CN101937264A - Power supply power management method and device as well as modularizing equipment - Google Patents

Power supply power management method and device as well as modularizing equipment Download PDF

Info

Publication number
CN101937264A
CN101937264A CN 201010266178 CN201010266178A CN101937264A CN 101937264 A CN101937264 A CN 101937264A CN 201010266178 CN201010266178 CN 201010266178 CN 201010266178 A CN201010266178 A CN 201010266178A CN 101937264 A CN101937264 A CN 101937264A
Authority
CN
China
Prior art keywords
power
module
business
power supply
strategy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010266178
Other languages
Chinese (zh)
Other versions
CN101937264B (en
Inventor
林宇建
谢水新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Star Net Ruijie Networks Co Ltd
Original Assignee
Beijing Star Net Ruijie Networks Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Star Net Ruijie Networks Co Ltd filed Critical Beijing Star Net Ruijie Networks Co Ltd
Priority to CN2010102661782A priority Critical patent/CN101937264B/en
Publication of CN101937264A publication Critical patent/CN101937264A/en
Application granted granted Critical
Publication of CN101937264B publication Critical patent/CN101937264B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides power supply power management method and device as well as modularizing equipment. The method comprises the following steps of: setting corresponding power-off strategies of business modules when all power supply modules and the combination of various power supply modules can not supply power according to the available power of all the power supply modules, the needed power of all the business modules and the priority of all the business modules; detecting power supply states of all the power supply modules in real time; and if detecting that one power supply module can not normally supply power, controlling the corresponding business module to carry out the power-off operation according to the power-off strategy. The invention realizes the rapid powering-off of the business modules on the basis of not adding additional power supply into the modularizing equipment or temporarily carrying out polling judgment operation of power on all the business modules when the output power of a power supply is insufficient, rapidly solves the problem of output power shortage of the power supply and prevents the generation of the whole machine power-off phenomenon caused by overlong overloading time of a bus power supply.

