CN101989312A - Graphical intelligent transformer substation model design method based on computer-aided design (CAD) - Google Patents

Graphical intelligent transformer substation model design method based on computer-aided design (CAD) Download PDF

Info

Publication number
CN101989312A
CN101989312A CN 201010549219 CN201010549219A CN101989312A CN 101989312 A CN101989312 A CN 101989312A CN 201010549219 CN201010549219 CN 201010549219 CN 201010549219 A CN201010549219 A CN 201010549219A CN 101989312 A CN101989312 A CN 101989312A
Authority
CN
China
Prior art keywords
model
cad
graphical
transformer substation
design
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010549219
Other languages
Chinese (zh)
Other versions
CN101989312B (en
Inventor
娄悦
林俊
杨合恭
胡华威
孙纯军
苏麟
陈飞
秦华
朱东升
鲁东海
朱红
沈泓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guodian Nanjing Automation Co Ltd
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Original Assignee
Guodian Nanjing Automation Co Ltd
Jiangsu Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guodian Nanjing Automation Co Ltd, Jiangsu Electric Power Design Institute filed Critical Guodian Nanjing Automation Co Ltd
Priority to CN2010105492199A priority Critical patent/CN101989312B/en
Publication of CN101989312A publication Critical patent/CN101989312A/en
Application granted granted Critical
Publication of CN101989312B publication Critical patent/CN101989312B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a graphical intelligent transformer substation pattern design method based on computer-aided design (CAD), which is characterized in that two functional modules including a graphical edit module and a model edit module are arranged in the CAD; the graphical edit module is used for drawing a conventional drawing and expanding attribute definition functions; the model edit module is used for finally generating a model file and supporting the high-order functions of importing, exporting, editing and verifying files and the like; and the graphical edit module and the model edit module carry out sharing operation on model information by accessing an extensive makeup language (XML) database interface. In the graphical intelligent transformer substation pattern design method based on the CAD provided by the invention, by developing graphical model design software based on the CAD, the design and the system of the intelligent transformer substation are integrated, thus not only realizing to carry out first and second wiring diagrams of the conventional transformer substation in the design, but also finishing the complete data model configuration of the whole substation and data stream connection of the transformer substation according to the interface control document (ICD) model files provided by equipment manufacturers and the configuration principle of the first and second equipment of the transformer substation.

