CN102031982A - 复合牙支顶过矿山法隧道施工技术 - Google Patents
复合牙支顶过矿山法隧道施工技术 Download PDFInfo
- Publication number
- CN102031982A CN102031982A CN2010101990693A CN201010199069A CN102031982A CN 102031982 A CN102031982 A CN 102031982A CN 2010101990693 A CN2010101990693 A CN 2010101990693A CN 201010199069 A CN201010199069 A CN 201010199069A CN 102031982 A CN102031982 A CN 102031982A
- Authority
- CN
- China
- Prior art keywords
- section
- jurisdiction
- shield
- tunnel
- technology
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 36
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 238000005065 mining Methods 0.000 title claims abstract description 6
- 230000005641 tunneling Effects 0.000 title claims description 3
- 239000002131 composite material Substances 0.000 title abstract 9
- 238000005516 engineering process Methods 0.000 claims abstract description 19
- 238000012544 monitoring process Methods 0.000 claims abstract description 7
- 230000001360 synchronised effect Effects 0.000 claims abstract description 7
- 238000005259 measurement Methods 0.000 claims abstract description 5
- 238000003908 quality control method Methods 0.000 claims abstract description 3
- 150000001875 compounds Chemical class 0.000 claims description 21
- 235000010627 Phaseolus vulgaris Nutrition 0.000 claims description 8
- 244000046052 Phaseolus vulgaris Species 0.000 claims description 8
- 239000002689 soil Substances 0.000 claims description 8
- 239000011440 grout Substances 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 5
- 238000002347 injection Methods 0.000 claims description 4
- 239000007924 injection Substances 0.000 claims description 4
- 239000002002 slurry Substances 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000012530 fluid Substances 0.000 claims description 3
- 239000007788 liquid Substances 0.000 claims description 3
- 239000007921 spray Substances 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000007569 slipcasting Methods 0.000 claims description 2
- 239000013589 supplement Substances 0.000 claims 1
- 238000004078 waterproofing Methods 0.000 abstract description 5
- 238000012545 processing Methods 0.000 abstract description 4
- 238000001514 detection method Methods 0.000 abstract 1
- 238000005507 spraying Methods 0.000 abstract 1
- 230000008961 swelling Effects 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract 1
- 230000000750 progressive effect Effects 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000000280 densification Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 238000007373 indentation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
类型 | 部位 | 支顶棒直径(mm) | 支顶棒长度L(mm) | 备注 |
A型 | 上部 | 40 | 500 | 受力最小 |
B型 | 侧面 | 40 | 450 | 受力较大 |
C型 | 导台位 | 40 | 350 | 受力最大 |
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010199069.3A CN102031982B (zh) | 2010-06-12 | 2010-06-12 | 复合牙支顶过矿山法隧道施工技术 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010199069.3A CN102031982B (zh) | 2010-06-12 | 2010-06-12 | 复合牙支顶过矿山法隧道施工技术 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102031982A true CN102031982A (zh) | 2011-04-27 |
CN102031982B CN102031982B (zh) | 2014-02-12 |
Family
ID=43885369
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010199069.3A Expired - Fee Related CN102031982B (zh) | 2010-06-12 | 2010-06-12 | 复合牙支顶过矿山法隧道施工技术 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102031982B (zh) |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102352757A (zh) * | 2011-10-28 | 2012-02-15 | 上海市第一市政工程有限公司 | 盾构机空推过矿山法隧道时控制管片上浮的方法 |
CN102425427A (zh) * | 2011-12-30 | 2012-04-25 | 中铁二局股份有限公司 | 盾构空推过矿山法隧道施工方法 |
CN102536265A (zh) * | 2012-02-03 | 2012-07-04 | 葛洲坝集团第五工程有限公司 | 盾构隧道预应力衬砌施工方法及所用的预应力管片 |
CN103510964A (zh) * | 2013-07-31 | 2014-01-15 | 中铁隧道集团有限公司 | 一种采用护盾式tbm施工时对豆砾石回填灌浆的方法 |
CN104389621A (zh) * | 2014-12-12 | 2015-03-04 | 东南大学 | 盾构隧道环向智能化加固结构及加固方法 |
CN104847393A (zh) * | 2015-06-02 | 2015-08-19 | 北京首尔工程技术有限公司 | 一种隧道移动支护结构及其保护下的隧道施工方法 |
CN106761821A (zh) * | 2017-02-16 | 2017-05-31 | 同济大学 | 拼装式隧道增强结构 |
CN107034794A (zh) * | 2017-05-24 | 2017-08-11 | 福州大学 | 一种加固装置及其使用方法 |
CN107091097A (zh) * | 2017-06-09 | 2017-08-25 | 中国铁建重工集团有限公司 | 一种矩形顶管机 |
CN107091101A (zh) * | 2017-03-27 | 2017-08-25 | 中铁隧道勘测设计院有限公司 | 海域中部矿山盾构交接隧道叠合型接头结构及施工方法 |
CN108708752A (zh) * | 2018-07-27 | 2018-10-26 | 西南交通大学 | Tbm隧道施作管片的临时支撑装置及豆砾石回填灌浆的方法 |
CN108775244A (zh) * | 2018-05-28 | 2018-11-09 | 中铁十六局集团有限公司 | 一种矿山法接收盾构机并盾构空推施工方法 |
CN109488319A (zh) * | 2018-12-17 | 2019-03-19 | 中国铁建重工集团有限公司 | 掘进机 |
CN110130931A (zh) * | 2019-06-28 | 2019-08-16 | 西南交通大学 | 一种圆形盾构隧道对称衬砌环的分块方法 |
CN110159291A (zh) * | 2019-05-06 | 2019-08-23 | 广州电力设计院有限公司 | 隧道施工方法及隧道结构 |
CN110985025A (zh) * | 2019-12-16 | 2020-04-10 | 中铁一局集团有限公司 | 一种改建盾构隧道进行矿山法施工的方法 |
CN111810173A (zh) * | 2020-07-24 | 2020-10-23 | 上海隧道工程有限公司 | 盾构掘进和管片拼装同步的施工方法 |
CN111878122A (zh) * | 2020-08-27 | 2020-11-03 | 黄河勘测规划设计研究院有限公司 | 混凝土隧洞施工过程中空洞监测方法 |
CN112031826A (zh) * | 2020-08-31 | 2020-12-04 | 中铁四院集团工程建设有限责任公司 | 用于整治隧道变形的方法 |
CN112412479A (zh) * | 2020-10-27 | 2021-02-26 | 中建三局基础设施建设投资有限公司 | 一种盾构长距离空推过矿山法隧道施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101294496A (zh) * | 2008-06-25 | 2008-10-29 | 上海隧道工程股份有限公司 | 注浆控制盾构姿态和纠偏的施工方法 |
CN101298836A (zh) * | 2008-06-23 | 2008-11-05 | 沈阳重型机械集团有限责任公司 | 用于盾构机始发的加压平衡装置 |
CN101672186A (zh) * | 2009-07-28 | 2010-03-17 | 中铁隧道股份有限公司 | 一种盾构隧道管片同步注浆方法和装置 |
CN101705829A (zh) * | 2009-10-21 | 2010-05-12 | 上海隧道工程股份有限公司 | 盾构法隧道管片衬砌质量控制方法及管片构造 |
-
2010
- 2010-06-12 CN CN201010199069.3A patent/CN102031982B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101298836A (zh) * | 2008-06-23 | 2008-11-05 | 沈阳重型机械集团有限责任公司 | 用于盾构机始发的加压平衡装置 |
CN101294496A (zh) * | 2008-06-25 | 2008-10-29 | 上海隧道工程股份有限公司 | 注浆控制盾构姿态和纠偏的施工方法 |
CN101672186A (zh) * | 2009-07-28 | 2010-03-17 | 中铁隧道股份有限公司 | 一种盾构隧道管片同步注浆方法和装置 |
CN101705829A (zh) * | 2009-10-21 | 2010-05-12 | 上海隧道工程股份有限公司 | 盾构法隧道管片衬砌质量控制方法及管片构造 |
Non-Patent Citations (1)
Title |
---|
汪茂祥: "盾构通过矿山法施工隧道段关键技术", 《现代隧道技术》 * |
Cited By (32)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102352757B (zh) * | 2011-10-28 | 2014-05-28 | 上海公路桥梁(集团)有限公司 | 盾构机空推过矿山法隧道时控制管片上浮的方法 |
CN102352757A (zh) * | 2011-10-28 | 2012-02-15 | 上海市第一市政工程有限公司 | 盾构机空推过矿山法隧道时控制管片上浮的方法 |
CN102425427A (zh) * | 2011-12-30 | 2012-04-25 | 中铁二局股份有限公司 | 盾构空推过矿山法隧道施工方法 |
CN102425427B (zh) * | 2011-12-30 | 2013-12-25 | 中铁二局股份有限公司 | 盾构空推过矿山法隧道施工方法 |
CN102536265A (zh) * | 2012-02-03 | 2012-07-04 | 葛洲坝集团第五工程有限公司 | 盾构隧道预应力衬砌施工方法及所用的预应力管片 |
CN102536265B (zh) * | 2012-02-03 | 2014-09-03 | 葛洲坝集团第五工程有限公司 | 盾构隧道预应力衬砌施工方法及所用的预应力管片 |
CN103510964B (zh) * | 2013-07-31 | 2016-08-24 | 中铁隧道集团有限公司 | 一种采用护盾式tbm施工时对豆砾石回填灌浆的方法 |
CN103510964A (zh) * | 2013-07-31 | 2014-01-15 | 中铁隧道集团有限公司 | 一种采用护盾式tbm施工时对豆砾石回填灌浆的方法 |
CN104389621A (zh) * | 2014-12-12 | 2015-03-04 | 东南大学 | 盾构隧道环向智能化加固结构及加固方法 |
CN104847393A (zh) * | 2015-06-02 | 2015-08-19 | 北京首尔工程技术有限公司 | 一种隧道移动支护结构及其保护下的隧道施工方法 |
CN104847393B (zh) * | 2015-06-02 | 2016-09-28 | 北京首尔工程技术有限公司 | 一种隧道移动支护结构及其保护下的隧道施工方法 |
CN106761821A (zh) * | 2017-02-16 | 2017-05-31 | 同济大学 | 拼装式隧道增强结构 |
CN106761821B (zh) * | 2017-02-16 | 2019-01-25 | 同济大学 | 拼装式隧道增强结构 |
CN107091101A (zh) * | 2017-03-27 | 2017-08-25 | 中铁隧道勘测设计院有限公司 | 海域中部矿山盾构交接隧道叠合型接头结构及施工方法 |
CN107091101B (zh) * | 2017-03-27 | 2023-09-01 | 中铁第六勘察设计院集团有限公司 | 海域中部矿山盾构交接隧道叠合型接头结构及施工方法 |
CN107034794A (zh) * | 2017-05-24 | 2017-08-11 | 福州大学 | 一种加固装置及其使用方法 |
CN107091097A (zh) * | 2017-06-09 | 2017-08-25 | 中国铁建重工集团有限公司 | 一种矩形顶管机 |
CN108775244A (zh) * | 2018-05-28 | 2018-11-09 | 中铁十六局集团有限公司 | 一种矿山法接收盾构机并盾构空推施工方法 |
CN108708752B (zh) * | 2018-07-27 | 2023-11-24 | 西南交通大学 | Tbm隧道施作管片的临时支撑装置及豆砾石回填灌浆的方法 |
CN108708752A (zh) * | 2018-07-27 | 2018-10-26 | 西南交通大学 | Tbm隧道施作管片的临时支撑装置及豆砾石回填灌浆的方法 |
CN109488319A (zh) * | 2018-12-17 | 2019-03-19 | 中国铁建重工集团有限公司 | 掘进机 |
CN109488319B (zh) * | 2018-12-17 | 2024-03-08 | 中国铁建重工集团股份有限公司 | 掘进机 |
CN110159291A (zh) * | 2019-05-06 | 2019-08-23 | 广州电力设计院有限公司 | 隧道施工方法及隧道结构 |
CN110130931A (zh) * | 2019-06-28 | 2019-08-16 | 西南交通大学 | 一种圆形盾构隧道对称衬砌环的分块方法 |
CN110130931B (zh) * | 2019-06-28 | 2024-05-28 | 西南交通大学 | 一种圆形盾构隧道对称衬砌环的分块方法 |
CN110985025A (zh) * | 2019-12-16 | 2020-04-10 | 中铁一局集团有限公司 | 一种改建盾构隧道进行矿山法施工的方法 |
CN111810173A (zh) * | 2020-07-24 | 2020-10-23 | 上海隧道工程有限公司 | 盾构掘进和管片拼装同步的施工方法 |
CN111810173B (zh) * | 2020-07-24 | 2021-10-12 | 上海隧道工程有限公司 | 盾构掘进和管片拼装同步的施工方法 |
CN111878122A (zh) * | 2020-08-27 | 2020-11-03 | 黄河勘测规划设计研究院有限公司 | 混凝土隧洞施工过程中空洞监测方法 |
CN112031826A (zh) * | 2020-08-31 | 2020-12-04 | 中铁四院集团工程建设有限责任公司 | 用于整治隧道变形的方法 |
CN112031826B (zh) * | 2020-08-31 | 2022-09-09 | 中铁四院集团工程建设有限责任公司 | 用于整治隧道变形的方法 |
CN112412479A (zh) * | 2020-10-27 | 2021-02-26 | 中建三局基础设施建设投资有限公司 | 一种盾构长距离空推过矿山法隧道施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102031982B (zh) | 2014-02-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102031982B (zh) | 复合牙支顶过矿山法隧道施工技术 | |
CN102425427B (zh) | 盾构空推过矿山法隧道施工方法 | |
CN100501124C (zh) | 地铁盾构区间隧道联络通道的施工方法 | |
CN105804758B (zh) | 浅覆土大断面小间距的矩形顶管上跨地铁隧道施工方法 | |
CN103775092B (zh) | 隧道浅埋暗挖预留核心土改良crd施工工法 | |
CN204511445U (zh) | 带有双层支护和可变管片直径的硬岩掘进机 | |
CN101672186B (zh) | 一种盾构隧道管片同步注浆方法和装置 | |
CN102155237B (zh) | 盾构掘进过程中更换尾刷的装置及其施工方法 | |
CN104747200A (zh) | 带有双层支护和可变管片直径的硬岩掘进机及其施工方法 | |
CN109372532A (zh) | 复杂地址环境下顶管施工工法 | |
CN105822312A (zh) | 一种地铁隧道工程中土压平衡盾构建压始发的施工方法 | |
CN108386202A (zh) | 城市地铁区间隧道单护盾tbm施工工法 | |
CN101614124A (zh) | 敞开式硬岩掘进机掘进与二次衬砌同步施工方法 | |
CN107178374B (zh) | 双护盾全断面岩石隧道掘进机的辅助支撑结构和前盾组件 | |
CN101936164A (zh) | 极软厚煤层超前支护抱采放顶煤采煤法与液压支架结构 | |
CN205422752U (zh) | 暗挖车站中隔壁法中导洞内顶纵梁与中拱二衬同步施工结构 | |
CN203700978U (zh) | 箱涵先导管幕装置 | |
CN111075457A (zh) | 一种复杂地质条件下盾构机尾盾变形的洞内修复方法 | |
CN111852487A (zh) | 一种防地层失稳式掘进装置及其施工方法 | |
CN105240012A (zh) | 一种实现煤柱同采的f型区段采煤方法 | |
CN104863599B (zh) | 综采工作面同步扩帮安装方法及支护系统 | |
CN211144498U (zh) | 新型盾构刀盘 | |
CN110410088B (zh) | 一种可退回掘进机及其退回方法 | |
CN104533447A (zh) | 采煤工作面沿空留巷支护方法 | |
CN115681613A (zh) | 用于淤泥质粉质黏土层施工中的顶管施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA RAILWAY 16 BUREAU GROUP BEIJING METRO ENGINE Effective date: 20130603 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhao Shuyin Inventor after: Wang Zhicai Inventor after: Gao Xianmin Inventor after: Huang Jianguang Inventor after: Cui Songtao Inventor after: Sun Guohui Inventor after: Guo Xiuqin Inventor after: Fan Zhigao Inventor after: Wu Qiong Inventor before: Zhao Shuyin Inventor before: Wang Zhicai Inventor before: Sun Guohui Inventor before: Guo Xiuqin Inventor before: Wu Qiong |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: ZHAO SHUYIN WANG ZHICAI SUN GUOHUI GUO XIUQIN WU QIONG TO: ZHAO SHUYIN WANG ZHICAI GAO XIANMIN HUANG JIANGUANG CUI SONGTAO SUN GUOHUI GUO XIUQIN FAN ZHIGAO WU QIONG |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20130603 Address after: 100018 Beijing city Chaoyang District No. 2 North Pine dam Park Applicant after: CHINA RAILWAY 16TH BUREAU GROUP Co.,Ltd. Applicant after: CHINA RAILWAY 16 BUREAU GROUP BEIJING METRO ENGINEERING CONSTRUCTION Co.,Ltd. Address before: 100018 Beijing city Chaoyang District No. 2 North Pine dam Park Applicant before: CHINA RAILWAY 16TH BUREAU GROUP Co.,Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140212 |