CN102041807B - Dense hole preliminary loosening hard plagioclase construction technique - Google Patents

Dense hole preliminary loosening hard plagioclase construction technique Download PDF

Info

Publication number
CN102041807B
CN102041807B CN201010199088.6A CN201010199088A CN102041807B CN 102041807 B CN102041807 B CN 102041807B CN 201010199088 A CN201010199088 A CN 201010199088A CN 102041807 B CN102041807 B CN 102041807B
Authority
CN
China
Prior art keywords
hole
pile foundation
drilling
pile
drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010199088.6A
Other languages
Chinese (zh)
Other versions
CN102041807A (en
Inventor
江拔其
胡伟
郑先奇
陈宏铭
潘寿东
焦冬梅
陈亚敏
楼敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201010199088.6A priority Critical patent/CN102041807B/en
Publication of CN102041807A publication Critical patent/CN102041807A/en
Application granted granted Critical
Publication of CN102041807B publication Critical patent/CN102041807B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a dense hole preliminary loosening hard plagioclase construction technique, which comprises a steel sleeve follow-up drilling and production technique and drilling impact stress calculation and analysis. The dense hole preliminary loosening hard plagioclase construction technique is characterized by adopting a down-hole drill for predrilled hole positioning so as to weaken resistance of pile foundation rocks and correct inclined holes on a sloped rock surface. The dense hole preliminary loosening hard plagioclase construction technique solves the problems of high hardness of surrounding rocks, cave development and pre-drilling on the sloped rock surface, accelerates the drill footage of a carst strong development stratum pile foundation, corrects the inclined holes on the sloped rock surface, and has high engineering precision.

Description

The hard tiltedly rock construction method of the pre-pine of a kind of dense holes
Technical field
The invention belongs to field of civil engineering, particularly relate to a kind of novel hard tiltedly drilled pile construction method of rock geology, slope scar inclined hole is revised in the resistance, the correction that adopt down-the-hole drill prebored hole location to weaken pile foundation rock.
Background technology
No matter built railway and domestic each road in the past, still nowadays build in a large number railway transport of passengers industrial siding (high-speed railway) and speedway, build bridge is absolutely necessary, and especially builds the ratio of high-speed railway build bridge roadbed, builds railway much higher than in the past.And drilled pile method is often taked on the basis (below ground) of building bridge, drilled pile is taked Churn drill construction method conventionally, as runs into slope scar or admant, and construction speed is extremely slow, the effort of not only taking a lot of work, and affect the duration.In order to solve this engineering roadblock, invent dense hole preliminary loosening hard plagioclase construction technique in conjunction with grand bridge slope, Beijing-Shanghai High-Speed Railway three bid sections (Tengzhou of Shandong Province is Xuzhou one by one) chaste tree river scar pile foundation construction, not only greatly accelerate drilled pile construction progress, and improved economic benefit, be one has as very promising new construction method very much.
Summary of the invention
The hard oblique rock construction method of the pre-pine of a kind of dense holes, comprises the resistance, the correction correction slope scar inclined hole that adopt down-the-hole drill prebored hole location to weaken pile foundation rock; Before Construction of Pile Bedding Boring on stake position entirety, hard scar the artificial broken rock of manufacturing, by boring multiple holes with down-the-hole drill on the scar of pile foundation stake position, described hole is diameter 210mm, and pore quantity is determined according to Pile Diameter, stake footpath 1.5m, holes 9; Stake footpath 1.25m, holes 7; Stake footpath 1.0m, holes 5, and the hole degree of depth is identical with the Pile Foundations Design degree of depth, and hole is equidistantly evenly arranged in pile foundation plane;
Described down-the-hole drill bore diameter is 105~305mm, maximum drilling depth 213m also adopts steel sleeve follow-up drilling and production technology, hard rock stratum is smashed with impactor, bore bit, the high pressure draught of air compressor is gone out rubble outside hole, with diameter 200mm drill bit, wear the heart and eccentric reaming drilling tool, after the pre-aligned pre-punching of five-point type and multipoint mode, form the hardness that hole reduces pile foundation rock, multiple holes of preboring have guide effect to prevent inclined to one side hole, pile foundation boring steel casing follow-up the impact drilling.
Accompanying drawing explanation
Schematic diagram is arranged in the boring of Fig. 1 diameter 150cm drilled pile;
Schematic diagram is arranged in the boring of Fig. 2 diameter 125cm drilled pile;
Schematic diagram is arranged in the boring of Fig. 3 diameter 100cm drilled pile.
The specific embodiment
1, prebored hole adopts SL400 type down-the-hole drill, and SL400 type down-the-hole drill is a kind of light-duty, high-efficiency multi-function track-mounted drill.This rig can adopt compressed air down-the-hole to creep on multiple stratum, coordinate U.S. Ingersoll-rand movable compressor XHP1017 (capacity 1017m3/30.3min, pressure limit 150-375psig), bore diameter 105~305mm, maximum drilling depth 213m.Be mainly used in Drilling well, monitor well, earth source heat pump hole, also can be used for the location of Bored Pile of Bridge inspecting hole and partially the correction in hole and pile foundation prebored hole reduce the hardness of pile foundation rock.
2, adopt steel sleeve follow-up drilling and production technology, solve covering layer and be difficult for a hole creating technology difficult problem, with impactor, bore bit, hard rock stratum is smashed, the high pressure draught of air compressor is gone out rubble outside hole.With diameter 200mm drill bit, wear the heart and eccentric reaming drilling tool, after the pre-aligned pre-punching of five-point type and multipoint mode, form the hardness that hole reduces pile foundation rock, multiple holes of preboring have guide effect to prevent inclined to one side hole, pile foundation boring steel casing follow-up the impact drilling, the not inclined to one side hole of pile foundation boring, drilling depth is fast.
3, in percussive drilling process, because drill bit impact energy produces impact stress to hole bed rock stone, hole bed rock stone meeting lateral deflection, crushing, the general equational method of impact fluctuation that adopts can approach true stress value.
Table 1 drill bit impact stress calculation parameter list
Figure GSB0000120133900000021
The forward and backward drill bit impact stress of table 2 prebored hole and bearing capacity of pile foundation ratio calculation table
Figure GSB0000120133900000022
Chaste tree river grand bridge Bored Pile Foundation design bearing stratum δ 0=800~1000kN/m 2limestone, the forward and backward drill bit impact stress of down-the-hole drill prebored hole and bearing capacity of pile foundation ratio are changed significantly, and the heavy difficult point pile foundation of chaste tree river grand bridge, adopts after down-the-hole drill prebored hole, pile foundation boring 24h drilling depth is generally in about 1.5~2.0m, drill footage soon, hole partially.Down-the-hole drill is large in hardness, solution cavity is grown, slope scar prebored hole, correction slope scar inclined hole, accelerates Construction of Pile Bedding Boring progress, has the features such as saving working hour, inclined hole rectifying effect are good, reasonable.

Claims (1)

1. the hard oblique rock construction method of the pre-pine of dense holes, comprises the resistance, the correction correction slope scar inclined hole that adopt down-the-hole drill prebored hole location to weaken pile foundation rock, before Construction of Pile Bedding Boring on stake position entirety, hard scar the artificial broken rock of manufacturing, by boring multiple holes with down-the-hole drill on the scar of pile foundation stake position, described hole is diameter 210mm, and pore quantity is determined according to Pile Diameter, stake footpath 1.5m, holes 9, stake footpath 1.25m, holes 7, stake footpath 1.0m, hole 5, the hole degree of depth is identical with the Pile Foundations Design degree of depth, hole is equidistantly evenly arranged in pile foundation plane, described down-the-hole drill bore diameter is 105~305mm, maximum drilling depth 213m also adopts steel sleeve follow-up drilling and production technology, with impactor, bore bit is smashed hard rock stratum, the high pressure draught of air compressor is gone out rubble outside hole, with diameter 200mm drill bit, wear the heart and eccentric reaming drilling tool, after the pre-aligned pre-punching of five-point type and multipoint mode, form the hardness that hole reduces pile foundation rock, multiple holes of preboring have guide effect to prevent inclined to one side hole, pile foundation boring steel casing follow-up the impact drilling.
CN201010199088.6A 2010-06-12 2010-06-12 Dense hole preliminary loosening hard plagioclase construction technique Active CN102041807B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010199088.6A CN102041807B (en) 2010-06-12 2010-06-12 Dense hole preliminary loosening hard plagioclase construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010199088.6A CN102041807B (en) 2010-06-12 2010-06-12 Dense hole preliminary loosening hard plagioclase construction technique

Publications (2)

Publication Number Publication Date
CN102041807A CN102041807A (en) 2011-05-04
CN102041807B true CN102041807B (en) 2014-05-14

Family

ID=43908319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010199088.6A Active CN102041807B (en) 2010-06-12 2010-06-12 Dense hole preliminary loosening hard plagioclase construction technique

Country Status (1)

