CN102024208A - Method and system for generating work breakdown structures - Google Patents

Method and system for generating work breakdown structures Download PDF

Info

Publication number
CN102024208A
CN102024208A CN2010106084801A CN201010608480A CN102024208A CN 102024208 A CN102024208 A CN 102024208A CN 2010106084801 A CN2010106084801 A CN 2010106084801A CN 201010608480 A CN201010608480 A CN 201010608480A CN 102024208 A CN102024208 A CN 102024208A
Authority
CN
China
Prior art keywords
task
data
generated
user
described material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010106084801A
Other languages
Chinese (zh)
Inventor
罗涛
贺唤平
陈伟
高峰霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yonyou Software Co Ltd
Original Assignee
Yonyou Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yonyou Software Co Ltd filed Critical Yonyou Software Co Ltd
Priority to CN2010106084801A priority Critical patent/CN102024208A/en
Publication of CN102024208A publication Critical patent/CN102024208A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a method for generating work breakdown structures, which comprises the following steps of: 102, judging whether the data of a selected material contains the data of a material generated into work tasks; 104, if the selected material contains the data of a material generated into work tasks, not importing the data of the material generated into the work tasks; and 106, generating the data of a material not generated into tasks in materials selected by a user into work breakdown structures. The invention also provides a system for generating work breakdown structures. The technical scheme of the invention can ensure that users do not import the data of a material generated into work tasks again, ensure accuracy of plans, and provide working efficiency for preparing project plans.

Description

Work breakdown structure (WBS) generates method and system
Technical field
The present invention relates to enterprise resource planning, relate in particular to work breakdown structure (WBS) and generate method and system.
Background technology
Manufacturing enterprise particularly by single manufacturing enterprise that produces in actual production, generally all be to produce while design, this establishment that just requires the project scheduling is not once to finish, but finishes according to design schedule is progressively additional.Relevant according to Bill of Material (BOM) (Bill Of Materials, be called for short BOM) building work decomposition texture (Work Breakdown Of Structure, abbreviation WBS) method, only support to generate WBS according to BOM, can not handle the problem whether the BOM data that imported repeat to import, like this, for this class enterprise, when formulating the project scheduling, can face identical BOM and import the problem that generates different task many times, the task of causing planning repeats, and plan is inaccurate, increase staff planners' workload, reduce the work efficiency of project scheduling establishment.
Therefore, need a kind of new WBS generation method, can make the user when selecting to generate the BOM data of task, show which BOM data has generated task, which does not generate task, can guarantee that the user can not repeat the importing task, guarantee the accuracy of plan, improve the work efficiency of project scheduling establishment.
Summary of the invention
In view of this, technical matters to be solved by this invention is, provides a kind of work breakdown structure (WBS) to generate method and system, can guarantee that the user can not repeat to import the BOM data that generate task, guarantees the accuracy of planning.
The invention provides a kind of work breakdown structure (WBS) generation method, comprising: whether step 102 has the data of the material that has generated task in the data of the material of judge selecting; In step 104,, then do not repeat to import the data of the material that generates task if judging to have in the material of selecting generates task; Step 106, the data that do not generate the material of task in the material with user's selection generate work breakdown structure (WBS).Like this, do not repeat to generate the material of task in the work breakdown structure (WBS) of generation.
In technique scheme, preferably, before step 102, can also comprise: the data that whether repeat to import the material that generates task are set; Be provided with under the data conditions that does not repeat to import the material that has generated task, be provided with and whether point out the user; Under the situation that the prompting user is set, the data of the material that the prompting user repeats to import are also reselected, do not point out under user's the situation in setting, do not point out the data of the material that the user repeats to import, the data of the material that generates task that directly will repeat to import are deleted from the data of the material selected.Be provided with by these, can generate required work breakdown structure (WBS) according to user's needs, more humane.
In technique scheme, preferably, in step 102, can also comprise: the data of searching the task of the material correspondence in the Bill of Material (BOM), judge whether material that the user selects is present in the data of the task that finds out corresponding material in the task output, if judged result is for existing, then material has generated task, wherein, the concrete rule of searching is: female with the Bill of Material (BOM) that generates task is starting point, search female the previous task that generates task and with the subitem of previous task as female, search the previous task that generates task of subitem again, there are not previous task or previous task not to generate task up to subitem, obtain the data of the generation task of material correspondence, the actual conditions of judging is: the subitem of the material of selection, whether female and layer sign indicating number equal the subitem of the material of the task output correspondence in the data of the task that finds out respectively, female and layer sign indicating number, if judged result is to be the subitem that equals the material of the task output correspondence in the data of the task that finds out respectively, female and layer sign indicating number, then the material of Xuan Zeing has generated task.Like this, can judge exactly whether the material that the user selects has generated task.
In technique scheme, preferably, can also comprise in step 106: the material that will generate task is denoted as and does not generate task.
In technique scheme, preferably, in step 106, can also comprise: adding automatically under the situation of longest path, if the material of longest path has generated task, then with the previous task of newly-generated task as the material of longest path, longest path is the path, place of the duration sum maximum of material; Needing polishing to be positioned under the situation of material in middle layer, if the material in middle layer has generated task, then newly-generated task is as the previous task of the material in middle layer, and the middle layer is the middle layer in path, place that is positioned at the material of selection.Like this, guaranteed the restriction relation of former task and new task.
The present invention also provides a kind of work breakdown structure (WBS) generation system, comprise: judge module is used for judging whether the data of the material of selection have the data of the material that has generated task and judge whether the material of longest path has generated task; Removing module has under the situation that generates task in the judge module judgement, and deletion has generated the data of the material of task; Generation module, the data that are used for the material that the user selects is not generated the material of task generate required work breakdown structure (WBS).Like this, do not repeat to generate the material of task in the work breakdown structure (WBS) of generation.
In technique scheme, preferably, can also comprise: first is provided with module, is used to be provided with and whether repeats to import the data that generate task; Second is provided with module, being used for first the module setting being set does not repeat to import under the data conditions of the material that generates task, be provided with and whether point out the user, under the situation that the prompting user is set, then point out the data of the material that the user repeats to import and reselect, do not point out under user's the situation being provided with, then not point out the data of the material that the user repeats to import, directly the data of the material that generates task that repeats of deletion; Reminding module is used for when judge module is judged material that the user selects and had the data of the material that has generated task the data of the material that the prompting user repeats.Be provided with by these, can generate required work breakdown structure (WBS) according to user's needs, more humane.
In technique scheme, preferably, can also comprise: search module, be used for searching the data of task of the described material correspondence of Bill of Material (BOM); Whether the material that judge module judge to be selected is present in corresponding material in the task output in the data of searching the task that module searches goes out, if judged result is for existing, then material has generated task, wherein, the concrete rule of searching the module searches task is: female with the Bill of Material (BOM) that generates task is starting point, search female the previous task that generates task and with the subitem of previous task as female, search the previous task that generates task of subitem again, there are not previous task or previous task not to generate task up to subitem, obtain the data of the generation task of material correspondence, the actual conditions that judge module is judged is: the subitem of the material of selection, whether female and layer sign indicating number equal the subitem of the material of the task output correspondence in the data of the task that finds out respectively, female and layer sign indicating number, if judged result is to be the subitem that equals the material of the task output correspondence in the data of the task that finds out respectively, female and layer sign indicating number, then the material of Xuan Zeing has generated task.Like this, can judge exactly whether the material that the user selects has generated task.
In technique scheme, preferably, generation module also comprises: indicate module, the material that is used for generating task is denoted as and does not generate task.
In technique scheme, preferably, automatically adding under the situation of longest path, if judge module is judged the material of longest path and has been generated task, then that generation module is newly-generated task is as the previous task of the material of longest path, and longest path is the path, place of the duration sum maximum of material; Needing polishing to be positioned under the situation of material in middle layer in path, place of material of selection, if the material in middle layer has generated task, then newly-generated task is as the previous task of the material in middle layer.Like this, guaranteed the restriction relation of former task and new task.
By technique scheme, can guarantee that the user can not repeat to import the material data that generates task, guarantee the accuracy of planning, the work efficiency of project scheduling establishment is provided.
Description of drawings
Fig. 1 shows the process flow diagram of work breakdown structure (WBS) generation method according to an embodiment of the invention;
Fig. 2 shows the block diagram of work breakdown structure (WBS) generating apparatus according to an embodiment of the invention;
Fig. 3 shows the operating process synoptic diagram of work breakdown structure (WBS) generation method according to an embodiment of the invention; And
Fig. 4 shows the synoptic diagram of bill-of-material structure according to an embodiment of the invention.
Embodiment
In order more to be expressly understood above-mentioned purpose of the present invention, feature and advantage, the present invention is further described in detail below in conjunction with the drawings and specific embodiments.
Set forth a lot of details in the following description so that fully understand the present invention, still, the present invention can also adopt other to be different from other modes described here and implement, and therefore, the present invention is not limited to the restriction of following public specific embodiment.
Fig. 1 shows the process flow diagram of work breakdown structure (WBS) generation method according to an embodiment of the invention.
As shown in Figure 1, work breakdown structure (WBS) generation method comprises according to an embodiment of the invention: whether step 102 has the data of the material that has generated task in the data of the material of judge selecting; In step 104,, then do not repeat to import the data of the material that generates task if judging to have in the material of selecting generates task; Step 106, the data that do not generate the material of task in the material with user's selection generate work breakdown structure (WBS).Like this, do not repeat to generate the material of task in the work breakdown structure (WBS) of generation.
In technique scheme, preferably, before step 102, can also comprise: the data that whether repeat to import the material that generates task are set; Be provided with under the data conditions that does not repeat to import the material that has generated task, be provided with and whether point out the user; Under the situation that the prompting user is set, the data of the material that the prompting user repeats to import are also reselected, do not point out under user's the situation in setting, do not point out the data of the material that the user repeats to import, the data of the material that generates task that directly will repeat to import are deleted from the data of the material selected.Be provided with by these, can generate required work breakdown structure (WBS) according to user's needs, more humane.
In technique scheme, preferably, in step 102, can also comprise: the data of searching the task of the material correspondence in the Bill of Material (BOM), judge whether material that the user selects is present in the data of the task that finds out corresponding material in the task output, if judged result is for existing, then material has generated task, wherein, the concrete rule of searching is: female with the Bill of Material (BOM) that generates task is starting point, search female the previous task that generates task and with the subitem of previous task as female, search the previous task that generates task of subitem again, there are not previous task or previous task not to generate task up to subitem, obtain the data of the generation task of material correspondence, the actual conditions of judging is: the subitem of the material of selection, whether female and layer sign indicating number equal the subitem of the material of the task output correspondence in the data of the task that finds out respectively, female and layer sign indicating number, if judged result is to be the subitem that equals the material of the task output correspondence in the data of the task that finds out respectively, female and layer sign indicating number, then the material of Xuan Zeing has generated task.Like this, can judge exactly whether the material that the user selects has generated task.
In technique scheme, preferably, can also comprise in step 106: the material that will generate task is denoted as and does not generate task.
In technique scheme, preferably, in step 106, can also comprise: adding automatically under the situation of longest path, if the material of longest path has generated task, then with the previous task of newly-generated task as the material of longest path, longest path is the path, place of the duration sum maximum of material; Needing polishing to be positioned under the situation of material in middle layer, if the material in middle layer has generated task, then newly-generated task is as the previous task of the material in middle layer, and the middle layer is the middle layer in path, place that is positioned at the material of selection.Like this, guaranteed the restriction relation of former task and new task.
Fig. 2 shows the block diagram of work breakdown structure (WBS) generating apparatus according to an embodiment of the invention.
As shown in Figure 2, work breakdown structure (WBS) generation system 200 comprises according to an embodiment of the invention: judge module 202 is used for judging whether the data of the material of selection have the data of the material that has generated task and judge whether the material of longest path has generated task; Removing module 204 has under the situation that generates task in judge module 202 judgements, and deletion has generated the data of the material of task; Generation module 206, the data that are used for the material that the user selects is not generated the material of task generate required work breakdown structure (WBS).Like this, do not repeat to generate the material of task in the work breakdown structure (WBS) of generation.
In technique scheme, preferably, can also comprise: first is provided with module 208, is used to be provided with and whether repeats to import the data that generate task; Second is provided with module 210, being used for first module 208 settings being set does not repeat to import under the data conditions of the material that generates task, be provided with and whether point out the user, under the situation that the prompting user is set, then point out the data of the material that the user repeats to import and reselect, do not point out under user's the situation being provided with, then not point out the data of the material that the user repeats to import, directly the data of the material that generates task that repeats of removing module 204 deletions; Reminding module 212 is used for when judge module 202 is judged material that the user selects and had the data of the material that has generated task the data of the material that the prompting user repeats.Be provided with by these, can generate required work breakdown structure (WBS) according to user's needs, more humane.
In technique scheme, preferably, can also comprise: search module 214, be used for searching the data of task of the described material correspondence of Bill of Material (BOM); Judge module 202 judges whether the material of selecting is present in corresponding material in the task output in the data of searching the task that module 214 finds out, if judged result is for existing, then material has generated task, wherein, the concrete rule of searching the module searches task is: female with the Bill of Material (BOM) that generates task is starting point, search female the previous task that generates task and with the subitem of previous task as female, search the previous task that generates task of subitem again, there are not previous task or previous task not to generate task up to subitem, obtain the data of the generation task of material correspondence, the actual conditions that judge module is judged is: the subitem of the material of selection, whether female and layer sign indicating number equal the subitem of the material of the task output correspondence in the data of the task that finds out respectively, female and layer sign indicating number, if judged result is to be the subitem that equals the material of the task output correspondence in the data of the task that finds out respectively, female and layer sign indicating number, then the material of Xuan Zeing has generated task.Like this, can judge exactly whether the material that the user selects has generated task.
In technique scheme, preferably, generation module 206 also comprises: indicate module 2062, the material that is used for generating task is denoted as and does not generate task.
In technique scheme, preferably, automatically adding under the situation of longest path, if judge module 202 judges that the material of longest path has generated task, then that generation module 206 is newly-generated task is as the previous task of the material of longest path, and longest path is the path, place of the duration sum maximum of material; Needing polishing to be positioned under the situation of material in middle layer in path, place of material of selection, if the material in middle layer has generated task, then the newly-generated task of generation module 206 is as the previous task of the material in middle layer.Like this, guaranteed the restriction relation of former task and new task.
By technique scheme, can guarantee that the user can not repeat to import the material data that generates task, guarantee the accuracy of planning, the work efficiency of project scheduling establishment is provided.
Describe the technical scheme of embodiments of the invention in detail below in conjunction with Fig. 3 and Fig. 4.
Fig. 3 shows the operating process synoptic diagram of work breakdown structure (WBS) generation method according to an embodiment of the invention.
As shown in Figure 3, in step 302, the user is selecting BOM condition picture to set the product quantity and the friendship phase of required material and material and is clicking expansion.
In step 304, system call BOM unwind is set expansion BOM according to the user.
In step 306, before the BOM result data loads, be invoked at the method for searching the corresponding task of BOM subitem in the task, this method is specially: with female corresponding task of BOM is starting point, look for the task output BOM subitem ID in the task data in its previous task not to be empty previous task, for these subitems, look for task output BOM subitem ID in its previous task not to be empty previous task more respectively, and as the subitem of its corresponding BOM subitem, till the task output that does not find previous task or previous task does not all have the BOM subitem.The task output data result who calls this method generation is returned to the task that the current BOM data importing of being selected by the user generates.
