CN102102364B - Embraced-to-jacked prestressed hollow pipe pile feeder - Google Patents

Embraced-to-jacked prestressed hollow pipe pile feeder Download PDF

Info

Publication number
CN102102364B
CN102102364B CN2009100734485A CN200910073448A CN102102364B CN 102102364 B CN102102364 B CN 102102364B CN 2009100734485 A CN2009100734485 A CN 2009100734485A CN 200910073448 A CN200910073448 A CN 200910073448A CN 102102364 B CN102102364 B CN 102102364B
Authority
CN
China
Prior art keywords
embraced
tube
pile
feeder
stress hollow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009100734485A
Other languages
Chinese (zh)
Other versions
CN102102364A (en
Inventor
张厚
王玉辉
崔海波
曹凤萍
何林
何大禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang 7th Building Engineering Co., Ltd.
Heilongjiang Zhonggu Building Energy Saving Technology Co., Ltd.
Original Assignee
HEILONGJIANG 7TH BUILDING ENGINEERING Co Ltd
HEILONGJIANG ZHONGGU BUILDING ENERGY SAVING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEILONGJIANG 7TH BUILDING ENGINEERING Co Ltd, HEILONGJIANG ZHONGGU BUILDING ENERGY SAVING TECHNOLOGY Co Ltd filed Critical HEILONGJIANG 7TH BUILDING ENGINEERING Co Ltd
Priority to CN2009100734485A priority Critical patent/CN102102364B/en
Publication of CN102102364A publication Critical patent/CN102102364A/en
Application granted granted Critical
Publication of CN102102364B publication Critical patent/CN102102364B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses an embraced-to-jacked prestressed hollow pipe pile feeder, which comprises an embraced-to-jacked prestressed hollow pipe pile feeder outer sleeve and an inner pile pressing cap, wherein the embraced-to-jacked prestressed hollow pipe pile feeder outer sleeve comprises an outer sleeve, an outer ring flange plate, a top plate, a reinforcing hoop, supports, a baffle plate, an inner ring flange plate and inner plates; the whole embraced-to-jacked prestressed hollow pipe pile feeder outer sleeve is shorter than a pressed prestressed hollow pipe pile; the diameter of the lower end of the outer sleeve is reduced, and the lower end of the inner side of the outer sleeve is connected with the inner ring flange plate; the upper part of the outer sleeve is connected with the outer ring flange plate, and the top part of the outer sleeve is connected with the top plate; the supports are connected with the top plate; the inner plates are arranged inside the supports; the distance between the two inner plates is smaller than the maximum stroke of a pile pressing machine; the two supports are connected through the reinforcing hoop; the inner pile pressing cap comprises a lug plate, a hinge pin, a bottom plate, a baffle plate and a pile pressing positioning device, wherein the pile pressing positioning device is fixed at the lower part of the bottom plate, and the baffle plate is connected with the lug plate by the hinge pin; and the inner plates press the baffle plate. The embraced-to-jacked prestressed hollow pipe pile feeder sinks piles by a jacked manner instead of an embraced manner; and when in construction of a variable-cross-section tubular pile, a clamp is unnecessary to be replaced.

