CN102002980A - Stone carving tenon structure and method for installing antiqued Hui-style dolmen applying tenon structure - Google Patents
Stone carving tenon structure and method for installing antiqued Hui-style dolmen applying tenon structure Download PDFInfo
- Publication number
- CN102002980A CN102002980A CN 201010513079 CN201010513079A CN102002980A CN 102002980 A CN102002980 A CN 102002980A CN 201010513079 CN201010513079 CN 201010513079 CN 201010513079 A CN201010513079 A CN 201010513079A CN 102002980 A CN102002980 A CN 102002980A
- Authority
- CN
- China
- Prior art keywords
- tenon
- stone
- groove
- dolmen
- tongue
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses a stone carving tenon structure and a method for installing an antiqued Hui-style dolmen applying the tenon structure. In the tenon structure, a tenon head and a tenon groove form a tenon interface. The stone carving tenon structure is characterized in that the bottom, the left side part and the right side part of the tenon head are planes; the end surface and the upper part of the tenon head are in arc shapes on the longitudinal sections, and an arc-shaped tenon head is formed; the tenon groove is an arc-shaped groove which is matched with the tenon head; and the tenon head and the tenon groove are arranged on the central position on the tenon interface. The invention has the advantages of reasonable structural design, simple structure and consistent stone color, can safely complete the installation of the stone carving dolmen and strengthen the integral strength of the dolmen and the artistic aesthetic feeling of the antiqued dolmen, ensures that the dolmen looks like integration and achieves good technical effect.
Description
Technical field
The invention belongs to ancient building construction and installation technical field, especially be applied to the tenon structure of stone carving memorial archway and the mounting method of dolmen member.
Background technology
At present, be applied in emblem modelled after an antique send in the dolmen member tenon structure as shown in Figure 2, tenon 4 in this tenon structure and tongue-and-groove 3 cooperate for rectangle, for stone beam 2 is installed between two stone columns 1, tongue-and-groove 3 need be set to groove as shown in Figure 4, promptly be perforation in the outside of stone column 1, tenon 4 directly pushes in the tongue-and-groove 3 from a side that connects.During installation, at first two stone columns with dolmen require the location according to construction drawing, then the stone beam are directly lifted on the stone column, and Shi Liang is connected by tenon, tongue-and-groove with stone column.Adopt the mounting process of this tenon structure comparatively simple, but can see the joggle seam on the surface of dolmen, need to adopt other materials after-treatments such as epoxy glue for this reason, easily member be polluted, and the stone material color consistency to member has considerable influence, influences the impression quality of antique stone memorial archway.
Summary of the invention
At the above-mentioned deficiency of prior art, the purpose of this invention is to provide the mounting method that dolmen is sent in a kind of emblem modelled after an antique that more can guarantee the apparent effect of antique stone memorial archway and the simple relatively stone carving tenon structure of operation and use this tenon structure.Its cost is lower, and is easy to use, not only overcomes the shortcoming that exists in the prior art, and can also strengthen the bulk strength of dolmen, increases the aesthetic of antique stone memorial archway, makes dolmen look one integrated mass, stone material quality unanimity.
Technical solution problem of the present invention adopts following technical scheme:
Stone carving tenon structure of the present invention constitutes the joggle face by tenon and tongue-and-groove, and its design feature is that the bottom and the left and right sides portion of described tenon is the plane, and the end face of tenon and top are curved on vertical section, forms the arc tenon; Described tongue-and-groove is set to the arc groove that matches with tenon; Described tenon and tongue-and-groove are being on the position placed in the middle on the joggle face.
It is that described dolmen member is to constitute " H " shape member by a pair of stone column and a stone beam that the present invention sends emblem modelled after an antique the characteristics of the mounting method of dolmen, the two ends of Shi Liang are tenon, on the inside wall of the stone column of relevant position tongue-and-groove is set, described dolmen member is installed as follows:
A, installation stone column use electric block to hang upright two stone columns of installing, and make two stone columns and ground be down the heeling condition of the Eight characters, use the timber wedge liner between the bottom of stone column and the column base;
B, installation stone beam, at first the leading section with Shi Liang two ends tenon places on the tongue-and-groove of both sides stone column, timber wedge with two stone column bottoms outwards withdraws from gradually then, make stone column gradually by heeling condition to the erectility adjustment, until timber wedge withdraw from fully, stone column is upright, the tenon at Shi Liang two ends enters in the tongue-and-groove of two root posts fully simultaneously, finishes installation.
Compared with the prior art, beneficial effect of the present invention is embodied in:
1, the present invention is reasonable in design, and simple structure is easy to use, and is cheap, can finish the installation work of stone carving memorial archway fool proofly.Not only overcome the shortcoming that exists in the prior art, and can also strengthen the bulk strength of dolmen, increased the aesthetic of antique stone memorial archway, made dolmen look one integrated mass, stone material quality unanimity reaches good technical effect.
2, the present invention also is applicable to the installation of the stone column and the stone beam of analog structure form applicable to the installation of the column and the crossbeam of antique stone memorial archway, and technique effect is obvious.
Description of drawings
Fig. 1 is a tenon structure schematic diagram of the present invention.
Fig. 2 is the prior art structural representation.
Fig. 3 is a stone column installation process schematic diagram of the present invention.
Fig. 4 is that stone column of the present invention, Shi Liang finish scheme of installation.
Drawing reference numeral: 1 stone column; 2 stone beams; 3 tongue-and-grooves; 4 tenons; 5 timber wedges; 6 electric blocks; 7 column bases; 8 native lining stones.
The specific embodiment
Referring to Fig. 1, the tenon structure in the present embodiment constitutes the joggle face by tenon 4 and tongue-and-groove 3, and the bottom of tenon 4 and left and right sides portion are the plane, and the end face of tenon 4 and top are curved on vertical section, forms the arc tenon; Tongue-and-groove 3 is set to the arc groove that matches with tenon 4, and promptly the bottom of tongue-and-groove and both sides are the plane, and the end face of tongue-and-groove and top are curved on vertical section; Tenon 4 and tongue-and-groove 3 are being on the position placed in the middle on the joggle face.
Referring to Fig. 3, Fig. 4, the dolmen member in the present embodiment constitutes " H " shape member by a pair of stone column 1 and a stone beam 2, and the two ends of Shi Liang 2 are tenon 4, on the inside wall of the stone column 1 of relevant position tongue-and-groove 3 are set.
The dolmen member is installed as follows:
1, the group of finishing native lining stone 8 and column base 7 is built, and calculates load, sets up the steel pipe scaffold that meets the demands;
2, stone column 1 is installed, use electric block 6 to hang upright two stone columns 1 of installing, make two stone columns 1 be down the heeling condition of the Eight characters on the ground, make liner with timber wedge 5 between the bottom of stone column 1 and the column base 7, the angle of inclination of stone column is not more than 15 ° usually, specifically according to the length of stone beam and highly different.
3, stone beam 2 is installed, at first the leading section with Shi Liang two ends tenon 4 places on the tongue-and-groove 3 of both sides stone column 1, timber wedge 5 with two stone column bottoms outwards withdraws from gradually then, make stone column 1 gradually by heeling condition to the erectility adjustment, until timber wedge 5 withdraw from fully, stone column 1 is upright, the tenon 4 at Shi Liang two ends enters in the tongue-and-groove 3 of two root posts fully simultaneously, finishes installation.
Claims (2)
1. a stone carving tenon structure constitutes the joggle face by tenon (4) and tongue-and-groove (3), it is characterized in that the bottom of described tenon (4) and left and right sides portion are the plane, and the end face and the top of tenon (4) are curved on vertical section, form the arc tenon; The arc groove that described tongue-and-groove (3) is set to and tenon (4) matches; Described tenon (4) and tongue-and-groove (3) are being on the position placed in the middle on the joggle face.
2. an application rights requires the emblem modelled after an antique of 1 described stone carving tenon structure to send the mounting method of dolmen, it is characterized in that described dolmen member constitutes " H " shape member by an a pair of stone column (1) and a stone beam (2), the two ends of Shi Liang (2) are tenon (4), tongue-and-groove (3) is set on the inside wall of the stone column of relevant position (1), and described dolmen member is installed as follows:
A, installation stone column (1) use electric block to hang upright two stone columns of installing, and make two stone columns and ground be down the heeling condition of the Eight characters, use timber wedge (5) liner between the bottom of stone column (1) and the column base (7);
B, installation stone beam (2), at first the leading section with Shi Liang two ends tenons (4) places on the tongue-and-groove (3) of both sides stone column (1), timber wedge (5) with two stone column bottoms outwards withdraws from gradually then, make stone column (1) gradually by heeling condition to the erectility adjustment, until timber wedge (5) withdraw from fully, stone column (1) is upright, the tenon (4) at Shi Liang two ends enters in the tongue-and-groove (3) of two root posts fully simultaneously, finishes installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010513079XA CN102002980B (en) | 2010-10-20 | 2010-10-20 | Stone carving tenon structure and method for installing antiqued Hui-style dolmen applying tenon structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010513079XA CN102002980B (en) | 2010-10-20 | 2010-10-20 | Stone carving tenon structure and method for installing antiqued Hui-style dolmen applying tenon structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102002980A true CN102002980A (en) | 2011-04-06 |
CN102002980B CN102002980B (en) | 2012-01-11 |
Family
ID=43810665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010513079XA Active CN102002980B (en) | 2010-10-20 | 2010-10-20 | Stone carving tenon structure and method for installing antiqued Hui-style dolmen applying tenon structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102002980B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112854439A (en) * | 2021-01-06 | 2021-05-28 | 重庆心乐璟科技有限公司 | Supporting and clamping mechanism for building beam |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10306512A (en) * | 1997-04-30 | 1998-11-17 | Tsutomu Iwao | Rod-like member for constructing building |
JP2001323569A (en) * | 2000-05-17 | 2001-11-22 | Mitsuo Mochiyama | Joint between horizontal member and vertical member in wooden building |
CN201025982Y (en) * | 2007-05-18 | 2008-02-27 | 陈日春 | Folding connection mechanism of table top |
CN201817916U (en) * | 2010-10-20 | 2011-05-04 | 安徽建工集团有限公司 | Stone-carving tenon structure |
-
2010
- 2010-10-20 CN CN201010513079XA patent/CN102002980B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10306512A (en) * | 1997-04-30 | 1998-11-17 | Tsutomu Iwao | Rod-like member for constructing building |
JP2001323569A (en) * | 2000-05-17 | 2001-11-22 | Mitsuo Mochiyama | Joint between horizontal member and vertical member in wooden building |
CN201025982Y (en) * | 2007-05-18 | 2008-02-27 | 陈日春 | Folding connection mechanism of table top |
CN201817916U (en) * | 2010-10-20 | 2011-05-04 | 安徽建工集团有限公司 | Stone-carving tenon structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112854439A (en) * | 2021-01-06 | 2021-05-28 | 重庆心乐璟科技有限公司 | Supporting and clamping mechanism for building beam |
Also Published As
Publication number | Publication date |
---|---|
CN102002980B (en) | 2012-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204530742U (en) | A kind of adjustable suspension column | |
CN206844815U (en) | A kind of transformer station's Assembled enclosing wall | |
CN205531247U (en) | Tile work device | |
CN105113786A (en) | Pad block support system for supporting fixed adjustable cast-in-situ stair formwork | |
CN108661202A (en) | A kind of large area hollow out lattice brick curtain wall construction modelled after an antique and construction method | |
CN201172916Y (en) | Reinforcement trough split head of concrete products for reinforced concrete slab | |
CN107630531B (en) | Large-cantilever bare concrete stair and construction method thereof | |
CN103498479B (en) | Stairstepping single footing formwork erection method | |
CN105332506A (en) | Formwork support system for parallel multi-section stair and method for constructing same | |
CN102002980B (en) | Stone carving tenon structure and method for installing antiqued Hui-style dolmen applying tenon structure | |
CN201817916U (en) | Stone-carving tenon structure | |
CN201428240Y (en) | Template with arc steps | |
CN205954482U (en) | Construction structures of " people " style of calligraphy cable tower entablature support | |
CN108756066A (en) | Pre-buried anticollision angle steel construction method and armored concrete column construction method | |
CN204960309U (en) | Fixed adjustable cast -in -place stair template is propped up to establish and is used cushion braced system | |
CN201292619Y (en) | Guard rail structure of composite structure of glass and flat iron | |
CN104372894A (en) | Bare concrete marble pillar, marble pillar template and construction method | |
CN107237436B (en) | A kind of method of temporarily fixing when cavity floor is constructed | |
CN105507568B (en) | A kind of tile work device and tile work method | |
CN204212304U (en) | A kind of fan-shaped imitative shell roofing | |
CN203531426U (en) | Hexagonal pavilion with novel frame structure | |
CN104074353B (en) | Stair construction joint stopend and using method thereof | |
CN203684665U (en) | Set-shaped steel formwork for stair formed by once pouring | |
CN102817376A (en) | Settlement joint template system for big-volume slabstone concrete and settlement joint construction method | |
CN206942134U (en) | A kind of embedded stair template device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170421 Address after: 233000 Anhui City, East China Sea Road, Cheung Shan Road South Patentee after: Anhui Water Resources Development Co., Ltd. Address before: Wuhu road in Baohe District of Hefei city in Anhui province 230001 Construction Building No. 325 Patentee before: Anhui Construction Engineering Group Co., Ltd. |
|