CN102045729A - Network flexible replacing method and device based on flux control - Google Patents

Network flexible replacing method and device based on flux control Download PDF

Info

Publication number
CN102045729A
CN102045729A CN2009101802456A CN200910180245A CN102045729A CN 102045729 A CN102045729 A CN 102045729A CN 2009101802456 A CN2009101802456 A CN 2009101802456A CN 200910180245 A CN200910180245 A CN 200910180245A CN 102045729 A CN102045729 A CN 102045729A
Authority
CN
China
Prior art keywords
migration
network
flow
phase
plan table
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009101802456A
Other languages
Chinese (zh)
Other versions
CN102045729B (en
Inventor
刘芙蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Open Invention Network LLC
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN200910180245.6A priority Critical patent/CN102045729B/en
Publication of CN102045729A publication Critical patent/CN102045729A/en
Application granted granted Critical
Publication of CN102045729B publication Critical patent/CN102045729B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a network flexible replacing method and device based on flux control. The method comprises the following steps of: after a new network is established, selecting one or more migration regions from an original network according to a preset selection principle and establishing a flux migration schedule according to the total flux of the original network; lowering the quality offset parameter values of cells inside the migration regions when carrying out the flux migration at the current migration stage according to the flux migration schedule; monitoring the newly increased volume of business in the new network in real time and restoring the quality offset parameter values of cells inside the migration regions to the original value when the volume of business meets the limit requirement on the flux migration schedule for the current migration stage. With the method provided by the invention, the problem that service can not be provided for users within short time during network replacement is solved, and the problems of unable control on user volume, large impact on equipment, poor user experience, seriously lowered network performance, difficult retroversion, high rise and the like in the traditional forced replacing process are also avoided.

Description

The soft replacement method and apparatus of a kind of network based on flow control
Technical field
The present invention relates to the mobile communication technology field, relate in particular to the soft replacement method and apparatus of a kind of network based on flow control.
Background technology
The present normally used wireless network of industry (refering in particular to WCDMA (Wideband Code DivisionMultiple Access, Wideband Code Division Multiple Access (WCDMA)) network) replacement method is that replace firmly single adjacent area.Concrete grammar is: whole network is divided into several panel region, removes the old network equipment piecewise, new network device is installed, and then provide service to wireless network user.Yet this replacement method has following shortcoming:
(1) removing the old network equipment, install new network device during this period of time in, provide service without any network to the user, promptly the mobile device (mobile phone or data card etc.) held of user can't carry out business such as voice call or data download without any signal;
(2) to operate piecewise whole network's coverage area, owing to be the burst cutover, can exist mass data to make and renewal, especially neighboring BS relationship need upgrade in time according to network replacement situation, increased the workload in each cutover stage, labor intensive and time;
(3) in the zone that each network is replaced, all users will be moved to new network at short notice simultaneously, and are very big to the New-deployed Network impact, thereby increase risk;
(4) there be same frequency or the alien frequencies interoperability between a large amount of devices from different manufacturers in employing burst cutover meeting, and very difficult assurance of the KPI of network (Key Performance Indicators, Key Performance Indicator) and user experience very poor like this, and operator faces a large amount of complaints;
(5) generally want seeking time short because network is replaced, every phase data making amount is big and operating procedure is many, be easy to make mistakes, and after makeing mistakes, the network rollback is difficult to.Because need to remove firm mounted new equipment in the back off procedure of several hrs, peace is changeed used equipment again, and imports original data;
(6) be difficult to make flexible adjustment according to the customer volume and the user behavior of migration.
So existing network replacement method has brought very big risk for operator and equipment commercial city.
Summary of the invention
In order to address the above problem, the invention provides the soft replacement method and apparatus of a kind of network based on flow control.
Concrete, the soft replacement method of the network based on flow control provided by the invention comprises:
After step 1, new network are set up, according to default selection principle, in old network, choose one or more migrations zone, and formulate flow migration plan table according to the total flow of described old network;
Step 2, in flow when migration of implementing current migration phase according to described flow migration plan table, reduces the quality offset parameter value of interior sub-district, described migration zone;
Step 3, monitor in the described new network newly-increased traffic carrying capacity in real time, when in described traffic carrying capacity satisfies described flow migration plan table, the qualification of current migration phase being required, the quality offset parameter value of sub-district in the described migration zone is revised back initial value.
Further, also comprise after the described step 3:
Judge in the described flow migration plan table whether have unenforced migration phase, if exist, choosing a migration phase as current migration phase from unenforced migration phase through behind the Preset Time, return step 2, if do not exist, flow process finishes.
Comprise following qualification parameter in the above-mentioned flow migration plan table: circuit domain telephone traffic and PS numeric field data flow.
Further, also comprise following qualification parameter in the described flow migration plan table: number of users, business proportion and total business and signaling traffic.
Concrete, comprising N migration phase in the above-mentioned flow migration plan table, described N is a positive integer.
Also comprise in the described step 1: in described migration zone, configuration is identical with the affiliated base station of old network cell, new network cell that the geographical position is identical is the alien frequencies adjacent area of described old network cell.
Above-mentioned new network and the same public land mobile network of old network home; The different Visited Location Registor of employing of above-mentioned new network and old network.
The present invention also provides a kind of network based on flow control soft alternative, comprising:
Network is replaced the unit is set, and is used for after new network is set up, and according to default selection principle, chooses one or more migrations zone in old network, and formulates flow migration plan table according to the total flow of described old network;
The parameter adjustment unit is used for reducing the quality offset parameter value of sub-district in the described migration zone when the flow migration of implementing current migration phase according to described flow migration plan table;
Network is replaced performance element, be used for monitoring in real time the newly-increased traffic carrying capacity of described new network, when in described traffic carrying capacity satisfies described flow migration plan table, the qualification of current migration phase being required, the quality offset parameter value of sub-district in the described migration zone is revised back initial value.
Further, device provided by the invention also comprises:
The migration judging unit, be used for judging whether described flow migration plan table exists unenforced migration phase, if exist, from unenforced migration phase, choosing a migration phase as current migration phase through behind the Preset Time, carry out described parameter adjustment unit, if do not exist, flow process finishes.
Further, comprise N migration phase in the above-mentioned flow migration plan table, described N is a positive integer.
Compared with prior art, the present invention has the following advantages:
Method provided by the invention, the problem of service can not be provided for the user in having solved when new and old network is replaced in short-term, further, this method can also produce impact thereby avoided all users to move to new network at short notice simultaneously to new network by the service traffics of control migration; And method provided by the invention makes operator have a PLMN to get final product, and does not need to provide other PLMN again; Operator does not need the website to the whole network to carry out matched adjacent zone or changes the operation of parameter, only needs several migration zones of control to get final product, and has reduced workload like this, saved manpower, strengthened network performance, reduced the risk that exists in replacing, and then improved user experience.
Description of drawings
In order to be illustrated more clearly in the embodiment of the invention or technical scheme of the prior art, to introduce simply the accompanying drawing of required use in embodiment or the description of the Prior Art below, apparently, accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the flow chart of the soft replacement method of a kind of network based on flow control provided by the invention;
Fig. 2 is moved to the interior migration schematic diagram of new network B for old network A sub-district in the migration zone in the embodiment of the invention.
Fig. 3 is the structure chart of a kind of soft alternative of network based on flow control provided by the invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that is obtained under the creative work prerequisite.
In order to solve problems of the prior art, the invention provides the soft replacement method and apparatus of a kind of network based on flow control, can avoid uncontrollable customer volume in the hard replacement process of tradition by using this method, equipment impacts big, poor user experience, network performance seriously descends, rollback difficulty, problems such as risk height.
Concrete, the soft replacement method of the network based on flow control provided by the invention as shown in Figure 1, may further comprise the steps:
After step S101, new network are set up, according to default selection principle, in old network, choose one or more migrations zone, and formulate flow migration plan table according to the total flow of old network.
In this step, in old network, choose one or more migrations zone after, also carry out following operation:
In the migration zone of choosing, configuration is identical with the affiliated base station of old network cell, new network cell that the geographical position is identical is the alien frequencies adjacent area of old network cell.
Step S102, in flow when migration of implementing current migration phase according to flow migration plan table, reduce the quality offset parameter value of sub-district in the migration zone.
Step S103, monitor in the new network newly-increased traffic carrying capacity in real time, when in this traffic carrying capacity satisfies flow migration plan table, the qualification of current migration phase being required, the quality offset parameter value of sub-district in the migration zone is revised back initial value.
Further, after this step, also carry out following operation: judge in the flow migration plan table whether have unenforced migration phase, if exist, from unenforced migration phase, choosing a migration phase as current migration phase through behind the Preset Time, return step S102, if do not exist, flow process finishes.
Wherein, comprise N migration phase in the flow migration plan table, described N is a positive integer.
Method provided by the invention, the problem of service can not be provided for the user in having solved when new and old network is replaced in short-term, further, this method can also produce impact thereby avoided all users to move to new network at short notice simultaneously to new network by the service traffics of control migration; And adopt method provided by the invention operator not need website to the whole network to carry out matched adjacent zone or change the operation of parameter, only need several migration zones of control to get final product, reduced workload like this, saved manpower, strengthened network performance, reduce the risk that exists in replacing, and then improved user experience.
Provide preferred embodiment of the present invention according to Fig. 2 below, and, further provide ins and outs of the present invention, make it that specific implementation process of the method that provides of the present invention can be described better in conjunction with description to embodiment.
The embodiment of the invention proposes a kind ofly to select the soft replacement method of network in migration zone, the core concept of this method to be based on flow, installs new equipment before network is replaced, the newly-built one network B that throws the net on the basis of old network A.In whole network replacement process, used equipment originally need not be removed, and old network A can provide service always.New used equipment exists simultaneously, and new and old two two nets of throwing the net are runed simultaneously.By select the big and big migration zone of flow of several telephone traffics on old network A, the parameter of revising old network A in the certain hour window forces the user who enters the migration zone to move to new network B.Like this user in the old network A is progressively caught up with into new network B, migrates into new network B up to all users, wait new network B run all normal after, old network A outage is removed.
Elaborate the soft replacement implementation procedure of network below, the system's network element that relates in the method that the embodiment of the invention provides has: the RNC of wireless side (Radio Network Controller, radio network controller) and NodeB (Node B, WCDMA system base-station); The VLR of core-network side (Visiting LocationRegister, Visited Location Registor).
Concrete implementation procedure comprises:
One, before network is replaced, carry out following operation:
(1) the newly-built one network B that throws the net, and after network-wide optimization is finished, " not reserved " (non-reservation) is arranged in new network B the whole network sub-district.
Wherein, new network B is used identical PLMN (Public Land Mobile Network, public land mobile network), i.e. user's HPLMN (Home PLMN, Home Public Land Mobile Network network) with old network A;
The core network element VLR of old network A and new network B needs different, and other core network elements are not limited, both can be identical, and also can be inequality.
(2), in old network A, choose at least one migration zone according to default selection standard.
Wherein, comprise one or more sub-districts in each migration zone; Default selection standard is preferably set by following constraints: distribute and mobility status according to country and city traffic, it is big to choose telephone traffic, flow is big, the many and strong zone (for example, customs's mouth, railway station, subway station, harbour and trade area etc.) of user mobility of number of users.What this zone was preferable should be distributed in different place (mainly being the geographical features according to national city).
Wherein, the telephone traffic in migration zone is added up with cell-level, chooses some higher sub-districts of numerical value.
(3) in selected migration zone, configuration is the alien frequencies adjacent area of the sub-district of old network A with the sub-district of the affiliated new network B that the base station is identical, the geographical position is identical in sub-district of old network A.
(4) formulate flow migration plan table according to the total flow situation of old network A the whole network, thus the flow of the each migration of control.
The PS numeric field data flow that comprises the CS territory telephone traffic and the different migration phase correspondences of different migration phase correspondences in this flow migration plan table, more preferred, can also comprise in this flow migration plan table: the number of users to be migrated of different migration phase correspondences, different migration phase corresponding service ratio and total business and signaling traffic.Wherein, number of users, business proportion and business and signaling traffic can by CS territory telephone traffic and PS numeric field data flow push away (this computational process belongs to prior art).
As shown in Table 1, be that a concrete flow migration plan is represented example, divided 6 stages to move in this example, the flow of the new network B of can moving into when just beginning is littler, thereby formulates rational time window duration.Certainly migration phase can be divided according to the total flow situation of old network A, when total flow is big, can be made as a plurality of, when total flow hour, also can only be set a stage.
