CN102044851A - Method for replacing optical fiber composite overhead ground wire or common overhead ground wire without power outage - Google Patents

Method for replacing optical fiber composite overhead ground wire or common overhead ground wire without power outage Download PDF

Info

Publication number
CN102044851A
CN102044851A CN2009102338191A CN200910233819A CN102044851A CN 102044851 A CN102044851 A CN 102044851A CN 2009102338191 A CN2009102338191 A CN 2009102338191A CN 200910233819 A CN200910233819 A CN 200910233819A CN 102044851 A CN102044851 A CN 102044851A
Authority
CN
China
Prior art keywords
ground wire
iron tower
stringing
tractor
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009102338191A
Other languages
Chinese (zh)
Inventor
吴永成
刘运锋
沈钦
葛守防
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hengtong Smart Grids Co Ltd
Original Assignee
Fujikura Hengtong Aerial Cable System Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujikura Hengtong Aerial Cable System Ltd filed Critical Fujikura Hengtong Aerial Cable System Ltd
Priority to CN2009102338191A priority Critical patent/CN102044851A/en
Publication of CN102044851A publication Critical patent/CN102044851A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention provides a method for replacing optical fiber composite overhead ground wire or common overhead ground wire without power failure, a plurality of hanging pulleys and a stringing tractor are hung on the old ground wire between iron towers, the hanging pulleys and the iron tower at one end, the adjacent hanging pulleys and the stringing tractor and the hanging pulleys are fixedly connected by connecting ropes with the interval length of 15-20 m, a new ground wire is discharged from a pay-off reel arranged on the ground, passes through a hole at the lower part of each hanging pulley after passing through the top of the iron tower at the end and is connected with an insulating rope arranged on the stringing tractor by a clamp, the stringing tractor is started to pull the new ground wire to the iron tower at the other end, the stringing reaches the top of the iron tower at the other end, the old ground wire is taken down and is arranged on the pulleys of the iron towers at two ends, the new ground wire is connected to the iron tower after being stretched to a specified arc sag, the connecting rope is fixed on the other end, the old ground wire is released, the upper and lower positions of the old ground wire and the new ground wire are exchanged, the old ground wire is retracted by a take-up reel arranged on the ground, meanwhile, the connecting rope, the insulating rope, the hanging pulley and the stringing tractor are dismounted, and finally, the sag of the new ground wire is accurately adjusted, the accessory is installed, and the positioning and the reinforcing are carried out. The invention can conveniently control the arc sag of the new and old ground wires, so that the new and old ground wires can not touch the power line, thereby being capable of constructing without power failure, reducing the trouble of reporting and approval and not influencing the production and life electricity consumption of units and residents.

Description

Do not have a power failure and change the method for OPGW or common aerial earth wire
Technical field
The present invention relates to a kind of replacing method of overhead ground wire of transmission line, especially do not have a power failure and change the method for Optical Fiber composite overhead Ground Wire or common overhead ground wire.
Background technology
The existing OPGW of transmission line of electricity or the method for common aerial earth wire changed at the old ground wire of dismounting with set up newly in the line process, can cause injury to the workmen because ground wire is touched power line easily, therefore must power cut construction.Like this, not only increase loaded down with trivial details procedure of submitting reports for approval but also can affect unit and resident's production, household electricity, brought very big inconvenience.
Summary of the invention
Deficiency for the method that overcomes the existing OPGW of changing transmission line of electricity or common aerial earth wire, solution is at the old ground wire of dismounting and set up the problem that ground wire in new the line process is touched power line easily, the invention provides a kind of the power failure and change the method for OPGW or common aerial earth wire, at the old ground wire of dismounting with set up newly in the line process, ground wire can not touched power line, thereby power cut construction not, not only reduce the declaration trouble but also can not affect unit and resident's production, household electricity.
A kind of power failure the provided by the invention changed the method for OPGW or common aerial earth wire, old ground wire between iron tower mounts a plurality of Hanging rollers and a stand line tractor, between Hanging roller and the end iron tower, between the adjacent Hanging roller, all be fixedly connected with connection cord between stringing tractor and the Hanging roller, gap length is 15 meters-20 meters, new ground wire is emitted through passing the hole of each Hanging roller bottom behind this end iron tower top from the draw drum that is located at ground, link together with anchor clamps with the insulating cord that is located on the stringing tractor, start the stringing tractor new ground wire is pulled to other end iron tower, the stringing tractor arrives other end iron tower top, take off on the pulley that old ground wire is mounted to the two ends iron tower, be connected on the iron tower after new ground wire being stretched to the sag degree of regulation, again that connection cord is fixing at other end iron tower, loosen old ground wire, make old ground wire, newly ground wire is upper, upper/lower positions exchanges, regain old ground wire by the take-up reel that is located at ground, unload simultaneously connection cord, insulating cord, Hanging roller, the stringing tractor is made accurate adjustment and installation accessories to the sag degree of new ground wire at last, the location reinforces.
Adopt method of the present invention to change in the OPGW or common aerial earth wire process of transmission line of electricity, arrange that the uniform a plurality of Hanging rollers in interval can be controlled newly easily, the sag degree of old ground wire, make them can not touch power line, therefore power cut construction had not only reduced the declaration trouble but also can not affect unit and resident's production, household electricity.
Description of drawings
Fig. 1 is the schematic diagram of annexation between each parts in the use of the present invention.
In Fig. 1,1, draw drum, 2, new ground wire, 3, an end iron tower, the pulley of 4, one end iron tower, 5, old ground wire, 6, Hanging roller, 7, connection cord, 8, anchor clamps, 9, insulation rope, 10, stringing tractor, 11, the pulley of other end iron tower, 12, power line, 13, other end iron tower, 14, take-up reel.
Embodiment
With reference to Fig. 1, at one end mount a plurality of Hanging rollers 6 and a stand line tractor 10 on the old ground wire 5 between iron tower 3 and the other end iron tower 13, between a Hanging roller 6 and the end iron tower 3, between the adjacent Hanging roller 6, all use connection cord 7 to fixedly connected between stringing tractor 10 and the Hanging roller 6, gap length is 15 meters-20 meters, new ground wire 2 is emitted through passing the hole of each Hanging roller 6 bottom behind these end iron tower 3 tops from the draw drum 1 that is located at ground, link together with the insulation rope 9 usefulness anchor clamps 8 that are located on the stringing tractor 10, start stringing tractor 10 new ground wire 2 is pulled to other end iron tower 13, stringing tractor 10 arrives other end iron tower 13 tops, take off the pulley 4 that old ground wire 5 is mounted to the two ends iron tower, on 11, be connected iron tower 3 after new ground wire 2 being stretched to the sag degree of regulation, on 13, again that connection cord 7 is fixing on other end iron tower 13, loosen old ground wire 5, make old ground wire 5, the upper-lower position of new ground wire 2 exchanges, regain old ground wire 5 by the take-up reel 14 that is located at ground, unload connection cord 7 simultaneously, insulation rope 9, Hanging roller 6, stringing tractor 10 is done accurately to adjust and installation accessories to the sag degree of new ground wire 2 at last, the location reinforces.

Claims (1)

1. one kind does not have a power failure and changes the method for OPGW or common aerial earth wire, it is characterized in that the old ground wire between iron tower mounts a plurality of Hanging rollers and a stand line tractor, between Hanging roller and the end iron tower, between the adjacent Hanging roller, all be fixedly connected with connection cord between stringing tractor and the Hanging roller, gap length is 15 meters-20 meters, new ground wire is emitted through passing the hole of each Hanging roller bottom behind this end iron tower top from the draw drum that is located at ground, link together with anchor clamps with the insulating cord that is located on the stringing tractor, start the stringing tractor new ground wire is pulled to other end iron tower, the stringing tractor arrives other end iron tower top, take off on the pulley that old ground wire is mounted to the two ends iron tower, be connected on the iron tower after new ground wire being stretched to the sag degree of regulation, again that connection cord is fixing at other end iron tower, loosen old ground wire, make old ground wire, newly ground wire is upper, upper/lower positions exchanges, regain old ground wire by the take-up reel that is located at ground, unload simultaneously connection cord, insulating cord, Hanging roller, the stringing tractor is made accurate adjustment and installation accessories to the sag degree of new ground wire at last, the location reinforces.
CN2009102338191A 2009-10-22 2009-10-22 Method for replacing optical fiber composite overhead ground wire or common overhead ground wire without power outage Pending CN102044851A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102338191A CN102044851A (en) 2009-10-22 2009-10-22 Method for replacing optical fiber composite overhead ground wire or common overhead ground wire without power outage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102338191A CN102044851A (en) 2009-10-22 2009-10-22 Method for replacing optical fiber composite overhead ground wire or common overhead ground wire without power outage

Publications (1)

Publication Number Publication Date
CN102044851A true CN102044851A (en) 2011-05-04

Family

ID=43910751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102338191A Pending CN102044851A (en) 2009-10-22 2009-10-22 Method for replacing optical fiber composite overhead ground wire or common overhead ground wire without power outage

Country Status (1)