Description

Power management method, device and modularized equipment
Technical field
The present invention relates to power management techniques, relate in particular to a kind of power management method, device and modularized equipment, belong to electronic technology field.
Background technology
Fast development along with network technology, the port density of modularized equipment, bandwidth, speed are more and more higher, the power that causes module to consume is also increasing, simultaneously the business module number of slots amount that is provided with along with modularized equipment is increasing, also further require modularized equipment that bigger system power can be provided, to satisfy the power demand of multi-service module.In order to satisfy this demand, modularized equipment has proposed the scheme of many power supplys cooperating, promptly in a modularized equipment a plurality of power supplys is set simultaneously, thinks that each business module provides power demand.Thereby, in the course of work of an exchange system with many power supplys, a plurality of high capacity, high bandwidth business module, if wherein one or more power supplys break down or by mistake down during electricity, just can be easy to occur the situation of business module power demand greater than power supply output general power, this moment, whole modularized equipment can be electric under the being forced to property because of the power overload, causes professional interruption.Therefore, in order to guarantee normal, the reliability service of modularized equipment machine system, to the management of power, particularly to the power management of the modularized equipment of high capacity, high bandwidth, just seeming is even more important.
In the prior art, in the modularized equipment of high capacity, high bandwidth, system's complete machine occurs, proposed two kinds of power Managed Solutions because of the situation that power supply transships electricity.First kind of power Managed Solution is: in the high capacity of high-power demand, high bandwidth modularized equipment, directly adopt the method for power redundancy backup, by on the basis of normally required primary power, adding backup battery, with break down at primary power or mistake under when electricity, substitute primary power and provide power demand for each business module.This solution is simple to operate, also need not to carry out complicated Power Supply Monitoring and management, but but also inapplicable for the modularized equipment of high capacity, high bandwidth.Itself just is provided with a plurality of power modules the modularized equipment of high capacity, high bandwidth, the increase of backup battery module not only causes the too high of cost of investment, make power supply effectively do not utilized, and when a plurality of backup battery of system power demand, the quantity of power slot position restricts a bottleneck of power redundancy backup scheme beyond doubt.
Second kind of power Managed Solution is business module poll lower electric tube reason scheme.In this scheme, modularized equipment is provided with down electric priority for each business module in advance, when the power available output power is discontented with the pedal system demand, management control module descends business module from high to low in regular turn according to following electric priority, whether business module of every electricity down just satisfies current system requirements to output power of power supply is again once judged, till making that finally output power of power supply satisfies system requirements.This technical scheme is by increasing management control module in modularized equipment, this management control module is according to the following electric priority-level of each business module, guarantee that with the electric down Managed Solution of poll output power of power supply finally can satisfy system requirements, be to have solved problem outwardly, but in the practical application, especially for the system of multi-service module, many power supplys, this technical scheme can't solve the problem of output power of power supply deficiency veritably.Particularly, in the modularized equipment of multi-service module, many power supplys, the each poll of management control module is judged equal needs regular hour of process that whether output power of power supply satisfy business module aggregate demand power, and too much when the quantity of business module and power supply, the time that software polling is judged will be easy to exceed power-supply system causes voltage decline even power down because of overload time.Thereby this technical scheme in actual applications, and the phenomenon that is easy to occur is: when whether software also satisfied the judgement of power condition, machine system but was forced to down because of underpower already.
Summary of the invention
The invention provides a kind of power management method, device and modularized equipment, too high and inapplicable in order to overcome existing power management method cost, perhaps can't solve the defective of the problem of output power of power supply deficiency veritably.
For achieving the above object, the invention provides a kind of power management method, comprising:
According to the power demand size of Gong the watt level of each power module, each business module and the priority level of each described business module, be provided with in the time of to power corresponding to the combination of each described power module and various described power modules, the following electricity strategy of described business module;
Detect the power supply state of each described power module in real time;
If detect arbitrary described power module can't normal power supply the time, according to the described strategy of electricity down, under the control corresponding service module.
For achieving the above object, the present invention also provides a kind of power management devices, comprising:
Following electric policy management module, be used for the power demand size of Gong watt level, each business module and the priority level of each described business module, be provided with in the time of to power corresponding to the combination of each described power module and various described power modules, the following electricity strategy of described business module according to each power module;
The power supply detection module is used for detecting in real time the power supply state of each described power module;
Following electric control module is used for then according to described electric strategy down the described strategy of electricity down that module sets in advance being set if described power supply detection module detects arbitrary described power module can't normal power supply the time, and control corresponding service module descend electricity to operate.
For achieving the above object, the present invention also provides a kind of modularized equipment, comprising: a plurality of business modules and a plurality of for described business module provides the power module of power demand also comprise:
Above-mentioned power management devices, described power management devices is connected with business module with described power module respectively, is used for the state according to described power module, and described business module is descended electric control.
Power management method provided by the invention, device and modularized equipment, by in advance according to Gong the watt level of each power module of system and the power demand size of each business module, formulate the following electric priority policy of the business module that need close when corresponding each power module breaks down, detect one or more power modules break down and cause current can power supply the general power of output during less than the general power of current business module needs, according to the following electricity strategy that pre-establishes, close the lower business module of assigned priority, thereby need not to increase extra power supply for modularized equipment, and need not when output power of power supply is not enough, each business module to be carried out on the basis of poll decision operation of power temporarily, just realized the down quick of business module, solved the problem of output power of power supply deficiency apace, avoided because of the long appearance that causes electrical phenomena under the complete machine of bus power source overload time.
Description of drawings
In order to be illustrated more clearly in the present invention or technical scheme of the prior art, to do one to the accompanying drawing of required use in embodiment or the description of the Prior Art below introduces simply, apparently, accompanying drawing in describing below is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the process flow diagram of power management method embodiment one of the present invention;
Fig. 2 is the process flow diagram of power management method embodiment two of the present invention;
Fig. 3 is the structural representation of power management devices embodiment one of the present invention;
Fig. 4 is the structural representation of power management devices embodiment two of the present invention;
Fig. 5 is the structural representation of modularized equipment embodiment of the present invention.
Embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that is obtained under the creative work prerequisite.
Fig. 1 is the process flow diagram of power management method embodiment one of the present invention, and as shown in Figure 1, present embodiment specifically comprises the steps:
Step 100, according to the power demand size of Gong the watt level of each power module, each business module and the priority level of each business module, be provided with in the time of to power corresponding to the combination of each power module and various power modules, the following electricity strategy of business module;
Power management method of the present invention is applied in the modularized equipment of many power supplys, multi-service module.Particularly, in modularized equipment of the present invention, increase and be provided with one and be used for when output power of power supply does not satisfy the power aggregate demand of business module, control corresponding business module is descended the following electric policy management module of electricity, and the electric policy management module of this time is connected with each power module and each business module.Further, for fear of occurring because of when power supply breaks down, whether electric policy management module need descend electricity to carry out interim poll judgement to each business module down, thereby the phenomenon that causes because of electricity under the long complete machine that causes of bus poll judgement time, in the present invention, the electric policy management module of this time also is used for: when modularized equipment carries out initial setting up, according to the power information that from each power module and each business module, gets access to, be the following electricity strategy of business module setting in advance corresponding to various situations.
By in modularized equipment, setting in advance electricity strategy down, when the system output power of modularized equipment is not enough, electric policy management module can be according to this time electricity strategy that sets in advance down, apace the corresponding business module is closed down immediately, thereby solved the problem of system power supply output power deficiency apace, avoided the generation of above-mentioned phenomenon.
Particularly, in modularized equipment of the present invention, because following electric policy management module is connected with each power module and each business module, thereby in the initialization setting up procedure, following electric policy management module can get access to its pairing power information by communication bus from each power module and each business module.For power module, following electric policy management module can be obtained Gong the watt level information of each power module from each power module, specifically refers to the watt level information that each power module can provide; And for business module, electric policy management module then can be obtained power demand size information and the priority level information of each business module from each business module down, refers to that specifically each business module is used to keep important the priority level information of own operate as normal desired power size information and each business module.
After getting access to these information, following electric policy management module can be descended the formulation and the setting of electricity strategy according to the information that gets access to.Particularly, owing to known Gong the watt level of each power module, thereby formulating to power with arbitrary power module the time and the various combinations of any several power module, power module can't power the time during the pairing strategy of electricity down, electric policy management module can learn that should control the total big or small business module for what of power demand at least descends electricity down, so that current power supply output general power can satisfy total power demand size of remaining all business modules.Further, owing to known the priority level of each business module, thereby when the above-mentioned electricity down of formulation strategy, electric policy management module can also be according to other with each business module corresponding priorities down, in following electric strategy the lower business module of rank being set preferentially closes, thereby the business module that guarantees professional outbalance can be closed relatively laterly, and then guarantees the continuity of important service.
Step 101 detects the power supply state of each power module in real time;
Step 102, if detect arbitrary power module can't normal power supply the time, according to electricity strategy down, control corresponding service module descend electricity to operate.
Behind the electric strategy of each time that has set in advance corresponding to the various failure conditions of power module, electric policy management module can be in the normal course of operation of modularized equipment down, detect the power supply state of each power module in real time, specifically refer to detect each power module and whether can export the predetermined electric power size effectively, thereby whether to needs carry out closing of business module according to electric strategy down and judge according to testing result.
Particularly, if following electric policy management module detects any one power module or inefficacy has taken place several power module, and can't normal power supply the time, electric policy management module can be known this moment because the power supply gross output reduces down, Gong the general power of system can't satisfy the power demand of all business modules, so this electric at present policy management module reads the following electricity strategy that sets in advance, and according to the following power mode corresponding that is provided with in the following electric strategy with present case, the business module of control appointment descends the electricity operation, thereby by the lower business module of closed portion priority level, make current system's output general power can satisfy total power demand of remaining business module, avoided total system because of not enough cause following of power supply.
Than existing poll judgment mechanism, power management method of the present invention breaks down or other reasons and can't powering at power module, when causing system's output power not enough, need not each business module to be carried out again the poll decision operation of power temporarily, but can be according to the following electricity strategy that sets in advance, promptly the corresponding business module is closed immediately, fast and effeciently the problem of resolution system output power of power supply deficiency.And further, power management method of the present invention also need not to be used as the power module that backs up to additionally increasing in modularized equipment, thereby has also overcome the too high and inapplicable defective of cost in the existing redundancy backup scheme.
The power management method of present embodiment, by in advance according to Gong the watt level of each power module of system and the power demand size of each business module, formulate the following electric priority policy of the business module that need close when corresponding each power module breaks down, detect one or more power modules break down and cause current can power supply the general power of output during less than the general power of current business module needs, according to the following electricity strategy that pre-establishes, close the lower business module of assigned priority, thereby need not to increase extra power supply for modularized equipment, and need not when output power of power supply is not enough, each business module to be carried out on the basis of poll decision operation of power temporarily, just realized the down quick of business module, solved the problem of output power of power supply deficiency apace, avoided because of the long appearance that causes electrical phenomena under the complete machine of bus power source overload time.
Fig. 2 is the process flow diagram of power management method embodiment two of the present invention, and as shown in Figure 2, present embodiment specifically comprises the steps:
Step 200 according to Gong the watt level of each power module, the power demand size of each business module and the priority level of each business module, is provided with down the electricity strategy;
In the present embodiment, following electric policy management module pre-establishes the step that electricity strategy is set down and specifically can comprise following a few sub-steps:
Step 2000 according to Gong the watt level of each power module, is calculated Gong the watt level corresponding to the various combinations of power module;
Electric policy management module is before the formulation of descending the electricity strategy down, at first need from each power module, to obtain Gong the power information of each power supply by the system bus of modularized equipment, and further, calculate Gong watt level corresponding to the various combinations of a plurality of power modules according to Gong the power information of each power module that gets access to.Particularly, because for modularized equipment with multi-power module, the failure mode of power module can have multiple situation, multiple combination, only comprising 3 power modules with simple modularized equipment is that example illustrates, the power-fail pattern that only comprises the modularized equipment of 3 power modules can comprise: all lost efficacy three types failure mode of the independent failure mode of 3 power modules, the failure mode of any two power modules and 3 power modules.Thereby under formulating before the electric strategy, following electric policy management module need at first calculate under the various integrated modes, Gong the watt level of corresponding various groups power module.
Step 2001 according to Gong the watt level of the combination correspondence of power demand size, the priority level of each business module and the various power modules that calculate, is provided with the following electricity strategy in the time of can't powering corresponding to the power module of various combinations;
After corresponding Gong the watt level of the various combinations that calculate power module, electric policy management module can be provided with tactful corresponding to the following electricity of various failure modes particularly according to the result who calculates and according to the power demand size of each business module that gets access to from each business module and the priority level of each business module down.According to the information of obtaining or calculating, when following electric policy management module is provided with in the formulation of descending the electricity strategy, need and meet some requirements according to certain principle.
Particularly, situation about can't power corresponding to the various combinations of power module, down electric policy management module is according to total Gong power of the power module corresponding various combinations, that can't power that calculates, and according to the power demand of each independent business module, at first can determine to close the business module of aggregate demand power for what, thereby during with electricity strategy under formulating, the corresponding business module of closing minimum number that is provided with is with the aggregate supply power of the power module that guarantees the to power condition less than the total power demand of the business module of closing.For example if Gong the power of certain power module is 1000W, when the following electricity strategy that is provided with to should power module can't power the time, if correspondence is provided with 3 business module LC1, LC2 and LC3 descends, the power demand summation of these 3 business modules must be greater than the supply power of the power module that can't power, be power demand>1000W of LC1+LC2+LC3, and 3 business modules should satisfy the minimum number of above-mentioned condition.
Further, on this basis, according to the priority level of each business module, following electric policy management module should guarantee that also in following electric strategy the business module of closing being set is the minimum business module of priority level, thereby can laterly be interrupted with the important service that guarantees modularized equipment.3 business modules with the above-mentioned LC1 of closing, LC2 and LC3 are that example describes equally, when electricity is tactful under being provided with, this time electricity strategy is except the supply power summation of power demand summation greater than the power module that can't power of three business modules that should guarantee to close, preferably, this time electricity strategy should guarantee that also 3 business modules of the LC1, the LC2 that close and LC3 are for can satisfy business module above-mentioned condition, that priority level is minimum.
Need to prove, in the practical application, if the supply power of each power module in the module device all equates, when electricity is tactful under being provided with, the disabled status that can correspondingly can't power for the identical power module combination of quantity is provided with identical following electricity strategy, promptly is provided with and closes same combination services module.
Particularly, be that example describes there to be 3 power modules in the modularized equipment with identical supply power.Suppose on the basis of power demand that fully takes into account each business module and priority level, when a power module with constant power can't be powered, at least need to close business module combination 1, as shown in the table, in the following electric strategy that is provided with, no matter when which power module in the power module 1,2,3 can't normal power supply, all can be provided with and close same business module combination 1, satisfy the power demand of all business modules of residue with the output power that guarantees the remaining power supply module.Similarly, no matter when which two power module in the power module 1,2,3 can't normal power supply, also can in electric strategy down, be provided with and close same business module combination 1 and business module combination 2, to satisfy the power demand of surplus lines module.
Power module 1 Power_Down1 1 0 1 0 1 0 1
Power module 2 Power_Down2 0 1 1 0 0 1 1
Power module 3 Power_Down3 0 0 0 1 1 1 1
Business module combination 1 Power_Ctrl1 1 1 1 1 1 1 1
Business module combination 2 Power_Ctrl2 0 0 1 0 1 1 1
Business module combination 3 Power_Ctrl3 0 0 0 0 0 0 1
Step 201 detects the power supply state of each power module in real time;
Behind the electric strategy of each time that has set in advance corresponding to the various failure conditions of power module, electric policy management module can be in the normal course of operation of modularized equipment down, detect the power supply state of each power module in real time, specifically refer to detect each power module and whether can export the predetermined electric power size effectively, thereby whether to needs carry out closing of business module according to electric strategy down and judge according to testing result.
Particularly, in the present embodiment, following electric policy management module can be determined by following two states that detect power module the detection of the power supply state of power module.First state is the state on the throne of each power module, and this situation on the throne refers to specifically whether each power module is normally assigned in the corresponding slot, still by artificial extracting.Particularly, in the practical application, the state on the throne of this power module can flow to down detecting at bit-identify power_present of electric policy management module to each power module by following electric policy management module.In slot, be provided with the power module of the correspondence circuit that detects on the throne whether corresponding to each power module, thereby according to this circuit flow to down electric policy management module at bit-identify power_present, following electric policy management module can be known the state on the throne of each power module.
And second state whether state breaks down for each power module, this situation specifically refer to each power module whether taken place fault, whether can operate as normal.Particularly, in the practical application, the malfunction of this power module can be detected the failure identification power_good that each power module flows to down electric policy management module by following electric policy management module.In system, corresponding to each power module the circuit whether power module to correspondence breaks down and detect can be set all, thereby flowing to down the failure identification power_good of electric policy management module according to this circuit, following electric policy management module can know whether each power module breaks down.And for how whether power module broken down detect, those skilled in the art can be achieved by any known detection method in present technique field, this is not limited in the present invention.
Two states for above-mentioned power module, down electric policy management module is when detecting a certain power module and any above-mentioned state occurred, detect promptly that fault has appearred in a certain power module or when not on the throne, can determine that then this power module can't normal power supply, thereby can carry out following step.
Step 202, if detect arbitrary power module can't normal power supply the time, whether the output power summation that detects the current power module that can power greater than the power demand summation of current all business modules, and execution in step 203 then if not is if then return execution in step 201;
Step 203, according to electricity is tactful down, control corresponding service module is descended the electricity operation;
And preferably, different with a last embodiment is, detect any one or a plurality of power module can't normal power supply the time in the electric instantly policy management module of present embodiment, do not carry out closing of business module immediately, but can again whether the current gross output of system be judged greater than the demand power summation of current all business modules according to before electric strategy is closed the corresponding business module down.And in the present embodiment, the purpose of carrying out this judgement again is: because in actual applications, even system is under the state of operate as normal, can only determine that also system's output power of this moment is enough to satisfy the aggregate demand power of system, and can not determine that this satisfies the degree of aggregate demand power, therefore even detect a power module can't normal power supply the time, can not be therefore definite fully, the power module that this can't normal power supply will cause the power module of remaining normal power supply can't satisfy the power demand of system.
Thereby, in the present embodiment, by when detecting arbitrary power module or any several power module and can't power, again whether the current gross output of system is detected judgement greater than the demand power summation of current all business modules, only when the power module that detects certain inefficacy has caused the system requirements underpower, just the corresponding business module is closed, guaranteed the rationality of time electric strategy execution.
Because the following electricity strategy that sets in advance among the present invention, be according to the power situation of each power module, each business module and according to the priority level system of each business module by following electric policy management module, thereby the closing business module of carrying out according to the electric strategy of this time, also can satisfy by control minimum number, other business module of lowest priority electricity down, to guarantee that power supply output general power is greater than all conditions of the required general power of the business module of electricity down not.
Step 204 is obtained the current power demand size information of each business module in real time;
Step 205 according to the current power demand size information of each business module that gets access to, is upgraded the following electric strategy that sets in advance in real time.
Further preferably, because in actual applications, along with the variation of the working environment of each business module or the influence of other objective factors, the power demand size of business module also might immediately change, thereby in the present embodiment, unreasonable or the incorrect phenomenon of following electricity strategy that sets in advance that changes and cause for fear of the power demand that occurs because of business module, the following electric policy management module of modularized equipment can also be obtained by the current power demand size information to each business module in real time, with real-time power information according to each business module that gets access to, in real time following electric strategy is upgraded, thereby guaranteed the following electricity strategy of setting and the instant coupling of system's current state, guaranteed time tactful reasonable correctness of electricity.
Particularly, in this step, electric policy management module can be with reference to the same principle that electricity strategy time institute's foundation is set down down, following electric strategy is upgraded, the following electricity strategy that promptly upgrades needs to satisfy by control minimum number, other business module of lowest priority electricity down equally, guarantees that power supply output general power is greater than all conditions of the power demand of the business module of electricity down not.
The power management method of present embodiment, by in advance according to Gong the watt level of each power module of system and the power demand size of each business module, formulate the following electric priority policy of the business module that need close when corresponding each power module breaks down, detect one or more power modules break down and cause current can power supply the general power of output during less than the general power of current business module needs, according to the following electricity strategy that pre-establishes, close the lower business module of assigned priority, thereby need not to increase extra power supply for modularized equipment, and need not when output power of power supply is not enough, each business module to be carried out on the basis of poll decision operation of power temporarily, just realized the down quick of business module, solved the problem of output power of power supply deficiency apace, avoided because of the long appearance that causes electrical phenomena under the complete machine of bus power source overload time.
Further, in the present embodiment also the current power demand information to each business module obtain in real time, with variation following electric strategy is upgraded in real time according to each business module power demand size, thereby guaranteed the accurate rationality of time electricity strategy further, guaranteed the following electricity strategy of setting and the instant coupling of system's current state.
One of ordinary skill in the art will appreciate that: all or part of step that realizes said method embodiment can be finished by the relevant hardware of programmed instruction, aforesaid program can be stored in the computer read/write memory medium, this program is carried out the step that comprises said method embodiment when carrying out; And aforesaid storage medium comprises: various media that can be program code stored such as ROM, RAM, magnetic disc or CD.
Fig. 3 is the structural representation of power management devices embodiment one of the present invention.As shown in Figure 3, the power management devices of present embodiment comprises: following electric policy management module 11, power supply detection module 12 and following electric control module 13.
Wherein, down electric policy management module 11 is used for Gong the watt level according to each power module, the power demand size of each business module and the priority level of each business module, is provided with in the time of can't powering corresponding to the various combinations of each power module and power module, the following electricity of described business module is tactful; Power supply detection module 12 is used for detecting in real time the power supply state of each power module; Following electric control module 13 is used for if power supply detection module 12 detects arbitrary power module can't normal power supply the time, the following electricity strategy that sets in advance according to electric policy management module 11 down then, and control corresponding service module descend electricity to operate.
Particularly, the related concrete course of work of above-mentioned all modules in the present embodiment can not repeat them here with reference to the related content of the related related embodiment exposure of above-mentioned power management method.
The power management devices of present embodiment, by in advance according to Gong the watt level of each power module of system and the power demand size of each business module, formulate the following electric priority policy of the business module that need close when corresponding each power module breaks down, detect one or more power modules break down and cause current can power supply the general power of output during less than the general power of current business module needs, according to the following electricity strategy that pre-establishes, close the lower business module of assigned priority, thereby need not to increase extra power supply for modularized equipment, and need not when output power of power supply is not enough, each business module to be carried out on the basis of poll decision operation of power temporarily, just realized the down quick of business module, solved the problem of output power of power supply deficiency apace, avoided because of the long appearance that causes electrical phenomena under the complete machine of bus power source overload time.
Fig. 4 is the structural representation of power management devices embodiment two of the present invention.On the basis of the foregoing description, in the power management devices of present embodiment, following electric policy management module 11 can also comprise that calculating sub module 111 and strategy are provided with 112 two submodules of submodule.Wherein, Gong the watt level that calculating sub module 111 is used for according to each power module is calculated Gong the watt level corresponding to the combination of various power modules; Strategy is provided with Gong the watt level that submodule 112 then is used for the combination correspondence of the various power modules that power demand size, priority level and calculating sub module 111 according to each business module calculate, following electricity strategy when setting can't be powered corresponding to the power module of various combinations, this time electricity strategy satisfies by control minimum number, other business module of lowest priority electricity down, guarantees that power supply output general power is greater than all conditions of the power demand of the business module of electricity down not.
Further, in the present embodiment, following electric control module 13 can also comprise power detection submodule 131 and 132 two submodules of following electric control submodule.Wherein, power detection submodule 131 is used for if power supply detection module 12 detects arbitrary power module can't normal power supply the time, and whether the output power summation that then further detects the current power module that can power is greater than the demand power summation of current all business modules; Following electric control submodule 132 then is used for when if power detection submodule 131 detects above-mentioned gross output less than above-mentioned aggregate demand power, then according to the following electricity strategy that sets in advance, controls under the business module corresponding with the power module that can't power.
Further, in the present embodiment, whether power supply detection module 12: it is on the throne to detect each power module in real time if specifically can being used for, and detect each power module in real time and whether break down, if it is on the throne or when breaking down to detect arbitrary power module, determine that then this power module can't normal power supply.
Further, in the power management devices of present embodiment, can also comprise information acquisition module 14 and following electric policy update module 15.Particularly, information acquisition module 14 is used for obtaining in real time the current power demand size information of each business module; Down electric policy update module 15 is used for the current power demand size information of each business module of getting access to according to information acquisition module 14, in real time the following electric strategy that sets in advance is upgraded.
Particularly, the related concrete course of work of above-mentioned all modules in the present embodiment can not repeat them here with reference to the related content of the related related embodiment exposure of above-mentioned power management method equally.
The power management devices of present embodiment, by in advance according to Gong the watt level of each power module of system and the power demand size of each business module, formulate the following electric priority policy of the business module that need close when corresponding each power module breaks down, detect one or more power modules break down and cause current can power supply the general power of output during less than the general power of current business module needs, according to the following electricity strategy that pre-establishes, close the lower business module of assigned priority, thereby need not to increase extra power supply for modularized equipment, and need not when output power of power supply is not enough, each business module to be carried out on the basis of poll decision operation of power temporarily, just realized the down quick of business module, solved the problem of output power of power supply deficiency apace, avoided because of the long appearance that causes electrical phenomena under the complete machine of bus power source overload time.
Further, in the present embodiment also the current power demand information to each business module obtain in real time, with variation following electric strategy is upgraded in real time according to each business module power demand size, thereby guaranteed the accurate rationality of time electricity strategy further, guaranteed the following electricity strategy of setting and the instant coupling of system's current state.
Fig. 5 is the structural representation of modularized equipment embodiment of the present invention.As shown in Figure 5, comprise a plurality of business modules 1 and a plurality of power modules 2 that power demand is provided for this business module 1 in the modularized equipment of present embodiment.Further, also comprise above-mentioned power management devices 3 in this modularized equipment, this power management devices 3 is connected with business module 1 with power module 2 respectively, is used for the state according to power module 2, to 1 time electric control of a plurality of business modules.Particularly, all modules and the related concrete course of work of all modules that power management devices 3 in the present embodiment is included, the related content that can disclose with reference to the related related embodiment of above-mentioned power management method and power management devices does not repeat them here.
The modularized equipment of present embodiment, by in advance according to Gong the watt level of each power module of system and the power demand size of each business module, formulate the following electric priority policy of the business module that need close when corresponding each power module breaks down, detect one or more power modules break down and cause current can power supply the general power of output during less than the general power of current business module needs, according to the following electricity strategy that pre-establishes, close the lower business module of assigned priority, thereby need not to increase extra power supply for modularized equipment, and need not when output power of power supply is not enough, each business module to be carried out on the basis of poll decision operation of power temporarily, just realized the down quick of business module, solved the problem of output power of power supply deficiency apace, avoided because of the long appearance that causes electrical phenomena under the complete machine of bus power source overload time.
It should be noted that at last: above embodiment only in order to technical scheme of the present invention to be described, is not intended to limit; Although with reference to previous embodiment the present invention is had been described in detail, those of ordinary skill in the art is to be understood that: it still can be made amendment to the technical scheme that aforementioned each embodiment put down in writing, and perhaps part technical characterictic wherein is equal to replacement; And these modifications or replacement do not make the essence of appropriate technical solution break away from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (11)

