.Two MCH modules are formed a double star structure.
At present, it is gem-pure for purpose and the functional description of using power module that the MicroTCA standard provides, and comprising: " realization of MicroTCA power module to the 12V voltage transformation, provides the useful load power supply for each AMC module from input voltage.The required 3.3V managing electrical power of AMC module is provided by power subsystem equally.The power control logic of power module shows as sequential control, protection and isolation features.Power subsystem is controlled by MCMC, and it guarantees to have before each power channel enables enough powers to go to drive." " power module has comprised necessary monitoring function equally with the managing electrical power subsystem.They need detect AMC, the existence of MCH and CU, and be the circuit that each power supply branch powers on.Power module also will be monitored the power quality of each branch road and guarantee their nonoverloads.If disposed a redundant power module, when main power source module lost efficacy, the redundant power module will be shouldered its power supply backup functionality automatically ".Power module mostly is the useful load and the power supply of administrative section device of 12 AMC modules most, also wants to be maximum 2 cooling systems and two MCH module for power supply.
From foregoing description as can be seen, numerous functions have been integrated in the power module, make power module become one of most important module in the MicroTCA system, and the design of power module can greatly influence overall system efficiency and reliability.
In the MicroTCA standard, for determining of power supply power supply mode, and switching between redundant power proposed requirement, still, and in the application of base station system reality, for how guaranteeing that each power channel has enough powers to go to drive before enabling, and the power supply power supply configuration management when moving in system, power supply trouble occurs and how to detect and circulate a notice of, all do not provide explanation and control method, that is to say, concrete power supply is not realized providing detailed technical scheme in the prior art.
Summary of the invention
The problem to be solved in the present invention provides a kind of power supply collocation method and device, to overcome in the prior art not concrete power supply realizes providing the defective of detailed technology scheme based on the base station system of MicroTCA standard.
According to an aspect of the present invention, provide a kind of power supply collocation method, having comprised:
From database, obtain each the advanced useful load that is used to described AMC power supply that embeds rated power and each power module of subcard AMC that sets in advance; Determine the power supply mapping relations and the preservation of described AMC and described power module according to described rated power and described useful load according to pre-defined rule; Open power supply power switch between described AMC and the described power module according to the described power supply mapping relations of preserving.
According to a further aspect in the invention, provide a kind of power supply inking device, comprised;
Acquisition module is used for obtaining each the advanced useful load that is used to described AMC power supply that embeds rated power and each power module of subcard AMC that sets in advance from database; Mapping block is used for determining according to described rated power and described useful load according to pre-defined rule the power supply mapping relations and the preservation of described AMC and described power module; Processing module is used for opening power supply power switch between described AMC and the described power module according to the described power supply mapping relations of preserving.
Beneficial effect of the present invention is as follows:
The embodiment of the invention is by determining the power supply mapping relations of AMC and power module according to the useful load of each the advanced rated power that embeds subcard AMC that sets in advance and each power module, overcome in the prior art not concrete power supply realizes providing the defective of detailed technology scheme based on the base station system of MicroTCA standard, make power module can guarantee before each power channel enables, to have enough powers to go to drive, can allow power module realize the intelligent power supply of AMC veneer is managed, guarantee that power module is under the power that maximum can provide, be the power supply of AMC subcard for as much as possible, guarantee that nonoverload makes power module, save the energy, environmental protection, the serviceable life of having improved power supply simultaneously.
Description of drawings
Fig. 1 is based on the frame result schematic diagram of MicroTCA standard in the prior art;
Fig. 2 for the embodiment of the invention to AMC power control synoptic diagram;
Fig. 3 is the process flow diagram of the power supply collocation method of the embodiment of the invention;
Fig. 4 is the PM subcard of the embodiment of the invention and the mapping relations synoptic diagram of AMC;
Fig. 5 is the overall mutual process flow diagram of power supply configuration of the embodiment of the invention;
Fig. 6 is the power on power supply configuration flow figure of original state of the system of the embodiment of the invention;
Processing flow chart when Fig. 7 changes for the PM subcard of the embodiment of the invention and AMC;
Fig. 8 is the structural representation of the power supply inking device of the embodiment of the invention.
Embodiment
At present, in base station based on the MicroTCA standard, power module (PM subcard) can carry out voltage output and monitoring management, has modularization, plurality of advantages such as energy-conservation and auto-control, but also brought the problem of total system power supply policy selection simultaneously, for example, how to guarantee PM subcard nonoverload? do you how to guarantee before each power channel enables, to have enough powers to drive? which AMC power supply does the PM subcard give? does power supply concern how this adjusts when the PM subcard breaks down or AMC configuring condition when changing? the problems referred to above are related to the stability and the health degree of whole BTS service operation.
In order to solve the problems of the technologies described above, the embodiment of the invention proposes a kind of base station power power supply collocation method based on the MicroTCA standard, the power supply controlling schemes when providing concrete power supply configuration and configuring condition to change.
Particularly, the embodiment of the invention is carried out safe and reliable configuration management based on hardware to power supply.Each AMC is indicated with rated power, each PM subcard is indicated with useful load (power), before this AMC is powered, need to check earlier PM subcard useful load whether greater than the rated power of this AMC, with decision whether to these AMC power-on and power-off.In case it is powered on, then the useful load of power supply need deduct the rated power of this AMC.Generate the power supply mapping relations of each PM subcard and each AMC according to this.Subsequently, the carrier management controller MCMC of support plate network service central plate sends the power supply configuration-direct to the PM subcard in the MicroTCA system, carry the needs of determining according to above-mentioned power supply mapping relations in this instruction and open the information of the power channel of switch, thereby realize the AMC in the wireless base station is powered.Fig. 2 for the embodiment of the invention to AMC power control synoptic diagram, as shown in Figure 2, DC converter, heat exchange module, voltage transformer are controlled by controller, will offer AMC from the voltage that wave filter obtains.
Below in conjunction with drawings and Examples, the specific embodiment of the present invention is described in further detail.Following examples are used to illustrate the present invention, but are not used for limiting the scope of the invention.
Method embodiment
According to embodiments of the invention, a kind of power supply collocation method is provided, Fig. 3 is the process flow diagram of the power supply collocation method of the embodiment of the invention, as shown in Figure 3, comprises according to the power supply collocation method of the embodiment of the invention:
Step 301 is obtained the useful load that is used to the AMC power supply of the rated power of each AMC that sets in advance and each PM subcard from database; In actual applications, at first each AMC is indicated with rated power, the PM subcard is indicated with useful load, database be obtained and be deposited in to above-mentioned data can by hardware observing and controlling.
In actual applications, it is that 2 cooling systems and 2 MCH modules are powered that the PM subcard also needs, and therefore, the rated power of 2 cooling systems and 2 MCH modules need be shootd off from the useful load of PM subcard, just can obtain the useful load into the AMC power supply.Therefore, in step 301, at first need from database, to obtain the gross payload of each PM subcard, from gross payload, deduct the rated power of constant drain again, just can obtain being used to the useful load of AMC power supply.
Step 302 is determined the power supply mapping relations and the preservation of AMC and PM subcard according to rated power and useful load according to pre-defined rule; Wherein, pre-defined rule comprises: the useful load of each PM subcard is more than or equal to having the summation of rated power of all AMC of power supply mapping relations with this PM subcard.
Particularly, before to each AMC power supply, check earlier whether the useful load of PM subcard satisfies the rated power requirement of this AMC, if satisfy, then includes this AMC in the power supply formation; If do not satisfy, then need check standby PM subcard successively, if do not satisfy, then orientate the power supply capacity deficiency as.
Fig. 4 is the PM subcard of the embodiment of the invention and the mapping relations synoptic diagram of AMC; as shown in Figure 4; comprise 1 in the power resources pond to n piece PM subcard; comprise 1 to m AMC in the AMC resource pool that needs to power; is corresponding AMC power supply with all PM subcards by the power supply mapping relations; need can guarantee the AMC of power supply to have enough power to provide, also make PM subcard nonoverload, each hardware has been carried out effective protection.
In actual applications, preferably, can also determine the power supply priority of AMC according to the type of AMC.In step 302, can determine the power supply mapping relations of AMC and PM subcard according to rated power, useful load and power supply priority according to pre-defined rule.
Step 303 is opened power supply power switch between AMC and the PM subcard according to the power supply mapping relations of preserving.So that being corresponding AMC, the PM subcard powers.
In actual applications, preferably, can also judge whether AMC resource and/or PM subcard resource change; Judging under the situation that AMC resource and/or PM subcard resource change, keep the AMC that do not change and the power supply mapping relations of PM subcard, according to pre-defined rule AMC and/or the PM subcard that changes shone upon again, and revise the power supply mapping relations of preserving.
By judging whether AMC resource and/or PM subcard resource change, making the PM subcard no matter be operated in the load sharing pattern still is active and standby pattern, can be when PM subcard fault, the intelligence that realizes power supply is switched, and keep the AMC that switches to count minimum, promptly, only the AMC that powers on the fault PM subcard is switched, power supply configuration relation on the PM subcard in good condition remains unchanged, the operation degree and the percent of call completed that can keep the wireless base station so to greatest extent, and automatically switch and can in the shortest time, repair the power supply of relevant AMC automatically, need not artificial last station service, the outdoor base station abominable for environment is especially necessary.
When there was insertion successively in the PM subcard or plugs midway, the AMC that still can remain maximum quantity powered.The power supply smart of embodiment of the invention power supply configuration and switchover policy can be so that power supply provide the most effective power, and save the energy, and environmental protection improves power supply serviceable life, guarantees the maximum functional contained fan of wireless base station.Be in normal mode of operation following time in system, also can realize neatly the power supply of PM subcard is controlled, improve the dirigibility of PM subcard control, satisfy base station system load rotate aspect protection and the demand optimized.
In sum, the embodiment of the invention can guarantee that the PM subcard had enough powers to go to drive before each power channel enables.Can allow the PM subcard realize the intelligent power supply of AMC is managed, only give the AMC power supply of appointment, and under the peak power that can provide, be AMC power supply as much as possible, guarantee PM subcard nonoverload simultaneously, and can allow AMC intelligence between the PM subcard, switch the selection of powering.
Be described in further detail below in conjunction with the technical scheme of accompanying drawing the embodiment of the invention.
Particularly, at first, the power supply allocation list of base station PM subcard need be carried out the mapping resources definition.The power that the PM subcard is provided is defined as producer's resource, the AMC of needs power supply is defined as consumer's resource, between produces the mapping resources relation, thereby realizes the intelligent power supply configuration of wireless base station, to realize that automatic control and management is carried out in the power supply of wireless base system.
For above-mentioned mapping relations, giving data in wireless base station whole service process keeps, be stored in the flash memory (Flash), when the configuring condition that PM subcard or AMC are wherein arranged changes, according to the method that the embodiment of the invention provides, can be modified in these mapping relations of preserving among the Flash, and with the single-chip microcomputer managing process on this mapping relations real-time informing PM subcard, by the switch of its control power channel, thereby reach the intelligent switching controls that veneer is powered.
In actual applications, the startup of wireless base system is divided into initialization and normal two stages of operation, with the third generation (3rd-generation, abbreviate 3G as) TD SDMA (Time Division-Synchronous Code Division Multiple Access in the standard, abbreviating TD-SCDMA as) base station is for example, the process of data is an initial phase in basic controlling process power up wherein and the loading of databases, after initial phase finished, system entered normal operating phase.Wherein, the PM subcard can be defaulted as MCH in early days and power on, and after the MCMC of MCH control module starts, can send heartbeat (PM Heart Beat) instruction to the PM subcard cycle, makes the power management in PM subcard later stage be taken over by MCMC fully.The wireless base station needs the data of base station are configured before operation, and these data are stored in the database in advance by the Engineering Service personnel usually, in actual applications, and also data that may occur preparing and the actual inconsistent situation of hardware device.At system's external power supply, after base station system brought into operation, for processing shown in Figure 5 is followed in the AMC power supply, Fig. 5 was the overall mutual process flow diagram of power supply configuration of the embodiment of the invention, as shown in Figure 5, comprises following processing:
Step 501, embedded OS powers on;
Step 502, the embedded OS notification database is carried out data load and data initialization;
Step 503, network management system are carried out the data configuration of AMC and PM subcard in database;
Step 504, resource management module read the configuration data of PM subcard from database, and resources effective is tested; The initial information of PM daughter card configuration data is not clear and definite in the MicroTCA agreement.In the TD-SCDMA base station of 3G, the state of PM subcard is defaulted as unavailable, reports its state by resource management module by heartbeat message, and the rewrite data storehouse, and notice Configuration Manager PM subcard resource changes, and carries out power supply increment configuration flow.That is, regard effective PM subcard as a kind of resource, resource becomes when effective or invalid, needs the change resource pool, and changes mapping relations synchronously, adds or the AMC of this PM subcard power supply is used in deletion;
Step 505, resource management module read the AMC configuration data that needs power supply from database, this configuration data is write by the Engineering Service personnel usually, and after system's operation, network management system can be changed related data, to satisfy actual requirement.When resource management module reads the AMC configuration data of power supply, type according to AMC, obtain the required rated power of AMC, and according to the type priority ordering of powering, for example, in the TD-SCDMA base station, the Optical Fiber Interface Board that connects the BBU-RRU mouth is to guarantee radio frequency resource and the mutual prerequisite of base-band resource, need preferential power supply, the power supply of taking second place of base-band resource plate, other type is analogized.That is to say, need to determine the priority of power supply AMC earlier according to the AMC function type, and with in this priority writing system program; By AMC is carried out the standard inspection, can guarantee that the AMC of actual access base station is consistent with the AMC of webmaster personnel actual disposition, and power division is correct.
Step 506, the PM subcard resource that resource management module notice Configuration Manager can be used, wherein, the PM subcard resource that breaks down is disabled resource.
Step 507 is assigned to available PM subcard mapping resources on the AMC, obtains power supply power supply configuration relation.In a minute timing, priority order is arranged, and control, thereby can guarantee that the PM subcard can use rationally and effectively by power calculation, can overload operation, avoid energy dissipation simultaneously, improve the serviceable life of PM subcard.
Step 508, the configuration information of poll check AMC, whether check to have needs the AMC of power supply not obtain power division, if have, the PM subcard underpower of configuration is described, promptly, the power supply capacity deficiency, the notice network management system is handled, and network management system can reduce AMC or increase the PM subcard; The webmaster personnel by this power supply configuring condition is carried out the correctness inspection, and send the power supply Configuration Status Report for automatically the webmaster personnel, so that can handle in good time.
Step 509, Configuration Manager send the power supply configuration information to carrier management controller MCMC, and the MCMC control module carries out the break-make of corresponding power passage according to PM subcard resource in the power supply configuration information and AMC resource mapping relation.
The power supply of PM subcard is not disposed in the Micro TCA standard agreement and make regulation, might cause PM subcard overload situations, thereby influence the life-span of PM subcard, even cause the PM subcard to burn out, influence the telecommunication service of whole base station.The power of the maximum of trying one's best to provide can not interfered under the normal situation about using of PM subcard by above-mentioned processing.
Fig. 6 is the power on power supply configuration flow figure of original state of the system of the embodiment of the invention, as shown in Figure 6, comprises following processing:
Step 601, system powers on, and database loads;
Step 602, read initialization PM subcard resource P1, P2 ..., Pn and initialization AMC resource A1, A2 ..., Am;
Step 603, the initialization PM subcard resource that judgement is read and the availability of initialization AMC resource, if judge that available resources are arranged, execution in step 604, otherwise, execution in step 608;
Step 604, according to P1, P2 ..., Pn respectively to A1, A2 ..., Am calculates;
Step 605, whether the afterpower of judging Px is greater than the required power of Ax; If the judgment is Yes, then execution in step 606, otherwise execution in step 607;
Step 606 is provided with Ax and is power supply, and the Px afterpower reduces, and revises the power supply mapping relations on the Px, execution in step 609;
Step 607 is returned the power supply mapping relations, and execution in step 609;
Step 608 is returned power supply mapping relations configuration failure, and execution in step 609;
Step 609, circular test A1, A2 ..., the power supply state of Am, judge whether to exist the not Ax of power supply, if the judgment is Yes, then execution in step 610, otherwise execution in step 611;
Step 610, to the network management system report and alarm, and execution in step 612;
Step 611 is eliminated the not enough alarm of power supply capacity to network management system, and execution in step 612;
Step 612, the power supply configuration messages that sends Px is to MCMC, by MCMC power on/off source channels switch.
From above-mentioned processing as can be seen, at initial phase, the embodiment of the invention produces legal mapping resources relation by producer's power and consumer's power are calculated, and can guarantee that PM card and AMC can rationally utilize, and improves serviceable life.When initialization, system may connect a PM subcard, also may connect two PM subcards, in Micro TCA standard, has stipulated that the PM card is defaulted as MCH power supply, and promptly the MCH acquiescence powers on, thereby has guaranteed the acquisition and the detection with resource of obtaining of data.After the MCMC of MCH started, power-supply system entered and is subjected to MCMC control in the time of the stage, and this moment, the work of power supply was controlled by the MCMC module fully, and MCMC can set the power supply configuration of power supply according to user's collocation strategy.In Micro TCA standard, the PM subcard to the principle that AMC powers is: when a certain power channel was powered, the on-off switch of PM subcard Px (x=1...n) was opened, and the power supply output load is by the power supply of PM subcard.Opening of these on-off switches carried out by MCMC module controls PM subcard.
Can find from last surface analysis, when initialization, to AMC power the configuration after, produced certain mapping relations between PM card power resource and the AMC resource.But, when wherein a certain resource situation changes, produced problem how to adjust these mapping relations.
In the wireless base station applications, when initialization, there is not the difference of priority or grade between the AMC, still, in case after producing the power supply allocation map, AMC has produced respectively, after the AMC operation of some power supplies, the base band radio frequency resource relations of distribution have been arranged, set up wireless area, might there be a plurality of users inserting this sub-district, carry out voice and exhale logical or other telecommunication service.Therefore, under the situation that changes a certain resource, need guarantee as much as possible that user's telecommunication service is normal, interference-free.
According to the technical scheme of the embodiment of the invention, when the AMC resource changes, keep the power supply configuration relation of unchanged AMC, to the AMC that changes, if newly-increased AMC, the PM subcard has available horsepower, then powers, if cancellation AMC, the power supply mapping is regained in then cancellation power supply, checks the AMC that whether has the inactivity mapping simultaneously, under the situation of the AMC that determines to exist the inactivity mapping, this AMC is distributed.
When PM subcard resource changes, for example, there is a PM subcard to break down, this moment and the AMC that this PM subcard shines upon,, will descend owing to lacked producer's power.In actual applications, it is available having an other PM subcard, and the mapping of the power on it does not reach state of saturation.In the prior art, the MicroTCA standard is not clearly when a PM subcard breaks down, how this handles by the AMC subcard of its power supply, in addition, there is defective in the active and standby PM subcard mode of operation that prior art provides, because the power that every PM subcard can provide is limited, generally can dispose 12 AMC based on MicroTCA standard base station, if every PM subcard can provide 200 watts power, and every AMC needs 30 watts power, then a PM subcard can't satisfy the power supply that surpasses 7 AMC, and this moment, active/standby mode did not have practical significance.
The PM subcard load sharing method of supplying power to that Micro TCA standard provides, not clearly when a PM subcard fault, how the power supply of AMC is handled.The intelligent power supply collocation method that the embodiment of the invention provides can recover the power supply of AMC to greatest extent, reaches the control purpose of Autonomic Migration Framework.When PM subcard fault, regularly detect by the resource management process, notice configuration management process, the PM resource changes, this moment, the AMC to the power supply of the mapping on this PM subcard descended electricity, detected remaining PM resource then, if available power resource is arranged, then the AMC that does not power on is carried out the power mapping, thereby reach the purpose of power supply mapping Autonomic Migration Framework.And previous not electric down AMC power supply relation remains unchanged, so as much as possible guaranteed the telecommunication service under the system-level malfunction situation, and need not manual intervention, in the shortest time, recover telecommunication service as much as possible automatically, be specially adapted to outdoor wireless base station.Below in conjunction with Fig. 7 technique scheme of the present invention is elaborated.Processing flow chart when Fig. 7 changes for the PM subcard of the embodiment of the invention and AMC as shown in Figure 7, comprises following processing:
Step 701, system normally moves;
Step 702 receives PM subcard resource and AMC resource increment message;
Step 703 is if the state of definite PM subcard Px is by unavailable available (this PM subcard is for newly plugging or fault recovery), then the execution in step 707-step 708 of becoming;
Step 704, state that determine to determine PM subcard Px is by available unavailable (this PM subcard fault or be pulled out), then the execution in step 709-step 711 of becoming;
Step 705 is if determine to increase newly an AMC, then execution in step 712-step 713;
Step 706 needs if determine the power supply of an AMC of cancellation, then execution in step 714-step 716;
Step 707 detects whether there is the Ax resource that does not power on;
Step 708 if exist, then powers on to this Ax, otherwise alarms, execution in step 717;
Step 709, the Ax that this PM subcard Px is gone up all power supplies descends;
Step 710 detects whether also have available power;
Step 711, if the judgment is Yes, to the Ax that the does not power on distribution of powering, execution in step 717;
Step 712, whether Px also has spendable power in poll check;
Step 713 if the judgment is Yes, then goes up electric treatment to the AMC that increases newly, otherwise the alarming processing of being correlated with, execution in step 717;
Step 714, the AMC that cancellation is powered descends electric treatment, regains the power resource of distributing to this AMC simultaneously;
Step 715 judges whether also to exist the AMC that does not power on;
Step 716 if the judgment is Yes, judges then whether power satisfies the AMC that this does not power on, if satisfy, then goes up electric treatment, otherwise, carry out alarming processing, execution in step 717;
Step 717, with alarm data informing network system, the configuration data of will powering sends to carrier controller;
Step 718 finishes the increment flow process.
By above-mentioned processing, guaranteed that as much as possible telecommunication service is unaffected, and the power of PM subcard is provided most possibly.
In actual applications, MCMC also can be by manually changing resource status, for example to the control of power supply, though PM subcard resource #2 is provided, but not configuration in database, at this moment, PM subcard resource #2 reality does not provide power, promptly do not enter the power supply mapping relations, can increase this PM subcard resource #2 this moment in network management system, can delete PM subcard resource #1 simultaneously, thereby reach the purpose of auto switching.The function of standby PM is used and verified to the burden of each PM module in the distribution system so balancedly.
Below, the specific operation process of the inventive method is described by a concrete example.According to present use 3G TD-SCDMA standard, and follow the NodeB base station situation that the MicroTCA standard design realizes, in this base station system, have 2 PM subcards, the first power supply PM1, second source PM2, two block power supplies all can provide 100 watts power.And need this moment to power for AMC1, AMC2, AMC3, AMC5, AMC6, AMC7, AMC8, AMC9.Wherein, AMC5, AMC6 are the Optical Fiber Interface Board of following the BBU-RRUIr interface protocol, and its rated power is 20 watts.AMC1, AMC2, AMC3 are for moving the baseband processing unit plate of digital signal processing, and its rated power is 35 watts.AMC7 is the clock control subcard, and rated power is 10 watts; AMC8 is transmission control subcard, and rated power is 10 watts; AMC9 is an integrated monitoring unit subcard, and rated power is 5 watts.
When initialization, the first power supply PM1 is AMC5, AMC6, AMC8, AMC1, AMC7, AMC9 power supply according to the priority initial configuration, 0 watt of afterpower; The AMC that residue can't be powered is powered by PM2, is respectively AMC2, AMC3,30 watts of afterpowers.The mapping relations between PM power supply resource and the AMC consumption of natural resource have been produced.Be respectively that PM1 is corresponding to AMC 5, AMC 6, AMC8, AMC 1, AMC 7, AMC 9; PM2 is corresponding to AMC 2, AMC 3.Two PM need open the power channel of base station backboard when AMC is powered.Specifically comprise following processing.
Step 1, because PM1 damages or extracts, the PM1 fault is unavailable.
Step 2, the resource management process detects the PM1 fault, and notice Configuration Manager PM1 becomes unavailable.
Step 3, the configuration management process receives notice, begins to cancel the mapping of PM1 and AMC 5, AMC 6, AMC 8, AMC 1, AMC 7, AMC 9, and corresponding AMC is carried out electricity under the logic, because the PM1 fault, so these AMC reality are down.
Step 4, have following AMC not power on this moment in the consumption of natural resource pond that does not power on, and is respectively AMC1, AMC5, AMC6, AMC7, AMC8, AMC9.Detect in the PM resource pool this moment, still has 30 watts of available horsepowers.
Step 5, each AMC in the poll consumption of natural resource pond, obtain power supply priority according to board type, at first judge AMC5,20 watts less than 30 watts, so the logic power supply, remain 10 watts, can be the AMC8 power supply according to priority, so carry out Autonomic Migration Framework, promptly the power mapping relations are at this moment: PM2 is corresponding to AMC 2, AMC 3, AMC 5, AMC 8.
Step 6 detects the AMC resource pool, finds to also have AMC1, AMC6, AMC7, AMC9 not to power on, then report and alarm, the notice network management system.
Step 7 sends to MCMC with new power supply mapping relations, by the switching of MCMC decision line related passage.
In the aforesaid operations process, AMC2, AMC3 subcard are keeping the power supply relation always, and AMC5, AMC8 subcard have experienced the electric down process that powers on again of an elder generation, in the TD base station of present employing MicroTCA standard, general continuing less than one minute guaranteed that telecommunication service is maximized stable.
Device embodiment
According to embodiments of the invention, a kind of power supply inking device is provided, Fig. 8 is the structural representation of the power supply inking device of the embodiment of the invention, as shown in Figure 8, comprises according to the power supply inking device of the embodiment of the invention: acquisition module 80, mapping block 82, processing module 84.Power supply inking device to the embodiment of the invention is described in detail below.
Particularly, acquisition module 80 is used for obtaining each the advanced useful load that is used to the AMC power supply that embeds rated power and each PM subcard of subcard AMC that sets in advance from database; In actual applications, at first each AMC is indicated with rated power, the PM subcard is indicated with useful load, database be obtained and be deposited in to above-mentioned data can by hardware observing and controlling.
In actual applications, it is that 2 cooling systems and 2 MCH modules are powered that the PM subcard also needs, and therefore, the rated power of 2 cooling systems and 2 MCH modules need be shootd off from the useful load of PM subcard, just can obtain the useful load into the AMC power supply.Therefore, first in the acquisition module obtains submodule at first obtains the AMC that sets in advance from database rated power; Subsequently, second obtain submodule obtains each PM subcard from database gross payload; At last, the 3rd obtains submodule deducts constant drain from gross payload rated power, obtains the useful load that is used to the AMC power supply.
Mapping block 82 is used for determining according to rated power and useful load according to pre-defined rule the power supply mapping relations and the preservation of AMC and PM subcard; Wherein, pre-defined rule comprises: the useful load of each PM subcard is more than or equal to having the summation of rated power of all AMC of power supply mapping relations with this PM subcard.
Particularly, before to each AMC power supply, check earlier whether the useful load of PM subcard satisfies the rated power requirement of this AMC, if satisfy, then includes this AMC in the power supply formation; If do not satisfy, then need check standby PM subcard successively, if do not satisfy, then orientate the power supply capacity deficiency as.
Processing module 84 is used for opening power supply power switch between AMC and the PM subcard according to the power supply mapping relations of preserving.
In actual applications, preferably, the power supply inking device can also comprise: determination module and judge module, and wherein, determination module is used for determining according to the type of AMC the power supply priority of AMC; Judge module is used to judge whether AMC resource and/or PM subcard resource change.Mapping block is further used for: the power supply mapping relations of determining AMC and PM subcard according to pre-defined rule according to rated power, useful load and power supply priority;
Judge under the situation that AMC resource and/or PM subcard resource change at judge module, mapping block also needs to keep the AMC that do not change and the power supply mapping relations of PM subcard, according to pre-defined rule AMC and/or the PM subcard that changes shone upon again, and revise the power supply mapping relations of preserving.
By judging whether AMC resource and/or PM subcard resource change, making the PM subcard no matter be operated in the load sharing pattern still is active and standby pattern, can be when PM subcard fault, the intelligence that realizes power supply is switched, and keep the AMC that switches to count minimum, promptly, only the AMC that powers on the fault PM subcard is switched, power supply configuration relation on the PM subcard in good condition remains unchanged, the operation degree and the percent of call completed that can keep the wireless base station so to greatest extent, and automatically switch and can in the shortest time, repair the power supply of relevant AMC automatically, need not artificial last station service, the outdoor base station abominable for environment is especially necessary.
When there was insertion successively in the PM subcard or plugs midway, the AMC that still can remain maximum quantity powered.The power supply smart of embodiment of the invention power supply configuration and switchover policy can be so that power supply provide the most effective power, and save the energy, and environmental protection improves power supply serviceable life, guarantees the maximum functional contained fan of wireless base station.Be in normal mode of operation following time in system, also can realize neatly the power supply of PM subcard is controlled, improve the dirigibility of PM subcard control, satisfy base station system load rotate aspect protection and the demand optimized.
In sum, the embodiment of the invention can guarantee that the PM subcard had enough powers to go to drive before each power channel enables.Can allow the PM subcard realize the intelligent power supply of AMC is managed, only give the AMC power supply of appointment, and under the peak power that can provide, be AMC power supply as much as possible, guarantee PM subcard nonoverload simultaneously, and can allow AMC intelligence between the PM subcard, switch the selection of powering.
The above only is a preferred implementation of the present invention; should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the technology of the present invention principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (10)

1. a power supply collocation method is characterized in that, comprising:
From database, obtain each the advanced useful load that is used to described AMC power supply that embeds rated power and each power module of subcard AMC that sets in advance;
Determine the power supply mapping relations and the preservation of described AMC and described power module according to described rated power and described useful load according to pre-defined rule;
Open power supply power switch between described AMC and the described power module according to the described power supply mapping relations of preserving.
2. the method for claim 1 is characterized in that, the described useful load of obtaining the described AMC power supply of being used to of each power module comprises:
From described database, obtain the gross payload of described each power module;
From described gross payload, deduct the rated power of constant drain, obtain being used to the described useful load of described AMC power supply.
3. the method for claim 1 is characterized in that, described from database, obtaining after described rated power and the described useful load, and described method also comprises:
Determine the power supply priority of described AMC according to the type of described AMC.
4. method as claimed in claim 3 is characterized in that, determines that according to described rated power and described useful load the power supply mapping relations of described AMC and described power module comprise according to pre-defined rule:
Determine the power supply mapping relations of described AMC and described power module according to described rated power, described useful load and described power supply priority according to described pre-defined rule.
5. the method for claim 1 is characterized in that, described method also comprises:
Judge whether AMC resource and/or power module resource change;
Judging under the situation that described AMC resource and/or described power module resource change, keep the AMC that do not change and the power supply mapping relations of power module, according to described pre-defined rule AMC and/or the power module that changes shone upon again, and revise the described power supply mapping relations of preserving.
6. as each described method in the claim 1 to 5, it is characterized in that described pre-defined rule comprises:
The described useful load of described each power module is more than or equal to having the summation of rated power of all AMC of power supply mapping relations with this power module.
7. a power supply inking device is characterized in that, comprising:
Acquisition module is used for obtaining each the advanced useful load that is used to described AMC power supply that embeds rated power and each power module of subcard AMC that sets in advance from database;
Mapping block is used for determining according to described rated power and described useful load according to pre-defined rule the power supply mapping relations and the preservation of described AMC and described power module;
Processing module is used for opening power supply power switch between described AMC and the described power module according to the described power supply mapping relations of preserving.
8. device as claimed in claim 7 is characterized in that, described acquisition module comprises:
First obtains submodule, is used for obtaining from database the rated power of the described AMC that sets in advance;
Second obtains submodule, is used for obtaining from described database the gross payload of described each power module;
The 3rd obtains submodule, is used for deducting from described gross payload the rated power of constant drain, obtains the described useful load that is used to described AMC power supply.
9. device as claimed in claim 7 is characterized in that, described device further comprises:
Determination module is used for determining according to the type of described AMC the power supply priority of described AMC;
Judge module is used to judge whether AMC resource and/or power module resource change.
10. device as claimed in claim 9 is characterized in that, described mapping block is further used for:
Determine the power supply mapping relations of described AMC and described power module according to described rated power, described useful load and described power supply priority according to described pre-defined rule;
Judge under the situation that described AMC resource and/or described power module resource change at described judge module, keep the AMC that do not change and the power supply mapping relations of power module, according to described pre-defined rule AMC and/or the power module that changes shone upon again, and revise the described power supply mapping relations of preserving.