In the table, the number of users, the 3rd that first different phase, second of classifying division as is classified the different phase correspondence as is classified different phase corresponding service ratio, the 4th as and is classified the CS territory telephone traffic, the 5th of different phase correspondence as and classify the PS numeric field data flow, the 6th of different phase correspondence as and classify total business and signaling traffic as.Owing to can observe the traffic carrying capacity of current migration more intuitively, in the soft replacement process of following network,, judge whether to reach the traffic carrying capacity of this migration by observing the migrated users number that whether reaches the current generation setting by the observation number of users.
Figure B2009101802456D0000071
Table one
Two, in network is replaced, carry out following operation:
(1) in selected migration zone, reduce the value of the quality offset parameter of old network A sub-district, for example, revising cell quality biasing Qoffset is-30dB to force the user to move to new network B.
Simultaneously, real-time monitored is moved to the number of users of new network B in the VLR of new network B, thereby assesses suitable time window length, so the length of this time window is not a definite value, has different length according to this time window of different situations.When in migration (in the error allowed band the approximate satisfied) table one that advances that number of users satisfies in the new network B during to the requiring of current migration phase, change back original value the cell quality offset parameter of old network A sub-district in the migration zone, time window is closed, after time window is closed, between old network A and the new network B without any interactive operation.
Wherein, the unlatching of time window starts from the modification of quality offset parameter value, time window close the end that terminates in the current generation, and the length of time window is by the telephone traffic decision of locality, purpose is to impact to new network B.
(2) repeated execution of steps (1), each stage is all put into the number of users of plan, all moves to new network B up to all users.
As shown in Figure 2, move to migration schematic diagram in the new network B for old network A sub-district in the migration zone in the embodiment of the invention, this schematic diagram is that example describes to choose two migration zones.Among the figure, the sub-district in the migration zone can carry out switching or reselection operation with frequency, and the sub-district of moving to new network B also can be carried out with switching frequently or reselection operation, so the user is moving zone and nonmigratory professional impression without any influence.But the sub-district in the new network B is re eligible or switch back old network A not.
Need to prove that also there are special circumstances in above-mentioned network replacement process, for example,, when but no longer increasing, illustrate that some user in the old network A did not enter the migration zone if the customer volume in the new network B of follow-up phase does not also reach 100%.Have two kinds of processing methods this moment: 1) when remaining user is also many in the old network A, and zone user mobility difference many number of users also is set to the migration zone, with above-mentioned moving method these users moved in the new network B; 2) when remaining user was fewer in the old network A, old network A was directly cut off the power supply, and all users enter new network B like this, and can't cause too big influence this moment to new network B.
Further, in each transition process, the user who enters the non-special-purpose attitude in migration zone can enter new network B; Still stay in the old network A and move the special-purpose attitude user in zone and do not enter the regional user of migration.
After the user enters new network B, can in new network B, move arbitrarily, be distributed in network Anywhere, carry out the business that various operators provide.And because migration zone chooses is that user mobility is big, the zone that flow is big is so after the user enters new network B, can be distributed to other zones of new network B rapidly.And, also allow them to enjoy service in new network B for not by migration zone and the resident roamer of time window, manual network selection user or other users to new network B.
Three, after the user was moved to new network B, the device powers down of old network A was moved back clothes and dismounting.
The method that the embodiment of the invention provides, the problem of service can not be provided for the user in having solved when new and old network is replaced in short-term, further, this method can also produce impact thereby avoided all users to move to new network at short notice simultaneously to new network by the service traffics of control migration; And method provided by the invention makes operator have a PLMN to get final product, and does not need to provide other PLMN again; Operator does not need the website to the whole network to carry out matched adjacent zone or changes the operation of parameter, only needs several migration zones of control to get final product, and has reduced workload like this, has saved manpower; And, if the problem that new network occurs, all users can get back to rapidly in the original old network, and rollback is easy, almost there is not risk for operator and equipment vendor, the user does not have sensation substantially, and in whole network replacement process, extensive work can be finished before the user moves, only need in the transition process to change individual parameters and monitor to get final product, save time and manpower, error probability is little, and risk is little.
The present invention also provides a kind of network based on flow control soft alternative, as shown in Figure 3, comprising:
Network is replaced unit 310 is set, and is used for after new network is set up, and according to default selection principle, chooses one or more migrations zone in old network, and formulates flow migration plan table according to the total flow of old network;
Parameter adjustment unit 320 is used for reducing the quality offset parameter value of sub-district in the migration zone when the flow migration of implementing current migration phase according to flow migration plan table;
Network is replaced performance element 330, is used for monitor in real time the newly-increased traffic carrying capacity of new network, when in this traffic carrying capacity satisfies flow migration plan table the qualification of current migration phase being required, the quality offset parameter value of the regional interior sub-district of migration is revised back initial value.
Further, this device also comprises:
Migration judging unit 340, be used for judging whether flow migration plan table exists unenforced migration phase, if exist, from unenforced migration phase, choosing a migration phase as current migration phase through behind the Preset Time, execution parameter adjustment unit 320, if do not exist, flow process finishes.
Further, comprise N migration phase in the above-mentioned flow migration plan table, described N is a positive integer.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, if of the present invention these are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the present invention also is intended to comprise these changes and modification interior.

Claims (10)

1. the soft replacement method of the network based on flow control is characterized in that, comprising:
After step 1, new network are set up, according to default selection principle, in old network, choose one or more migrations zone, and formulate flow migration plan table according to the total flow of described old network;
Step 2, in flow when migration of implementing current migration phase according to described flow migration plan table, reduces the quality offset parameter value of interior sub-district, described migration zone;
Step 3, monitor in the described new network newly-increased traffic carrying capacity in real time, when in described traffic carrying capacity satisfies described flow migration plan table, the qualification of current migration phase being required, the quality offset parameter value of sub-district in the described migration zone is revised back initial value.
2. the method for claim 1 is characterized in that, also comprises after the described step 3:
Judge in the described flow migration plan table whether have unenforced migration phase, if exist, choosing a migration phase as current migration phase from unenforced migration phase through behind the Preset Time, return step 2, if do not exist, flow process finishes.
3. method as claimed in claim 1 or 2 is characterized in that, comprises following qualification parameter in the described flow migration plan table: circuit domain telephone traffic and PS numeric field data flow.
4. method as claimed in claim 3 is characterized in that, also comprises following qualification parameter in the described flow migration plan table: number of users, business proportion and total business and signaling traffic.
5. method as claimed in claim 1 or 2 is characterized in that, comprises N migration phase in the described flow migration plan table, and described N is a positive integer.
6. the method for claim 1 is characterized in that, also comprises in the described step 1:
In described migration zone, configuration is identical with the affiliated base station of old network cell, new network cell that the geographical position is identical is the alien frequencies adjacent area of described old network cell.
7. the method for claim 1 is characterized in that, described new network and the same public land mobile network of old network home; The different Visited Location Registor of employing of described new network and old network.
8. the soft alternative of the network based on flow control is characterized in that, comprising:
Network is replaced the unit is set, and is used for after new network is set up, and according to default selection principle, chooses one or more migrations zone in old network, and formulates flow migration plan table according to the total flow of described old network;
The parameter adjustment unit is used for reducing the quality offset parameter value of sub-district in the described migration zone when the flow migration of implementing current migration phase according to described flow migration plan table;
Network is replaced performance element, be used for monitoring in real time the newly-increased traffic carrying capacity of described new network, when in described traffic carrying capacity satisfies described flow migration plan table, the qualification of current migration phase being required, the quality offset parameter value of sub-district in the described migration zone is revised back initial value.
9. device as claimed in claim 8 is characterized in that, also comprises:
The migration judging unit, be used for judging whether described flow migration plan table exists unenforced migration phase, if exist, from unenforced migration phase, choosing a migration phase as current migration phase through behind the Preset Time, carry out described parameter adjustment unit, if do not exist, flow process finishes.
10. install as claimed in claim 8 or 9, it is characterized in that comprise N migration phase in the described flow migration plan table, described N is a positive integer.
CN200910180245.6A 2009-10-10 2009-10-10 Network flexible replacing method and device based on flux control Expired - Fee Related CN102045729B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910180245.6A CN102045729B (en) 2009-10-10 2009-10-10 Network flexible replacing method and device based on flux control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910180245.6A CN102045729B (en) 2009-10-10 2009-10-10 Network flexible replacing method and device based on flux control

Publications (2)

Publication Number Publication Date
CN102045729A true CN102045729A (en) 2011-05-04
CN102045729B CN102045729B (en) 2014-11-12

Family

ID=43911384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910180245.6A Expired - Fee Related CN102045729B (en) 2009-10-10 2009-10-10 Network flexible replacing method and device based on flux control

