CN101673372A - Method and device for updating bill of material - Google Patents

Method and device for updating bill of material Download PDF

Info

Publication number
CN101673372A
CN101673372A CN200910173436A CN200910173436A CN101673372A CN 101673372 A CN101673372 A CN 101673372A CN 200910173436 A CN200910173436 A CN 200910173436A CN 200910173436 A CN200910173436 A CN 200910173436A CN 101673372 A CN101673372 A CN 101673372A
Authority
CN
China
Prior art keywords
bom
client
configuration
feature
change
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910173436A
Other languages
Chinese (zh)
Inventor
林细洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kingdee Software China Co Ltd
Original Assignee
Kingdee Software China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kingdee Software China Co Ltd filed Critical Kingdee Software China Co Ltd
Priority to CN200910173436A priority Critical patent/CN101673372A/en
Publication of CN101673372A publication Critical patent/CN101673372A/en
Pending legal-status Critical Current

Links

Images

Abstract

The embodiment of the invention discloses a method and device for updating a bill of material. The method provided by the embodiment of the invention configures the relationship between BOMID of BOM and the client BOM to automatically obtain and configure first client BOM corresponding to BOM, further determines second client BOM of current changing material which is non-characteristic in the first client BOM, and then determines third client BOM which is needed to change with configured BOM synchronously on the basis of the second client BOM. The method of the invention simplifies the operation process of changing client BOM synchronously when configuring the update of BOM, increases the work efficiency and usability for synchronously changing client BOM to a great extent, increases the accuracy of operation and reduces the error rate.

Description

A kind of method and apparatus that upgrades Bill of Material (BOM)
Technical field
The present invention relates to the ERP technical field, relate in particular to a kind of method and apparatus that upgrades Bill of Material (BOM).
Background technology
Bill of Material (BOM) (BOM, Bill Of Material) is the key foundation data of ERP system.The material of product constitutes inventory, reflected product by starting material to semi-manufacture, again to finished product the process and assemble process---a certain material which time stage material is made of, how many consumptions of stage material is under each, its corresponding attribute be what etc.Bill of Material (BOM) is the important foundation data of corporation plan, buying, production, commercial affairs, cost accounting and technical management.Bill of Material (BOM) whether accurately, neat cover whether in time, directly have influence on the running of related services such as market, commercial affairs, plan, production.
Each BOM generally is made up of father's item material and more than one subitem material, and its subitem can be father's item of another one BOM.Configuration BOM refers to the BOM of material attribute for configuration class material, and it is that all component materials of the diversified product of a class are all unified to be put among the BOM.The user configures the client BOM that meets different customer requirements according to different clients' needs.
For example computer housing has red cabinet, blue cabinet, the black cabinet, we are put into a BOM the inside with the cabinet of these colors, this BOM disposes BOM exactly, the client only selects a kind of color when buying, we just dispose BOM according to this and configure the various different client BOM that meet so, these BOM that dispose out according to actual customer demand family BOM that just calls out-customer.
In configuration BOM, some material is all the same at all client BOM, and these materials just are non-characteristic body material.
Configuration class BOM and feature class BOM are client BOM through the formed BOM in configuration back.Class BOM and feature class BOM dispose with configuration, carry out customization and generate client BOM, with a series of client BOM as the BOM configuration scheme of finally meeting customer need.
The inventor, when configuration BOM is updated, if wish to upgrade synchronously client BOM, can only manually finish in the existing BOM allocation plan by to the discovering of prior art.And manual modification need be reassigned the client BOM of lower floor, and when a lot of and level each client BOM of the client BOM that changes when needs was also a lot, the workload of this change was very big, and error rate is very high.
Summary of the invention
In view of this, the purpose of the embodiment of the invention is to provide a kind of method and apparatus that upgrades Bill of Material (BOM), when realization is upgraded configuration BOM, upgrades client BOM accurately and efficiently.
For achieving the above object, the embodiment of the invention provides following technical scheme:
A kind of method of upgrading Bill of Material (BOM) BOM comprises:
BOM sign BOMID according to the configuration BOM under the material of current change when configuration BOM is carried out alter operation obtains the first corresponding client BOM with described configuration BOM;
Whether the material of judging current change is non-feature in the described first client BOM;
If the material of current change is non-feature in the described first client BOM, then described client BOM is the second client BOM;
Need among the described second client BOM to determine the 3rd client BOM of change synchronously;
The alter operation that carries out according to the described non-feature to described configuration BOM carries out same alter operation to the 3rd client BOM.
Described alter operation comprises deletion material or newly-increased material.
Describedly judge whether the material of current change is non-feature in the described first client BOM:
Whether the non-feature sign of judging the material of current change is true.
Obtaining the first client BOM corresponding with described configuration BOM according to the BOMID of the configuration BOM under the material of current change comprises:
Determine the BOMID of the configuration BOM under the material of current change;
From the gauge outfit information of BOM, search the first client BOM of BOMID of configuration BOM that the FparentID field equals the material place of current change.
Need among the described second client BOM to determine the 3rd client BOM of change synchronously to comprise:
By selecting the interface that the described second client BOM is offered the user, choose the 3rd client BOM that needs synchronous change for the user;
Obtain synchronous the 3rd client BOM that changes of needs that the user chooses.
Described the 3rd client BOM comprises the client BOM among at least one described second client BOM.
According to the alter operation that the described described non-feature that disposes BOM is carried out the 3rd client BOM being carried out same alter operation is specially:
The material identical with the material ISN of quilt change material among the configuration BOM to material ISN among the table body information table ICCUSTBOMCHILD of the 3rd client BOM changes.
A kind of device that upgrades Bill of Material (BOM) BOM comprises:
Acquiring unit, be used for to configuration BOM when carrying out alter operation the BOM sign BOMID according to the configuration BOM under the material of current change obtain the first corresponding client BOM with described configuration BOM;
Identifying unit judges whether the material of current change is non-feature in the described first client BOM;
First determining unit, the material that is used for current change determines that described client BOM is the second client BOM when the described first client BOM is non-feature;
Second determining unit is used for determining that the described second client BOM needs the 3rd client BOM of change synchronously;
The change unit is used for according to the alter operation that the described non-feature to described configuration BOM carries out the 3rd client BOM being carried out same alter operation.
Described judging unit, whether the non-feature sign of the material by judging current change judges whether the material of current change is non-feature.
Described acquiring unit comprises:
Determine subelement, be used for determining the BOMID of the configuration BOM under the material of current change;
Search subelement, be used for searching the first client BOM of BOMID of configuration BOM that the FparentID field equals the material place of current change from the gauge outfit information of BOM.
As seen, in embodiments of the present invention, the BOM sign BOMID according to the configuration BOM under the material of current change when configuration BOM is carried out alter operation obtains the first corresponding client BOM with described configuration BOM; Whether the material of judging current change is non-feature in the described first client BOM; If the material of current change is non-feature in the described first client BOM, then described client BOM is the second client BOM; Need among the described second client BOM to determine the 3rd client BOM of change synchronously; The alter operation that carries out according to the described non-feature to described configuration BOM carries out same alter operation to the 3rd client BOM.The scheme that the embodiment of the invention provided is obtained the first client BOM corresponding with disposing BOM by the BOMID of configuration BOM automatically with corresponding relation among the client BOM, the material of further determining current variation is the second client BOM of non-feature in the first client BOM, on the basis of the second client BOM, determine the 3rd client BOM that need change synchronously with configuration BOM then, simplified when configuration BOM change, the operating process of change client BOM synchronously, work efficiency and the ease for use of synchronous change client BOM have been improved to a great extent, improve the accuracy of operation, reduced error rate.
Description of drawings
In order to be illustrated more clearly in the technical scheme in the embodiment of the invention, the accompanying drawing of required use is done to introduce simply in will describing the embodiment of the invention below, apparently, accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the process flow diagram of the method that one embodiment of the invention provided;
Fig. 2 is the process flow diagram of the method that another embodiment of the present invention provided;
Fig. 3 is the process sectional drawing of the method that one embodiment of the invention provided;
Fig. 4 is the process sectional drawing of the method that another embodiment of the present invention provided;
Fig. 5 is the structural representation of the device that one embodiment of the invention provided;
Fig. 6 is the structural representation of a unit in the device that one embodiment of the invention provided.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that is obtained under the creative work prerequisite.
Referring to Fig. 1, the method that the embodiment of the invention provided comprises:
S101, the BOM sign BOMID according to the configuration BOM under the material of current change when configuration BOM is carried out alter operation obtains the first corresponding client BOM with described configuration BOM;
In the embodiment of the invention, the alter operation that the material among the configuration BOM is carried out comprises deletion material or newly-increased material.In the practical application, if certain material changes, its essence also is earlier with a material deletion, then at newly-increased material.
In the embodiment of the invention, the relevant information of BOM is mainly carried out record by three physics tables in database, comprise gauge outfit information table (as the ICBOM table), the first table body information table (as ICBOMCHILD physics table) and the second table body information table (as ICCUSTBOMCHILD physics table).Wherein, the first table body information table is used for the table body information of stored configuration BOM, the table body information that the second table body information table is used to store client BOM.And the gauge outfit information of configuration BOM and client BOM all is stored in the gauge outfit information table.
In the gauge outfit information table, can distinguish the gauge outfit information of configuration BOM and the gauge outfit information of client BOM by a field.For example, in the ICBOM table, distinguish client BOM and configuration BOM by field FparentID.For configuration BOM, then that this field store is the BOM group ID of configuration under the BOM, and for client BOM, this field store be the BOM sign (BOMID) of the pairing configuration of client BOM BOM.
The first client BOM is all client BOM that the FParentID field among the Table I CBOM equals configuration BOMID in the change in the work.Introduce us and know that the FParentID field record the BOMID of the pairing configuration of client BOM BOM by top.If so the FParentID field of a client BOM equate with the ID of the configuration BOM that is changed, illustrate that then this configuration BOM and this client BOM are corresponding.So when the material among the configuration BOM is changed, need find all client BOM of this configuration BOM correspondence.
S102 judges whether the material of current change is non-feature in the described first client BOM;
Identify by increasing non-feature in advance that to distinguish a material be non-feature or feature in the embodiment of the invention.For example, can be by in the table body information table of client BOM, increasing a parameter, for example in ICBOMCHILD physics table, increase the non-feature sign of this parameter of ForgMarshType as material, it is set to Boolean variable, when its value is true, for example its value is 1 o'clock, thinks that its corresponding material is non-feature, otherwise is feature.
S103, if the material of current change is to be non-feature in the described first client BOM, then described client BOM is the second client BOM; If when the material that takes place to change was non-feature in the first client BOM, this client BOM was the second client BOM.Is that the situation of feature forecloses by S103 with the material of current change.
S104 need among the described second client BOM to determine the 3rd client BOM of change synchronously;
Need to prove that in the practical application, a material that disposes among the BOM changes, not all and its corresponding client BOM needs synchronous change.In order to realize change synchronously exactly, also need from the second client BOM, to determine need with the configuration BOM of the change client BOM of change synchronously---i.e. the 3rd client BOM.Comprise the client BOM among at least one second client BOM among the 3rd client BOM.
S105, the alter operation that carries out according to the described non-feature to described configuration BOM carries out same alter operation to the 3rd client BOM.
After having determined the 3rd client BOM that need change synchronously with the configuration BOM of change, the alter operation that carries out according to the described non-feature to described configuration BOM carries out same alter operation to the 3rd client BOM.Even dispose and increased certain material among the BOM newly, then newly-increased same material in client BOM.If deleted certain material among the configuration BOM, then in client BOM, delete same material.
In the prior art, when change takes place in configuration BOM, the user needs manual the modification and this configuration BOM corresponding client BOM, manual operations is loaded down with trivial details, poor efficiency and makeing mistakes easily, especially ought exist under the more situation of multi-layer configuration and configuration BOM client BOM down, operate and seem more loaded down with trivial details, and error rate is higher.And the BOMID of the method that the embodiment of the invention provided by configuration BOM obtains the first client BOM corresponding with disposing BOM automatically with corresponding relation among the client BOM, the material of further determining current variation is the second client BOM of non-feature in the first client BOM, on the basis of the second client BOM, determine the 3rd client BOM that need change synchronously with configuration BOM then, simplified when configuration BOM change, the operating process of change client BOM synchronously, work efficiency and the ease for use of synchronous change client BOM have been improved to a great extent, improve the accuracy of operation, reduced error rate.
Fig. 2 is another embodiment of the present invention, specifically comprises:
S201 sets up Zhang Gong's journey Request for Change.
In the embodiment of the invention, by the change in the work unirecord to the change carried out of configuration BOM, and with the record guidance of this project Request for Change synchronous change to client BOM.
S202 obtains the current BOMID that carries out the configuration BOM of alter operation from ICBOM.
In the embodiment of the invention, alter operation comprises deletion material or newly-increased material.In the embodiment of the invention with the deletion material be that example describes.
S203 obtains the first client BOM that the FparentID field equals to dispose the BOMID of BOM from ICBOM.
Introduce us by the front and know, preserved the gauge outfit information of configuration BOM and client BOM among the ICBOM.FParentID field record wherein the ID of the pairing configuration of client BOM BOM.So the first client BOM is exactly all client BOMs corresponding with the configuration BOM that carries out alter operation.Just may need all client BOM of changing synchronously.
S204 judges whether the ForgMarshType value of the material of current change among the described first client BOM is 1.
In the embodiment of the invention, by the non-feature sign of this parameter of ForgMarshType as material among the client BOM.ForgMarshType is a Boolean variable, has only two values, can represent with 0,1.When the value of ForgMarshType is 1, represent that its corresponding material is non-feature.When its value is 0, represent that then its corresponding material is a feature.
S205, if the ForgMarshType=1 of the material of current change among the first client BOM, then described client BOM is the second client BOM, and the ISN of this material is recorded in the change in the work list.
S206 for the user provides interactive interface, offers the user with the second client BOM and need to select the 3rd client BOM of change synchronously for it.
S207 receives the 3rd client BOM that the user selects, and deletes among the ICCUSTBOMCHILD of the 3rd client BOM the identical material of material ISN in the material ISN and change in the work singly.
The information stores of client BOM table body is in ICCUSTBOMCHILD physics table.In the embodiment of the invention, use the ISN of the material that changes among the change in the work unirecord configuration BOM, after having determined the 3rd client BOM, directly that material ISN among the ICCUSTBOMCHILD of the 3rd BOM is identical with material ISN in change in the work list material changes and gets final product.
In the practical application, change in the work singly is complementary means, even do not adopt change in the work single, as long as after having determined the 3rd client BOM, can be with the material ISN that is changed material among material ISN among the ICCUSTBOMCHILD of the 3rd client BOM and the configuration BOM identical material change and get final product.Qualification is not done in the present invention's contrast.
Fig. 3 is the process sectional drawing that this one embodiment of the invention provided, and as can be seen from Figure 3, this alter operation is the deletion material.One comprises three client BOM among the first client BOM that obtains by the method that the embodiment of the invention provided, and numbering is respectively CustBOM000001, CustBOM000002, CustBOM000003.By this interactive interface, the user has selected two client BOM (being numbered CustBOM000002, CustBOM000003), is about to be numbered among the ICCUSTBOMCHILD of client BOM of CustBOM000002, CustBOM000003 deleted by the identical material of the material ISN of change material in the material ISN and configuration BOM.
Fig. 4 is the process sectional drawing that another embodiment of the present invention provided, and as can be seen from Figure 4, this alter operation is newly-increased material.One comprises three client BOM among the first client BOM that obtains by step S203, and numbering is respectively CustBOM000001, CustBOM000002, CustBOM000003.By this interactive interface, the user selects all client BOM, promptly the 3rd client BOM integral body increases operation newly, and it is newly-increased to the ICCUSTBOMCHILD of the client BOM that is numbered CustBOM000001, CustBOM000002 and CustBOM000003 to be about to the material identical with the material ISN of quilt change material among the configuration BOM.
The method that the embodiment of the invention provided, BOMID and the corresponding relation among the client BOM by configuration BOM obtain the first client BOM corresponding with disposing BOM automatically, the material of further determining current variation is the second client BOM of non-feature in the first client BOM, on the basis of the second client BOM, determine the 3rd client BOM that need change synchronously with configuration BOM then, simplified when configuration BOM change, the operating process of change client BOM synchronously, work efficiency and the ease for use of synchronous change client BOM have been improved to a great extent, improve the accuracy of operation, reduced error rate.
Referring to Fig. 5, one embodiment of the invention also provides a kind of device that upgrades Bill of Material (BOM) BOM, comprising:
Acquiring unit 501, be used for to configuration BOM when carrying out alter operation the BOM sign BOMID according to the configuration BOM under the material of current change obtain the first corresponding client BOM with described configuration BOM;
In the embodiment of the invention, the relevant information of BOM is mainly carried out record by three physics tables in database, comprise gauge outfit information table (as the ICBOM table), the first table body information table (as ICBOMCHILD physics table) and the second table body information table (as ICCUSTBOMCHILD physics table).Wherein, the first table body information table is used for the table body information of stored configuration BOM, the table body information that the second table body information table is used to store client BOM.And the gauge outfit information of configuration BOM and client BOM all is stored in the gauge outfit information table.
In the gauge outfit information table, can distinguish the gauge outfit information of configuration BOM and the gauge outfit information of client BOM by a field.For example, in the ICBOM table, distinguish client BOM and configuration BOM by field FparentID.For configuration BOM, then that this field store is the BOM group ID of configuration under the BOM, and for client BOM, this field store be the BOMID of the pairing configuration of client BOM BOM.
The first client BOM is all client BOM that the FParentID field among the Table I CBOM equals configuration BOMID in the change in the work.Introduce us and know that the FParentID field record the BOMID of the pairing configuration of client BOM BOM by top.If so the FParentID field of a client BOM equate with the ID of the configuration BOM that is changed, illustrate that then this configuration BOM and this client BOM are corresponding.So when the material among the configuration BOM is changed, need find all client BOM of this configuration BOM correspondence.
Identifying unit 502 judges whether the material of current change is non-feature in the described first client BOM;
First determining unit 503, the material that is used for current change determines that described client BOM is the second client BOM when the described first client BOM is non-feature;
Second determining unit 504 is used for determining that the described second client BOM needs the 3rd client BOM of change synchronously;
Change unit 505 is used for according to the alter operation that the described non-feature to described configuration BOM carries out the 3rd client BOM being carried out same alter operation.
Wherein, whether the non-feature sign of the material that described judging unit 502 specifically can be by judging current change judges whether the material of current change is non-feature.
Identify by increasing non-feature in advance that to distinguish a material be non-feature or feature in the embodiment of the invention.For example, by the non-feature sign of this parameter of ForgMarshType as material, it is set to Boolean variable, when its value is that very perhaps value is 1 o'clock, thinks that its corresponding material is non-feature, otherwise is feature.
In the embodiment of the invention, the alter operation that the material among the configuration BOM is carried out comprises deletion material or newly-increased material.In the practical application, if certain material changes, its essence also is earlier with a material deletion, then at newly-increased material.
Referring to Fig. 6, in an embodiment of the present invention, acquiring unit 501 shown in Figure 5 can comprise:
Determine subelement 601, be used for determining the BOMID of configuration BOM at the material place of current change;
Search subelement 602, be used for searching the first client BOM of BOMID of configuration BOM that the FparentID field equals the material place of current change from the gauge outfit information of BOM.
The device that the embodiment of the invention provided obtains the first client BOM corresponding with disposing BOM by the BOMID of configuration BOM automatically with corresponding relation among the client BOM, the material of further determining current variation is the second client BOM of non-feature in the first client BOM, on the basis of the second client BOM, determine the 3rd client BOM that need change synchronously with configuration BOM then, simplified when configuration BOM change, the operating process of change client BOM synchronously, work efficiency and the ease for use of synchronous change client BOM have been improved to a great extent, improve the accuracy of operation, reduced error rate.
The present invention can describe in the general context of the computer executable instructions of being carried out by computing machine, for example program module.Usually, program module comprises the routine carrying out particular task or realize particular abstract, program, object, assembly, data structure or the like.Also can in distributed computing environment, put into practice the present invention, in these distributed computing environment, by by communication network connected teleprocessing equipment execute the task.In distributed computing environment, program module can be arranged in the local and remote computer-readable storage medium that comprises memory device.
The above only is a preferred implementation of the present invention; should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the principle of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (10)

1, a kind of method of upgrading Bill of Material (BOM) BOM is characterized in that, comprising:
BOM sign BOMID according to the configuration BOM under the material of current change when configuration BOM is carried out alter operation obtains the first corresponding client BOM with described configuration BOM;
Whether the material of judging current change is non-feature in the described first client BOM;
If the material of current change is non-feature in the described first client BOM, then described client BOM is the second client BOM;
Need among the described second client BOM to determine the 3rd client BOM of change synchronously;
The alter operation that carries out according to the described non-feature to described configuration BOM carries out same alter operation to the 3rd client BOM.
2, method according to claim 1 is characterized in that, described alter operation comprises deletion material or newly-increased material.
3, method according to claim 1 is characterized in that, describedly judges whether the material of current change is non-feature in the described first client BOM:
Whether the non-feature sign of judging the material of current change is true.
4, method according to claim 1 is characterized in that, obtains the first client BOM corresponding with described configuration BOM according to the BOMID of the configuration BOM under the material of current change and comprises:
Determine the BOMID of the configuration BOM under the material of current change;
From the gauge outfit information of BOM, search the first client BOM of BOMID of configuration BOM that the FparentID field equals the material place of current change.
5, method according to claim 1 is characterized in that, need among the described second client BOM to determine the 3rd client BOM of change synchronously to comprise:
By selecting the interface that the described second client BOM is offered the user, choose the 3rd client BOM that needs synchronous change for the user;
Obtain synchronous the 3rd client BOM that changes of needs that the user chooses.
6, method according to claim 5 is characterized in that, described the 3rd client BOM comprises the client BOM among at least one described second client BOM.
7, method according to claim 4 is characterized in that, according to the alter operation that the described described non-feature that disposes BOM is carried out the 3rd client BOM is carried out same alter operation and is specially:
The material identical with the material ISN of quilt change material among the configuration BOM to material ISN among the table body information table ICCUSTBOMCHILD of the 3rd client BOM changes.
8, a kind of device that upgrades Bill of Material (BOM) BOM is characterized in that, comprising:
Acquiring unit, be used for to configuration BOM when carrying out alter operation the BOM sign BOMID according to the configuration BOM under the material of current change obtain the first corresponding client BOM with described configuration BOM;
Identifying unit judges whether the material of current change is non-feature in the described first client BOM;
First determining unit, the material that is used for current change determines that described client BOM is the second client BOM when the described first client BOM is non-feature;
Second determining unit is used for determining that the described second client BOM needs the 3rd client BOM of change synchronously;
The change unit is used for according to the alter operation that the described non-feature to described configuration BOM carries out the 3rd client BOM being carried out same alter operation.
9, device according to claim 8 is characterized in that,
Described judging unit, whether the non-feature sign of the material by judging current change judges whether the material of current change is non-feature.
10, device according to claim 8 is characterized in that, described acquiring unit comprises:
Determine subelement, be used for determining the BOMID of the configuration BOM under the material of current change;
Search subelement, be used for searching the first client BOM of BOMID of configuration BOM that the FparentID field equals the material place of current change from the gauge outfit information of BOM.
CN200910173436A 2009-09-16 2009-09-16 Method and device for updating bill of material Pending CN101673372A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910173436A CN101673372A (en) 2009-09-16 2009-09-16 Method and device for updating bill of material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910173436A CN101673372A (en) 2009-09-16 2009-09-16 Method and device for updating bill of material

Publications (1)

Publication Number Publication Date
CN101673372A true CN101673372A (en) 2010-03-17

Family

ID=42020588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910173436A Pending CN101673372A (en) 2009-09-16 2009-09-16 Method and device for updating bill of material

Country Status (1)

Country Link
CN (1) CN101673372A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102024208A (en) * 2010-12-27 2011-04-20 用友软件股份有限公司 Method and system for generating work breakdown structures
CN102034166A (en) * 2010-12-27 2011-04-27 用友软件股份有限公司 Method and device for acquiring material changing range
CN103853556A (en) * 2014-03-04 2014-06-11 北京神舟航天软件技术有限公司 Method for building accurate BOM (Bill of Materials) in PDM (Product Data Management) system
CN104361436A (en) * 2014-10-30 2015-02-18 南京航空航天大学 Method and device for engineering change information transfer on basis of three-dimensional BOM (bill of material) structure
CN104881740A (en) * 2015-05-21 2015-09-02 广州盖特软件有限公司 Method and device for generating multiple bills of material (BOM) of same type in ERP (Enterprise Resource Planning) via paper grid color matching
CN106435069A (en) * 2016-10-17 2017-02-22 中冶赛迪工程技术股份有限公司 Material changing detection method and system for blast furnace smelting production process
CN108090073A (en) * 2016-11-22 2018-05-29 上海汽车集团股份有限公司 A kind of conversion method and device of configurable bill of materials
CN109902958A (en) * 2019-02-28 2019-06-18 苏州浪潮智能科技有限公司 A kind of method and system improving server module BOM restricted class versatility
CN110060174A (en) * 2019-04-24 2019-07-26 上海蔚来汽车有限公司 For realizing vehicle dynamic configuration and the matched method and device thereof of COM code
WO2019154353A1 (en) * 2018-02-07 2019-08-15 中兴通讯股份有限公司 System running parameter query method, matching method and apparatus, and node device
CN115034645A (en) * 2022-06-23 2022-09-09 广域铭岛数字科技有限公司 Production plan feasibility judgment method and system, electronic device and storage medium

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102034166A (en) * 2010-12-27 2011-04-27 用友软件股份有限公司 Method and device for acquiring material changing range
CN102024208A (en) * 2010-12-27 2011-04-20 用友软件股份有限公司 Method and system for generating work breakdown structures
CN103853556A (en) * 2014-03-04 2014-06-11 北京神舟航天软件技术有限公司 Method for building accurate BOM (Bill of Materials) in PDM (Product Data Management) system
CN103853556B (en) * 2014-03-04 2017-05-17 北京神舟航天软件技术有限公司 Method for building accurate BOM (Bill of Materials) in PDM (Product Data Management) system
CN104361436A (en) * 2014-10-30 2015-02-18 南京航空航天大学 Method and device for engineering change information transfer on basis of three-dimensional BOM (bill of material) structure
CN104361436B (en) * 2014-10-30 2017-10-20 南京航空航天大学 Change in the work information transfer device and its method based on three-dimensional BOM structures
CN104881740B (en) * 2015-05-21 2018-07-13 广州盖特软件有限公司 By paper lattice color matching generation with the method and device of the multiple BOM of money in ERP
CN104881740A (en) * 2015-05-21 2015-09-02 广州盖特软件有限公司 Method and device for generating multiple bills of material (BOM) of same type in ERP (Enterprise Resource Planning) via paper grid color matching
CN106435069A (en) * 2016-10-17 2017-02-22 中冶赛迪工程技术股份有限公司 Material changing detection method and system for blast furnace smelting production process
CN106435069B (en) * 2016-10-17 2018-07-06 中冶赛迪工程技术股份有限公司 A kind of change material detection method and system towards blast furnace process production process
CN108090073A (en) * 2016-11-22 2018-05-29 上海汽车集团股份有限公司 A kind of conversion method and device of configurable bill of materials
CN108090073B (en) * 2016-11-22 2022-12-06 上海汽车集团股份有限公司 Configurable bill of material conversion method and device
WO2019154353A1 (en) * 2018-02-07 2019-08-15 中兴通讯股份有限公司 System running parameter query method, matching method and apparatus, and node device
CN109902958A (en) * 2019-02-28 2019-06-18 苏州浪潮智能科技有限公司 A kind of method and system improving server module BOM restricted class versatility
CN110060174A (en) * 2019-04-24 2019-07-26 上海蔚来汽车有限公司 For realizing vehicle dynamic configuration and the matched method and device thereof of COM code
CN115034645A (en) * 2022-06-23 2022-09-09 广域铭岛数字科技有限公司 Production plan feasibility judgment method and system, electronic device and storage medium

Similar Documents

Publication Publication Date Title
CN101673372A (en) Method and device for updating bill of material
CN109446218A (en) SQL statement generation method, device and computer readable storage medium
CN102819557B (en) Data query treating apparatus and data query disposal route
CN101316183B (en) Human-machine interaction interface generation method and system of digital home network
CN105447122A (en) Implementation method for autonomously creating file system based on multi-table association
WO2019140978A1 (en) Screen parameter configuration system
KR20130102191A (en) Method and apparatus for providing short-cut icon and portable device including the apparatus
US20170289731A1 (en) Mobile Database Access Application Development System and Method
CN109002334B (en) Operation and maintenance platform and data processing method thereof
CN106919427A (en) A kind of method to set up, setting device and electronic equipment
CN103186632A (en) Method and device for customizing operation and maintenance form
CN101989295A (en) Resource management and information publish system based on main interface of operating system (OS)
CN104102670A (en) Performance indicator analytical framework
KR20060044524A (en) Business application entity subscription synch operation management
CN104615602A (en) Automatic generation device and method thereof for query interface
CN104679900A (en) Application program searching method and device
CN108446327A (en) Operation system dynamic creation method, device, computer equipment and storage medium
CN104317964A (en) Object-relational mapping method and system based on iBatis
CN103123660A (en) Computer-aided design (CAD) graphical modeling method for software/hardware system
US20090287868A1 (en) Master data managemnt system with improved data structure and storage medium storing the master data
CN109344165A (en) A kind of querying method and storage equipment
CN102455905B (en) Method and system for establishing main panel interface, main panel and main panel interface system
CN111046113B (en) Data retrieval device and method for different types of data warehouses
CN101685395A (en) Object property processing method of product data management system
CN111460194A (en) Method and device for configuring style library, computer equipment and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100317