CN2009102593369A 2009-12-18 2009-12-18 Power supply configuration method and device Expired - Fee Related CN102103712B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102593369A CN102103712B (en) 2009-12-18 2009-12-18 Power supply configuration method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102593369A CN102103712B (en) 2009-12-18 2009-12-18 Power supply configuration method and device

Publications (2)

Publication Number Publication Date
CN102103712A true CN102103712A (en) 2011-06-22
CN102103712B CN102103712B (en) 2013-03-27

Family

ID=44156461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102593369A Expired - Fee Related CN102103712B (en) 2009-12-18 2009-12-18 Power supply configuration method and device

Country Status (1)

Country Link
CN (1) CN102103712B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102770824A (en) * 2012-05-14 2012-11-07 华为技术有限公司 Device and method for system power supply management and system with function of power source energy saving management
CN103019359A (en) * 2011-09-23 2013-04-03 中国科学院声学研究所 Method, device and ATCA (Advanced Telecom Computing Architecture) carrier board for dynamically allocating power to AMC (Advanced Mezzanine Card)
CN104519104A (en) * 2013-09-30 2015-04-15 华为数字技术(苏州)有限公司 Power source control method and equipment
WO2015090068A1 (en) * 2013-12-20 2015-06-25 华为技术有限公司 Single board, communication device and single board power supply method
US9575530B2 (en) 2013-12-20 2017-02-21 Huawei Technologies Co., Ltd. Board, communications device, and method for supplying power for board
CN110018728A (en) * 2019-03-29 2019-07-16 联想(北京)有限公司 A kind of electronic equipment
WO2023024685A1 (en) * 2021-08-26 2023-03-02 华为技术有限公司 Network device and power supply relationship determination method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101202933B (en) * 2006-12-13 2010-12-08 华为技术有限公司 Communication equipment, advanced interlayer card and supply power providing method thereof
CN101394301A (en) * 2007-09-21 2009-03-25 华为技术有限公司 Micro general hardware platform system, apparatus for telecommunication and computer, and communication method thereof
CN101425907B (en) * 2007-10-30 2011-05-04 华为技术有限公司 General purpose hardware platform, corresponding architecture system
CN101453337A (en) * 2007-11-28 2009-06-10 华为技术有限公司 Micro telecommunication and computer general hardware platform architecture system and electric power control method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103019359A (en) * 2011-09-23 2013-04-03 中国科学院声学研究所 Method, device and ATCA (Advanced Telecom Computing Architecture) carrier board for dynamically allocating power to AMC (Advanced Mezzanine Card)
CN103019359B (en) * 2011-09-23 2015-12-02 中国科学院声学研究所 A kind of is the method for AMC card dynamic assignment power, device and ATCA support plate
CN102770824A (en) * 2012-05-14 2012-11-07 华为技术有限公司 Device and method for system power supply management and system with function of power source energy saving management
WO2013170417A1 (en) * 2012-05-14 2013-11-21 华为技术有限公司 Device and method for system power supply management and system having power supply energy-saving management function
CN102770824B (en) * 2012-05-14 2014-04-16 华为技术有限公司 Device and method for system power supply management and system with function of power source energy saving management
CN104519104A (en) * 2013-09-30 2015-04-15 华为数字技术(苏州)有限公司 Power source control method and equipment
CN104519104B (en) * 2013-09-30 2018-02-23 华为数字技术(苏州)有限公司 A kind of method and apparatus of power supply
WO2015090068A1 (en) * 2013-12-20 2015-06-25 华为技术有限公司 Single board, communication device and single board power supply method
US9575530B2 (en) 2013-12-20 2017-02-21 Huawei Technologies Co., Ltd. Board, communications device, and method for supplying power for board
CN110018728A (en) * 2019-03-29 2019-07-16 联想(北京)有限公司 A kind of electronic equipment
CN110018728B (en) * 2019-03-29 2021-05-18 联想(北京)有限公司 Electronic equipment
WO2023024685A1 (en) * 2021-08-26 2023-03-02 华为技术有限公司 Network device and power supply relationship determination method

Also Published As

Publication number Publication date
CN102103712B (en) 2013-03-27

Similar Documents

Publication Publication Date Title
CN102103712B (en) Power supply configuration method and device
US20060041767A1 (en) Methods, devices and computer program products for controlling power supplied to devices coupled to an uninterruptible power supply (UPS)
CN104281511B (en) Intelligent-platform management interface system, baseboard management controller and implementation method
CN101616031B (en) Method for setting single-plate parameters of advanced telecommunication computing structure
CN101937264A (en) Power supply power management method and device as well as modularizing equipment
CN101605037A (en) A kind of apparatus and method of single plate peripheral power supply management
CN106774752A (en) A kind of Rack servers spare fans control method
CN111488049A (en) Server cabinet power supply system and control method
JP2009005544A (en) Control method and control circuit of storage battery system
CN101515834B (en) Main control card, switching system based on multi-backup main control card, switching method of switching system
EP2317803A1 (en) Method and system for power saving management
CN101252762B (en) Base station power supply main standby switching control method based on minitype electric communication computing architecture standard
CN101557307B (en) Dispatch automation system application state management method
CN1595886A (en) A communication equipment power management system and implementing method thereof
CN101022633B (en) Allocation data recovering method, system and device
CN113038299A (en) Switch, configuration method, control method and storage medium
CN102098177A (en) Network management system and method for monitoring power supply thereof
CN100395962C (en) Method and system for equipment switching in communication system
CN109783264A (en) A kind of High Availabitity solution of database
CN109491867A (en) A kind of communication automatic recovery method and device
CN107273203B (en) Asset energy distribution method and device for data center business equipment
CN104796973A (en) Wireless access device control method and wireless access device
CN107528698A (en) Optical network device service board, optical network device and its method for controlling power supply
CN102325040A (en) Power management method based on MicroTCA system
CN111883200A (en) SSD stability testing device and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327

Termination date: 20171218

CF01 Termination of patent right due to non-payment of annual fee