1. a power management method is characterized in that, comprising:
According to the power demand size of Gong the watt level of each power module, each business module and the priority level of each described business module, be provided with in the time of to power corresponding to the combination of each described power module and various described power modules, the following electricity strategy of described business module;
Detect the power supply state of each described power module in real time;
If detect arbitrary described power module can't normal power supply the time, according to the described strategy of electricity down, under the control corresponding service module.
2. power management method according to claim 1, it is characterized in that, the priority level of the power demand of described Gong watt level according to each power module, each business module size and each described business module is provided with in the time of can't powering corresponding to the combination of each described power module and various described power modules, the following electric strategy of described business module specifically comprises:
According to Gong the watt level of each described power module, calculate Gong watt level corresponding to the combination correspondence of various described power modules;
Gong watt level according to the combination correspondence of power demand size, the priority level of each described business module and the various described power modules that calculate, the described strategy of electricity down when setting can't be powered corresponding to the power module of each described power module and various described combinations, described down electricity strategy satisfies by control minimum number, other business module of lowest priority electricity down, guarantees that power supply output general power is greater than all conditions of the power demand of the business module of electricity down not.
3. power management method according to claim 1 is characterized in that, described if detect arbitrary described power module can't normal power supply the time, according to the described strategy of electricity down, electricity specifically comprises under the control corresponding service module:
If detect arbitrary described power module can't normal power supply the time, whether the output power summation that then detects the current power module that can power is greater than the demand power summation of current all business modules;
If when detecting current described output power summation, then, control under the business module corresponding with the power module that can't power according to the described strategy of electricity down less than current described demand power summation.
4. power management method according to claim 1 is characterized in that, the described power supply state that detects each described power module in real time specifically comprises:
Whether whether it is on the throne to detect each described power module in real time, and detect each described power module in real time and break down, if it is on the throne or when breaking down to detect arbitrary described power module, determines that then described power module can't normal power supply.
5. according to the arbitrary described power management method of claim 1~4, it is characterized in that described method also comprises:
Obtain the current power demand size information of each described business module in real time;
According to the current power demand size information of each the described business module that gets access to, in real time described electric strategy is down upgraded.
6. a power management devices is characterized in that, comprising:
Following electric policy management module, be used for the power demand size of Gong watt level, each business module and the priority level of each described business module, be provided with in the time of to power corresponding to the combination of each described power module and various described power modules, the following electricity strategy of described business module according to each power module;
The power supply detection module is used for detecting in real time the power supply state of each described power module;
Following electric control module is used for then according to described electric strategy down the described strategy of electricity down that module sets in advance being set if described power supply detection module detects arbitrary described power module can't normal power supply the time, and control corresponding service module descend electricity to operate.
7. power management devices according to claim 6 is characterized in that, described electric policy management module down specifically comprises:
Calculating sub module is used for Gong the watt level according to each described power module, calculates Gong the watt level corresponding to the combination of various described power modules;
Strategy is provided with submodule, be used for Gong watt level according to the combination correspondence of power demand size, the priority level of each described business module and the various described power modules that calculate, the described strategy of electricity down when setting can't be powered corresponding to the power module of each described power module and various described combinations, described down electricity strategy satisfies by control minimum number, other business module of lowest priority electricity down, guarantees that power supply output general power is greater than all conditions of the power demand of the business module of electricity down not.
8. power management devices according to claim 6 is characterized in that, described electric control module down specifically comprises:
The power detection submodule is used for if described power supply detection module detects arbitrary described power module can't normal power supply the time, and whether the output power summation that then detects the current power module that can power is greater than the demand power summation of current all business modules;
Following electric control submodule is used for then according to the described strategy of electricity down, controlling under the business module corresponding with the power module that can't power when if described power detection submodule detects current described output power summation less than current described demand power summation.
9. power management devices according to claim 6 is characterized in that, described power supply detection module specifically is used for:
Whether whether it is on the throne to detect each described power module in real time, and detect each described power module in real time and break down, if it is on the throne or when breaking down to detect arbitrary described power module, determines that then described power module can't normal power supply.
10. according to the arbitrary described power management devices of claim 6~9, it is characterized in that described device also comprises:
The information acquisition module is used for obtaining in real time the current power demand size information of each described business module;
Following electric policy update module is used for the current power demand size information of each described business module of getting access to according to described information acquisition module, in real time described electric strategy is down upgraded.
11. a modularized equipment comprises a plurality of business modules and for described business module provides a plurality of power modules of power demand, it is characterized in that, also comprises:
As the arbitrary described power management devices of claim 6~10, described power management devices is connected with business module with described power module respectively, is used for the power supply state according to described power module, and described business module is descended electric control.
CN2010102661782A 2010-08-27 2010-08-27 Power supply power management method and device as well as modularizing equipment Active CN101937264B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102661782A CN101937264B (en) 2010-08-27 2010-08-27 Power supply power management method and device as well as modularizing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102661782A CN101937264B (en) 2010-08-27 2010-08-27 Power supply power management method and device as well as modularizing equipment

Publications (2)

Publication Number Publication Date
CN101937264A true CN101937264A (en) 2011-01-05
CN101937264B CN101937264B (en) 2012-07-25

Family

ID=43390640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102661782A Active CN101937264B (en) 2010-08-27 2010-08-27 Power supply power management method and device as well as modularizing equipment

Country Status (1)

Country Link
CN (1) CN101937264B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102437636A (en) * 2011-09-28 2012-05-02 北京星网锐捷网络技术有限公司 Power supply method and power supply control device
CN103197748A (en) * 2012-01-10 2013-07-10 广达电脑股份有限公司 Server cabinet system and power management method thereof
CN103902014A (en) * 2014-03-21 2014-07-02 浪潮电子信息产业股份有限公司 Novel design method for achieving energy-saving power supply of server power supply
CN104184612A (en) * 2014-07-30 2014-12-03 华为技术有限公司 Power supply fault processing method and device
CN104484026A (en) * 2015-01-07 2015-04-01 加弘科技咨询(上海)有限公司 Power management method and system and rack server
CN105262613A (en) * 2015-09-07 2016-01-20 北京星网锐捷网络技术有限公司 Dynamic power management method and device
CN105260003A (en) * 2015-11-30 2016-01-20 浪潮(北京)电子信息产业有限公司 Automatic protecting method and system for complete server
CN106896889A (en) * 2015-12-21 2017-06-27 技嘉科技股份有限公司 Power control system, computer system and power control method
WO2017173926A1 (en) * 2016-04-06 2017-10-12 中兴通讯股份有限公司 Power allocation method and device
CN107783882A (en) * 2017-09-14 2018-03-09 华为技术有限公司 A kind of server energy consumption management method and equipment
CN111399622A (en) * 2020-03-13 2020-07-10 苏州浪潮智能科技有限公司 Server power consumption control method and system, electronic equipment and storage medium

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110908944B (en) * 2018-09-14 2021-10-01 瑞昱半导体股份有限公司 High-speed interface connecting device and method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1920745A (en) * 2005-08-23 2007-02-28 国际商业机器公司 System and method for maximizing server utilization in a resource constrained environment
CN101277200A (en) * 2007-03-30 2008-10-01 联想(北京)有限公司 Method and device for managing multiserver power supply
US20090147393A1 (en) * 2007-12-07 2009-06-11 Kazuo Hakamata Storage apparatus with power usage control function and power usage control method in storage apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1920745A (en) * 2005-08-23 2007-02-28 国际商业机器公司 System and method for maximizing server utilization in a resource constrained environment
CN101277200A (en) * 2007-03-30 2008-10-01 联想(北京)有限公司 Method and device for managing multiserver power supply
US20090147393A1 (en) * 2007-12-07 2009-06-11 Kazuo Hakamata Storage apparatus with power usage control function and power usage control method in storage apparatus

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102437636B (en) * 2011-09-28 2014-01-22 北京星网锐捷网络技术有限公司 Power supply method and power supply control device
CN102437636A (en) * 2011-09-28 2012-05-02 北京星网锐捷网络技术有限公司 Power supply method and power supply control device
CN103197748A (en) * 2012-01-10 2013-07-10 广达电脑股份有限公司 Server cabinet system and power management method thereof
US9304562B2 (en) 2012-01-10 2016-04-05 Quanta Computer Inc. Server rack system and power management method applicable thereto
CN103902014A (en) * 2014-03-21 2014-07-02 浪潮电子信息产业股份有限公司 Novel design method for achieving energy-saving power supply of server power supply
CN104184612B (en) * 2014-07-30 2018-07-31 华为技术有限公司 A kind of method and device of power supply trouble processing
CN104184612A (en) * 2014-07-30 2014-12-03 华为技术有限公司 Power supply fault processing method and device
CN104484026A (en) * 2015-01-07 2015-04-01 加弘科技咨询(上海)有限公司 Power management method and system and rack server
CN105262613A (en) * 2015-09-07 2016-01-20 北京星网锐捷网络技术有限公司 Dynamic power management method and device
CN105260003A (en) * 2015-11-30 2016-01-20 浪潮(北京)电子信息产业有限公司 Automatic protecting method and system for complete server
CN106896889A (en) * 2015-12-21 2017-06-27 技嘉科技股份有限公司 Power control system, computer system and power control method
WO2017173926A1 (en) * 2016-04-06 2017-10-12 中兴通讯股份有限公司 Power allocation method and device
CN107273203A (en) * 2016-04-06 2017-10-20 中兴通讯股份有限公司 The assets energy distribution method and device of a kind of data center traffic equipment
CN107273203B (en) * 2016-04-06 2021-02-23 中兴通讯股份有限公司 Asset energy distribution method and device for data center business equipment
CN107783882A (en) * 2017-09-14 2018-03-09 华为技术有限公司 A kind of server energy consumption management method and equipment
WO2019052461A1 (en) * 2017-09-14 2019-03-21 华为技术有限公司 Method and device for managing power consumption of server
CN107783882B (en) * 2017-09-14 2021-01-01 华为技术有限公司 Server power consumption management method and equipment
US11385985B2 (en) 2017-09-14 2022-07-12 Huawei Technologies Co., Ltd. Server power consumption management method and device
CN111399622A (en) * 2020-03-13 2020-07-10 苏州浪潮智能科技有限公司 Server power consumption control method and system, electronic equipment and storage medium
CN111399622B (en) * 2020-03-13 2021-11-09 苏州浪潮智能科技有限公司 Server power consumption control method and system, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN101937264B (en) 2012-07-25

Similar Documents

Publication Publication Date Title
CN101937264B (en) Power supply power management method and device as well as modularizing equipment
CN102687094B (en) Processing method and appliance for multi-power supply
CN102290854B (en) Method and device for performing state control on redundant power module
CN102395955B (en) Data center control
CN101246361B (en) Electric power management method and system
CN105703475A (en) Method and system of uninterrupted intelligent power supply of ATM
CN103135732B (en) Server cabinet system
WO2021233318A1 (en) Passive cms equalization circuit and method based on super-capacitor
CN106655399B (en) A kind of electric car charge information processing method, device, charger and automobile
CN103197748A (en) Server cabinet system and power management method thereof
CN101621214B (en) Battery backup module as well as power supply method and storage system thereof
CN103155350A (en) Backup power supply systems and methods
CN109426325A (en) Storage server system
CN102035679A (en) Ethernet/IP protocol based remote I/O (Input/ Output) module with short-circuit protection and self diagnosis function
CN105811487A (en) Battery set, automatic capacity calibration learning method for battery set and automatic capacity calibration learning system
CN107247647A (en) BBU working state detecting methods and system in a kind of storage system
CN102324838A (en) Current-sharing power supply voltage adjusting method and device as well as network equipment
CN101593082A (en) A kind of device of managing power supply circuit of memory equipment, method and computing machine
CN102103712B (en) Power supply configuration method and device
CN104011956A (en) Overload Detection Device
CN202906431U (en) Power supply equipment
CN106611995A (en) Uninterruptible power supply (UPS) method and equipment having active voltage adjustment
CN104423528A (en) Power allocation method and power allocation system for data centre
CN101908977B (en) Network equipment, power supply management method and system of network equipment
CN115276205B (en) Uninterrupted power supply control method, system and device for continuous power supply and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant