CN102071943B - 城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置 - Google Patents
城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置 Download PDFInfo
- Publication number
- CN102071943B CN102071943B CN2010105844126A CN201010584412A CN102071943B CN 102071943 B CN102071943 B CN 102071943B CN 2010105844126 A CN2010105844126 A CN 2010105844126A CN 201010584412 A CN201010584412 A CN 201010584412A CN 102071943 B CN102071943 B CN 102071943B
- Authority
- CN
- China
- Prior art keywords
- displacement meter
- centrifugal
- shield tunnel
- tunnel construction
- model casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明属岩土及地下工程中的隧道工程领域,具体涉及一种城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置。该测试装置主要由模型箱、位移计小支架、位移计大支架、隧道开挖装置以及LVDT(线性可变差分变压器)位移计等构成。其中,模型箱为中部空心的长方体;位移计小支架和位移计大支架通过沿水平方向和垂直方向多方位调节LVDT位移计,可以实现对地表沉陷和内部土层变形的测量;隧道开挖装置可以通过排放一定体积的水来模拟地层损失引起的土体变形。本发明能够更方便、更真实有效地模拟出城市盾构隧道施工对周围地层的变形影响,为隧道设计与施工提供更真实准确的实验数据,保障城市盾构隧道建设的高效与安全。
Description
技术领域
本发明属于岩土及地下工程中的隧道工程领域,具体涉及一种城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置。
背景技术
近年来,我国城市化水平的迅速提高带动了城市地下轨道交通系统的快速发展。盾构法隧道施工由于可以较小程度地对地面交通产生影响而越来越广泛的被应用于地下铁道的建设中,该工法已经成为我国城市地下轨道交通系统中的一种重要施工方法。然而,在隧道的修建过程中,由于地质条件和施工工艺的限制,盾构机压力舱支护压力与地层土、水压力不平衡导致开挖面前方土体移动以及盾尾空隙的闭合造成地层损失,周围孔隙水压变化等原因,都会使土层原始应力重新分布,原有的土体平衡状态遭到破坏,最终引起周围地层变形及地表沉降,特别是在软土盾构隧道中尤为明显。在现场施工过程中,地表沉降发生的概率很高,南京地铁1号线施工过程中,在汉口路与中山路交汇处曾发生面积约15 m2,深为2 m的地面道路沉陷,严重影响了地面的正常交通;深圳地铁1号线施工期内地面沉降事故占了总事故的25 %,其中一期工程暗挖施工段最大地表沉降达到了300 mm。2008年11月杭州萧山湘湖段发生地铁施工塌方事故,导致风情大道75米路面坍塌,下陷达15米,并造成十几人的重大伤亡事故。因此亟待针对城市盾构隧道施工诱发的地表沉陷机理以及演变规律进行研究,从而为地铁隧道施工和运营提供良好咨询和建议。
目前国内外针对城市盾构隧道施工诱发地表沉陷的研究主要集中在数值模拟方法、现场监测方法以及室内一般物理模型试验上。数值模拟方法相对比较成熟,但是存在的不足之处主要有:(1)土体物理力学参数对数值模拟结果影响很大,然而由于测试仪器设备的限制,很难得到精确的各项土体参数;(2)数值模拟方法对土体的应力历史以及边界条件难以完全模拟,从而造成结果的偏差。现场监测方法的不足之处主要有:(1)由于仪器设备以及人为观察因素的限制,现场结果具有一定偏差;(2)现场预埋测试元件较难保护,非常容易在施工中损坏,从而延误监测;(3)现场监测需要大量人力物力财力的支持,尤其针对隧道施工引起的土体长期沉降监测,更加不容易实施,并且时效性较差。室内一般物理模型试验最大的缺点就是无法再现现场土层在真实重力状态下的初始应力状态,而土工离心试验作为一种先进的物理模拟手段,能够通过施加适当的离心力再现原型应力状态,非常适用于进行岩土及地下工程的机理研究,从而使其成为研究该问题的首选方法之一。
土工离心试验技术是近二三十年迅速发展起来的一项崭新的土工物理模型技术,其原理是通过在模型上施加离心惯性力使模型的容重增大,从而使模型的应力状态与原型一致。具体来讲,将原型尺寸1/n实验模型置于ng离心重力场中,试验模型自重将增大n倍,则模型中每点所受到的应力与原型中相应点的应力相同,这也就是离心模型试验的相似性定律。
发明内容
本发明目的在于针对该领域现有研究方法的不足之处,提出一种城市盾构隧道施工诱发地表沉陷的离心试验模拟方法,从而提高对盾构隧道施工土工环境效应的模拟,加深对盾构隧道施工土工环境效应的机理认识。
本发明目的是由以下技术方案实现的:
本发明提出的城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置,由模型箱1、有机玻璃窗2、位移计小支架3、位移计大支架4、隧道开挖模拟装置5、进水导管6、出水导管7、进水电磁阀8、出水电磁阀9、乳胶带10以及LVDT(线性可变差分变压器)位移计11组成。
本发明中的模型箱1为中部空心的长方体结构,其前侧面为有机玻璃窗2,便于进行土层标注以及外部同步摄影;其顶面可以设置为开口,便于放置测量仪器位移计小支架3和位移计大支架4,其中顶面四周均布置有锚孔以便固定仪器支架;其余四面均为铝合金板,适于承受较大离心场力。
本发明中位移计小支架3可以供5个LVDT位移计11同时进行测量,其位移计水平方向固定,不可调节,但垂直方向可以根据试验需要进行调节;位移计大支架4可以供5个LVDT位移计11同时进行测量,其位移计水平方向和垂直方向均可以根据试验需要进行调节。其特征在于:通过位移计沿水平方向和垂直方向的多方位调节,可以实现对地表沉陷和内部土层变形的测量。
本发明中的隧道开挖模拟装置5放置于模型箱1中部位置,其具体位置根据试验要求确定;开挖装置5中间为一空心黄铜管12,外部围有一橡皮膜13,空心黄铜管12和橡皮膜13之间形成环状水腔14,水体注满后容积可达0.031 m3;开挖装置5侧面接近两端及端面处沿径向缠绕有乳胶带10,以使空心黄铜管12与橡皮膜13间形成封闭空间构成模拟隧道开挖的重要结构,其中一端连有进水导管6,进水导管6与进水电磁阀8连接,另外一端连有出水导管7,出水导管7与出水电磁阀9连接,由进水电磁阀8以及出水电磁阀9引出的导管分别连接离心机的液体控制系统。其特征在于:通过排放一定量的水来模拟地层损失引起的土体变形。
本发明的工作过程如下:隧道开挖模拟装置5按照模型设计图制作完毕,将进水电磁阀8以及出水电磁阀9引出的液体导管分别连接到离心机的液体控制系统,此时进水电磁阀8以及出水电磁阀9呈关闭状态。在模型箱1 内壁四周涂抹硅油,以便减小箱体与土体的摩擦。加入调制好的隧道下部第一层试验土,其土层厚度达200 mm。
继续填土直至达到300 mm厚度,即填完隧道下卧层土,然后放入隧道开挖模拟装置5,隧道开挖模拟装置5两侧用乳胶带10缠绕,通过水准尺测量使隧道开挖模拟装置5水平,打开进水电磁阀8将隧道开挖模拟装置5内充入水,水体注满后容量可达0.031 m3,隧道开挖模拟装置5水充满后进水电磁阀8关闭。继续填土直至填完,总厚度达450 mm。在填土过程中,要预先将LVDT延伸计埋到指定位置以便测量土体内部变形。
将模型箱1运用吊车装置放置于土工离心机系统中,离心机主要由下部支座15、上部支座16、主驱动轴17、连接横轴18、离心配重19等组成,其中下部支座15固定在地板20上,上部支座16固定在天花板21上,主驱动轴17与离心电机相连并获取动能,模型箱1挂杆与连接横轴18活动铰接22,以使模型箱1与离心加速度方向保持一致。启动离心机,离心主驱动轴17将带动连接横轴18转动,同时带动模型箱1同速转动,直到达到预定离心加速度100g,此时离心场稳定,之后打开出水电磁阀9,释放隧道开挖模拟装置5中水体,以0.3%/分速率放水达到6%土体损失,增加到0.7%/分达到10%土体损失,中间重点记录0.3%、0.4%、0.5%、0.6%、1%、2%、3%、5%、6%、8%以及10%土体损失比时各类测试仪器读数,从而可以观测盾构隧道施工诱发地表沉陷值以及内部土体位移值。
在离心机运行工程中,地表沉降形态以及演化过程可以通过离心机室内高倍同步摄影机获取。结合LVDT位移计测量结果以及高倍同步摄影图像,可以较好地对城市盾构隧道施工诱发的地表沉陷机理进行研究。
本发明与现有技术相比较,具有如下显著优点:本发明可提供在高速离心场中狭小空间内模拟城市盾构隧道施工诱发的地表沉陷灾害并进行精确测量。本测试装置特点如下:
(1)本试验模拟系统可承受最大离心加速度150g;
(2)对隧道模型自由端的约束符合实际情况,隧道管两端的乳胶带可以起到防震作用;
(3)功能与构造紧密结合,利用离心机容易模拟长期沉降的优点,可以在几十小时内模拟几十年后的沉降,缩短了研究时间,并能很好地模拟实际隧道在土中的应力水平等参数;
(4)本试验各种设备可以手工制作,可以广泛投入到相关科研之中,同时试验方案具有较强扩展性,可以进一步应用到城市盾构隧道施工对临近既有建(构)筑物的变形影响研究中;
(5)利用本套模拟测试装置进行隧道施工环境土工效应的试验研究,可以促进相关专业学科的理论研究,同时可为隧道工程现场施工及运营提供良好的咨询与建议。
附图说明
附图1为本发明的模型箱内模拟测试装置示意图;
附图2为本发明的附图1A-A断面示意图;
附图3为本发明的离心机系统示意图;
附图4为本发明的测量实施示意图;
附图5为本发明的位移计支架示意图。
具体实施方式
结合附图,通过一个优选实施例对本发明作进一步的详细说明:如图1和图2所示,模型箱1 外形呈长方体,净尺寸为800mm×500mm×500mm(长×宽×高),由6个侧面拼接组成。前侧面为30mm厚的有机玻璃窗2,有机玻璃窗2便于试验准备过程中标注以及试验运行过程中摄像,其它侧面为30mm厚的硬质合金铝板。隧道开挖模拟装置5中间为一空心黄铜管12,外径为50mm,内径为46mm,壁厚为2mm,长度为480mm,外侧一周围有厚度为1mm的橡皮膜13,注满水后可形成一个4mm厚度的环状水腔14。隧道开挖模拟装置5侧面距离两端沿径向及端部套有定制的乳胶带10,轴向宽度为15mm,厚度为5mm。进水电磁阀8和出水电磁阀9均为通用型号,进水导管6和出水导管7外径均为5mm,壁厚均为0.5mm,由进水电磁阀8引出的进水导管6以及由出水电磁阀9引出的出水导管7连接上离心机的液体控制系统。
图3所示,土工离心机离心能力可达150g·t,最大离心加速度可达200g,有效旋转半径达3.0m,在本实施例中,离心加速度为100g。如图4和图5所示,位移计小支架3固定在模型箱1顶面,长度为800mm,宽度为120mm,其轴线位置60mm处开有5个外径为60mm的预留小孔,便于LVDT位移计11的固定,小孔23孔中心位置与模型箱1一侧28外缘距离为215mm,小孔23孔中心位置与小孔24孔中心位置距离为100mm,小孔24孔中心位置与小孔25孔中心位置距离为100mm,小孔25孔中心位置与小孔26孔中心位置距离为100mm,小孔26孔中心位置与小孔27孔中心位置距离为100mm,在本实施例中,该处位移计用于土体内部变形测量。位移计大支架4固定在模型箱1顶面,长度为800mm,宽度为180mm,其以轴线位置90mm处为对称位置,开有长度780mm,宽度80mm的长方形孔,便于LVDT位移计11的固定,在本实施例中,小孔29孔中心位置与模型箱1一侧34外缘距离为125mm,小孔29孔中心位置与小孔30孔中心位置距离为130mm,小孔30孔中心位置与小孔31孔中心位置距离为130mm,小孔31孔中心位置与小孔32孔中心位置距离为100mm,小孔32孔中心位置与小孔33孔中心位置距离为100mm,该处位移计用于土体表面变形测量。
Claims (6)
1.一种城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置,由模型箱(1)、有机玻璃窗(2)、位移计小支架(3)、位移计大支架(4)、隧道开挖装置(5)、进水导管(6)、出水导管(7)、进水电磁阀(8)、出水电磁阀(9)、乳胶带(10)以及LVDT位移计(11)组成,其特征在于:模型箱(1)为中部空心的长方体结构,其前侧面为有机玻璃窗(2),其顶面开口,便于放置位移计小支架(3)和位移计大支架(4);隧道开挖装置(5)放置于模型箱(1)中部位置,其中部为一空心黄铜管(12),外部围有一橡皮膜(13),空心黄铜管(12)和橡皮膜(13)之间注有液体水(14)。
2.根据权利要求1所述的城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置,其特征在于模型箱(1)放置于土工离心机中,离心主驱动轴(17)带动连接横轴(18)转动,同时带动模型箱(1)同速转动,直至达到预定离心加速度。
3.根据权利要求1所述的城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置,其特征在于位移计小支架(3)开有小孔(23、24、25、26、27);位移计大支架(4)开有小孔(29、30、31、32、33)。
4.根据权利要求1所述的城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置,其特征在于隧道开挖装置(5)侧面接近两端及端面处沿径向缠绕有乳胶带(10),其中一端连有进水导管(6),进水导管(16)与进水电磁阀(8)连接,另外一端连有出水导管(7),出水导管(7)与出水电磁阀(9)连接,由进水电磁阀(8)以及出水电磁阀(9)引出的导管分别连接土工离心机的液体控制系统。
5.根据权利要求1所述的城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置,其特征在于所述模型箱(1)的其余五个侧面均采用铝合金板。
6.根据权利要求1所述的城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置,其特征在于所述模型箱(1)内壁四周均涂抹硅油,且模型箱(1)内部填有试验用土。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105844126A CN102071943B (zh) | 2010-12-13 | 2010-12-13 | 城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105844126A CN102071943B (zh) | 2010-12-13 | 2010-12-13 | 城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102071943A CN102071943A (zh) | 2011-05-25 |
CN102071943B true CN102071943B (zh) | 2012-11-07 |
Family
ID=44030679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105844126A Expired - Fee Related CN102071943B (zh) | 2010-12-13 | 2010-12-13 | 城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102071943B (zh) |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103115788B (zh) * | 2012-11-20 | 2016-03-23 | 上海理工大学 | 既有隧道受双线地铁施工影响的室内模型试验装置 |
CN103105310A (zh) * | 2013-01-22 | 2013-05-15 | 北京工业大学 | 模拟地铁盾构隧道施工引发地层变形的试验装置及方法 |
CN103558044B (zh) * | 2013-11-05 | 2016-04-27 | 上海理工大学 | 盾构隧道注浆施工对邻近桩基影响的室内模型试验装置 |
CN103940672B (zh) * | 2014-02-23 | 2016-07-06 | 中国水利水电科学研究院 | 用于离心机试验平台的测试系统 |
CN104501771B (zh) * | 2014-12-08 | 2017-04-26 | 香港科技大学 | 用于土工离心机中模拟高速公路建造的装置及方法 |
CN104713987B (zh) * | 2015-01-25 | 2017-04-19 | 北京工业大学 | 一种模拟隧道开挖过程的模型试验装置 |
CN104655822B (zh) * | 2015-02-05 | 2016-08-24 | 长安大学 | 公路涵洞离心模型试验的一体式工况模拟装置及试验方法 |
CN104820086B (zh) * | 2015-04-30 | 2016-05-04 | 山东科技大学 | 一种岩层及地表沉陷模拟箱式试验装置 |
CN105021418B (zh) * | 2015-07-22 | 2017-12-08 | 河海大学 | 适用于土工离心模型试验的盾构开挖面模型及模拟方法 |
CN105135182B (zh) * | 2015-08-31 | 2017-03-08 | 中国工程物理研究院总体工程研究所 | 离心机模型箱位移传感器多方向可调安装支架 |
CN105203387B (zh) * | 2015-09-30 | 2018-08-14 | 华北理工大学 | 场地沉降及断层影响下的管土模型试验装置 |
CN105928486A (zh) * | 2016-05-02 | 2016-09-07 | 北京工业大学 | 一种测量隧道施工引起邻域雨污管线变形的试验装置与方法 |
CN106017407B (zh) * | 2016-05-03 | 2018-05-01 | 大连交通大学 | 一种结合表观和内部量测的地层位移量测装置及量测方法 |
CN106169267B (zh) * | 2016-08-30 | 2022-02-22 | 宋戈阳 | 离心场中隧道地层损失模拟系统 |
CN106931940B (zh) * | 2017-03-30 | 2019-03-05 | 上海理工大学 | 管涌对隧道的影响及灌浆治理研究的室内模拟试验装置 |
CN107036515B (zh) * | 2017-06-08 | 2023-03-28 | 浙江工业大学 | 模拟台阶法隧道施工引发地表变形的试验装置及试验方法 |
CN107024575B (zh) * | 2017-06-08 | 2023-03-28 | 浙江工业大学 | 模拟全断面隧道施工引发地表变形的试验装置及试验方法 |
CN107524446A (zh) * | 2017-07-31 | 2017-12-29 | 杭州市地下空间建设发展中心 | 模拟cd法隧道施工引起地表变形的实验装置及实验方法 |
CN107387098A (zh) * | 2017-08-04 | 2017-11-24 | 天津大学 | 一种模拟盾构隧道局部破坏事故的破坏引发装置 |
CN107884548B (zh) * | 2017-10-27 | 2023-12-15 | 西南石油大学 | 一种地下工程地质灾害教学演示装置以及方法 |
CN108166980B (zh) * | 2017-12-25 | 2019-04-26 | 北京交通大学 | 一种隧道地层损失模拟装置 |
CN109239312B (zh) * | 2018-10-24 | 2023-11-24 | 山东科技大学 | 一种用于模拟地下开采的实验方法 |
CN110130904B (zh) * | 2019-05-30 | 2024-01-19 | 国网河北省电力有限公司石家庄供电分公司 | 一种用于顶管掘进施工模拟试验的模拟顶管管节 |
CN110320346A (zh) * | 2019-07-24 | 2019-10-11 | 中国水利水电科学研究院 | 隧道挖掘离心模型试验方法 |
CN110487150A (zh) * | 2019-09-09 | 2019-11-22 | 泰宏建设发展有限公司 | 脚手架位移测量系统及测量方法 |
CN110821499A (zh) * | 2019-11-19 | 2020-02-21 | 西南交通大学 | 盾构隧道开挖诱发多层地层变形的测试装置及测试方法 |
CN112485125B (zh) * | 2020-11-23 | 2024-04-09 | 山东建筑大学 | 一种可控土体损失率的隧道模型试验装置及试验方法 |
CN114278309A (zh) * | 2021-12-06 | 2022-04-05 | 绍兴文理学院 | 一种隧道物理模型中隧洞位置调节定位装置 |
CN115132048B (zh) * | 2022-06-28 | 2023-11-28 | 中铁四院集团西南勘察设计有限公司 | 一种在已建隧道区域近接施工的模拟试验装置及试验方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101403306A (zh) * | 2008-11-10 | 2009-04-08 | 西南交通大学 | 一种土压平衡式盾构模拟试验系统 |
CN201297175Y (zh) * | 2008-11-11 | 2009-08-26 | 西南交通大学 | 一种土压平衡式盾构施工过程模拟试验装置 |
CN201352179Y (zh) * | 2008-12-15 | 2009-11-25 | 西南交通大学 | 一种盾构隧道结构模型综合试验装置 |
CN101793616A (zh) * | 2010-02-05 | 2010-08-04 | 上海盾构设计试验研究中心有限公司 | 盾构模拟试验台用可移动式液压加载装置 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4694820B2 (ja) * | 2004-11-15 | 2011-06-08 | 富士重工業株式会社 | バンク角推定装置 |
IL187933A (en) * | 2007-12-06 | 2010-12-30 | Michael Naumov | Method for determining linear acceleration and device for its implementation |
-
2010
- 2010-12-13 CN CN2010105844126A patent/CN102071943B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101403306A (zh) * | 2008-11-10 | 2009-04-08 | 西南交通大学 | 一种土压平衡式盾构模拟试验系统 |
CN201297175Y (zh) * | 2008-11-11 | 2009-08-26 | 西南交通大学 | 一种土压平衡式盾构施工过程模拟试验装置 |
CN201352179Y (zh) * | 2008-12-15 | 2009-11-25 | 西南交通大学 | 一种盾构隧道结构模型综合试验装置 |
CN101793616A (zh) * | 2010-02-05 | 2010-08-04 | 上海盾构设计试验研究中心有限公司 | 盾构模拟试验台用可移动式液压加载装置 |
Non-Patent Citations (4)
Title |
---|
JP特开2006-138800A 2006.06.01 |
张治国等.层状地基中隧道开挖对临近既有隧道的影响分析.《岩土工程学报》.2009,第31卷(第4期),第600-607页. * |
曹杰等.硬质土层中隧道结构动力离心模型试验.《岩土工程学报》.2010,第32卷(第7期),第1101-1108页. * |
黄茂松等.隧道地震响应简化分析与动力离心试验验证.《岩石力学与工程学报》.2010,第29卷(第2期),第271-279页. * |
Also Published As
Publication number | Publication date |
---|---|
CN102071943A (zh) | 2011-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102071943B (zh) | 城市盾构隧道施工诱发地表沉陷的离心试验模拟测试装置 | |
CN105040754B (zh) | 有限土体刚性挡墙土压力模型试验装置 | |
CN103996348B (zh) | 上下交叠隧道施工对运营隧道影响的室内模型试验装置 | |
CN103115788B (zh) | 既有隧道受双线地铁施工影响的室内模型试验装置 | |
CN103558044B (zh) | 盾构隧道注浆施工对邻近桩基影响的室内模型试验装置 | |
CN201843152U (zh) | 深基坑工程施工和监测模拟试验装置 | |
CN104713987B (zh) | 一种模拟隧道开挖过程的模型试验装置 | |
CN107202707B (zh) | 一种土-地下结构大型拟静力试验装置及方法 | |
CN101710019B (zh) | 离心场中隧道渗漏水模拟与测量系统 | |
CN104153404A (zh) | 桩复合地基结合碎石垫层基础的试验装置及试验方法 | |
CN106836317B (zh) | 一种考虑土塞效应的沉桩模型试验装置及其应用 | |
CN103117020A (zh) | 盾构隧道动态掘进诱发地层损失及地表沉陷试验装置 | |
CN104032776B (zh) | 离心场基坑开挖支护模拟设备 | |
CN102426396A (zh) | 一种模拟深部位移引发地层变形协调机制的试验装置 | |
CN108709977A (zh) | 一种地面堆载影响既有地铁隧道的室内模型试验装置及试验方法 | |
CN107894311A (zh) | 土石坝地震破坏的模型试验方法 | |
CN104914231A (zh) | 基坑群开挖顺序及支撑情况对地层影响的模型试验装置 | |
CN105527404A (zh) | 模拟盾构隧道纵断面内地层损失扩展的试验系统及方法 | |
CN110284530A (zh) | 结合基坑与隧道的多功能组合拼装模型试验箱装置及应用 | |
CN109030033A (zh) | 一种模拟双线地铁列车运营工况的试验装置 | |
CN104790441A (zh) | 一种可变参数超长桩有效桩长研究模拟试验箱 | |
CN208902713U (zh) | 地面堆载影响既有地铁隧道的室内模型试验装置 | |
CN109696541B (zh) | 模拟含空洞地层隧道开挖沉降的三维模型隧道试验装置 | |
CN108361042B (zh) | 一种模拟浅埋盾构隧道开挖面被动破坏的试验方法 | |
CN103088847B (zh) | 一种地基加固离心模型试验砂桩制作装置及制作方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121107 Termination date: 20151213 |
|
EXPY | Termination of patent right or utility model |