CN102000696B - Production method of striped stainless steel stripes - Google Patents
Production method of striped stainless steel stripes Download PDFInfo
- Publication number
- CN102000696B CN102000696B CN 201010511526 CN201010511526A CN102000696B CN 102000696 B CN102000696 B CN 102000696B CN 201010511526 CN201010511526 CN 201010511526 CN 201010511526 A CN201010511526 A CN 201010511526A CN 102000696 B CN102000696 B CN 102000696B
- Authority
- CN
- China
- Prior art keywords
- stainless steel
- temperature
- steel band
- controlled
- semi
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Heat Treatment Of Steel (AREA)
- Heat Treatment Of Sheet Steel (AREA)
Abstract
The invention relates to a production method of striped stainless steel stripes. The production method is characterized by adopting the following process steps: grinding a general roll into a striped roll, carrying out a primary rolling process to a stainless steel stripe blank to roll the stainless steel stripe blank into a semi-finished stainless steel stripe; conveying the semi-finished stainless steel stripe into an annealing furnace and inflating protective gases, wherein the temperature in the annealing furnace is divided into six zones and a preheating section; carrying out a secondary rolling process after finishing annealing and then annealing again; carrying out a tertiary rolling process to roll the semi-finished stainless steel stripe into a finished striped stainless steel stripe with the thickness of 0.2-0.5 mm; then, annealing the well-rolled stainless steel stripe for the last time; and finally cutting and packaging into a finished product. The invention has good surface quality, high yield, straight stripes and easily-controlled stripe depth and can satisfy the use requirements of users.
Description
Technical field
The present invention relates to a kind of production method of striped stainless steel band, be widely used in the industries such as exterior wall, cooking apparatus, light industry product in building decoration, luxurious door, elevator decoration, metal cabinet shell, plant equipment shell, shipbuilding, train interior trim etc. and outdoor engineering, advertisement nameplate, cabinet smallpox, walkway board, screen, Tunnel Engineering, hotel, the hall, belong to the cold-rolled substrate Material Field.
Background technology
In the prior art, in traditional production method, be the corrosion resistant plate that first stainless steel billet is rolled into desired thickness, then be polished into the striped stainless steel at polishing machine, the striped stainless steel band surface of producing like this is of poor quality, production cycle is long, cost is high, and output is not high, and lines is not straight, fringe depths is difficult to hold, and can not satisfy client's instructions for use.
Summary of the invention
The object of the invention is to overcome above-mentioned weak point, thereby a kind of production method of more effective striped stainless steel band is provided, its striped stainless steel band surface quality is good, and output is high, and lines is straight, and fringe depths is easily held, and can satisfy the client to the requirement of striped.
According to technical scheme provided by the invention, a kind of production method of striped stainless steel band
,Adopt following processing step:
The first step: raw material are prepared; Selecting thickness is 2.5~3mm, and width is the stainless steel band blank of 275~700mm;
Second step: grinding oil grinding roller: roller is contained on the grinding machine, opens the vibration switch of grinding machine, open grinding machine, repeat grinding twice or thrice, then close vibration switch, the grinding oil grinding roller once gets final product.Its objective is to make roll surface totally smooth, without pit and scuffing.
The 3rd step: grinding mark roller: need a diamond pen, it is installed on the grinding machine, mix up the depth of cut of diamond pen, the depth of cut is 0.10mm~0.15mm, mixes up the feed speed of diamond pen, and feed speed is 600mm/min, then begin abrasive grinding wheel, repeat grinding 3 times, the fringe spacing 1mm of striped roller, fringe depths 0.10mm~0.15mm.
The 4th step: the first rolling process: adopt four roller finishing rolling mill units to carry out the rolling process first time, cold rolling 6~8 passages, rolling tensile force KN:5~10, steel band mill speed: 80~120 Mi ∕ minutes, stainless steel band blank 2.5~3mm is rolled into semi-finished product, and stainless steel band thickness is: 0.8~1.0mm;
The 5th step: annealing in process for the first time: the semi-finished product stainless steel band is entered annealing furnace with 3.5~4 Mi ∕ minute speed, and the temperature in the annealing furnace is: 1030~1060 ℃, be filled with simultaneously protective gas, and be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1000~1050 ℃ in the first area; Temperature is controlled at 1000~1050 ℃ in the second area stove; Temperature is controlled at 1080~1090 ℃ in the 3rd zone furnace; Temperature is controlled at 1080~1090 ℃ in the 4th zone furnace; Temperature is controlled at 1080~1090 ℃ in the 5th zone furnace; Come out of the stove when temperature is controlled at 1050~1060 ℃ in the 6th zone furnace and enter the cooling section cooling; The temperature of described cooling section remains on 40~60 ℃;
The 6th step: the second rolling process; Semi-finished product stainless steel band that will annealing in process is crossed through the first time is rolled cold rolling 1 passage, rolling tensile force KN:2~5, steel band mill speed: 120~180 Mi ∕ minutes with four roller finishing rolling mill groups; With semi-finished product stainless steel band thickness be: 0.8~1.0mm is rolled into thickness and is: 0.4~0.5mm;
The 7th step: annealing in process for the second time: the semi-finished product stainless steel band is entered annealing furnace with 6.5~7.0 Mi ∕ minute speed, and the temperature in the annealing furnace is: 1030~1070 ℃, be filled with simultaneously protective gas, and be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1000~1050 ℃ in the first area; Temperature is controlled at 1000~1050 ℃ in the second area stove; Temperature is controlled at 1080~1090 ℃ in the 3rd zone furnace; Temperature is controlled at 1080~1090 ℃ in the 4th zone furnace; Temperature is controlled at 1080~1090 ℃ in the 5th zone furnace; Come out of the stove when temperature is controlled at 1050~1060 ℃ in the 6th zone furnace and enter the cooling section cooling; The temperature of described cooling section remains on 40~60 ℃;
The 8th step: the 3rd rolling process; Semi-finished product stainless steel band that will annealing in process is crossed through the second time is rolled with four roller finishing rolling mill groups, cold rolling 1 passage, rolling tensile force KN:2~5, steel band mill speed: 120~180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.4~0.5mm is rolled into thickness and is: 0.28~35mm; Adopt four roller finishing rolling mill groups to be rolled, change roller into the good striped roller of grinding, cold rolling 1 passage, rolling tensile force KN:2~5, steel band mill speed: 120~180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.28~0.35mm is rolled into thickness and is: 0.27~0.33mm; Adopt four roller finishing rolling mill groups to be rolled, change roller into grinding good oil abrasion roller, cold rolling 1 passage, rolling tensile force KN:2~5, steel band mill speed: 120~180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.27~0.33mm mm is rolled into thickness and is: the semi-finished product striped stainless steel band of 0.25~0.3mm;
The 9th step: annealing in process for the third time: semi-finished product striped stainless steel band is entered annealing furnace with 9.5~1.0 Mi ∕ minute speed, temperature in the annealing furnace is: 1030~1060 ℃, be filled with simultaneously protective gas, be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1000~1050 ℃ in the first area; Temperature is controlled at 1000~1050 ℃ in the second area stove; Temperature is controlled at 1080~1090 ℃ in the 3rd zone furnace; Temperature is controlled at 1080~1090 ℃ in the 4th zone furnace; Temperature is controlled at 1080~1090 ℃ in the 5th zone furnace; Come out of the stove when temperature is controlled at 1050~1060 ℃ in the 6th zone furnace and enter cooling section and be cooled to finished product striped stainless steel band; The temperature of described cooling section remains on 40~60 ℃;
The tenth step: cutting, packing, warehouse-in.
Described first, second and third time annealing in process protective gas adopts ammonia (N2H3) heating to resolve into 75% hydrogen and 25% nitrogen: furnace pressure is at 0.3~0.5MP, and pressure is controlled at 0.06~0.1Mp.
The thickness deviation of the semi-finished product stainless steel band that described the second rolling process is rolling is ± 0.02mm.
The rolling semi-finished product striped stainless steel band thickness deviation of described the 3rd rolling process is ± 0.01mm.
Compared with the prior art the present invention has the following advantages:
The present invention compares traditional striped stainless steel band production, and surface quality is good, and is with short production cycle, and cost is low, and output is high, and lines is straight, and fringe depths is easily held, and can satisfy client's instructions for use.
The specific embodiment
Following the present invention is further described in connection with embodiment:
Embodiment one:
The production method of a kind of striped stainless steel band of the present invention, adopt following processing step:
The first step: raw material are prepared; Selecting thickness is 2.5mm, and width is the stainless steel band blank of 510mm;
Second step: grinding oil grinding roller: roller is contained on the grinding machine, opens the vibration switch of grinding machine, open grinding machine, repeat grinding twice or thrice, then close vibration switch, the grinding oil grinding roller once gets final product.Its objective is to make roll surface totally smooth, without pit and scuffing.
The 3rd step: grinding mark roller: need a diamond pen, it is installed on the grinding machine, mix up the depth of cut of diamond pen, the depth of cut is 0.12mm, mixes up the feed speed of diamond pen, and feed speed is 600mm/min, then begins abrasive grinding wheel.Repeat grinding 3 times, the fringe spacing 1mm of striped roller, fringe depths 0.12mm.
The 4th step: the first rolling process: adopt four roller finishing rolling mill unit 750# to carry out the rolling process first time, cold rolling 6 passages, rolling tensile force KN: forward pull 10KN, backward pull 8KN, technological lubrication oil 40#, flow is: 100 Sheng ∕ minutes, the steel band mill speed: 80 Mi ∕ minutes, stainless steel band blank 2.5mm is rolled into semi-finished product, stainless steel band thickness is: 0.9mm;
The 5th step: annealing in process for the first time: the semi-finished product stainless steel band is entered the horizontal bright continuous annealing furnace of 750# with 3.5 Mi ∕ minute speed, temperature in the annealing furnace is basic constant temperature: 1060 ° of C, be filled with simultaneously protective gas ammonia (N2H3) heating and resolve into 75% hydrogen and 25% nitrogen, be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1040 ° of C in the first area; Temperature is controlled at 1040 ° of C in the second area stove; Temperature is controlled at 1090 ° of C in the 3rd zone furnace; Temperature is controlled at 1090 ° of C in the 4th zone furnace; Temperature is controlled at 1080 ° of C in the 5th zone furnace; Come out of the stove when temperature is controlled at 1060 ° of C in the 6th zone furnace and enter the cooling section cooling; So the temperature of cooling section remains on 50 ° of C;
The 6th step: the second rolling process; Adopt four roller finishing rolling mill group 750# to be rolled, cold rolling 1 passage, rolling tensile force KN: forward pull 3KN, backward pull 5KN, steel band mill speed: 150 Mi ∕ minutes; With semi-finished product stainless steel band thickness be: 0.9mm is rolled into thickness and is: 0.45mm, and semi-finished product stainless steel band thickness deviation is ± 0.02mm;
The 7th step: annealing in process for the second time: the semi-finished product stainless steel band is entered the horizontal bright continuous annealing furnace of 750# with 6.5 Mi ∕ minute speed, temperature in the annealing furnace is: 1060 ° of C, be filled with simultaneously protective gas, be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1040 ° of C in the first area; Temperature is controlled at 1040 ° of C in the second area stove; Temperature is controlled at 1090 ° of C in the 3rd zone furnace; Temperature is controlled at 1090 ° of C in the 4th zone furnace; Temperature is controlled at 1080 ° of C in the 5th zone furnace; Come out of the stove when temperature is controlled at 1060 ° of C in the 6th zone furnace and enter the cooling section cooling; The temperature of described cooling section remains on 50 ° of C;
The 8th step: the 3rd rolling process; Adopt four roller finishing rolling mill group 750# to be rolled, cold rolling 1 passage, rolling tensile force KN: forward pull 2KN, backward pull 5KN, steel band mill speed: 180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.45mm is rolled into thickness and is: 0.3mm; Adopt four roller finishing rolling mill group 750# to be rolled, change roller into the good striped roller of grinding, cold rolling 1 passage, rolling tensile force KN: forward pull 2KN, backward pull 5KN, steel band mill speed: 180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.3mm is rolled into thickness and is: 0.29mm; Adopt four roller finishing rolling mill group 750# to be rolled, change roller into grinding good oil abrasion roller, cold rolling 1 passage, rolling tensile force KN: forward pull 2KN, backward pull 5KN, steel band mill speed: 180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.29mm, being rolled into thickness is: the semi-finished product striped stainless steel band of 0.27mm, and semi-finished product stainless steel band thickness deviation is ± 0.01mm;
The 9th step: annealing in process for the third time: the semi-finished product stainless steel band is entered the horizontal bright continuous annealing furnace of 750# with 9.5 Mi ∕ minute speed, temperature in the annealing furnace is: 1050 ° of C, be filled with simultaneously protective gas, be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1040 ° of C in the first area; Temperature is controlled at 1040 ° of C in the second area stove; Temperature is controlled at 1090 ° of C in the 3rd zone furnace; Temperature is controlled at 1090 ° of C in the 4th zone furnace; Temperature is controlled at 1080 ° of C in the 5th zone furnace; Come out of the stove when temperature is controlled at 1060 ° of C in the 6th zone furnace and enter cooling section and be cooled to finished product striped stainless steel band; The temperature of described cooling section remains on 50 ° of C;
The tenth step: cutting, be packaged as the finished product stainless steel band.
Embodiment two:
The production method of a kind of striped stainless steel band of the present invention, adopt following processing step:
The first step: raw material are prepared; Selecting thickness is 3mm, and width is the stainless steel band blank of 500mm;
Second step: grinding oil grinding roller: roller is loaded onto grinding machine, open the vibration switch of grinding machine, open grinding machine, repeat grinding twice or thrice, then close vibration switch, the grinding oil grinding roller once gets final product.Its objective is to make roll surface totally smooth, without pit and scuffing.
The 3rd step: grinding mark roller: need a diamond pen, it is installed on the grinding machine, mix up the depth of cut of diamond pen, the depth of cut is 0.13mm, mixes up the feed speed of diamond pen, and feed speed is 600mm/min, then begins abrasive grinding wheel.Repeat grinding 3 times, the fringe spacing 1mm of striped roller, fringe depths 0.13mm.
The 4th step: the first rolling process: adopt four roller finishing rolling mill unit 750# to carry out the rolling process first time, cold rolling 6 passages, rolling tensile force KN: forward pull 10KN, backward pull 8KN, technological lubrication oil 40#, flow is: 100 Sheng ∕ minutes, the steel band mill speed: 80 Mi ∕ minutes, stainless steel band blank 3mm is rolled into semi-finished product, stainless steel band thickness is: 1.0mm;
The 5th step: annealing in process for the first time: the semi-finished product stainless steel band is entered the horizontal bright continuous annealing furnace of 750# with 3.5 Mi ∕ minute speed, temperature in the annealing furnace is basic constant temperature: 1060 ° of C, be filled with simultaneously protective gas ammonia (N2H3) heating and resolve into 75% hydrogen and 25% nitrogen, be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1030 ° of C in the first area; Temperature is controlled at 1030 ° of C in the second area stove; Temperature is controlled at 1080 ° of C in the 3rd zone furnace; Temperature is controlled at 1080 ° of C in the 4th zone furnace; Temperature is controlled at 1080 ° of C in the 5th zone furnace; Come out of the stove when temperature is controlled at 1050 ° of C in the 6th zone furnace and enter the cooling section cooling; The temperature of described cooling section remains on 45 ° of C;
The 6th step: the second rolling process; Adopt four roller finishing rolling mill group 750# to be rolled, cold rolling 1 passage, rolling tensile force KN: forward pull 3KN, backward pull 5KN, steel band mill speed: 150 Mi ∕ minutes; With semi-finished product stainless steel band thickness be: 1.0mm is rolled into thickness and is: 0.5mm, and semi-finished product stainless steel band thickness deviation is ± 0.02mm;
The 7th step: annealing in process for the second time: the semi-finished product stainless steel band is entered the horizontal bright continuous annealing furnace of 750# with 6.5 Mi ∕ minute speed, temperature in the annealing furnace is: 1050 ° of C, be filled with simultaneously protective gas, be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1030 ° of C in the first area; Temperature is controlled at 1030 ° of C in the second area stove; Temperature is controlled at 1070 ° of C in the 3rd zone furnace; Temperature is controlled at 1070 ° of C in the 4th zone furnace; Temperature is controlled at 1070 ° of C in the 5th zone furnace; Come out of the stove when temperature is controlled at 1055 ° of C in the 6th zone furnace and enter the cooling section cooling; The temperature of described cooling section remains on 55 ° of C;
The 8th step: the 3rd rolling process; Adopt four roller finishing rolling mill group 750# to be rolled, cold rolling 1 passage, rolling tensile force KN: forward pull 2KN, backward pull 5KN, steel band mill speed: 160 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.5mm is rolled into thickness and is: 0.35mm; Adopt four roller finishing rolling mill group 750# to be rolled, change roller into the good striped roller of grinding, cold rolling 1 passage, rolling tensile force KN: forward pull 2KN, backward pull 5KN, steel band mill speed: 180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.35mm is rolled into thickness and is: 0.33mm; Adopt four roller finishing rolling mill group 750# to be rolled, change roller into grinding good oil abrasion roller, cold rolling 1 passage, rolling tensile force KN: forward pull 2KN, backward pull 5KN, steel band mill speed: 180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.33mm, being rolled into thickness is: the semi-finished product striped stainless steel band of 0.3mm, and semi-finished product stainless steel band thickness deviation is ± 0.01mm;
The 9th step: annealing in process for the third time: the semi-finished product stainless steel band is entered the horizontal bright continuous annealing furnace of 750# with 9.5 Mi ∕ minute speed, temperature in the annealing furnace is: 1050 ° of C, be filled with simultaneously protective gas, be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1035 ° of C in the first area; Temperature is controlled at 1035 ° of C in the second area stove; Temperature is controlled at 1085 ° of C in the 3rd zone furnace; Temperature is controlled at 1085 ° of C in the 4th zone furnace; Temperature is controlled at 1085 ° of C in the 5th zone furnace; Come out of the stove when temperature is controlled at 1060 ° of C in the 6th zone furnace and enter cooling section and be cooled to finished product striped stainless steel band; The temperature of described cooling section remains on 50 ° of C;
The tenth step: cutting, be packaged as the finished product stainless steel band.
Embodiment three:
The production method of a kind of striped stainless steel band of the present invention, feature adopts following processing step:
The first step: raw material are prepared; Selecting thickness is 2.7mm, and width is the stainless steel band blank of 400mm;
Second step: grinding oil grinding roller: roller is loaded onto grinding machine, open the vibration switch of grinding machine, open grinding machine, repeat grinding twice or thrice, then close vibration switch, the grinding oil grinding roller once gets final product.Its objective is to make roll surface totally smooth, without pit and scuffing.
The 3rd step: grinding mark roller: need a diamond pen, it is installed on the grinding machine, mix up the depth of cut of diamond pen, the depth of cut is 0.12mm, mixes up the feed speed of diamond pen, and feed speed is 600mm/min, then begins abrasive grinding wheel.Repeat grinding 3 times, the fringe spacing 1mm of striped roller, fringe depths 0.12mm.
The 4th step: the first rolling process: adopt four roller finishing rolling mill unit 750# to carry out the rolling process first time, cold rolling 7 passages, rolling tensile force KN: forward pull 10KN, backward pull 8KN, technological lubrication oil 40#, flow is: 100 Sheng ∕ minutes, the steel band mill speed: 80 Mi ∕ minutes, stainless steel band blank 2.7mm is rolled into semi-finished product, stainless steel band thickness is: 0.8mm;
The 5th step: annealing in process for the first time: the semi-finished product stainless steel band is entered the horizontal bright continuous annealing furnace of 750# with 3.5 Mi ∕ minute speed, temperature in the annealing furnace is basic constant temperature: 1050 ° of C, be filled with simultaneously protective gas ammonia (N2H3) heating and resolve into 75% hydrogen and 25% nitrogen, be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1040 ° of C in the first area; Temperature is controlled at 1030 ° of C in the second area stove; Temperature is controlled at 1080 ° of C in the 3rd zone furnace; Temperature is controlled at 1080 ° of C in the 4th zone furnace; Temperature is controlled at 1080 ° of C in the 5th zone furnace; Come out of the stove when temperature is controlled at 1060 ° of C in the 6th zone furnace and enter the cooling section cooling; The temperature of described cooling section remains on 50 ° of C;
The 6th step: the second rolling process; Adopt four roller finishing rolling mill group 750# to be rolled, cold rolling 1 passage, rolling tensile force KN: forward pull 3KN, backward pull 5KN, steel band mill speed: 180 Mi ∕ minutes; With semi-finished product stainless steel band thickness be: 0.8mm is rolled into thickness and is: 0.4mm, and semi-finished product stainless steel band thickness deviation is ± 0.02mm;
The 7th step: annealing in process for the second time: the semi-finished product stainless steel band is entered the horizontal bright continuous annealing furnace of 750# with 6.5 Mi ∕ minute speed, temperature in the annealing furnace is: 1070 ° of C, be filled with simultaneously protective gas, be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1050 ° of C in the first area; Temperature is controlled at 1050 ° of C in the second area stove; Temperature is controlled at 1090 ° of C in the 3rd zone furnace; Temperature is controlled at 1090 ° of C in the 4th zone furnace; Temperature is controlled at 1080 ° of C in the 5th zone furnace; Come out of the stove when temperature is controlled at 1060 ° of C in the 6th zone furnace and enter the cooling section cooling; The temperature of described cooling section remains on 50 ° of C;
The 8th step: the 3rd rolling process; Adopt four roller finishing rolling mill group 750# to be rolled, cold rolling 1 passage, rolling tensile force KN: forward pull 2KN, backward pull 5KN, steel band mill speed: 180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.4mm is rolled into thickness and is: 0.28mm; Adopt four roller finishing rolling mill group 750# to be rolled, change roller into the good striped roller of grinding, cold rolling 1 passage, rolling tensile force KN: forward pull 2KN, backward pull 4KN, steel band mill speed: 180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.28mm is rolled into thickness and is: 0.27mm; Adopt four roller finishing rolling mill group 750# to be rolled, change roller into grinding good oil abrasion roller, cold rolling 1 passage, rolling tensile force KN: forward pull 1.5KN, backward pull 4KN, steel band mill speed: 180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.27mm, being rolled into thickness is: the semi-finished product striped stainless steel band of 0.25mm, and semi-finished product stainless steel band thickness deviation is ± 0.01mm;
The 9th step: annealing in process for the third time: the semi-finished product stainless steel band is entered the horizontal bright continuous annealing furnace of 750# with 9.5 Mi ∕ minute speed, temperature in the annealing furnace is: 1050 ° of C, be filled with simultaneously protective gas, be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1050 ° of C in the first area; Temperature is controlled at 1050 ° of C in the second area stove; Temperature is controlled at 1090 ° of C in the 3rd zone furnace; Temperature is controlled at 1090 ° of C in the 4th zone furnace; Temperature is controlled at 1080 ° of C in the 5th zone furnace; Come out of the stove when temperature is controlled at 1060 ° of C in the 6th zone furnace and enter cooling section and be cooled to finished product striped stainless steel band; The temperature of described cooling section remains on 50 ° of C;
The tenth step: cutting, be packaged as the finished product stainless steel band.
Claims (4)
1. the production method of a striped stainless steel band is characterized in that: adopt following processing step:
First step: raw material are prepared; Selecting thickness is 2.5~3mm, and width is the stainless steel band blank of 275~700mm;
Second step: grinding roller: roll is contained on the grinding machine, opens the vibration switch of grinding machine, open grinding machine, repeat grinding twice or thrice, then close vibration switch, grinding roller once gets final product;
Third step: grinding mark roller: need a diamond pen, it is installed in grinding mark roller on the grinding machine, mix up the depth of cut of diamond pen, the depth of cut is 0.10mm~0.15mm, mix up the feed speed of diamond pen, feed speed is 600mm/min, then begins with wheel grinding striped roller; Repeat grinding 3 times, the fringe spacing 1mm of striped roller, fringe depths 0.10mm~0.15mm;
The 4th step: the first rolling process: adopt four roller finishing rolling mill units to carry out the rolling process first time, cold rolling 6~8 passages, rolling tensile force KN:5~10, steel band mill speed: 80~120 Mi ∕ minutes, stainless steel band blank 2.5~3mm is rolled into semi-finished product, and stainless steel band thickness is: 0.8~1.0mm;
The 5th step: annealing in process for the first time: the semi-finished product stainless steel band is entered annealing furnace with 3.5~4 Mi ∕ minute speed, and the temperature in the annealing furnace is: 1030~1060 ℃, be filled with simultaneously protective gas, and be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1000~1050 ℃ in the first area; Temperature is controlled at 1000~1050 ℃ in the second area stove; Temperature is controlled at 1080~1090 ℃ in the 3rd zone furnace; Temperature is controlled at 1080~1090 ℃ in the 4th zone furnace; Temperature is controlled at 1080~1090 ℃ in the 5th zone furnace; Come out of the stove when temperature is controlled at 1050~1060 ℃ in the 6th zone furnace and enter the cooling section cooling; The temperature of described cooling section remains on 40~60 ℃;
The 6th step: the second rolling process; Semi-finished product stainless steel band that will annealing in process is crossed through the first time adopts four roller finishing rolling mill groups to be rolled, cold rolling 1 passage, rolling tensile force KN:2~5, steel band mill speed: 120~180 Mi ∕ minutes; With semi-finished product stainless steel band thickness be: 0.8~1.0mm is rolled into thickness and is: 0.4~0.5mm;
The 7th step: annealing in process for the second time: the semi-finished product stainless steel band is entered annealing furnace with 6.5~7.0 Mi ∕ minute speed, and the temperature in the annealing furnace is: 1030~1070 ℃, be filled with simultaneously protective gas, and be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1000~1050 ℃ in the first area; Temperature is controlled at 1000~1050 ℃ in the second area stove; Temperature is controlled at 1080~1090 ℃ in the 3rd zone furnace; Temperature is controlled at 1080~1090 ℃ in the 4th zone furnace; Temperature is controlled at 1080~1090 ℃ in the 5th zone furnace; Come out of the stove when temperature is controlled at 1050~1060 ℃ in the 6th zone furnace and enter the cooling section cooling; The temperature of described cooling section remains on 40~60 ℃;
The 8th step: the 3rd rolling process; Semi-finished product stainless steel band that will annealing in process is crossed through the second time adopts four roller finishing rolling mill groups to be rolled, cold rolling 1 passage, rolling tensile force KN:2~5, steel band mill speed: 120~180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.4~0.5mm is rolled into thickness and is: 0.28~35mm; Adopt four roller finishing rolling mill groups to be rolled, change roller into the good striped roller of grinding, cold rolling 1 passage, rolling tensile force KN:2~5, steel band mill speed: 120~180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.28~0.35mm is rolled into thickness and is: 0.27~0.33mm; Adopt four roller finishing rolling mill groups to be rolled, change roller into grinding good roll, cold rolling 1 passage, rolling tensile force KN:2~5, steel band mill speed: 120~180 Mi ∕ minutes, with semi-finished product stainless steel band thickness be: 0.27~0.33mm mm is rolled into thickness and is: the semi-finished product striped stainless steel band of 0.25~0.3mm;
The 9th step: annealing in process for the third time: semi-finished product striped stainless steel band is entered annealing furnace with 9.5~1.0 Mi ∕ minute speed, temperature in the annealing furnace is: 1030~1060 ℃, be filled with simultaneously protective gas, be divided into six zones and one section preheating section in the annealing furnace;
Temperature is controlled at 1000~1050 ℃ in the first area; Temperature is controlled at 1000~1050 ℃ in the second area stove; Temperature is controlled at 1080~1090 ℃ in the 3rd zone furnace; Temperature is controlled at 1080~1090 ℃ in the 4th zone furnace; Temperature is controlled at 1080~1090 ℃ in the 5th zone furnace; Come out of the stove when temperature is controlled at 1050~1060 ℃ in the 6th zone furnace and enter cooling section and be cooled to finished product striped stainless steel band; The temperature of described cooling section remains on 40~60 ℃;
The tenth step: cutting, packing, warehouse-in.
2. the production method of a kind of striped stainless steel band according to claim 1 is characterized in that: described first, second and third time annealing in process protective gas adopts the ammonia heating to resolve into 75% hydrogen and 25% nitrogen: the annealing furnace internal pressure is at 0.3~0.5MP.
3. the production method of a kind of striped stainless steel band according to claim 1 is characterized in that: the thickness deviation of the semi-finished product stainless steel band that described the second rolling process is rolling is ± 0.02mm.
4. the production method of a kind of striped stainless steel band according to claim 1 is characterized in that: the rolling semi-finished product striped stainless steel band thickness deviation of described the 3rd rolling process is ± 0.01mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010511526 CN102000696B (en) | 2010-10-19 | 2010-10-19 | Production method of striped stainless steel stripes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010511526 CN102000696B (en) | 2010-10-19 | 2010-10-19 | Production method of striped stainless steel stripes |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102000696A CN102000696A (en) | 2011-04-06 |
CN102000696B true CN102000696B (en) | 2013-02-13 |
Family
ID=43808543
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010511526 Expired - Fee Related CN102000696B (en) | 2010-10-19 | 2010-10-19 | Production method of striped stainless steel stripes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102000696B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102228902A (en) * | 2011-04-25 | 2011-11-02 | 无锡嘉联不锈钢有限公司 | Cold-rolling process of ultrathin stainless steel band |
CN102489503B (en) * | 2012-01-04 | 2012-12-05 | 山东能源机械集团乾元不锈钢制造有限公司 | Production method for cold-rolled wire-drawing steel belt and production method for wire-drawing roller applied to production |
CN103866103B (en) * | 2014-03-24 | 2015-11-04 | 无锡宝顺不锈钢有限公司 | The production method of 3G mobile battery case Stainless Steel Band |
CN104209320A (en) * | 2014-08-27 | 2014-12-17 | 无锡市华牧机械有限公司 | Cold rolling method for stainless steel band |
CN106755871A (en) * | 2016-12-14 | 2017-05-31 | 安徽楚江特钢有限公司 | A kind of cold-rolled strip manufacture method for deep-draw application high |
CN110257599A (en) * | 2019-06-19 | 2019-09-20 | 江苏甬金金属科技有限公司 | A kind of electric cooker cover Special precision stainless steel band method for annealing |
CN111014334B (en) * | 2019-12-21 | 2021-08-17 | 宁波奇亿金属有限公司 | Stainless steel wire drawing process |
CN111282994B (en) * | 2020-02-17 | 2022-04-29 | 光丰(肇庆)钢业有限公司 | Stainless steel material rolling method and stainless steel |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60262918A (en) * | 1984-06-08 | 1985-12-26 | Kawasaki Steel Corp | Manufacture of surface treating raw sheet without causing stretcher strain |
CN2042757U (en) * | 1988-07-30 | 1989-08-16 | 郑州市上街有色金属合金厂 | Rolling machine for cold-rolling double-faced aluminium figured plate band |
DE19515336A1 (en) * | 1995-04-26 | 1996-10-31 | Alcatel Kabel Ag | Mfg. internally grooved tubes for heat exchangers in, e.g., air conditioners |
CN2592300Y (en) * | 2002-12-20 | 2003-12-17 | 宝钢集团上海梅山有限公司 | Riffled plate rolling apparatus |
CN1314534C (en) * | 2004-03-12 | 2007-05-09 | 应卫忠 | Multilayer composite patterned stainless steel and its mfg. method |
CN201166253Y (en) * | 2008-01-15 | 2008-12-17 | 浙江创业钢带有限公司 | Embossing sheet metal |
CN101537425B (en) * | 2009-04-21 | 2011-06-01 | 北京冶金正源科技有限公司 | Cold rolling technique of stainless steel plate with frosted surfaces |
CN101653780A (en) * | 2009-09-10 | 2010-02-24 | 山西太钢不锈钢股份有限公司 | Rolling method of stainless checkered plate |
CN101869910A (en) * | 2010-06-04 | 2010-10-27 | 山东泰山建能机械集团有限公司 | Method for machining special surface of cold rolled stainless steel band |
-
2010
- 2010-10-19 CN CN 201010511526 patent/CN102000696B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN102000696A (en) | 2011-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102000696B (en) | Production method of striped stainless steel stripes | |
CN103372567B (en) | A kind of method of cold continuous rolling production texturing surface ferrite stainless steel band | |
CN101704019B (en) | Production method of grit-blasted surface stainless steel band | |
CN102717233B (en) | Method for manufacturing 304 precision stainless steel band of precision needle head | |
CN107042236A (en) | The preparation method of very thin austenic stainless steel belt with glossy surface | |
CN107042235B (en) | The production method of very thin ferritic stainless steel band with glossy surface | |
CN101244427B (en) | Method for producing textured surface accurate stainless steel band | |
CN101386024A (en) | Stainless steel band production method for mobile telephone | |
CN101869911B (en) | Production technology of precise stainless steel strip used for high-level mobile phone | |
CN106040749B (en) | Rough rolling rhythm control method | |
CN101239357A (en) | Method for producing stainless steel band | |
CN101716595A (en) | Process for producing accurate stainless steel band applied in electronic industry | |
PL1951451T3 (en) | Method for producing a hot-rolled steel strip and combined casting and rolling installation for carrying out the method | |
CN104209320A (en) | Cold rolling method for stainless steel band | |
CN102671940B (en) | Rolling method for producing phase changes in finish rolling process of low-grade non-oriented silicon steel | |
CN102489550A (en) | Production method for stainless steel belt for etching | |
CN102029290A (en) | Cold rolling method for hard stainless steel band | |
CN102107350A (en) | Method for producing precision wire-drawing surface stainless steel bands | |
CN102107209B (en) | Method for producing stainless steel band of automobile exhaust pipe | |
CN102492813A (en) | Production technology of stainless steel band for weaving reed | |
CN108118130A (en) | The production method of smart mobile phone supporting rack stainless steel band | |
CN102107210B (en) | Method for producing stainless steel band of heating pipe | |
CN104889163B (en) | A kind of method of pure titanium seamless tubes roll piercing | |
CN114405991A (en) | Cogging method for reducing surface decarburization depth of medium-high carbon steel blank | |
CN102719640A (en) | Production method of stainless steel band used for internal round diamond blade |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130213 Termination date: 20151019 |
|
EXPY | Termination of patent right or utility model |