CN102009278A - Backward deformation welding process method for side beam of bogie - Google Patents

Backward deformation welding process method for side beam of bogie Download PDF

Info

Publication number
CN102009278A
CN102009278A CN 201010565123 CN201010565123A CN102009278A CN 102009278 A CN102009278 A CN 102009278A CN 201010565123 CN201010565123 CN 201010565123 CN 201010565123 A CN201010565123 A CN 201010565123A CN 102009278 A CN102009278 A CN 102009278A
Authority
CN
China
Prior art keywords
side beam
welding
air spring
spring seat
seat board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010565123
Other languages
Chinese (zh)
Inventor
彭长伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Changchun Railway Vehicles Co Ltd
Original Assignee
Changchun Railway Vehicles Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Railway Vehicles Co Ltd filed Critical Changchun Railway Vehicles Co Ltd
Priority to CN 201010565123 priority Critical patent/CN102009278A/en
Publication of CN102009278A publication Critical patent/CN102009278A/en
Pending legal-status Critical Current

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses a backward deformation welding process method for the side beam of a bogie, which is characterized by comprising the following steps: firstly, carrying out track welding on an air spring seat board on the upper cover board of the side beam to form rigid fixing; and then welding the side beam. In the invention, the air spring seat board pairing process is performed before a side beam pairing process from a framework pairing process, the characteristic that the air spring seat board is similar to the upper cover board of the side beam in shape is utilized, and before the side beam is welded by a manipulator, the air spring seat board is subject to track welding on the upper cover board of the side beam to form rigid fixing, thereby effectively controlling welding deformation, improving product quality, improving production efficiency and reducing labor intensity.

Description

Bogie curb girder reversible deformation welding technique
Technical field
The present invention relates to city rail bogie curb girder reversible deformation welding technique.
Background technology
At present, the welding after curb girder is formed the manipulator welding, before the framework one step welding of air spring seat board, this technology has three shortcomings: 1, postwelding curb girder upper cover plate air spring seat board place is sagging, must just can descend the step operation through adjusting before the framework assembly welding; 2, curb girder upper cover plate deflection is big herein, only can guarantee front end and air spring seat board in one plane during adjusting, forms a recessed pocket near the commissure, causes air spring seat board and curb girder upper cover plate fit clearance part excessive; 3, adjusting herein needs two people to cooperate, and a people uses the gas welding heating, and a people applies external force, and nearly about 1 hour consuming time, the low and serious waste human and material resources of production efficiency.
Summary of the invention
Technical problem to be solved by this invention provides a kind of city rail bogie curb girder reversible deformation welding technique, to improve the quality of products, enhances productivity, and reduces labour intensity.
For solving the problems of the technologies described above, the invention provides a kind of bogie curb girder reversible deformation welding technique, it is characterized in that: elder generation on the curb girder upper cover plate, forms air spring seat board tack welding one and rigidly fixes, and then the welding curb girder.
The present invention with air spring seat board group to operation being advanced to the curb girder group to operation from the framework group, utilize itself and curb girder upper cover plate similar characteristics of shape herein, before manipulator welding curb girder earlier with air spring seat board tack welding on the curb girder upper cover plate, forming one rigidly fixes, thereby effectively control welding deformation, improve the quality of products, enhance productivity, reduce labour intensity.
The specific embodiment
Take all factors into consideration whole city rail bogie frame assembly welding technique flow process, and in conjunction with curb girder upper cover plate and air spring seat board shape and thickness characteristics, adopt more reasonably technology utilization to face parts mutually and do one and rigidly fix, add an external force in advance to reduce welding deformation amount in the opposite direction of distortion.Optimize the framework assembly welding technique, with air spring seat board group to operation being advanced to the curb girder group to operation from the framework group, utilize itself and curb girder upper cover plate similar characteristics of shape herein, before manipulator welding curb girder earlier with air spring seat board tack welding on the curb girder upper cover plate, form one and rigidly fix, thereby effectively control welding deformation.

Claims (1)

1. bogie curb girder reversible deformation welding technique is characterized in that: earlier with air spring seat board tack welding on the curb girder upper cover plate, forms one and rigidly fixes, and then weld curb girder.
CN 201010565123 2010-11-30 2010-11-30 Backward deformation welding process method for side beam of bogie Pending CN102009278A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010565123 CN102009278A (en) 2010-11-30 2010-11-30 Backward deformation welding process method for side beam of bogie

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010565123 CN102009278A (en) 2010-11-30 2010-11-30 Backward deformation welding process method for side beam of bogie

Publications (1)

Publication Number Publication Date
CN102009278A true CN102009278A (en) 2011-04-13

Family

ID=43839708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010565123 Pending CN102009278A (en) 2010-11-30 2010-11-30 Backward deformation welding process method for side beam of bogie

Country Status (1)

Country Link
CN (1) CN102009278A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103273259A (en) * 2012-11-10 2013-09-04 上海中远川崎重工钢结构有限公司 Method for manufacturing large-capacity boiler load-bearing support device
CN104475999A (en) * 2014-11-28 2015-04-01 长春轨道客车股份有限公司 Prefabrication reversible deformation welding process for framework cantilever member of city railway carriage bogie

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB746010A (en) * 1953-06-11 1956-03-07 Gen Motors Corp Improved railway bogie construction
US4030424A (en) * 1975-04-29 1977-06-21 Acf Industries, Incorporated Rigid railway car truck
JPH05262225A (en) * 1992-03-03 1993-10-12 Sumitomo Metal Ind Ltd Manufacture of truck frame for railway rolling stock
JP2008149913A (en) * 2006-12-18 2008-07-03 Tokyu Car Corp Structure for rolling stock truck and its manufacturing method
CN201198321Y (en) * 2008-08-05 2009-02-25 铁道部运输局 Light weight welding framework

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB746010A (en) * 1953-06-11 1956-03-07 Gen Motors Corp Improved railway bogie construction
US4030424A (en) * 1975-04-29 1977-06-21 Acf Industries, Incorporated Rigid railway car truck
JPH05262225A (en) * 1992-03-03 1993-10-12 Sumitomo Metal Ind Ltd Manufacture of truck frame for railway rolling stock
JP2008149913A (en) * 2006-12-18 2008-07-03 Tokyu Car Corp Structure for rolling stock truck and its manufacturing method
CN201198321Y (en) * 2008-08-05 2009-02-25 铁道部运输局 Light weight welding framework

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103273259A (en) * 2012-11-10 2013-09-04 上海中远川崎重工钢结构有限公司 Method for manufacturing large-capacity boiler load-bearing support device
CN104475999A (en) * 2014-11-28 2015-04-01 长春轨道客车股份有限公司 Prefabrication reversible deformation welding process for framework cantilever member of city railway carriage bogie
CN104475999B (en) * 2014-11-28 2016-08-03 长春轨道客车股份有限公司 The framework cantilever member reversed deformation welding procedure of subway passenger car bogie

Similar Documents

Publication Publication Date Title
WO2008099922A1 (en) Stiffened plate and process for producing the same
CN104162616B (en) Thermonuclear fusion heap ears U-shaped forging forging method
CN201493356U (en) Rounding device for collecting pipe of finned radiator for transformer
CN204843369U (en) Steel case roof beam steel structure welding anti -deformation platform device
CN102009278A (en) Backward deformation welding process method for side beam of bogie
CN208214662U (en) A kind of stainless sheet steel welding anti-deformation tool
CN102294425B (en) Forging device and forging method for upper wide anvil and lower narrow anvil
CN105345322B (en) Full carrying van side carriage plate welding procedure
CN105269167A (en) Full-load van front body plate welding process
CN204974824U (en) Correction fixture of well light gauge welding
CN208322576U (en) Pressure code fixture suitable for penstock tile weld seam
CN204308457U (en) A kind of suspension type multi-point welding device
CN103192189A (en) Semitrailer girder structure and welding process thereof
CN104475928B (en) Boiler steel structure superposed beam manufacturing process
CN201644770U (en) Double-sided tundish cast steel cover plate of continuous caster
CN201603965U (en) Manufacturing and assembling clamping fixture for long side of large-scale prebaked anode electrolytic cell
CN202063623U (en) Upper/lower beam of elevator car frame
CN204075492U (en) Explosive welding support body
CN201757264U (en) Composite steel grating with cross rods below
CN204565603U (en) Penstock stiffening ring mounting and adjusting means for correcting
CN102615483A (en) Process for forming inner automobile longeron plate and outer automobile longeron plate at the same time
CN202240175U (en) Base plate of annular support of vertical device
CN103801905B (en) The processing method of slim steel disc
CN202147097U (en) Adjuster for misalignment of welding junctions
CN201849926U (en) Discharge hopper

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110413