Description

Graphical intelligent substation modelling method based on CAD
Technical field
The present invention relates to a kind of intelligent substation modelling method, belong to the automatic control technology of power system field.
Background technology
In existing intelligent substation engineering, the mode basically identical of design and original conventional substation, by IED manufacturer generator schematic diagram and group screen figure, be responsible for drawing engineering drawings such as first and second system wiring figure and network connection figure by designing institute according to project planning, again by system manufacturer secondary input generation system model file, and finish the model configuration, flow process is as shown in Figure 1.
The drawback of this design is:
1. bring the duplication of labour and the possibility mistake of the artificial input information of contrast drawing.The engineering drawing that designing institute provides is transferred in integrator's generation model file process, unavoidably needs repeatedly artificial input information, has increased fallibility greatly.
2. progress seriously relies on equipment vendors.Because the drawing that designing institute provides does not directly relate to model file, all must be in design, construction, debugging, maintenance process by auxiliary design and the model configuration of finishing data message stream in the station of manufacturer, basically grasp uniting and adjustment job schedule and project progress by manufacturer, bring a large amount of manufacturers coordination problem and work.
3. the facility that when transformer station's reorganization and expansion, does not obtain to envision.Because the system integration is finished by equipment vendors, and device configuration tool and system configuration utility shortage versatility, very limited during reorganization and expansion if the then original configuration of replacing manufacturer is inherited, limit engineering reorganization and expansion dirigibility greatly.
Summary of the invention
Technical matters to be solved by this invention provides a kind of intelligent substation modelling software, is implemented in the design phase to finish the configuration of the complete data model of intelligent substation and is connected with data stream, and realization information is once imported, and is shared alternately.
For solving the problems of the technologies described above, the invention provides a kind of graphical intelligent substation modelling method based on CAD, it is characterized in that, may further comprise the steps:
1) two functional modules are set in CAD respectively: the graphics edition module is used to draw conventional drawing and extended attribute defined function; The model editing module is used for final generation model file, supports the senior functions such as importing, derivation, editor and verification of file, and described graphics edition module and model editing module are finished the sharing operation of model information by visit XML database interface;
2) the pel piece of each equipment in first and second system of definition transformer station comprises isolating switch, disconnector, mutual inductor, transformer, bus, protective device, merge cells etc.;
3) all pel pieces add extended attribute by the information of requirement in the IEC 61850-6 standard, and extended attribute comprises: IED title, logical device LD(Logical Device) title, logic node LN(Logical Node) title, prefix name prefix, instance number inst(Instance number), empty terminal open into and leave title etc.;
4) definition special map layer is drawn the first and second system wiring figure of transformer station, electric substation automation system network chart and empty terminal connection layout respectively, the pel piece with IEC 61850 extended attributes that all kinds of pel pieces in the figure layer all adopt step 3) to generate;
5) generate pel piece extended attribute value according to wiring and network chart, the extended attribute value is imported the XML database according to IEC 61850-6 standard;
6) generation and edit model, reading of data generates the SCD model file from the XML database, or amended model file is imported database reverse correlation figure, and the model that imports, derive is carried out the grammer verification.
Aforesaid graphical intelligent substation modelling method based on CAD, it is characterized in that: in described step 5), pel piece attribute is stored in the XML database by the output of the file layout of XML, make graphics edition module and model editing module can both from database, obtain the information that needs, realize information sharing.
The beneficial effect that the present invention reached:
The present invention is by the graphical model design software of exploitation one cover based on CAD, intelligent substation design and system integration work are merged, be implemented in the design except that finishing conventional transformer station's first and second wiring diagram, the ICD model file that can also provide according to each equipment vendors and the configuration principle of transformer station's first and second equipment are finished the complete data model configuration in full station and are connected with the data stream of transformer station.Complete data model comprises the SSD file that reacts primary connection and comprises SSD, ICD and the SCD file of data stream configuration that data stream connects and comprises general OO transformer substation case GOOSE(Generic Object Oriented SubStation Event) and the SV(Sampled Values that samples) empty terminal be connected.Accomplish that really information is only imported once in the transformer station, realize sharing of information, on design level, improve and realize the opening of intelligent substation by alternant way.Designing institute can directly provide a complete set of drawing and transformer station's allocation models file, instruct engineering construction, debugging, not needing to adopt configuration tool separately by manufacturer again is model file with design drawing " translation ", for the maintenance and the reorganization and expansion of engineering from now on facilitates.
Description of drawings
Fig. 1 is existing intelligent substation design flow diagram.
Fig. 2 is software overall plan figure of the present invention.
Fig. 3 is for adopting intelligent substation design flow diagram of the present invention.
Fig. 4 is the associated diagram of software module among the present invention and XML database.
Embodiment
With certain transformer station is example, the graphical intelligent substation modelling method based on CAD of the present invention,
Concrete implementation step is as follows:
1) the pel piece of each equipment in first and second system of definition transformer station, as: isolating switch, disconnector, mutual inductor, transformer, bus, protective device, merge cells etc.
2) all pel pieces add extended attribute by the information of requirement in the IEC 61850-6 standard, as IED title, logical device LD(Logical Device) title, logic node LN(Logical Node) title, prefix name prefix, instance number inst(Instance number), empty terminal open into and leave title etc.Logic node LN(Logical Node wherein) title, prefix name prefix, instance number inst(Instance number), empty terminal open into and leave title etc. and can directly import by the mounted cast that device manufacturer provides.
3) definition special map layer, draw the first and second system wiring figure of transformer station, electric substation automation system network chart and empty terminal connection layout respectively, all kinds of pel pieces in the figure layer all adopt the piece (i.e. the pel piece of (2) step generation) with IEC 61850 extended attributes.
4) can generate pel piece extended attribute value automatically by software according to wiring and network chart, and the extended attribute value be imported the XML database according to IEC 61850-6 standard.
5) reading of data generates the SCD model file from the XML database.
Adopt intelligent substation design cycle after said method improves for as shown in Figure 3.Fig. 4 is the synoptic diagram that graphics edition module and model editing module are passed through the information sharing of XML database implementation model.
The present invention has following characteristics:
1) design of intelligent transformer station, be reduced to " behind the device manufacturer generator model designing institute directly design and generation model file " by in the past " designing institute provides the system design drawing---each system manufacturer input engineering information generation system model---, and device manufacturer generator model generates full station allocation models by system manufacturer ", with conventional 220kV transformer station is example, to reduce the relevant artificial repetition input information work of nearly 200 device, avoid the possible mistake of this link.
2) in construction, debugging, the maintenance, the link of in the past " designing institute's revisions on drawings---information is re-entered by integrator; re-generate the SCD model file---equipment vendor re-generates the CID model file " will be reduced to " designing institute revises and the generation model file ", reduce in engineering construction, debugging, the maintenance dependence to manufacturer greatly.
3) during the engineering reorganization and expansion, because directly by designing institute's design and generation model file, therefore no longer be confined to the configuration tool of former engineering manufacturer, manufacturer selects more flexible.
Below disclose the present invention with preferred embodiment, so it is not in order to restriction the present invention, and all employings are equal to replaces or technical scheme that the equivalent transformation mode is obtained, all drops within protection scope of the present invention.

Claims (2)

1. the graphical intelligent substation modelling method based on CAD is characterized in that, may further comprise the steps:
1) two functional modules are set in CAD respectively: the graphics edition module is used to draw conventional drawing and extended attribute defined function; The model editing module is used for final generation model file, supports the senior functions such as importing, derivation, editor and verification of file, and described graphics edition module and model editing module are finished the sharing operation of model information by visit XML database interface;
2) the pel piece of each equipment in first and second system of definition transformer station;
3) all pel pieces add extended attribute by the information of requirement in the IEC 61850-6 standard;
4) definition special map layer is drawn the first and second system wiring figure of transformer station, electric substation automation system network chart and empty terminal connection layout respectively, the pel piece with IEC 61850 extended attributes that all kinds of pel pieces in the figure layer all adopt step 3) to generate;
5) generate pel piece extended attribute value according to wiring and network chart, the extended attribute value is imported the XML database according to IEC 61850-6 standard;
6) generation and edit model, reading of data generates the SCD model file from the XML database, or amended model file is imported database reverse correlation figure, and the model that imports, derive is carried out the grammer verification.
2. the graphical intelligent substation modelling method based on CAD according to claim 1, it is characterized in that: in described step 5), pel piece attribute is stored in the XML database by the output of the file layout of XML, make graphics edition module and model editing module can both from database, obtain the information that needs, realize information sharing.
CN2010105492199A 2010-11-18 2010-11-18 Graphical intelligent transformer substation model design method based on computer-aided design (CAD) Active CN101989312B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105492199A CN101989312B (en) 2010-11-18 2010-11-18 Graphical intelligent transformer substation model design method based on computer-aided design (CAD)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105492199A CN101989312B (en) 2010-11-18 2010-11-18 Graphical intelligent transformer substation model design method based on computer-aided design (CAD)

Publications (2)

Publication Number Publication Date
CN101989312A true CN101989312A (en) 2011-03-23
CN101989312B CN101989312B (en) 2011-11-16

Family

ID=43745845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105492199A Active CN101989312B (en) 2010-11-18 2010-11-18 Graphical intelligent transformer substation model design method based on computer-aided design (CAD)

Country Status (1)

Country Link
CN (1) CN101989312B (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102185378A (en) * 2011-05-04 2011-09-14 国电南瑞科技股份有限公司 Method for realizing automatic system of intelligent transformer station
CN102270261A (en) * 2011-08-09 2011-12-07 山东电力工程咨询院有限公司 Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration
CN102289547A (en) * 2011-08-09 2011-12-21 山东电力工程咨询院有限公司 Method for realizing intelligent device model interchange based on semantic matching
CN102314540A (en) * 2011-10-24 2012-01-11 河北省电力勘测设计研究院 Method for automatically generating thermal-control power supply cabinet wiring diagram for electric power plant
CN102323966A (en) * 2011-09-05 2012-01-18 江苏西电南自智能电力设备有限公司 CAD (Computer-Aided Design) network topological graph analysis method based on rapid group search technology
CN102360398A (en) * 2011-10-11 2012-02-22 广东省电力设计研究院 IEC61850-based CAD electric power graphic generation analysis method
CN102411649A (en) * 2011-08-09 2012-04-11 山东电力工程咨询院有限公司 Method for interchanging designs by using general model of intelligent device
CN102437655A (en) * 2012-01-11 2012-05-02 温州电力局 Analogue display method and system of virtual terminals of intelligent substation
CN102508084A (en) * 2011-11-29 2012-06-20 广东电网公司电力科学研究院 Power system monitoring method and system thereof
CN102611199A (en) * 2012-03-07 2012-07-25 长园深瑞继保自动化有限公司 Design and configuration integrated system for intelligent substation
CN102622463A (en) * 2012-01-05 2012-08-01 山东电力工程咨询院有限公司 Drawing-model uniformity based method for automatic check of design drawings
CN102624607A (en) * 2011-12-31 2012-08-01 山东电力工程咨询院有限公司 Intelligent transformer substation communication method capable of modeling on basis of physical port of Ethernet switch
CN103093007A (en) * 2011-10-31 2013-05-08 河南省电力公司 Power transmission iron tower three-dimensional virtual assembly method
CN103187801A (en) * 2011-12-31 2013-07-03 山东电力工程咨询院有限公司 Optical fiber distribution frame port configuration method in intelligent transformer substation secondary system
CN103543509A (en) * 2013-10-12 2014-01-29 广东电网公司电力科学研究院 Method and system for laying optical cables in intelligent transformer substation
CN103617304A (en) * 2013-10-22 2014-03-05 芜湖大学科技园发展有限公司 Electric power system graphical modeling method based on network
CN104008223A (en) * 2014-03-12 2014-08-27 国家电网公司 Graphical expressing method for connection of virtual terminals of secondary system of intelligent substation
CN104318833A (en) * 2012-10-30 2015-01-28 江苏省电力公司常州供电公司 Working method for of power grid dispatching automation training system
CN104504217A (en) * 2015-01-07 2015-04-08 山东鲁能智能技术有限公司 DL/ T860 model auxiliary system for power supply of transformer substation and working method thereof
CN105260942A (en) * 2015-09-16 2016-01-20 国网天津市电力公司 Substation model management method based on layer
CN107391458A (en) * 2017-06-15 2017-11-24 国网辽宁省电力有限公司电力科学研究院 A kind of method that SCD decouplings are realized using extension tag
CN110908758A (en) * 2019-11-19 2020-03-24 国网智能科技股份有限公司 Graphical configuration method and system for anti-misoperation lockout logic expression

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101035099A (en) * 2007-02-09 2007-09-12 浙江大学 General gateway design method for realizing the IEC61850 standard
CN101303707A (en) * 2008-07-03 2008-11-12 天津市三源电力设备制造有限公司 Computer-aided design method for premounting transformer substation air vent
CN101706773A (en) * 2009-11-19 2010-05-12 北京四方继保自动化股份有限公司 Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination
CN101882812A (en) * 2010-08-06 2010-11-10 平顶山市恒华科技有限公司 Object-oriented implementation method for intelligent electronic device of digital substation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101035099A (en) * 2007-02-09 2007-09-12 浙江大学 General gateway design method for realizing the IEC61850 standard
CN101303707A (en) * 2008-07-03 2008-11-12 天津市三源电力设备制造有限公司 Computer-aided design method for premounting transformer substation air vent
CN101706773A (en) * 2009-11-19 2010-05-12 北京四方继保自动化股份有限公司 Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination
CN101882812A (en) * 2010-08-06 2010-11-10 平顶山市恒华科技有限公司 Object-oriented implementation method for intelligent electronic device of digital substation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《电力系统自动化》 20060725 童晓阳,李岗,陈德明,王晓茹 采用IEC 61850的变电站间隔层IED软件设计方案 54-57,81 1 第30卷, 第14期 2 *

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102185378B (en) * 2011-05-04 2013-06-12 国电南瑞科技股份有限公司 Method for realizing automatic system of intelligent transformer station
CN102185378A (en) * 2011-05-04 2011-09-14 国电南瑞科技股份有限公司 Method for realizing automatic system of intelligent transformer station
CN102270261B (en) * 2011-08-09 2012-10-03 山东电力工程咨询院有限公司 Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration
CN102270261A (en) * 2011-08-09 2011-12-07 山东电力工程咨询院有限公司 Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration
CN102289547A (en) * 2011-08-09 2011-12-21 山东电力工程咨询院有限公司 Method for realizing intelligent device model interchange based on semantic matching
CN102411649A (en) * 2011-08-09 2012-04-11 山东电力工程咨询院有限公司 Method for interchanging designs by using general model of intelligent device
CN102289547B (en) * 2011-08-09 2012-10-17 山东电力工程咨询院有限公司 Method for realizing intelligent device model interchange based on semantic matching
CN102323966A (en) * 2011-09-05 2012-01-18 江苏西电南自智能电力设备有限公司 CAD (Computer-Aided Design) network topological graph analysis method based on rapid group search technology
CN102323966B (en) * 2011-09-05 2015-01-14 江苏西电南自智能电力设备有限公司 CAD (Computer-Aided Design) network topological graph analysis method based on rapid group search technology
CN102360398A (en) * 2011-10-11 2012-02-22 广东省电力设计研究院 IEC61850-based CAD electric power graphic generation analysis method
CN102360398B (en) * 2011-10-11 2014-04-23 广东省电力设计研究院 IEC61850-based CAD electric power graphic generation analysis method
CN102314540A (en) * 2011-10-24 2012-01-11 河北省电力勘测设计研究院 Method for automatically generating thermal-control power supply cabinet wiring diagram for electric power plant
CN103093007A (en) * 2011-10-31 2013-05-08 河南省电力公司 Power transmission iron tower three-dimensional virtual assembly method
CN103093007B (en) * 2011-10-31 2016-06-15 河南省电力公司 Power transmission iron tower three-dimensional virtual assembly method
CN102508084A (en) * 2011-11-29 2012-06-20 广东电网公司电力科学研究院 Power system monitoring method and system thereof
CN102624607A (en) * 2011-12-31 2012-08-01 山东电力工程咨询院有限公司 Intelligent transformer substation communication method capable of modeling on basis of physical port of Ethernet switch
CN102624607B (en) * 2011-12-31 2013-03-27 山东电力工程咨询院有限公司 Intelligent transformer substation communication method capable of modeling on basis of physical port of Ethernet switch
CN103187801A (en) * 2011-12-31 2013-07-03 山东电力工程咨询院有限公司 Optical fiber distribution frame port configuration method in intelligent transformer substation secondary system
CN103187801B (en) * 2011-12-31 2014-10-29 山东电力工程咨询院有限公司 Method of optical fiber distribution frame port configuration method in intelligent transformer substation secondary system
CN102622463A (en) * 2012-01-05 2012-08-01 山东电力工程咨询院有限公司 Drawing-model uniformity based method for automatic check of design drawings
CN102437655B (en) * 2012-01-11 2013-10-16 温州电力局 Analogue display method and system of virtual terminals of intelligent substation
CN102437655A (en) * 2012-01-11 2012-05-02 温州电力局 Analogue display method and system of virtual terminals of intelligent substation
CN102611199A (en) * 2012-03-07 2012-07-25 长园深瑞继保自动化有限公司 Design and configuration integrated system for intelligent substation
CN102611199B (en) * 2012-03-07 2014-04-02 长园深瑞继保自动化有限公司 Design and configuration integrated system for intelligent substation
CN104318833A (en) * 2012-10-30 2015-01-28 江苏省电力公司常州供电公司 Working method for of power grid dispatching automation training system
CN103543509A (en) * 2013-10-12 2014-01-29 广东电网公司电力科学研究院 Method and system for laying optical cables in intelligent transformer substation
CN103543509B (en) * 2013-10-12 2015-12-23 广东电网公司电力科学研究院 The method and system of laying optical cable in intelligent substation
CN103617304A (en) * 2013-10-22 2014-03-05 芜湖大学科技园发展有限公司 Electric power system graphical modeling method based on network
CN104008223A (en) * 2014-03-12 2014-08-27 国家电网公司 Graphical expressing method for connection of virtual terminals of secondary system of intelligent substation
CN104008223B (en) * 2014-03-12 2017-04-12 国家电网公司 Graphical expressing method for connection of virtual terminals of secondary system of intelligent substation
CN104504217B (en) * 2015-01-07 2017-06-20 山东鲁能智能技术有限公司 A kind of transformer station's power supply DL/T860 model-aideds system and its method of work
CN104504217A (en) * 2015-01-07 2015-04-08 山东鲁能智能技术有限公司 DL/ T860 model auxiliary system for power supply of transformer substation and working method thereof
CN105260942A (en) * 2015-09-16 2016-01-20 国网天津市电力公司 Substation model management method based on layer
CN105260942B (en) * 2015-09-16 2019-03-29 国网天津市电力公司 A kind of transformer station model management method based on figure layer
CN107391458A (en) * 2017-06-15 2017-11-24 国网辽宁省电力有限公司电力科学研究院 A kind of method that SCD decouplings are realized using extension tag
CN107391458B (en) * 2017-06-15 2020-08-07 国网辽宁省电力有限公司电力科学研究院 Method for realizing SCD decoupling by adopting extension tag
CN110908758A (en) * 2019-11-19 2020-03-24 国网智能科技股份有限公司 Graphical configuration method and system for anti-misoperation lockout logic expression
CN110908758B (en) * 2019-11-19 2023-09-01 山东鲁软数字科技有限公司智慧能源分公司 Anti-misoperation locking logic expression graphical configuration method and system

Also Published As

Publication number Publication date
CN101989312B (en) 2011-11-16

Similar Documents

Publication Publication Date Title
CN101989312B (en) Graphical intelligent transformer substation model design method based on computer-aided design (CAD)
CN104133953B (en) Intelligent substation secondary design system
CN102957205B (en) A kind of method and system setting up electricity distribution network model
CN102611199B (en) Design and configuration integrated system for intelligent substation
CN102622463B (en) Drawing-model uniformity based method for automatic check of design drawings
CN104123271B (en) Intelligent substation secondary design system based on Excel
CN102270261B (en) Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration
CN105515189B (en) Comprehensive intelligent gateway machine configuration method based on transformer station's unified Modeling
CN102184280A (en) Drawing and model integrated visual integration design method
CN104008223B (en) Graphical expressing method for connection of virtual terminals of secondary system of intelligent substation
CN106294929A (en) Satellite low-frequency cable design system, design software framework and method for designing
Vaubourg et al. Multi-agent multi-model simulation of smart grids in the MS4SG project
CN102779156B (en) Configuration method for database of communication device in digital substation
CN105224511A (en) A kind of method of calibration of intelligent substation SCD file
CN102411649B (en) Method for interchanging designs by using general model of intelligent device
CN110569557A (en) Intelligent autonomous design platform for power transmission and transformation project and working method thereof
CN105205039A (en) Customizable SCD (substation configuration description) file verification method
CN105373008A (en) Full physics model simulation method for electric power system
CN111880883B (en) Dynamic combination primitive realization method based on equipment object
CN104036667B (en) A kind of virtual terminals of intelligent substation connects the implementation method of design training
CN112926106A (en) Power transmission and transformation project collaborative design method and system based on six-level system
CN112966315A (en) Three-dimensional design system and method for secondary automation system of intelligent substation
Galkin et al. Automatic generation of data centre digital twins for virtual commissioning of their automation systems
CN113887071A (en) Process flow chart manufacturing method, system, storage medium and equipment
Song et al. Research on the data management and decision-making method of the intelligent substation system based on SCD

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP JIANGSU ELECTRIC PO

Free format text: FORMER NAME: JIANGSU ELECTRIC POWER DESIGNING INST.

CP01 Change in the name or title of a patent holder

Address after: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Patentee after: Chinese energy construction group Jiangsu Prov. Power Design Inst Co., Ltd

Patentee after: Nanjing Automation Co., Ltd., China Electronics Corp.

Address before: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Patentee before: Jiangsu Electric Power Designing Institute

Patentee before: Nanjing Automation Co., Ltd., China Electronics Corp.