CN102103162A - System for remotely monitoring leakage current of lightning arrester on line - Google Patents

System for remotely monitoring leakage current of lightning arrester on line Download PDF

Info

Publication number
CN102103162A
CN102103162A CN2009102644286A CN200910264428A CN102103162A CN 102103162 A CN102103162 A CN 102103162A CN 2009102644286 A CN2009102644286 A CN 2009102644286A CN 200910264428 A CN200910264428 A CN 200910264428A CN 102103162 A CN102103162 A CN 102103162A
Authority
CN
China
Prior art keywords
leakage current
circuit
collector
arrester
program
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009102644286A
Other languages
Chinese (zh)
Inventor
夏正新
王昱
居大为
张孝军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAOYING COUNTY POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
BAOYING COUNTY POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAOYING COUNTY POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co filed Critical BAOYING COUNTY POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Priority to CN2009102644286A priority Critical patent/CN102103162A/en
Publication of CN102103162A publication Critical patent/CN102103162A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a system for remotely monitoring the leakage current of a lightning arrester on line, and relates to an improvement on the system for remotely monitoring the leakage current of the lightning arrester on line. The system comprises a data acquisition control device arranged on an acquisition device, and a leakage current signal processing circuit arranged on a near-end integrated automation system, wherein the data acquisition control device comprises a processor, a storage, a clock circuit, an analog-to-digital converter, a signal transceiving circuit and a far-end antenna which are connected; a preset safe current value, a comparison program for comparing the value of the acquired leakage current with the safe current value to control the work of the signal transceiving circuit, a control program for timely sending far-end leakage current data according to a near-end instruction, and a program for timely sending the leakage current data according to time set by the clock circuit are stored in the storage; the leakage current signal processing circuit comprises a signal centralized control transceiving circuit and a near-end antenna; and the signal centralized control transceiving circuit is connected with the integrated automation system. By the system, manual transcription is not needed, and the labor intensity of personnel is reduced.

Description

A kind of leakage current of an arrester remote online monitoring system
Technical field
The present invention relates to improvement to the leakage current of an arrester remote online monitoring system.
Background technology
According to the unwatched situation of current electric substation, the Zinc-Oxide Arrester register needs manually regularly to make a copy of, and has caused use, management inconvenience, and personnel labor intensity is very big, can not grasp timely and accurately the security of lightning arrester.According to investigation, go back in the market the neither one system can set pair the information such as Leakage Current of Zinc-Oxide Arrester gather, communication, preservation, management, share.
Summary of the invention
The present invention is directed to above problem, provide a kind of need not manually regularly to make a copy of, thereby reduced labour intensity greatly, and can guarantee the leakage current of an arrester remote online monitoring system of complex automatic system grasp field condition at any time, in time.
Technical scheme of the present invention is: comprise collector, described collector is connected between Zinc-Oxide Arrester and the ground, and collector comprises gathers leakage current of an arrester microampere order current transformer, leakage current table and power supply; It also comprises data acquisition control device that is arranged on the collector and the leakage current signal treatment circuit that is arranged on the near-end complex automatic system; Described data acquisition control device comprises interconnective processor, storer, clock circuit, analog to digital converter, signal transmitting and receiving circuit and far-end antenna, store default safety current value in the described storer, with the leakage current gathered with the safety current value compares and then control signal transmission circuit work whether comparison program, in time send the control program of far-end leakage current data and the program of in time leakage current data being sent according to the time of clock circuit setting according to the near-end instruction; Described leakage current signal treatment circuit comprises set of signals control transmission circuit and near-end antenna, and described set of signals control transmission circuit links to each other with complex automatic system.
Described power supply is solar cell or rechargeable battery.
The present invention is the measurement collection and the data management system of Leakage Current information, adopt microampere electrode current mutual inductor to gather leakage current of an arrester, utilize the novel radio transmission technology with the data of gathering to the public measurement and control unit of Synthetic Automation System of Transformer Substation, by existing dispatch automated system data transmission is arrived the dispatching automation main website, the dispatching and monitoring personnel can be monitored in real time.Need not manually to make a copy of, alleviated personnel's labour intensity greatly.The present invention realized transformer station's Zinc-Oxide Arrester Leakage Current in real time, remote monitoring, the running status of accurate and effective judgement Zinc-Oxide Arrester need not the people and makes a copy of leakage current to the scene, for the safe operation of converting equipment provides technological means.
Description of drawings
Fig. 1 is a user mode reference view of the present invention
1 is high-voltage conducting wires among the figure, the 2nd, and lead-in wire, the 3rd, lightning arrester, the 4th, data acquisition control device, the 5th, power supply.
Fig. 2 is the structured flowchart of data acquisition control device of the present invention
Fig. 3 is the schematic block diagram of near-end of the present invention (control end)
Embodiment
The present invention as Figure 1-3, comprise collector, described collector is connected on the lead-in wire 2 between Zinc-Oxide Arrester 3 and the ground (lightning arrester 3 links to each other with high-voltage conducting wires 1), and collector comprises gathers leakage current of an arrester microampere order current transformer, leakage current table and power supply 5; It also comprises data acquisition control device 4 that is arranged on the collector and the leakage current signal treatment circuit that is arranged on the near-end complex automatic system; Described data acquisition control device 4 comprises interconnective processor, storer, clock circuit, analog to digital converter, signal transmitting and receiving circuit and far-end antenna, store default safety current value in the described storer, with the leakage current gathered with the safety current value compares and then control signal transmission circuit work whether comparison program, in time send the control program of far-end leakage current data and the program of in time leakage current data being sent according to the time of clock circuit setting according to the near-end instruction; Described leakage current signal treatment circuit comprises set of signals control transmission circuit and near-end antenna, and described set of signals control transmission circuit links to each other with complex automatic system.
Described power supply 5 is solar cell or rechargeable battery.
The function of leakage current of an arrester monitoring terminal is to gather the leakage current of lightning arrester and its form with digital quantity is stored in the storer of terminal the collection of wait collector.Terminal does not generally initiatively send data to acquisition terminal; Solar electric power supply system comprises solar cell and accumulator.Carry out communication by wireless digital broadcasting station between terminal and the collector.
AD converter was measured the voltage after leakage current changes in per 30 minutes and is converted into digital quantity according to the instruction of clock circuit, and cpu is stored in these digital quantities and acquisition time in the data-carrier store.
Collector every day collected data with all monitoring terminals and call the survey time together on same day, left in the storer.Collector is connected with complex automatic system, and workstation can long-rangely read the leakage current data in the collector.Collector is stored in the leakage current data in the storer by the wireless telecommunications timing acquiring and it is stored in the storer, uses by complex automatic system and manages for long-range workstation.
Principle of work: native system is at first used the regularly value of lightning arrester Leakage Current of AD converting system, and it is left in the storer.
Characteristics of the present invention are: 1, can be to informations such as electric substation's Zinc-Oxide Arrester Leakage Currents. 2, this acquisition terminal is located at Zinc-Oxide Arrester monitor inside. 3, adopt the mode of solar cell+rechargeable battery that acquisition terminal is powered, the acquisition terminal power consumption is very low, can guarantee long time continuous working. 4, electric substation is carried out wireless arranging net with the new generation of wireless network, this wireless technology has low in energy consumption, anti-interference strong, the characteristics such as transfer rate is high, good confidentiality, agreement are simple, stable performance, can be used as the communication transfer means of this project fully. 5, in electric substation's night shift room, be provided with a gateway, connected with network cable network and electric substation's MIS place network 6, set up electric substation's Zinc-Oxide Arrester Leakage Current management information system, both can control acquisition terminal oxidisability arrester Leakage Current had been carried out Real-time Collection, and can the data that acquisition terminal transmits have been managed, share, the operation such as automatic report generation.

Claims (2)

1. a leakage current of an arrester remote online monitoring system comprises collector, and described collector is connected between Zinc-Oxide Arrester and the ground, and collector comprises gathers leakage current of an arrester microampere order current transformer, leakage current table and power supply; It is characterized in that it also comprises data acquisition control device that is arranged on the collector and the leakage current signal treatment circuit that is arranged on the near-end complex automatic system; Described data acquisition control device comprises interconnective processor, storer, clock circuit, analog to digital converter, signal transmitting and receiving circuit and far-end antenna, store default safety current value in the described storer, with the leakage current gathered with the safety current value compares and then control signal transmission circuit work whether comparison program, in time send the control program of far-end leakage current data and the program of in time leakage current data being sent according to the time of clock circuit setting according to the near-end instruction; Described leakage current signal treatment circuit comprises set of signals control transmission circuit and near-end antenna, and described set of signals control transmission circuit links to each other with complex automatic system.
2. a kind of leakage current of an arrester remote online monitoring system according to claim 1 is characterized in that described power supply is solar cell or rechargeable battery.
CN2009102644286A 2009-12-22 2009-12-22 System for remotely monitoring leakage current of lightning arrester on line Pending CN102103162A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102644286A CN102103162A (en) 2009-12-22 2009-12-22 System for remotely monitoring leakage current of lightning arrester on line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102644286A CN102103162A (en) 2009-12-22 2009-12-22 System for remotely monitoring leakage current of lightning arrester on line

Publications (1)

Publication Number Publication Date
CN102103162A true CN102103162A (en) 2011-06-22

Family

ID=44156088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102644286A Pending CN102103162A (en) 2009-12-22 2009-12-22 System for remotely monitoring leakage current of lightning arrester on line

Country Status (1)

Country Link
CN (1) CN102103162A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103499762A (en) * 2013-09-30 2014-01-08 河南开启电力实业有限公司 Online detection device for leakage current of lightning arrester of power distribution network
CN104215815A (en) * 2014-08-14 2014-12-17 河南开启电力实业有限公司 Leakage current monitoring device of lightning arrester
CN104950164A (en) * 2015-05-25 2015-09-30 广东电网有限责任公司中山供电局 Lightning overvoltage monitoring system for substation secondary system
CN107807266A (en) * 2017-10-31 2018-03-16 国家电网公司 Leakage current of an arrester remote online monitoring system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103499762A (en) * 2013-09-30 2014-01-08 河南开启电力实业有限公司 Online detection device for leakage current of lightning arrester of power distribution network
CN104215815A (en) * 2014-08-14 2014-12-17 河南开启电力实业有限公司 Leakage current monitoring device of lightning arrester
CN104950164A (en) * 2015-05-25 2015-09-30 广东电网有限责任公司中山供电局 Lightning overvoltage monitoring system for substation secondary system
CN107807266A (en) * 2017-10-31 2018-03-16 国家电网公司 Leakage current of an arrester remote online monitoring system

Similar Documents

Publication Publication Date Title
CN103346615B (en) Based on plant stand end centralized control method and the device of intelligent telecontrol
CN202836615U (en) Intelligent electrical network comprehensive on-line monitoring system
CN104362756A (en) Household electricity consumption real-time analyzing system
CN210776268U (en) Airport navigation equipment centralized monitoring system with high anti-interference performance
CN102103162A (en) System for remotely monitoring leakage current of lightning arrester on line
CN202057756U (en) Distribution network fault locating system based on fault indicator
CN201278005Y (en) Wireless monitoring apparatus for electric power system lightning arrestor
CN201607501U (en) Remote online monitoring device for current leakage of lightening arrester
CN113206544B (en) Power grid GIC monitoring device based on transformer high-voltage incoming and outgoing lines
CN104614619A (en) Remote power data collection system and method based on wireless network
CN209927942U (en) Intelligent online monitoring instrument for lightning arrester of power transmission line based on wireless communication
CN204205722U (en) Household electricity real-time analyzer
CN201409017Y (en) Distribution transformer comprehensive monitoring and reactive power compensating system
CN110784021A (en) Thing networking air switch based on demand side power consumption management
CN204065313U (en) A kind of distribution line failure on-Line Monitor Device
CN109743718A (en) Wireless ad hoc network system based on LoRa
CN202737583U (en) Breaker with electric quantity collecting and information transmitting functions
CN206114745U (en) Electric formula of asking for response circulation monitoring devices
CN205210162U (en) High tension cable sheath earth current on -line monitoring system
CN213183074U (en) Intelligent air switch for remote meter reading
CN205248917U (en) Electric power property remote management system
CN210839564U (en) Carrier communication device of intelligent electric meter and intelligent electric meter equipment
CN208421057U (en) It is a kind of for acquiring the monitoring device of ultra-high-tension power transmission line induction field energy
CN202798151U (en) Lead-dynamic capacity-increasing system based on RF transmission
CN102035878A (en) Rapid turnout deployment monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: YANGZHOU POWER SUPPLY CO., JIANGSU PROV ELECTRIC P

Effective date: 20121115

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121115

Address after: 225801 members of the Baoying province Jiangsu County Road No. 288

Applicant after: Baoying County Power Supply Company of Jiangsu Electric Power Company

Applicant after: Yangzhou Power Supply Company of Jiangsu Electric Power Company

Applicant after: Jiangsu Electric Power Company

Applicant after: State Grid Corporation of China

Address before: 225801 members of the Baoying province Jiangsu County Road No. 288

Applicant before: Baoying County Power Supply Company of Jiangsu Electric Power Company

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110622