CN102066669A - Elastic construction foundation method - Google Patents

Elastic construction foundation method Download PDF

Info

Publication number
CN102066669A
CN102066669A CN2009801228366A CN200980122836A CN102066669A CN 102066669 A CN102066669 A CN 102066669A CN 2009801228366 A CN2009801228366 A CN 2009801228366A CN 200980122836 A CN200980122836 A CN 200980122836A CN 102066669 A CN102066669 A CN 102066669A
Authority
CN
China
Prior art keywords
bearing surface
engineering
cube
shock
wirerope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009801228366A
Other languages
Chinese (zh)
Inventor
扬尼斯·基萨纳基斯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN102066669A publication Critical patent/CN102066669A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/30Foundations made with permanent use of sheet pile bulkheads, walls of planks, or sheet piling boxes

Abstract

The structure bearing surface is artificially constructed, avoiding any foundation failures which, according to aftershock data, have already occurred resulting in cracks or even in complete rupture of joints. Anti-seismic insulation is then created by using cell cushions, whereas erosion to connecting mechanisms as well as to the primary shock-proof mechanism may be prevented by using insulators. The sand ensures stable working surface for the equal load distribution during the time required for the construction, as well as following the completion of the project. Moreover, at the time of the earthquake, the mechanical properties of the sand shall provide elasticity, enhancing the shock-proof properties of cushions, preventing at the same time the uneven load distribution on building frame. The connecting mechanisms, which are fixed on the main points of both sides of the entire project, shall provide the secure operation of shock-proof mechanism.

Description

The method that is used for the elasticity building lot
The earthquake protection method of building and other structure is mainly used in the ground stage but is not limited thereto.
Excavating and laying a small amount of base-material (footing mix) afterwards, making up the antidetonation bearing surface by following several forms, [" operation band (ran tie) " (falling) flaggy] or [layer of falling the beam slab] or cube and tie-beam flaggy with steel concrete.It can be the flaggy that maybe can divide separately, and thickness and intensity is according to Static Design and building size and form yet to be built, and determines according to soil property.
In the process of reinforcing structure, between bearing surface and structure yet to be built, linkage is set according to requirement of engineering, shown in figure S1, this linkage is by wirerope Shu Zucheng, and according to the regulation of Static Design it carried out technical finesse.The feature of the steel wire among Fig. 1 { cross section, size, the density of steel wire } can change.Make with suitable iron fork finish reinforce the iron member after, the wirerope bundle is easy on the level that is installed in or the vertical iron member of reinforcing.
After concreting and solidifying, should be provided with and have the ring or the rubber slider of cube shaped, shown in figure E1, the different and variation to some extent of its composition, size and hardness according to engineering.As shown in Figure 2.
Must filling on remaining half engineering face by reclaim, through honeycomb liner technical finesse, that the old vehicle tire is made, until ring or cubical whole height, as scheme shown in E2 and the E3, the effect that the raw material that promptly has no value for use after those of short duration before this uses is used again can be reached on the one hand, also structural elasticity can be strengthened on the other hand.As shown in Figure 3.
Use after the laying,, must fill sand grains, can use the building of conventional construction method or the work plane of other structure construction usually to form, as shown in Figure 4 at a described remaining half space or until ring or the final honeybee chamber filling part highly of cube.
In the reinforcing process of new building, use and the wirerope bundle is anchored at than identical method anchoring wirerope bundle in the low flaggy.
Below be brief description of drawings:
Fig. 1. show the structure of antidetonation isolation bearings face and base and building linkage.
Fig. 2. show the complete structure of the supporting surface that is used to be provided with slider, be etched, slider is set on bearing surface in order to prevent linkage and elementary vibration abatement.
Fig. 3. with cellular liner filling bearing surface.
Fig. 4. fill the honeybee chamber with the grains of sand, be suitable for the work plane of any building type with formation.
The linkage of figure S1. wirerope bundle.
The shape of figure E1. slider rubber cube or ring.
Figure E2. covers the shape of the recovery tire honeybee chamber liner of supporting isolation surface periphery at (below the crossbeam in engineering yet to be built) between the cylinder.
Figure E3. is used for the shape of the recovery tire honeybee chamber liner of filling bearing surface remaining space.
Use the Science Effice of the method
{ building between earthquake period, bear acutely rock change vibration into }.
{ therefore the resonance phenomenon can reduce }.
{ crack even the fracture of the junction that is mainly caused by concrete hardness can reduce to minimum }.
{ the ear-piercing noise that is mainly caused by vibration can weaken significantly }.
{ use old vehicle tyre to be conducive to structure and avoid ecological pollution }.
{ along with the increase of building height, the thickness of building frame should be lowered, and therefore its weight can reduce }.
{ artificial earth fill is better than existing soil certainly }.
This elastic foundation method will help a large amount of fabric structures.Separate house, 2 layers or 3 one storey buildings, even higher building all can benefit from it, in addition, the ancillary facility of school and school and little hotel unit also can be benefited certainly.
Finally, its range of application depends on the use of this method undoubtedly, along with the beneficial effect that brings thus, counteracting is depended on engineering and issuable financial burden.
Is 85m for one at area 2Susceptor surface on have 2 one storey buildings of ground and 9 support columns, should calculate the thickness of isolation bearings face and spacer assembly so that after excavating, can under situation about meeting the following conditions, implement this method:
1] the full-face tunneling bearing surface is to compute depth.
2] lay a small amount of base-material, can begin strengthening construction afterwards a flaggy { operation band (falling) template layer, its thickness and intensity obtain by Static Design }.Simultaneously, { position of 9} is provided with linkage, shown in figure S1, uses concrete to finish shockproof isolation surface afterwards in the support that will be set up.As shown in Figure 1.
3] shown in figure E1; slider be arranged at from isolation bearings towards outside on the outstanding linkage; protecting described linkage to exempt from erosion, and make this braced structures have unified shockproof properties, this is because the structure of slider structure is closely knit and hardness is even relatively.As shown in Figure 2.
4] on the side face of isolation bearings face, and from a slider to another slider ground (from a pillar to another pillar), to be arranged on the placement location of the pillar supporting crossbeam of structure yet to be built as the honeybee chamber liner of figure shown in the E2, these positions are starved of load and evenly distribute and reduce sedimentation (settlement).
On remaining bearing surface and as figure shown in the E2 between liner, will the honeybee chamber liner shown in figure E3 be arranged on the position that the free space (flaggy) of future architecture thing is located, its load should minimize, and vibration tolerance should increase.As shown in Figure 3.
Finish the bearing surface separation layer by slider and liner; With the gap of all honeybee chambers of grains of sand filling and the gap among the linkage slider, the steady operation face that begins with the construction of the 2 one storey building structures that are formed for comprising ground.Can be according to not implementing this job practices with the mode of isolation, fixedly connected in the same manner mechanism, it has been fixed to be used for the construction of isolation bearings face.As shown in Figure 4.

Claims (5)

1. after excavating and use the base-material mixing, based on required form and the size of building, adopt steel concrete that the antishock device bearing surface is constructed to following several form: " operation band " (fall backplane level) or the template of falling beam layer or { flaggy of making by cube and tie-beam }.
2. in reinforcing construction process, according to requirement of engineering, locating connector on the bearing surface of structure yet to be built, shown in figure S1, this linkage is by according to the mode of the Static Design wirerope Shu Zucheng through technical finesse, as shown in Figure 1.
3. after bearing surface formed, the rubber slider of annular or cube shaped was positioned at the position of wirerope bundle, shown in figure E1, and the different and variation to some extent of its size and hardness according to engineering, as shown in Figure 2.
4. on remaining half engineering face, must be fills up to ring or cubical whole height, as figure E2, E3 and shown in Figure 3 by the cellular liner that reclaims, make through the old tire of technical finesse.
5. after using described liner, on a described remaining half space of ring or the final height of cube, filling sand grains, to form the work plane of the architecture construction that can use conventional construction method, as shown in Figure 4.
CN2009801228366A 2008-06-27 2009-06-19 Elastic construction foundation method Pending CN102066669A (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
GR2008100430 2008-06-27
GR20080100430A GR1006394B (en) 2008-06-27 2008-06-27 Method for elastic foundation of constructions
PCT/GR2009/000042 WO2009156770A2 (en) 2008-06-27 2009-06-19 Elastic construction foundation method.

Publications (1)

Publication Number Publication Date
CN102066669A true CN102066669A (en) 2011-05-18

Family

ID=40792561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009801228366A Pending CN102066669A (en) 2008-06-27 2009-06-19 Elastic construction foundation method

Country Status (9)

Country Link
US (1) US20110061315A1 (en)
EP (1) EP2382358A2 (en)
KR (1) KR20110038050A (en)
CN (1) CN102066669A (en)
AU (1) AU2009263936A1 (en)
CA (1) CA2725553A1 (en)
GR (1) GR1006394B (en)
WO (1) WO2009156770A2 (en)
ZA (1) ZA201100315B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106460354A (en) * 2014-03-24 2017-02-22 马西莫·基亚皮妮 Composite foundations for seismic protection of building constructions

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8789317B2 (en) * 2012-01-17 2014-07-29 James L. CHEH Method for forming a double-curved structure and double-curved structure formed using the same
CN103469724B (en) * 2012-06-08 2016-01-06 辽宁省交通规划设计院 A kind of steel structure bridge of the foundational system with controlled sedimentation and construction method thereof
CN103015747B (en) * 2012-12-21 2014-10-22 昆山生态屋建筑技术有限公司 Full-assembled integral pouring composite house and construction method thereof
CN103088992B (en) * 2013-01-25 2015-04-29 中国建筑第八工程局有限公司 Floating floor slab of high-rise building large scale device and construction method

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5172528A (en) * 1991-10-15 1992-12-22 Clarke Paul H Building construction incorporating recycling tires
US6192649B1 (en) * 1995-05-12 2001-02-27 General Electric Company Elastomeric seismic isolation of structures and components
US6401420B1 (en) * 1997-11-24 2002-06-11 Darwin Aldis Salls Tire recycling/disposal system and tire recycling/disposal annulet cylinder or construction block
JPH11264262A (en) * 1998-03-16 1999-09-28 Tsutomu Mizuno Base isolation device for small-scale building
US20020100228A1 (en) * 2000-09-01 2002-08-01 Yoder Sheldon V. Dynamic flexible extruding building method and apparatus and construction material used therewith
ES2169683B1 (en) * 2000-09-22 2003-12-01 Innovacion Y Diseno Orovay S L MODULAR PROVISION OF PROTECTION ANTISEISMS APPLICABLE IN THE CONSTRUCTION OF BUILDINGS AND SIMILAR.
US20050257478A1 (en) * 2001-12-05 2005-11-24 Garry Callinan Foundation void former unit
US6862848B1 (en) * 2002-07-22 2005-03-08 Anna F Lang Method and apparatus for reducing earthquake damage in developing nations using recycled tires
JP4222812B2 (en) * 2002-11-05 2009-02-12 宏和 竹宮 Anti-vibration method
WO2004053247A1 (en) * 2002-12-09 2004-06-24 Sanders Design International, Inc. Siesmic sensitive mass motion power converter for protecting structures from earthquakes
NZ524611A (en) * 2003-03-07 2005-09-30 Robinson Seismic Ltd Bearing assembly with sliding member between upper and lower bearing seats with elastic self-centering sleeve around seats
US20050155297A1 (en) * 2004-01-20 2005-07-21 Eugenio Aburto Ponce Massive construction system using rock masonry
WO2005100712A2 (en) * 2004-04-13 2005-10-27 Shaw Reece F Article of manufacture for building structures made from precast concrete units and process for making structural system
US7234897B2 (en) * 2004-12-27 2007-06-26 Vincent Paul Conroy Area earthquake defense system
US20090056243A1 (en) * 2007-08-30 2009-03-05 Sneed Terryle L Method and apparatus for retrofitting existing escalator systems
WO2009042860A1 (en) * 2007-09-27 2009-04-02 Prs Mediterranean Ltd. Earthquake resistant earth retention system using geocells
US8627623B2 (en) * 2009-02-25 2014-01-14 Michael Leonard Modular foundation system and method
US8353134B2 (en) * 2009-04-07 2013-01-15 Tongji University Grouted tubular energy-dissipation unit
US8555587B2 (en) * 2010-05-11 2013-10-15 Mitek Holdings, Inc. Restoration anchoring system
CN102296859B (en) * 2010-06-22 2013-07-17 吴全忠 Seismic isolation building structure capable of instantaneously starting up seismic isolation mechanism

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106460354A (en) * 2014-03-24 2017-02-22 马西莫·基亚皮妮 Composite foundations for seismic protection of building constructions

Also Published As

Publication number Publication date
CA2725553A1 (en) 2009-12-30
ZA201100315B (en) 2011-10-26
WO2009156770A2 (en) 2009-12-30
GR1006394B (en) 2009-05-13
WO2009156770A9 (en) 2010-04-08
AU2009263936A1 (en) 2009-12-30
US20110061315A1 (en) 2011-03-17
KR20110038050A (en) 2011-04-13
EP2382358A2 (en) 2011-11-02

Similar Documents

Publication Publication Date Title
US3626702A (en) Floating foundation and process therefor
CN106522270A (en) Pile foundation and retaining wall anti-earthquake retaining structure comprising EPS buffer layers and construction method
CN112726692A (en) Multi-defense line vibration control method for ancient building
CN102066669A (en) Elastic construction foundation method
CN106164380A (en) Wind-driven generator fabricated base
JP6855665B2 (en) Pile foundation structure and how to reinforce existing piles
CN106917396B (en) A kind of taper foundation reinforcement method
CN110397091A (en) Ancient building shock insulation barrier
RU2344231C1 (en) Method of foundation bed construction by horizontal reinforcing with precast concrete components
KR101117354B1 (en) Lightweight material mounding structure and method for constructing the same
CN210797245U (en) Structure is backfilled to bridgehead abutment back of body
JPH03172412A (en) Forming method for under surface area and liquid state-generating apparatus
CN206346220U (en) A kind of pile foundation barricade antidetonation retaining structure of the cushion containing EPS
JP6803102B1 (en) Ground subsidence suppression structure of building exterior and its construction method
CN109667278A (en) Tower crane anti-cracking and seepage control construction method is set under underground garage isolated footing
CN214459743U (en) Bridge foundation reinforcing structure
JP3155456B2 (en) Pile structure to be joined to floor slab connected to foam resin material, and construction method of pile structure
CN215715449U (en) Offshore single-pile sludge in-situ curing structure
Jovanović et al. Excavation support system with piles—Case study
CN109403652B (en) Masonry hoop kiln reinforcing method based on cast-in-place reinforced concrete roof panel
CN109577381B (en) Seismic isolation method for underground structure and seismic isolated underground structure
CN108038272B (en) Method for weakening ground vibration caused by large-scale structure collapse
CN117587795A (en) Construction method of lining wall
CN111088801A (en) Supporting structure of underground structure supporting beam and construction method
Yong-chun et al. Deformation of metro station excavation and its influence on nearby pile foundations of bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110518