Country Link
CN (1) CN102044851A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103500964A (en) * 2013-09-26 2014-01-08 国家电网公司 Method of live-wire replacement of overhead ground wire
CN103594961A (en) * 2013-11-01 2014-02-19 国家电网公司 Method for replacing cable
CN103840396A (en) * 2014-02-24 2014-06-04 国网重庆云阳县供电有限责任公司 Method for replacing lightning conductor on high-voltage iron towers
CN104764385A (en) * 2015-03-17 2015-07-08 国网辽宁省电力有限公司辽阳供电公司 Drainage arc measurer
CN105390990A (en) * 2013-08-26 2016-03-09 郑州思辩科技有限公司 Spanning wire laying device
CN106207869A (en) * 2016-06-28 2016-12-07 江苏永太新能源科技有限公司 One is touring drags collimation method construction technology
CN104410005B (en) * 2014-10-24 2017-08-04 国家电网公司 A kind of replacing aerial condutor, the operational method of ground wire
CN107226428A (en) * 2017-06-23 2017-10-03 国网浙江省电力公司检修分公司 The big big span line live-line work rope fixture of the discrepancy in elevation and its method of work
CN112132531A (en) * 2020-08-17 2020-12-25 国网河北省电力有限公司大名县供电分公司 Overhead line construction progress metering device and overhead line construction progress visualization method
CN114380105A (en) * 2022-01-12 2022-04-22 济南佰思特自动化技术有限公司 System and method for vertically controlling steel strip based on PID algorithm

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105390990A (en) * 2013-08-26 2016-03-09 郑州思辩科技有限公司 Spanning wire laying device
CN105390990B (en) * 2013-08-26 2017-12-15 江苏智光创业投资有限公司 One kind crosses over wire laying device
CN103500964A (en) * 2013-09-26 2014-01-08 国家电网公司 Method of live-wire replacement of overhead ground wire
CN103594961A (en) * 2013-11-01 2014-02-19 国家电网公司 Method for replacing cable
CN103594961B (en) * 2013-11-01 2016-08-24 国家电网公司 A kind of method changing cable
CN103840396A (en) * 2014-02-24 2014-06-04 国网重庆云阳县供电有限责任公司 Method for replacing lightning conductor on high-voltage iron towers
CN104410005B (en) * 2014-10-24 2017-08-04 国家电网公司 A kind of replacing aerial condutor, the operational method of ground wire
CN104764385A (en) * 2015-03-17 2015-07-08 国网辽宁省电力有限公司辽阳供电公司 Drainage arc measurer
CN106207869A (en) * 2016-06-28 2016-12-07 江苏永太新能源科技有限公司 One is touring drags collimation method construction technology
CN107226428A (en) * 2017-06-23 2017-10-03 国网浙江省电力公司检修分公司 The big big span line live-line work rope fixture of the discrepancy in elevation and its method of work
CN112132531A (en) * 2020-08-17 2020-12-25 国网河北省电力有限公司大名县供电分公司 Overhead line construction progress metering device and overhead line construction progress visualization method
CN112132531B (en) * 2020-08-17 2023-08-25 国网河北省电力有限公司大名县供电分公司 Overhead line construction progress metering device and overhead line construction progress visualization method
CN114380105A (en) * 2022-01-12 2022-04-22 济南佰思特自动化技术有限公司 System and method for vertically controlling steel strip based on PID algorithm
CN114380105B (en) * 2022-01-12 2024-04-23 济南佰思特自动化技术有限公司 System and method for vertically controlling steel belt based on PID algorithm

Similar Documents

Publication Publication Date Title
CN102044851A (en) Method for replacing optical fiber composite overhead ground wire or common overhead ground wire without power outage
CN102832571B (en) Cable bending radius controller and cable bending method
CN110534318B (en) Three-phase dry-type transformer based on adjustable insulator outlet structure
CN201146346Y (en) Portable insulation maintenance gap bridge
CN202102158U (en) Novel optical fiber wiring box based on optical fiber construction layout for intelligent transformer substation
CN205210354U (en) Air -sweeping type optical cable branch box
CN209455823U (en) A kind of combined type pay off rack for electric wire
CN216774076U (en) Electrified mounting system of 10 kilovolt distribution lines post switch
CN209044113U (en) One kind is convenient for adjusting fibre distribution frame
CN205942037U (en) Simple and easy optic fibre channel
CN203535287U (en) Indoor distribution optical cable convenient for being stripped and branched
CN205257632U (en) Cable drawing drum
CN213479363U (en) Fire-fighting pipeline hoisting support capable of being finely adjusted
CN104393544B (en) The cartridge type fixing device of removal cable
CN214692581U (en) Electric wire lays auxiliary device
CN204166176U (en) Relay protection switch screen cabinet optical fiber storage line storehouse
CN105322472A (en) Wire-arranging machine for network cabinet
CN203768563U (en) Low-outage warping machine
CN208423609U (en) A kind of substation equipment maintenance and repair electricity consumption Cable insulation support device
CN201639251U (en) Transmission cable laying structure of electric slab clamp
CN110683409A (en) Novel cable paying-off support
CN221126803U (en) Groove type cable bridge convenient to disassemble
CN110127434A (en) A kind of power construction actinobacillus device
CN204211254U (en) The optical cable production line of smooth operation
CN216129119U (en) Movable loose tube extra length rewinding device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110504