In step 308, the data that find out the task output are called the method for coupling task output and BOM subitem afterwards, this method is specially: if there is the layer yard of BON subitem in female of BOM in BOM subitem in BOM subitem=task output and the female item=task output of BOM and this BOM subitem layer sign indicating number=task output, illustrate that then this BOM subitem has generated task, otherwise explanation does not generate task.
In step 310, receive BOM expanding data and BOM and import the task data that generates, and be arranged on the BOM subitem and launch to add among the result data rows that has generated task, the BOM expanding data of handling well is showed the user, the layer sign indicating number of generation task and subitem correspondence and female data rows are arranged in the BOM expanding data.
In step 312, the user selects the BOM data of the task that will generate.
In step 314, the user generates the picture setting at formation condition and whether repeats import option.This is provided with decision, and this imports whether need to import the BOM subitem that generates task.
In step 316, also be to generate the processing mode that picture is provided with repeating data at working condition.Be provided with when not repeating to import the BOM subitem that has generated task the user, this processing mode decision is set is to point out the user with repeating data, still repeating data is removed from the BOM data that the user selects.
In step 318, when after the user chooses the BOM data that will import WBS, clicking the generation task, carry out verification, method of calibration is specially: if repeat the import option user whether when being set to not repeat, if there are the BOM data that generated task in the BOM data that the user selects, be provided with according to the user then that the user please be reselected or do not pointed out to BOM data that the prompting user selected to generate task and the BOM data of the task that generates the user not selected import again.
In step 320, after data that the user selects are by verification, call BOM and generate the WBS method, accept the BOM data that the user selects and generate option, according to BOM data generation WBS task.
Wherein, BOM generates the WBS method and is specially: generate task once more if will generate the BOM subitem of task, then select to generate WBS according to existing algorithm according to the user; Generate task once more if will not generate the BOM subitem of task, then algorithm is as follows:
At first carry out pre-service, the BOM subitem that generates task is denoted as the task of not generating, if do not need to add automatically longest path, then algorithm is with existing algorithm; Automatically add longest path if desired, judge then whether the longest path node has generated task, if the longest path node has generated task, then with the previous task of newly-generated task as this task, newly-generated task is as the BOM subitem of this longest path node, if do not need polishing to be positioned at the task of the material of middle layer node, then algorithm is with existing algorithm; Polishing is positioned at the task of the material of middle layer node if desired, judge then whether middle layer node has generated task, if middle layer node has generated task, then newly-generated task is made the previous task of this task, newly-generated task is as the BOM subitem of this task.The node in the path, place of the longest or duration sum maximum time in advance that the longest path node being represented gathering of material.
Pass through technique scheme, can make the user when selecting to generate the BOM data of task, be shown to which BOM data of user and generated task, which does not generate task, and provide and option is set is provided with for the user and whether repeats to import, revise the method that BOM generates WBS that imports simultaneously, guarantee the restriction relation of new task and former task.Can guarantee that the user can not repeat to import the data of the material that generates task, guarantee the accuracy of plan, improve the work efficiency of project scheduling establishment.
In order to further specify the technical scheme of top illustrated embodiments of the invention, the technical scheme of embodiments of the invention is described as example in conjunction with Fig. 4 and some charts more below.
The BOM tree that shows the user as shown in Figure 4, A, B, C, E and F represent five kinds of materials respectively, A is female, layer sign indicating number be ground floor, B and C are the subitems of A, layer sign indicating number be the second layer, E and F are again the subitems of C, layer yard are the 3rd layer.
If calculated term of works time in advance of according to this layer, then the duration of A, B, C, E and F material was respectively 10 days, 20 days, 40 days, 20 days, 30 days, be invoked at the method for searching the corresponding task of BOM subitem in the task, obtain task data then as table 1, as shown in table 1.
Figure BDA0000040941620000091
Table 1
As can be known from Table 1, the material A in the BOM tree, B, C have generated task, and B material and C material are the previous task of A material.
If the user selects the A material, it is as shown in table 2 that then BOM launches the result.
Sequence number ?BOM Duration Layer sign indicating number Female The generation task Select
10 A 20 1 True
20 B 10 2 10 True
30 C 10 2 40 True
40 E 20 3 30 False
50 F 30 3 30 False
Table 2
As shown in table 2, BOM launches kind as a result and has the layer sign indicating number of production task data rows and corresponding material and female.If the user has selected C, E, F material to generate work breakdown structure (WBS), as shown in table 3 below according to the result of relevant technical scheme execution so:
Figure BDA0000040941620000101
Table 3
As can be seen from the table, A, C material repeat to import.
If the user has selected E, F material, according to the technical scheme of embodiments of the invention, no matter whether repeat to import the data of the material that generates task, the work breakdown structure (WBS) of generation is as shown in table 4 below:
Figure BDA0000040941620000102
Table 4
If the user selects C, E, these three kinds of materials of F, and the user selected not repeat to import the data of the material that has generated task, and then the work breakdown structure (WBS) of Sheng Chenging is as above shown in the table 4.
If the user selects C, E, these three kinds of materials of F, the user has selected not repeat to import the data of the material that has generated task, and the data of the material that the processing mode of selecting repeating data repeats to select for this user of prompting, system prompt user then: selected BOM data sequence number: 30, material C has generated task, please reselect.
If the user selects C, E, these three kinds of materials of F, the user has selected not repeat to import the data of the material that has generated task, and the processing mode that repeating data is set is the data that do not import the material that generates task of repetition, and execution result is as shown in table 5 below:
Figure BDA0000040941620000111
Table 5
As can be seen from the table, the C material has generated task, so do not repeat to import.
If the user selects C, E, these three kinds of materials of F, the user has selected to repeat to import the data of the material that has generated task, and then execution result is as shown in table 6 below:
Figure BDA0000040941620000112
Table 6
As can be seen from Table 6, the C material is repeated to generate task.
BOM structural relation in the reality is used the technical scheme of embodiments of the invention than the complexity shown in the example, can avoid having generated the selected once more task that generates of data of task, has improved work efficiency.
More than, with reference to the accompanying drawings embodiments of the invention are described in detail.Technical scheme according to this embodiment of the invention, can realize that a kind of work breakdown structure (WBS) generates method and system, can be provided with according to the user and select not repeat to import the material data that has generated task, and processing mode that can the set handling repeating data, can guarantee the accuracy of planning, improve the work efficiency of project scheduling establishment.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a work breakdown structure (WBS) generation method is characterized in that, comprising:
Whether step 102 has the described data of the described material that has generated task in the data of the material of judge selecting;
In step 104,, then do not repeat to import the data of the described material that generates described task if judging to have in the described material of selecting generates described task;
Step 106, the described data that do not generate the described material of described task in the described material with user's selection generate described work breakdown structure (WBS).
2. work breakdown structure (WBS) generation method according to claim 1 is characterized in that, also comprises before step 102: the data that whether repeat to import the described material that generates described task are set;
Be provided with under the described data conditions that does not repeat to import the described material that has generated described task, be provided with and whether point out the user;
Under the situation that the described user of prompting is set, point out the described data of the described described material that repeats to import of described user and reselect, do not point out under described user's the situation in setting, do not point out the described data of the described described material that repeats to import of described user, directly the described data of the described described material that generates described task that repeats to import are deleted from the described data of the described material of described selection.
3. work breakdown structure (WBS) generation method according to claim 1, it is characterized in that, in step 102, also comprise: the data of searching the described task of the described material correspondence in the Bill of Material (BOM), judge whether described material that described user selects is present in the data of the described task that finds out corresponding described material in the task output, if judged result is for existing, then described material has generated described task
Wherein, The specific rules of searching is: take female of the described BOM that generates described task as starting point; Search described female the previous task that generates described task and with described previous task as described female subitem; Search again the described previous task that generates described task of described subitem; Until described subitem does not have described previous task or described previous task not to generate described task; Obtain the data of described generation task corresponding to described material
The actual conditions of judging is: whether the subitem of the described material of selection, female and layer sign indicating number equal subitem, female and the layer sign indicating number of the described material of the task output correspondence in the data of the described task that finds out respectively, if judged result is to be subitem, female and the layer sign indicating number that equals the described material of the task output correspondence in the data of the described task that finds out respectively, then the described material of Xuan Zeing has generated described task.
4. work breakdown structure (WBS) generation method according to claim 1 is characterized in that, also comprises in step 106: the material that will generate described task is denoted as and does not generate described task.
5. according to each described work breakdown structure (WBS) generation method in the claim 1 to 4, it is characterized in that, in step 106, also comprise: adding automatically under the situation of longest path, if the described material of described longest path has generated described task, then with the previous task of newly-generated described task as the described material of described longest path, described longest path is the path, place of the duration sum maximum of described material;
Needing polishing to be positioned under the situation of described material in middle layer, if the described material in described middle layer has generated described task, then newly-generated described task is as the described previous task of the described material in described middle layer, and described middle layer is the middle layer in path, described place that is positioned at the described material of selection.
6. a work breakdown structure (WBS) generation system is characterized in that, comprising:
Judge module is used for judging whether the data of the material of selection have the described data of the described material that has generated task and judge whether the described material of longest path has generated described task;
Removing module has under the situation that generates described task in described judge module judgement, and deletion has generated the data of the described material of described task;
Generation module, the described data that are used for the described material that the user selects is not generated the described material of described task generate required described work breakdown structure (WBS).
7. work breakdown structure (WBS) generation system according to claim 6 is characterized in that, also comprises: first is provided with module, is used to be provided with and whether repeats to import the data that generate described task;
Second is provided with module, be used for being provided with under the described data conditions that the module setting do not repeat to import the described material that generates described task described first, be provided with and whether point out described user, under the situation that the described user of prompting is set, then point out the described data of the described described material that repeats to import of described user and reselect, do not point out under described user's the situation in setting, then do not point out the described data of the described described material that repeats to import of described user, described removing module is directly deleted the described described data that generated the described material of described task of repetition;
Reminding module is used for pointing out the described data of the described material of the described repetition of described user when described judge module is judged described material that described user selects and had the data of the described material that has generated described task.
8. work breakdown structure (WBS) generation system according to claim 6 is characterized in that, also comprises: search module, be used for searching the data of described task of the described material correspondence of Bill of Material (BOM);
Described judge module judges whether the described material of selecting is present in corresponding described material in the task output in the described data of searching the described task that module searches goes out, if judged result is for existing, then described material has generated described task,
Wherein, The described specific rules of searching the described task of module searches is: take female of the described BOM that generates described task as starting point; Search described female the previous task that generates described task and with described previous task as described female subitem; Search again the described previous task that generates described task of described subitem; Until described subitem does not have described previous task or described previous task not to generate described task; Obtain the data of described generation task corresponding to described material
The actual conditions that described judge module is judged is: whether the subitem of the described material of selection, female and layer sign indicating number equal subitem, female and the layer sign indicating number of the described material of the task output correspondence in the data of the described task that finds out respectively, if judged result is to be subitem, female and the layer sign indicating number that equals the described material of the task output correspondence in the data of the described task that finds out respectively, then the described material of Xuan Zeing has generated described task.
9. system according to claim 6 is characterized in that, described generation module also comprises: indicate module, the described material that is used for generating described task is denoted as and does not generate described task.
10. according to each described work breakdown structure (WBS) system in the claim 6 to 9, it is characterized in that, automatically adding under the situation of longest path, if described judge module is judged the described material of described longest path and has been generated described task, then that described generation module is newly-generated described task is as the previous task of the described material of described longest path, and described longest path is the path, place of the duration sum maximum of described material;
Needing polishing to be positioned under the situation of described material in middle layer in path, described place of described material of selection, if the described material in described middle layer has generated described task, then between the newly-generated described task of described generation module as the described previous task of the described material in described middle layer.
CN2010106084801A 2010-12-27 2010-12-27 Method and system for generating work breakdown structures Pending CN102024208A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010106084801A CN102024208A (en) 2010-12-27 2010-12-27 Method and system for generating work breakdown structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010106084801A CN102024208A (en) 2010-12-27 2010-12-27 Method and system for generating work breakdown structures

Publications (1)

Publication Number Publication Date
CN102024208A true CN102024208A (en) 2011-04-20

Family

ID=43865479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010106084801A Pending CN102024208A (en) 2010-12-27 2010-12-27 Method and system for generating work breakdown structures

Country Status (1)

Country Link
CN (1) CN102024208A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208063A (en) * 2011-06-03 2011-10-05 用友软件股份有限公司 Task data generating device and task data generating method
CN103136246A (en) * 2011-11-30 2013-06-05 成都飞机工业(集团)有限责任公司 Work breakdown structure (WBS) automatic generation method based on flow diagram

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101458786A (en) * 2007-12-14 2009-06-17 英业达股份有限公司 Material bracket altering method and system of material manifest
CN101673372A (en) * 2009-09-16 2010-03-17 金蝶软件(中国)有限公司 Method and device for updating bill of material
CN101697216A (en) * 2009-11-06 2010-04-21 金蝶软件(中国)有限公司 Importing method of product data management data and enterprise resource planning system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101458786A (en) * 2007-12-14 2009-06-17 英业达股份有限公司 Material bracket altering method and system of material manifest
CN101673372A (en) * 2009-09-16 2010-03-17 金蝶软件(中国)有限公司 Method and device for updating bill of material
CN101697216A (en) * 2009-11-06 2010-04-21 金蝶软件(中国)有限公司 Importing method of product data management data and enterprise resource planning system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208063A (en) * 2011-06-03 2011-10-05 用友软件股份有限公司 Task data generating device and task data generating method
CN102208063B (en) * 2011-06-03 2015-09-02 用友软件股份有限公司 Task data generating apparatus and task data generation method
CN103136246A (en) * 2011-11-30 2013-06-05 成都飞机工业(集团)有限责任公司 Work breakdown structure (WBS) automatic generation method based on flow diagram

Similar Documents

Publication Publication Date Title
Li et al. Single batch processing machine scheduling with two-dimensional bin packing constraints
McGovern et al. 2-opt heuristic for the disassembly line balancing problem
CN104915260B (en) A kind of distribution method and system of Hadoop cluster managements task
CN107239468B (en) Task node management method and device
CN110751358A (en) Scheduling method for airport ground service personnel, electronic equipment and storage medium
CN101976240B (en) Form number generating method and system
CN108898351A (en) Distribution side's selection method, system, medium and calculating equipment
CN105302533A (en) Code synchronizing method and apparatus
CN104915251A (en) Task scheduling method and device
CN104461743A (en) Device and method for automatically generating resources and configuration
CN102857949B (en) A kind of method and apparatus that layout data consistency guarantees
CN104573184A (en) Construction method and construction device for high speed train product meta-model
CN105447296A (en) Poker hand pattern sequence data processing system, apparatus and method and Poker card order sequence data processing system, apparatus and method
CN105300398A (en) Method, device and system for acquiring site information
Li et al. Scheduling policies for the stochastic resource leveling problem
CN101673374A (en) Bill processing method and device
CN102207935A (en) Method and system for establishing index
CN106844319A (en) Report form generation method and device
CN106648839A (en) Method and device for processing data
CN102024208A (en) Method and system for generating work breakdown structures
CN105446812A (en) Multitask scheduling configuration method
CN102253837A (en) Object tree-based software framework designing technology
CN104239212A (en) Query method and device of test case and establishment method and device of test case
CN108921502B (en) Project process tracking method and device
CN103686668A (en) Data updating method, system and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110420