Country Link
CN (1) CN102041807B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102434097A (en) * 2011-08-23 2012-05-02 谢清光 Quick pile forming process
CN102913132B (en) * 2012-09-29 2016-06-01 中铁十九局集团有限公司 Method for processing inclined rock of drilled pile near existing line karst area
CN103147687B (en) * 2013-02-21 2015-02-11 北京鑫实路桥建设有限公司 Ring-type cutting method for excavating rocks at bottom part of pit shaft of bored pile
CN104805831A (en) * 2015-04-09 2015-07-29 深圳市永鑫建筑工程集团有限公司 Pore-forming method of hard rock foundation pile with large diameter
CN104878762A (en) * 2015-05-15 2015-09-02 中铁三局集团有限公司 Bored pile construction method suitable for tilt hard rock section
CN104895130B (en) * 2015-05-15 2017-12-22 中铁三局集团有限公司 One kind is applied to tilt solid rock location construction method of underground continuous wall
CN106759282B (en) * 2016-12-30 2018-03-20 安徽省建筑科学研究设计院 A kind of mechanical hole building method of super-large diameter hard rock bored concrete pile half
CN108193671A (en) * 2017-12-15 2018-06-22 中铁上海工程局集团有限公司 For the weight dangerous region super-large diameter pile foundation drilling construction method of alpine terrain landforms
CN108193672A (en) * 2017-12-25 2018-06-22 上海建工二建集团有限公司 One kind, which is enclosed, a little beats round type large area stone-filled region spiral-digging pore construction process of bored concrete pile
CN110306927B (en) * 2019-07-09 2020-11-20 山东九商工程机械有限公司 Deep hole drilling machine capable of identifying stratum and preventing drill bit from being broken
CN111005379A (en) * 2019-12-02 2020-04-14 中建八局轨道交通建设有限公司 Construction method for removing pile body of reinforced concrete cast-in-place pile
CN113106997B (en) * 2021-03-26 2022-09-27 广州市建筑科学研究院有限公司 Pile foundation construction method for pre-drilling guide hole in inclined rock stratum

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101570971A (en) * 2009-05-31 2009-11-04 中国水利水电第四工程局有限公司 Rock mass pile foundation pore-forming preboring construction method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101570971A (en) * 2009-05-31 2009-11-04 中国水利水电第四工程局有限公司 Rock mass pile foundation pore-forming preboring construction method

Also Published As

Publication number Publication date
CN102041807A (en) 2011-05-04

Similar Documents

Publication Publication Date Title
CN102041807B (en) Dense hole preliminary loosening hard plagioclase construction technique
CN104763343B (en) A kind of multistage borehole-enlarging drilling tool and its expanding method of the bionical nozzle of build-in
CN105156035B (en) A kind of oscillating tooth PDC drill bit
CN106381865B (en) A kind of brill milling combination engineering method applied to hard rock grooving
CN203584301U (en) Hole guide equipment
CN102094580A (en) Coal engineering hole directional drilling method
CN104533284A (en) Long screw pile machine
CN105422006A (en) Adjustable underground rock breaking tool combining drilling and expanding
Gonzales et al. Improvements in Cutter Technology Leads to Faster Drilling in Hard Abrasive Formations, East Texas Basin
CN202832187U (en) Hydraulic breaker type rotary drilling rig
CN204163632U (en) A kind of guiding drifting instrument
CN204266925U (en) A kind of coal mine roadway rock-reinforcing anti-collapse hole drill head
CN103835647A (en) Method for drilling floating pebble bed
CN103104289A (en) Mine water disaster treatment method
Danilov et al. Justification of basic diagrams of horizontal drilling deflectors
CN206801455U (en) Rock drill
CN102628268A (en) Cyclone pile
CN102383803B (en) Cutter of comprehensive mechanized rock tunnel boring machine
CN202108046U (en) Portable ground anchor for moving drilling machine
CN201306123Y (en) Composite cushioned drill bit
CN105672892A (en) PDC drill bit of rotary drilling rig
CN203334951U (en) Down hole hammer
CN207728307U (en) A kind of rotary drilling rig
CN102434188A (en) Long-distance deep hole water injection process for fully mechanized coal mining face coal seam
CN205400598U (en) Dig rig PDC drill bit soon

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: THIRD ENGINEERING CO., LTD. OF CHINA RAILWAY 16TH

Effective date: 20140115

Owner name: NO. 1 ENGINEERING CO., LTD. OF CHINA RAILWAY 16TH

Free format text: FORMER OWNER: CHINA RAILWAY CONSTRUCTION ENGINEERING BUREAU NO.16 GROUP CORP., LTD.

Effective date: 20140115

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Jiang Baqi

Inventor after: Hu Wei

Inventor after: Zheng Xianqi

Inventor after: Chen Hongming

Inventor after: Pan Shoudong

Inventor after: Jiao Dongmei

Inventor after: Chen Yamin

Inventor after: Lou Min

Inventor before: Jiang Baqi

Inventor before: Hu Wei

Inventor before: Zheng Xianqi

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: JIANG BAQI HU WEI ZHENG XIANQI TO: JIANG BAQI HU WEI ZHENG XIANQI CHEN HONGMING PAN SHOUDONG JIAO DONGMEI CHEN YAMIN LOU MIN

Free format text: CORRECT: ADDRESS; FROM: 100018 CHAOYANG, BEIJING TO: 101300 SHUNYI, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20140115

Address after: 101300 No. 15 East Street, Shunyi, Beijing

Applicant after: The First Engineering Co., Ltd. Of China Railway 16th Construction Bureau Group

Applicant after: The Third Engineering Co.,Ltd.of China Railway 16th Group

Applicant after: China Railway Construction Engineering Bureau No.16 Group Corp., Ltd.

Address before: 100018 Beijing city Chaoyang District No. 2 North Pine dam Park

Applicant before: China Railway Construction Engineering Bureau No.16 Group Corp., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant