CN102064494A - Wire lifting device of electric power rush repair tower - Google Patents

Wire lifting device of electric power rush repair tower Download PDF

Info

Publication number
CN102064494A
CN102064494A CN2010105515877A CN201010551587A CN102064494A CN 102064494 A CN102064494 A CN 102064494A CN 2010105515877 A CN2010105515877 A CN 2010105515877A CN 201010551587 A CN201010551587 A CN 201010551587A CN 102064494 A CN102064494 A CN 102064494A
Authority
CN
China
Prior art keywords
electric power
connection block
lifting device
right sides
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105515877A
Other languages
Chinese (zh)
Other versions
CN102064494B (en
Inventor
李福员
周建强
吕卫国
温珍瑚
孙飞
赵伟
唐再君
童祖冬
潘希望
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power Research Institute Co Ltd
Ningbo Tianhong Power Appliance Co Ltd
Original Assignee
Ningbo Tianhong Power Appliance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Tianhong Power Appliance Co Ltd filed Critical Ningbo Tianhong Power Appliance Co Ltd
Priority to CN 201010551587 priority Critical patent/CN102064494B/en
Publication of CN102064494A publication Critical patent/CN102064494A/en
Application granted granted Critical
Publication of CN102064494B publication Critical patent/CN102064494B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention discloses a wire lifting device of an electric power rush repair tower, comprising a left connecting base (1), a right connecting base (1), an adjusting device (3) and two connecting devices (2), wherein the left connecting base (1) is connected with a left cross arm; the right connecting base (1) is connected with a right cross arm; the adjusting device(3) is arranged between the left and the right connecting bases (1) and used for adjusting a distance between the left and the right connecting bases; the two connecting devices (2) are arranged up and down; the adjusting device (3) is detachably connected with the left and the right connecting bases(1); and the connecting devices are detachably connected with the left and the right connecting bases(1). In the invention, a wire still can effectively thread the cross arms under the situation of removing a supporting bar; the use is more convenient; and the supporting bar is not needed in a practical operation, therefore the production cost is also reduced.

Description

Electric power first-aid tower lead lifting device
Technical field
The invention discloses a kind of electric power first-aid tower lead lifting device.
Background technology
After the iron tower that is used to transmit electricity collapsed, lead was also not disconnected sometimes, and lead may just differ, and after emergent repairing tower was set up, some lead was above cross-arm on the emergent repairing tower, and some lead is below the following cross-arm of emergent repairing tower.As shown in Figure 1, be existing emergent repairing tower, and in the real work, lead is that frame is between last cross-arm 03 and following cross-arm 04.Therefore just lead need be passed cross-arm 03 or pass down cross-arm 04, make lead get back to up and down between cross-arm.Two vertical king-posts 01 about emergent repairing tower comprises are provided with cross-arm 03 and following cross-arm 04 between the left and right sides king-post 01, cross-arm includes left and right sides cross-arm up and down, are convenient to the device that lead passes cross-arm by one between the cross-arm of the left and right sides and are connecting.
Existing electric power first-aid tower lead lifting device just a kind ofly is convenient to the device that lead passes cross-arm.It is connecting left and right sides cross-arm by bolt between the cross-arm of the left and right sides.Electric power first-aid tower lead lifting device below is provided with a support bar 02, and these support bar 02 two ends are connecting left and right sides king-post 01.During the threading operation, below lead was descending cross-arm 04, existing electric power first-aid tower lead lifting device was to realize that in the following manner lead passes cross-arm:
The first step is unclamped support bar and being connected of a king-post wherein, and lead is mentioned down between cross-arm and the support bar; Second step made support bar be connected once more with left and right sides king-post, then with electric power first-aid tower lead lifting device with about wherein cross-arm in time cross-arm separate, be convenient to lead pass cross-arm enter into about between the cross-arm.
When lead is on last cross-arm, support bar moves to up and down between the cross-arm, the pull bar at emergent repairing tower top is taken off, with electric power first-aid tower lead lifting device with about wherein cross-arm of going up in the cross-arm separate, be convenient to lead pass cross-arm enter into about between the cross-arm.
This electric power first-aid tower lead lifting device is when guaranteeing that lead passes cross-arm, because the emergent repairing tower king-post is very heavy, if there is not support bar, will produce bigger pulling force or pressure between electric power first-aid tower lead lifting device and the left and right sides cross-arm, make external force can't turn bolt, eliminate cross force between electric power first-aid tower lead lifting device and the left and right sides cross-arm, make things convenient for bolt to back-out by a support bar is installed, therefore need a support bar to assist, be convenient to lead and pass cross-arm.The electric power first-aid tower lead lifting device of said structure has the following disadvantages:
1, also needs auxiliary support bar, the production cost height in the emergent repairing tower threading process of this electric power first-aid tower lead lifting device.
2, support bar is not to be fixed on everywhere between the king-post of the left and right sides, is to fix according to the fixing point on the king-post.Therefore, to pass through cross-arm by electric power first-aid tower lead lifting device also cumbersome comparatively speaking for lead.
Summary of the invention
Technical problem to be solved by this invention is: provide a kind of support bar that need not to make things convenient for lead to pass the electric power first-aid tower lead lifting device of cross-arm again.
The technical solution used in the present invention is: a kind of electric power first-aid tower lead lifting device, it comprise the left Connection Block that is connected with left horizontal stretcher, the right Connection Block that is connected with right horizontal stretcher, about be used to regulate two jockeys of the adjusting device and the upper and lower settings of left and right sides Connection Block distance between two Connection Blocks, adjusting device with about two Connection Blocks removably connect, jockey with about two Connection Blocks removably connect.
Adjusting device with about two Connection Blocks removably connect and be meant that the adjusting device two ends respectively are provided with an installing hole, left and right sides Connection Block medial surface is equipped with corresponding with position of mounting hole and has first connecting plate of bolt hole, be installed with bolt in the bolt hole on the installing hole and first connecting plate, the bolt other end is combined with nut.
Described first connecting plate is made up of two parallel-plates, is equipped with bolt hole on two parallel-plates, two bolt hole coaxial lines.
Described adjusting device comprises the double end adjusting nut that the opposite adjusting screw(rod) of two external screw threads, two internal thread are opposite and the contiguous block of two one end band installing holes; Two contiguous blocks are away from installing the end that nose end is connecting two adjusting screw(rod)s one to one, and the other end of two adjusting screw(rod)s screws one to one with the two ends of regulating the double end nut.
Described adjusting device is four, be up and down alignment, about alignment be provided with.
Described jockey with about two Connection Blocks removably connect and be meant that the jockey two ends respectively are provided with connecting hole, left and right sides Connection Block medial surface is equipped with corresponding with the connecting hole position and has second connecting plate of screw hole, be installed with screw rod in the screw hole on the connecting hole and second connecting plate, the two ends of screw rod are combined with nut.
The jockey of described two upper and lower settings is meant the link of two upper and lower settings.
Described link comprises two horizontal parallel-plate and two parallel longitudinal plates, and described two parallel longitudinal plates link to each other between two horizontal parallel-plates and with two horizontal parallel-plates.
Be equipped with a connecting hole on four angles of the horizontal parallel-plate of each of described link.
About described link is connected by screw rod and nut on two Connection Blocks.
The invention has the beneficial effects as follows: electric power first-aid tower lead lifting device of the present invention, under the situation of removing support bar, still can effectively lead be passed cross-arm, the present invention uses convenient, need not support bar in the practical operation, has also reduced production cost.
Adjusting device with about two Connection Blocks removably connect and be meant that the adjusting device two ends respectively are provided with an installing hole, left and right sides Connection Block medial surface is equipped with corresponding with position of mounting hole and has first connecting plate of bolt hole, be installed with bolt in the bolt hole on the installing hole and first connecting plate, the bolt other end is combined with nut.This structure is used more convenient.
Described first connecting plate is made up of two parallel-plates, is equipped with bolt hole on two parallel-plates, two bolt hole coaxial lines.Be convenient to manufacture.
Described adjusting device comprises the double end adjusting nut that the opposite adjusting screw(rod) of two external screw threads, two internal thread are opposite and the contiguous block of two one end band installing holes; Two contiguous blocks are away from installing the end that nose end is connecting two adjusting screw(rod)s one to one, and the other end of two adjusting screw(rod)s screws one to one with the two ends of regulating the double end nut.A kind of preferred, can regulate the distance between the Connection Block of the left and right sides.
Described adjusting device is four, be up and down alignment, about alignment be provided with.Make that device is more firm really.
Described jockey with about two Connection Blocks removably connect and be meant that the jockey two ends respectively are provided with connecting hole, left and right sides Connection Block medial surface is equipped with corresponding with the connecting hole position and has second connecting plate of screw hole, be installed with screw rod in the screw hole on the connecting hole and second connecting plate, the two ends of screw rod are combined with nut.Product is simple, but practicality is still powerful.
The jockey of described two upper and lower settings is meant the link of two upper and lower settings.Described link comprises two horizontal parallel-plate and two parallel longitudinal plates, and described two parallel longitudinal plates link to each other between two horizontal parallel-plates and with two horizontal parallel-plates.Be equipped with a connecting hole on four angles of the horizontal parallel-plate of each of described link.Be convenient to manufacture.
About being connected by screw rod and nut, described link on two Connection Blocks, is convenient to install.
Description of drawings
Fig. 1 is existing emergent repairing tower schematic diagram.
Fig. 2 is for being equipped with emergent repairing tower schematic diagram of the present invention.
Fig. 3 is a front view of the present invention.
Fig. 4 is a vertical view of the present invention.
Fig. 5 is an adjusting device schematic diagram of the present invention.
Fig. 6 is a link vertical view of the present invention.
Fig. 7 is first embodiment of the invention figure.
Fig. 8 is second embodiment of the invention figure.
Fig. 9 is third embodiment of the invention figure.
Figure 10 is fourth embodiment of the invention figure.
Figure 11 is fifth embodiment of the invention figure.
Among the figure, 01. king-post, 02. support bar, cross-arm on 03., 04. following cross-arm, 1. Connection Block, 11. first connecting plates, 12. second connecting plate, 2. link, 21. horizontal parallel-plates, 22. the parallel longitudinal plate, 3. adjusting device, 31. adjusting nuts, 32. adjusting screw(rod), 33. contiguous blocks, 331. installing holes, 4. screw rod, 41. nuts, 5. lead.
Embodiment
Below be preferred embodiment of the present invention, but therefore do not limit protection scope of the present invention.
Fig. 2 is for being equipped with emergent repairing tower of the present invention, and last cross-arm 03 is equipped with one, and following cross-arm 04 also is equipped with one, and the present invention is installed between the cross-arm of the left and right sides.With reference to Fig. 3~Fig. 6, a kind of electric power first-aid tower lead lifting device, it comprise the left Connection Block 1 that is connected with left horizontal stretcher, the right Connection Block 1 that is connected with right horizontal stretcher, about be used to regulate two jockeys 2 of the adjusting device 3 and the upper and lower settings of left and right sides Connection Block distance between two Connection Blocks 1, adjusting device 3 with about two Connection Blocks 1 removably connect, jockey 2 with about two Connection Blocks 1 removably connect.Right Connection Block 1 top is provided with two hanging holes that are used to make things convenient for the connection of emergent repairing tower drag-line.
Adjusting device 3 with about two Connection Blocks 1 removably connect and be meant that adjusting device 3 two ends respectively are provided with an installing hole 331, Connection Block 1 medial surface in the left and right sides is equipped with corresponding with installing hole 331 positions and has first connecting plate 11 of bolt hole, be installed with bolt in the bolt hole on the installing hole 331 and first connecting plate 11, the bolt other end is combined with nut.Just adjusting device 3 and left and right sides Connection Block 1 are coupled together with bolt and nut.Described first connecting plate 11 is made up of two parallel-plates, is equipped with bolt hole on two parallel-plates, two bolt hole coaxial lines.Adjusting device 3 two ends between two parallel-plates, installing hole 331 and two bolt hole three coaxial lines.Can significantly find out in conjunction with Fig. 3, Fig. 4.
Described adjusting device 3 comprises the contiguous block 33 of the opposite adjusting screw(rod) of two external screw threads 32, a double end adjusting nut 31 that two internal thread is opposite and two one end band installing holes 331; Two contiguous blocks 33 are connecting an end of two adjusting screw(rod)s 32 one to one away from installing hole 331 ends, and the other end of two adjusting screw(rod)s 32 screws one to one with the two ends of regulating double end nut 31.As shown in Figure 5.
Described adjusting device 3 is four, be up and down alignment, about alignment, be the square setting, the both sides of two jockeys (link 2) respectively are provided with an adjusting device 3.Adjusting device 3 mainly is the distance of in use regulating between two Connection Blocks 1, just the cross force (pulling force or pressure) in order to regulate two king-posts 02.With reference to Fig. 3, Fig. 4
Described jockey 3 with about two Connection Blocks 1 removably connect and be meant that jockey 3 two ends respectively are provided with connecting hole, Connection Block 1 medial surface in the left and right sides is equipped with corresponding with the connecting hole position and has second connecting plate 12 of screw hole, be installed with screw rod 4 in the screw hole on the connecting hole and second connecting plate 12, the two ends of screw rod 4 are combined with nut 41.The jockey of described two upper and lower settings is meant the link 2 of two upper and lower settings.Just link 2 and left and right sides Connection Block 1 are coupled together, with reference to Fig. 3, Fig. 4 with screw rod 4 and nut 41.
Described link 2 comprises two horizontal parallel-plate 21 and two parallel longitudinal plates 22, and described two parallel longitudinal plates 22 link to each other between two horizontal parallel-plates 21 and with two horizontal parallel-plates 21.With reference to shown in Figure 6,
Be equipped with a connecting hole on four angles of the horizontal parallel-plate 21 of each of described link 2, can draw in conjunction with Fig. 3, Fig. 4, Fig. 5, each link 2 is provided with 8 connecting holes, also is provided with on the left and right sides Connection Block 1 and the identical fixed head of the link corresponding number in 2 connecting hole positions.Being convenient to screw rod 4 is connected link 2 with nut 41 with left and right sides Connection Block 1.
Below in conjunction with each figure of the present invention, use flow process of the present invention is further explained following steps:
The first step is first embodiment of the invention figure with reference to Fig. 7, for lead 5 below electric power first-aid tower lead lifting device of the present invention.
Second step, with reference to Fig. 8 is second embodiment of the invention figure, adjust two adjusting devices 3 in below of the present invention, relatively more loose between link 2 below making and the Connection Block 1, thereby remove nut 41 and screw rod 4 between below link 2 and the Connection Block 1, make link 2 to swing as shown in Figure 8, lead 5 enters up and down between the link 2.
The 3rd step was third embodiment of the invention figure with reference to Fig. 9, and the link 2 of below and adjusting device 3 reconnect back original state with Connection Block 1.
The 4th step, with reference to Figure 10 is fourth embodiment of the invention figure, adjust two adjusting devices 3 in top of the present invention, relatively more loose between link 2 above making and the Connection Block 1, thereby remove nut 41 and screw rod 4 between top link 2 and the Connection Block 1, make link 2 to swing as shown in figure 10 lead 5 is passed cross-arm.
The 5th step was fifth embodiment of the invention figure with reference to Figure 11, and the link 2 of top and adjusting device 3 reconnect back original state with Connection Block 1.The present invention passes cross-arm with lead very easily.
Certainly, when lead is above last cross-arm 03, remove earlier the pull bar on the emergent repairing tower, then with lead through up and down between the cross-arm.Lead 5 mode of passing through when the mode of passing through on the last cross-arm 03 and lead 5 are below cross-arm 04 down is similarly, repeats no more here.

Claims (10)

1. electric power first-aid tower lead lifting device, it is characterized in that: it comprises the left Connection Block (1) that is connected with left horizontal stretcher, the right Connection Block (1) that is connected with right horizontal stretcher, be positioned at two jockeys (2) of the adjusting device (3) and the upper and lower settings that are used to regulate left and right sides Connection Block (1) distance between the left and right sides Connection Block (1), adjusting device (3) removably connects with left and right sides Connection Block (1), and jockey (2) removably connects with left and right sides Connection Block (1).
2. electric power first-aid tower lead lifting device according to claim 1, it is characterized in that: adjusting device (3) removably connects with left and right sides Connection Block (1) and is meant that adjusting device (3) two ends respectively are provided with an installing hole (331), left and right sides Connection Block (1) medial surface is equipped with corresponding with installing hole (331) position and has first connecting plate (11) of bolt hole, be installed with bolt in the bolt hole on installing hole (331) and first connecting plate (11), the bolt other end is combined with nut.
3. electric power first-aid tower lead lifting device according to claim 2, it is characterized in that: described first connecting plate (11) is made up of two parallel-plates, is equipped with bolt hole on two parallel-plates, two bolt hole coaxial lines.
4. electric power first-aid tower lead lifting device according to claim 2 is characterized in that: described adjusting device (3) comprises the double end adjusting nut (31) that the opposite adjusting screw(rod) (32) of two external screw threads, two internal thread are opposite and the contiguous block (33) of two one end band installing holes (331); Two contiguous blocks (33) are held an end that is connecting two adjusting screw(rod)s (32) one to one away from installing hole (331), and the other end of two adjusting screw(rod)s (32) screws one to one with the two ends of regulating double end nut (31).
5. according to claim 1 or 2 or 4 described electric power first-aid tower lead lifting devices, it is characterized in that: described adjusting device (3) is four, be up and down alignment, about alignment be provided with.
6. electric power first-aid tower lead lifting device according to claim 1, it is characterized in that: described jockey (3) removably connects with left and right sides Connection Block (1) and is meant that the jockey two ends respectively are provided with connecting hole, left and right sides Connection Block (1) medial surface is equipped with corresponding with the connecting hole position and has second connecting plate (12) of screw hole, be installed with screw rod (4) in the screw hole on connecting hole and second connecting plate (12), the two ends of screw rod (4) are combined with nut (41).
7. electric power first-aid tower lead lifting device according to claim 1 is characterized in that: the jockey of described two upper and lower settings is meant the link (2) of two upper and lower settings.
8. electric power first-aid tower lead lifting device according to claim 7, it is characterized in that: described link (2) comprises two horizontal parallel-plates (21) and two parallel longitudinal plates (22), and described two parallel longitudinal plates (22) are positioned between the two horizontal parallel-plates (21) and with two horizontal parallel-plates (21) and link to each other.
9. electric power first-aid tower lead lifting device according to claim 8 is characterized in that: be equipped with a connecting hole on four angles of each horizontal parallel-plate (21) of described link (2).
10. electric power first-aid tower lead lifting device according to claim 9 is characterized in that: described link (21) is connected on the left and right sides Connection Block (1) by screw rod (4) and nut (41).
CN 201010551587 2010-11-12 2010-11-12 Wire lifting device of electric power rush repair tower Expired - Fee Related CN102064494B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010551587 CN102064494B (en) 2010-11-12 2010-11-12 Wire lifting device of electric power rush repair tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010551587 CN102064494B (en) 2010-11-12 2010-11-12 Wire lifting device of electric power rush repair tower

Publications (2)

Publication Number Publication Date
CN102064494A true CN102064494A (en) 2011-05-18
CN102064494B CN102064494B (en) 2013-01-16

Family

ID=43999663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010551587 Expired - Fee Related CN102064494B (en) 2010-11-12 2010-11-12 Wire lifting device of electric power rush repair tower

Country Status (1)

Country Link
CN (1) CN102064494B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786134A (en) * 2016-11-30 2017-05-31 国网上海市电力公司 Electrodynamic type jacking does not have a power failure the construction method of resistance to opening and closing and cross-arm equipment
CN107511414A (en) * 2017-08-29 2017-12-26 张家港凯航通力船用设备有限公司 A kind of square steel bending press
CN110374818A (en) * 2019-08-16 2019-10-25 太原重工股份有限公司 Wind power generating set
CN112713549A (en) * 2020-06-15 2021-04-27 符建波 Auxiliary device for delivering and erecting wire guide rod
CN112713548A (en) * 2020-06-15 2021-04-27 符建波 Lead rod loading device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4466506A (en) * 1982-01-15 1984-08-21 Dolenti Alfred N Wire lift device for high tension electric line
US5242137A (en) * 1991-12-17 1993-09-07 Yang Chin Hui Overhead conductor carrier
CN101013802A (en) * 2007-01-05 2007-08-08 宁波天弘电力器具有限公司 Lead elevating mechanism for gate emergent repairing tower
US20070252122A1 (en) * 2001-06-11 2007-11-01 Daewon Electric Co. Ltd. Electric wire changing device for wire replacing works on electric poles and power distributing method without cutting off power supply
CN201966534U (en) * 2010-11-12 2011-09-07 宁波天弘电力器具有限公司 Elevator for lead of power overhauling tower

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4466506A (en) * 1982-01-15 1984-08-21 Dolenti Alfred N Wire lift device for high tension electric line
US5242137A (en) * 1991-12-17 1993-09-07 Yang Chin Hui Overhead conductor carrier
US20070252122A1 (en) * 2001-06-11 2007-11-01 Daewon Electric Co. Ltd. Electric wire changing device for wire replacing works on electric poles and power distributing method without cutting off power supply
CN101013802A (en) * 2007-01-05 2007-08-08 宁波天弘电力器具有限公司 Lead elevating mechanism for gate emergent repairing tower
CN201966534U (en) * 2010-11-12 2011-09-07 宁波天弘电力器具有限公司 Elevator for lead of power overhauling tower

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786134A (en) * 2016-11-30 2017-05-31 国网上海市电力公司 Electrodynamic type jacking does not have a power failure the construction method of resistance to opening and closing and cross-arm equipment
CN106786134B (en) * 2016-11-30 2018-03-20 国网上海市电力公司 Electrodynamic type jacks the construction method of do not have a power failure resistance to opening and closing and cross-arm equipment
CN107511414A (en) * 2017-08-29 2017-12-26 张家港凯航通力船用设备有限公司 A kind of square steel bending press
CN110374818A (en) * 2019-08-16 2019-10-25 太原重工股份有限公司 Wind power generating set
CN112713549A (en) * 2020-06-15 2021-04-27 符建波 Auxiliary device for delivering and erecting wire guide rod
CN112713548A (en) * 2020-06-15 2021-04-27 符建波 Lead rod loading device
CN112713549B (en) * 2020-06-15 2022-04-08 符建波 Auxiliary device for delivering and erecting wire guide rod
CN112713548B (en) * 2020-06-15 2022-07-19 符建波 Lead rod loading device

Also Published As

Publication number Publication date
CN102064494B (en) 2013-01-16

Similar Documents

Publication Publication Date Title
CN102064494B (en) Wire lifting device of electric power rush repair tower
CN202121254U (en) Cross arm lateral side clamp of double-fission double-suspension insulator string for erecting tower
CN201708474U (en) Lead clamp splitpin installer
CN204927981U (en) Whole string of insulator of change strain insulator is with pull rod device of adjustable length
CN201966534U (en) Elevator for lead of power overhauling tower
CN203380094U (en) Screen device for vibratory screening
CN204947466U (en) Portable live line working line lifter
CN203568503U (en) Stacker crane brick clamping device
CN203398707U (en) Wire-bracing clamp
CN202150660U (en) Novel clamping apparatus for replacing hydraulic tension-proof wire clip single-string porcelain bottles
CN201629516U (en) Three-connected extension-resisting clamp for extra HVDC transmission line
CN204946645U (en) A kind of two-stub transformer stand
CN205061378U (en) A device for hoisting cable end of a thread
CN204668828U (en) Change two bracing wire aid
CN202662836U (en) Easily-mounted wiring terminal for electric energy meter
CN202940543U (en) High-voltage cable fixing device
CN201674161U (en) SZ type double-return tangent tower electrified replacement suspension insulator suspension wire clamp assembly
CN206753108U (en) A kind of main couple supporting apparatus of sheet truss combining structure
CN206352013U (en) A kind of tower crane attachment structure of construction
CN204942985U (en) Video monitoring camera mounting support
CN111102439A (en) Supporting device for camera based on security network system
CN202274262U (en) Display splicing frame
CN204886086U (en) Many drainages of formula strain clamp is inserted to awl
CN202240414U (en) Auxiliary disassembling device for hydraulic manifold blocks
CN204391603U (en) Charged insulating ceiling plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NORTH CHINA POWER SCIENCE RESEARCH INST., CO., LTD

Effective date: 20131217

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 315722 NINGBO, ZHEJIANG PROVINCE TO: 315700 NINGBO, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20131217

Address after: The Western Zhou Dynasty in Xiangshan County in Zhejiang province 315700 Ningbo City Electrical Industrial Park

Patentee after: Ningbo Tianhong Power Appliance Co., Ltd.

Patentee after: North China Electrical Power Research Institute LLC

Address before: 315722, Zhejiang, Ningbo province Xiangshan County West Industrial Park, Ningbo Celestica Electric Appliance Co., Ltd.

Patentee before: Ningbo Tianhong Power Appliance Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130116

Termination date: 20141112

EXPY Termination of patent right or utility model