Description

The pre-stress hollow pile tube is embraced changes the roof pressure Pile feeder
Technical field: the technical field that the present invention relates to is the piling device during the prestressed pipe pile foundation construction in the construction work.
Background technology: at present when the construction work pile foundation construction, the pre-stress hollow pile tube is because its pile quality is good, and pile sinking speed is fast, and the bearing capacity of stake can read on pile press at any time, thereby adopted by a large amount of engineerings at present.According to the building foundation engineering design, pile body will satisfy the effect of the suffered horizontal force of opposing building on top, and vertical bearing capacity, and the top pile body will have enough sectional areas and intensity to meet design requirement when design.The cross section and the arrangement of reinforcement that then can reduce stake in the pile body bottom can meet design requirement, so pile foundation can be designed to the pile foundation of variable cross-section when design.As adopting non-uniform pile, can significantly reduce construction costs, but the pre-stress hollow pile tube is as being designed to the variable cross-section pile body in the engineering; Generally use at present quiet armful press in the piling construction technology and can't realize quick pile sinking; As press non-uniform pile also to need frequent replacing to embrace the pressure anchor clamps, and what these were a large amount of loses time, and construction is very inconvenient; And the top pressing type pile press is fewer on the market, so restricted applying of variable cross-section hollow shell pill.
Summary of the invention: the purpose of this invention is to provide a kind ofly when not changing the anchor clamps of quiet armful of pile press, transfer the hugging pressure type piling to the top pressing type piling, a kind of pre-stress hollow pile tube that can realize the quick piling construction of variable cross-section pile tube is embraced and is changeed the roof pressure Pile feeder.Technical scheme of the present invention is: the present invention includes the pre-stress hollow pile tube and embrace commentaries on classics roof pressure Pile feeder overcoat and interior piling cap; The pre-stress hollow pile tube is embraced and is changeed roof pressure Pile feeder overcoat and comprise outer tube, outer ring flange, top board, reinforcement hoop, support, baffle plate, interior annular flange dish, inner panel, and the pre-stress hollow pile tube is embraced changes roof pressure Pile feeder overcoat total length, lacks than the pre-stress hollow pile tube that institute will press; Outer tube leans on the lower end part diameter to diminish; The outer tube inside lower end is connected with interior annular flange dish, and interior annular flange dish internal diameter is identical with outer tube bottom microcephaly's internal diameter, and the outer tube upper outside is connected with the outer ring flange; Outer ring flange internal diameter is identical with outer tube top large head external diameter; The outer tube top is connected with annular roof plate, and the internal diameter of top board is identical with outer tube microcephaly internal diameter, is furnished with two supports relatively on the top board; The bottom of support is connected with top board is vertical; Each support inboard at interval is fixedly connected with inner panel from top to bottom, and at interval distance is less than the pile press range between per two inner panels, and two supports are connected and fixed through spaced apart reinforcement hoop from top to bottom.Interior piling cap comprises two otic placodes, bearing pin, base plate, two baffle plates, piling locator; The piling locator is fixed on the base plate bottom, is connected with the otic placode of two bottom band circular pin holes above the base plate, is placed with two baffle plates in the middle of two otic placodes; Have circular pin hole on the baffle plate; On the baffle plate on circular hole and the otic placode pin-and-hole size identical, four pin-and-hole centers are on same straight line, the pin-and-hole that bearing pin passes on baffle plate and the otic placode connects; Can place two supports that the pre-stress hollow pile tube is embraced changes roof pressure Pile feeder overcoat with respect to the interior piling cap that support moves downward, the pre-stress hollow pile tube is embraced the inner panel that changes roof pressure Pile feeder overcoat and can be pressed on the baffle plate of interior piling cap.Embracing pile press clamp clamps Pile feeder when the present invention constructs moves down; Pile feeder will be embraced frictional force that pile press anchor clamps and outer tube produce and convert downward pressure into and act on pre-stressed concrete hollow pile tube top, thereby realize transferring the hugging pressure type pile sinking to the roof pressure pile sinking.When the varying cross-section duct pile driving construction, no longer need change quiet armful and press anchor clamps, save the engineering time, can realize quick pile sinking, improve efficiency of construction.The present invention also has advantages such as the processing of being easy to, easy for operation, safe and reliable, maintenance convenient.
Description of drawings: Fig. 1 is a specific embodiment of the invention user mode overall structure sketch map
Fig. 2 is that specific embodiment of the invention pre-stress hollow pile tube is embraced commentaries on classics roof pressure Pile feeder jacket structure sketch map
Fig. 3 is a piling cap sketch map in the specific embodiment of the invention
Fig. 4 is that specific embodiment of the invention pre-stress hollow pile tube is embraced commentaries on classics roof pressure Pile feeder overcoat cross-sectional schematic
The specific embodiment: the present invention includes the pre-stress hollow pile tube and embrace commentaries on classics roof pressure Pile feeder overcoat; Interior piling cap; Pre-stress hollow pile tube 15, pre-stress hollow pile tube are embraced commentaries on classics roof pressure Pile feeder overcoat and are comprised outer tube 1, outer ring flange 2, outer stiffener 3, top board 4, arc first quarter moon reinforcement hoop 6, support 5, interior annular flange dish 7, inner panel 8, interior stiffener 9.The pre-stress hollow pile tube is embraced changes roof pressure Pile feeder overcoat total length, lacks 1 ~ 1.5m than the pre-stress hollow pile tube that institute will press, and outer tube 1 lower end diameter diminishes; Outer tube 1 inside lower end is connected with interior annular flange dish 7; Interior annular flange dish 7 top separation have stiffener 9 in the triangle, and interior annular flange dish internal diameter 7 is identical with outer tube 1 microcephaly's internal diameter, and outer tube 1 leans on the outside on top to be connected with outer ring flange 2; Outer ring flange 2 top separation have the outer stiffener 3 of triangle; Outer ring flange 2 internal diameters are identical with outer tube 1 large head external diameter, and outer tube 1 top is connected with annular roof plate 4, and the internal diameter of top board 4 is identical with outer tube 1 microcephaly's internal diameter; Be furnished with two supports 5 relatively on the top board; Support 5 adopts channel-section steel to process, and the bottom of support 5 and 4 vertical connections of top board are fixedly connected with inner panel 8 from top to bottom at interval in each support; At interval distance is less than the pile press range between per two inner panels 8, and two supports are connected and fixed through spaced apart arc first quarter moon reinforcement hoop 6 from top to bottom.Interior piling cap comprises otic placode 10, bearing pin 11, base plate 12, baffle plate 13, cylindrical piling locator 14; Piling locator 14 is fixed on disc base plate 12 bottoms; 10, two otic placodes of rectangle otic placode, 10 centres that are connected with two bottom band circular pin holes above the base plate 12 have been placed with two baffle plates 13, have circular pin hole on the baffle plate 13; On the baffle plate 13 on circular hole and the otic placode 10 the pin-and-hole size identical; Four pin-and-hole centers are on same straight line, and the pin-and-hole that bearing pin 11 passes on baffle plate 13 and the otic placode 10 connects, and baffle plate can only upwards rotate around bearing pin; Piling locator 14 inserts in the pre-stress hollow pile tube 15; The lower end of pre-stress hollow pile tube 15 is placed in the outer tube 1, can place two supports 5 that the pre-stress hollow pile tube is embraced changes roof pressure Pile feeder overcoat with respect to the interior piling cap that support moves downward, and the pre-stress hollow pile tube is embraced the inner panel 8 that changes roof pressure Pile feeder overcoat and is pressed on the baffle plate of interior piling cap.
During work, startup is embraced and is pressed a clamp outer tube, drives an armful commentaries on classics roof pressure Pile feeder overcoat and moves up together; The first order (uppermost) inner panel 8 tops contact with baffle plate 13 bottoms, and the Pile feeder overcoat continues to move up, and inner panel 8 promotes baffle plate 13 and upwards rotates around bearing pin 11; Behind inner panel 8 rising certain distances, separate with baffle plate 13, baffle plate 13 is got back to original position being rotated down around bearing pin under the effect of gravity; Stop the Pile feeder overcoat this moment and rise, first order inner panel 8 is pressed in baffle plate 13 tops.Embrace and press clamp outer tube 1 descending, drive an armful commentaries on classics roof pressure Pile feeder overcoat and move down together, inner panel 8 produces downward pressure to baffle plate 13; Drive whole pre-stress hollow pile tube 15 and move down, the pre-stress hollow pile tube is compressed into soil layer, be moved down into a stroke after; Unclamp to embrace and press anchor clamps (release distance is very little); Embrace and press anchor clamps, produce the thrust that makes progress of external annular flange dish 2, drive the Pile feeder overcoat and move up together to rising; Repeat a process, until the pre-stress hollow pile tube is suppressed design elevation.

Claims (6)

1. a pre-stress hollow pile tube is embraced changes the roof pressure Pile feeder, and comprising that the pre-stress hollow pile tube is embraced changes roof pressure Pile feeder overcoat and interior piling cap, and the pre-stress hollow pile tube is embraced and changeed roof pressure Pile feeder overcoat and comprise outer tube, outer ring flange, top board, reinforcement hoop, support, baffle plate, interior annular flange dish, inner panel; The pre-stress hollow pile tube is embraced changes roof pressure Pile feeder overcoat total length, and shorter than the pre-stress hollow pile tube that institute will press, outer tube diminishes by the lower end part diameter; The outer tube inside lower end is connected with interior annular flange dish, and interior annular flange dish internal diameter is identical with outer tube bottom microcephaly's internal diameter, and the outer tube upper outside is connected with the outer ring flange; Outer ring flange internal diameter is identical with outer tube top large head external diameter; The outer tube top is connected with annular roof plate, and the internal diameter of top board is identical with outer tube microcephaly internal diameter, is furnished with two supports relatively on the top board; The bottom of support is connected with top board is vertical; Each support inboard at interval is fixedly connected with inner panel from top to bottom, and at interval distance is less than the pile press range between per two inner panels, and two supports are connected and fixed through spaced apart reinforcement hoop from top to bottom; Interior piling cap comprises two otic placodes, bearing pin, base plate, two baffle plates, piling locator; The piling locator is fixed on the base plate bottom, is connected with the otic placode of two bottom band circular pin holes above the base plate, is placed with two baffle plates in the middle of two otic placodes; Have circular pin hole on the baffle plate; On the baffle plate on circular hole and the otic placode pin-and-hole size identical, four pin-and-hole centers are on same straight line, the pin-and-hole that bearing pin passes on baffle plate and the otic placode connects; Can place two supports that the pre-stress hollow pile tube is embraced changes roof pressure Pile feeder overcoat with respect to the interior piling cap that support moves downward, the pre-stress hollow pile tube is embraced the inner panel that changes roof pressure Pile feeder overcoat and is pressed on the baffle plate of interior piling cap.
2. a kind of pre-stress hollow pile tube as claimed in claim 1 is embraced changes the roof pressure Pile feeder, it is characterized in that: interior annular flange dish top separation has stiffener in the triangle.
3. a kind of pre-stress hollow pile tube as claimed in claim 1 is embraced changes the roof pressure Pile feeder, it is characterized in that: outer ring flange top separation has the outer stiffener of triangle.
4. a kind of pre-stress hollow pile tube as claimed in claim 1 is embraced changes the roof pressure Pile feeder, and it is characterized in that: the reinforcement hoop is curved semi-moon shaped.
5. a kind of pre-stress hollow pile tube as claimed in claim 1 is embraced changes the roof pressure Pile feeder, it is characterized in that: support is to adopt channel-section steel to process.
6. a kind of pre-stress hollow pile tube as claimed in claim 1 is embraced changes the roof pressure Pile feeder, it is characterized in that: the pre-stress hollow pile tube is embraced changes roof pressure Pile feeder overcoat total length, lacks 1-1.5 rice than the pre-stress hollow pile tube that institute will press.
CN2009100734485A 2009-12-17 2009-12-17 Embraced-to-jacked prestressed hollow pipe pile feeder Expired - Fee Related CN102102364B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100734485A CN102102364B (en) 2009-12-17 2009-12-17 Embraced-to-jacked prestressed hollow pipe pile feeder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100734485A CN102102364B (en) 2009-12-17 2009-12-17 Embraced-to-jacked prestressed hollow pipe pile feeder

Publications (2)

Publication Number Publication Date
CN102102364A CN102102364A (en) 2011-06-22
CN102102364B true CN102102364B (en) 2012-07-04

Family

ID=44155404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100734485A Expired - Fee Related CN102102364B (en) 2009-12-17 2009-12-17 Embraced-to-jacked prestressed hollow pipe pile feeder

Country Status (1)

Country Link
CN (1) CN102102364B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518133B (en) * 2011-12-15 2015-05-20 昆明理工大学 Pile sinking method for prestress hollow pipe piles by aid of follow-up sleeve
CN103225302B (en) * 2013-05-07 2015-05-27 中国石油大学(北京) Six-wing piling cap for marine riser
CN104674813A (en) * 2015-01-30 2015-06-03 福建省建筑科学研究院技术开发部 Deep-vibration pile follower
CN105507323A (en) * 2015-11-24 2016-04-20 江苏省电力公司连云港供电公司 Small-diameter steel pipe pile side static-pressure hoop device
CN105369806B (en) * 2015-12-09 2017-05-17 浙江科技学院 Multistage elastic pile transporting device for static pressure pipe pile
CN106522205B (en) * 2016-12-30 2019-01-18 上海市机械施工集团有限公司 A kind of pile cover
CN109024566B (en) * 2018-08-28 2024-08-06 毕建宏 Internal pile pressing construction device and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2349262Y (en) * 1998-10-01 1999-11-17 昆明大力地基有限公司 Pile feeder
WO2004042152A1 (en) * 2003-07-24 2004-05-21 Yip, Hoi, Thong A piling device
CN2698847Y (en) * 2004-05-21 2005-05-11 梁毅 Pile feeding mechanism of top-pressing static pile press
CN1916296A (en) * 2006-09-06 2007-02-21 刘小檀 Construction technique for self-leading hole at pile tip of embrace press type PHC tubular pile to enter rock through static pressure
CN201272970Y (en) * 2008-09-27 2009-07-15 洪子云 Pressing type large-diameter statically pressed encased cast-in-place pile pressing machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2349262Y (en) * 1998-10-01 1999-11-17 昆明大力地基有限公司 Pile feeder
WO2004042152A1 (en) * 2003-07-24 2004-05-21 Yip, Hoi, Thong A piling device
CN2698847Y (en) * 2004-05-21 2005-05-11 梁毅 Pile feeding mechanism of top-pressing static pile press
CN1916296A (en) * 2006-09-06 2007-02-21 刘小檀 Construction technique for self-leading hole at pile tip of embrace press type PHC tubular pile to enter rock through static pressure
CN201272970Y (en) * 2008-09-27 2009-07-15 洪子云 Pressing type large-diameter statically pressed encased cast-in-place pile pressing machine

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特开2005-48494A 2005.02.24
JP特开2007-16513A 2007.01.25

Also Published As

Publication number Publication date
CN102102364A (en) 2011-06-22

Similar Documents

Publication Publication Date Title
CN102102364B (en) Embraced-to-jacked prestressed hollow pipe pile feeder
CN201645645U (en) Multistage vertical pipemaking machine with radial extrusion
CN202509487U (en) Combined pile pipe for construction of overall process of pipeline sinking pressure grouting pile
CN204222248U (en) High accuracy four column rotating press device
CN101761090A (en) Space truss multi-barrel base of offshore wind power unit
CN113323009A (en) Inclined strut offshore wind power single pile foundation with damping sleeve and construction method
CN114776529A (en) Assembled wind power tower drum and assembling method thereof
CN206873760U (en) A kind of support of factory building roof beam
CN206494685U (en) A kind of pipeline lifting apparatus
CN200999702Y (en) Novel tower barrel of wind generating set
CN201486483U (en) Retaining mechanism for drill rod
CN204382694U (en) For the high-precision rotary swager of material forming
CN214940107U (en) Hammer cap for marine pile hammer
CN201695413U (en) Embedded load case for PHC tubular pile foundation bearing capacity test
CN213265347U (en) Steel pipe transport collection vehicle for building site
CN212405281U (en) Vertical resistance to plucking static load detection device of single pile
CN204402496U (en) A kind of vertical shaft steel strand jack hangs slip-form lifting device
CN202745064U (en) Hydraulic walking pile frame with composite masts
CN216587958U (en) Absorption tower cone section installation strutting arrangement and braced system
CN108661309B (en) Bent pipe concrete slip form traction steering device
CN202446868U (en) Circular thickener
CN201472090U (en) Rim dismounting device of vacuum tire
CN204222235U (en) Rotate for material and press-fit shaping equipment
CN113653343B (en) A spill grey device for PHC tubular pile body location mark
CN104564084B (en) Vertical shaft sliding formwork and grouting platform steel strand wires jack lifting construction equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HEILONGJIANG ZHONGGU CONSTRUCTION ENERGY-SAVING TE

Free format text: FORMER OWNER: HEILONGJIANG CONSTRUCTION ENGINEERING GROUP CO., LTD.

Effective date: 20120214

Owner name: CONSTRUCTION ENGINEERING CO., LTD. OF HEILONGJIANG

Effective date: 20120214

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 150046 HARBIN, HEILONGJIANG PROVINCE TO: 150001 HARBIN, HEILONGJIANG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20120214

Address after: 9 floor, No. 61 Changjiang Road, Heilongjiang, Harbin, 150001

Applicant after: Heilongjiang Zhonggu Building Energy Saving Technology Co., Ltd.

Co-applicant after: Heilongjiang 7th Building Engineering Co., Ltd.

Address before: 150046 Heilongjiang construction group, three power road 532, Xiangfang District, Heilongjiang, Harbin

Applicant before: Heilongjiang Construction Engineering Group Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704