Country Status (1)

Country Link
CN (1) CN102045729B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017054718A1 (en) * 2015-09-29 2017-04-06 杭州华三通信技术有限公司 User migration

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1801853A (en) * 2004-12-31 2006-07-12 华为技术有限公司 Telecommunication managerial grid service shearing and connecting method and system
CN101132331A (en) * 2007-08-16 2008-02-27 华为技术有限公司 UMTS network system and method for building the same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1801853A (en) * 2004-12-31 2006-07-12 华为技术有限公司 Telecommunication managerial grid service shearing and connecting method and system
CN101132331A (en) * 2007-08-16 2008-02-27 华为技术有限公司 UMTS network system and method for building the same

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王智芬: "GSM网络无线设备替换搬迁方案的探讨和实施", 《2009年信息通信网络技术委员会年会征文》 *
雷增平: "WCDMA的软搬迁软割接", 《中兴通讯技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017054718A1 (en) * 2015-09-29 2017-04-06 杭州华三通信技术有限公司 User migration
US10791167B2 (en) 2015-09-29 2020-09-29 New H3C Technologies Co., Ltd User migration

Also Published As

Publication number Publication date
CN102045729B (en) 2014-11-12

Similar Documents

Publication Publication Date Title
CN101627643B (en) Self configuring and optimisation of cell neighbours in wireless telecommunications networks
CN1926906B (en) Method and apparatuses for cell-differentiated handover in a mobile communications system
CN101815298B (en) Tracking area optimizing and updating method, device and system
CN101594681B (en) Method for realizing self-optimization of LTE system
CN103999506A (en) User equipment signaling traffic reduction
CN101296477B (en) Method and device for planning network topological
CN102421146A (en) Method and device for realizing carrier service distribution
CN103079235A (en) Method and device for realizing load balance in long term evolution (LTE) system
CN101505476A (en) Cellular communication system and cell filtering method thereof
CN101562834A (en) Method and system supporting macro base station to be switched over to household base station
CN103118402A (en) Method and base station of updating adjacent region relation
CN100499926C (en) Method and network side device for controlling terminal mobile process
CN102300252B (en) A kind of neighbor cell information management method and system
CN101772108A (en) Method, system and device for realizing handoff in micro-micro cellular communication system
CN102685783A (en) Method and device for searching network coverage dead zone in mobile communication network
CN1984489A (en) Method for fetching adjacent domain system message by user equipment
CN101540987B (en) Method, device and system for updating neighbor cell list
CN102365882A (en) Method, equipment and system for overlaying network in monitoring room
CN102036327B (en) Method for switching UE (User Equipment) from outdoor base station to indoor base station in TD-SCDMA (Time Division-Synchronization Code Division Multiple Access)
CN104936241A (en) Mobility parameter configuring method and device
CN102158841A (en) Neighboring cell information transmission method and system
CN1984485A (en) Method for selecting switch object residence
CN102045729B (en) Network flexible replacing method and device based on flux control
CN101437262A (en) Method, system for measuring district and district controller
CN105246088A (en) Base station and adjacent cell list configuration method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANGHAI ZHONGXING SOFTWARE CO., LTD.

Free format text: FORMER OWNER: ZTE CORPORATION

Effective date: 20141010

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518057 SHENZHEN, GUANGDONG PROVINCE TO: 201203 PUDONG NEW AREA, SHANGHAI

TA01 Transfer of patent application right

Effective date of registration: 20141010

Address after: 201203 No. 889 blue wave road, Shanghai, Pudong New Area

Applicant after: Shanghai Zhongxing Software Co.,Ltd.

Address before: 518057 Nanshan District Guangdong high tech Industrial Park, South Road, science and technology, ZTE building, Ministry of Justice

Applicant before: ZTE Corp.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190128

Address after: 518057, 5th floor, ZTE A Block, 55 South Science and Technology Road, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: ZTE Corp.

Address before: 201203 No. 889 Bibo Road, Pudong New Area, Shanghai

Patentee before: Shanghai Zhongxing Software Co.,Ltd.

Effective date of registration: 20190128

Address after: Delaware

Patentee after: Open Invention Network Co.,Ltd.

Address before: 518057, 5th floor, ZTE A Block, 55 South Science and Technology Road, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: ZTE Corp.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141112

Termination date: 20211010