CN101986228A - Compensation method of random time-delay of external forward and internal feedback path of network cascade control system - Google Patents

Compensation method of random time-delay of external forward and internal feedback path of network cascade control system Download PDF

Info

Publication number
CN101986228A
CN101986228A CN2010105528735A CN201010552873A CN101986228A CN 101986228 A CN101986228 A CN 101986228A CN 2010105528735 A CN2010105528735 A CN 2010105528735A CN 201010552873 A CN201010552873 A CN 201010552873A CN 101986228 A CN101986228 A CN 101986228A
Authority
CN
China
Prior art keywords
control
node
network
sub
device node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105528735A
Other languages
Chinese (zh)
Other versions
CN101986228B (en
Inventor
杜锋
杜文才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan University
Original Assignee
Hainan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan University filed Critical Hainan University
Priority to CN2010105528735A priority Critical patent/CN101986228B/en
Publication of CN101986228A publication Critical patent/CN101986228A/en
Application granted granted Critical
Publication of CN101986228B publication Critical patent/CN101986228B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Feedback Control In General (AREA)

Abstract

The invention provides a compensation method of random time-delay of the external forward and internal feedback paths of a network cascade control system, belonging to the technical field of the network control system. The method uses the actual external forward network path nodes of the network cascade control system and adopts the network data transmission process between the internal feedback network path nodes to replace the compensation model of network time-delay between the nodes, avoid the measurement, observation, estimation or identification of the network data transmission random time-delay between the nodes and remove the synchronization requirement on the node clock signal. By adopting the method, the influence of the random network time-delay on the system stability can be reduced and the performance quality of system control can be imprved. The method of the invention is suitable for the dynamic compensation and control of random network time-delay when the mathematical models of the main controlled object and auxiliary controlled object are known and the network only exists in the external forward and internal feedback paths of the cascade control system.

Description

Outer forward direction of network cascade control system and the compensation method of internal feedback path random delay
Technical field
The present invention relates to the compensation method of outer forward direction of network cascade control system and internal feedback path randomness network delay, belong to the network control system technical field.
Background technology
In recent years, the develop rapidly of computer networking technology, caused the deep reform of control technology and the generation of corresponding control new theory thereof. the feedback control system that forms closed loop by network be called as network control system (Network control systems, NCS).
The research of network control system grew up from the middle and later periods nineties 20th century, it has become one of focus of current automatic control and network communications technology development. network control system has that system's line is few, expansion is convenient, diagnosis safeguard simple, dirigibility is high, can realize advantages such as resource sharing and Long-distance Control, be widely used in the industrial process of many complexity such as automated manufacturing factory, power plant, robot, space flight and aviation and electrified transportation.
Network control system is mainly studied and how to be realized control system is carried out the real-time reliable network control, and the network own characteristic has caused the complicacy of network control system. multiple users share communication line and fluctuations in discharge are irregular on the network, transmitting data stream is not unique through numerous computing machines and communication facilities and path, data cell in transmission because network congestion, reasons such as connection interruption can cause the sequential entanglement, data-bag lost. therefore, data transmission in the network control system certainly exists time delay, packet loss, the consequent network bandwidth and real-time problem must be considered and solve to problems such as many bag transmission and network scheduling during system design.
At present, research about network control system mainly is at single-circuit control system both at home and abroad, constant at network delay respectively, in time, become or at random, network delay is less than a sampling period or greater than a sampling period, single bag transmission or many bag transmission, have or not under the various conditions such as data-bag lost, it is carried out modeling and stability analysis, but rarely have paper that the network cascade control system is studied. control loop is called network cascade control system (NCCS) by the cascade control system of real-time network closure, and the typical structure block diagram that is applicable to network cascade control system of the present invention is as shown in Figure 1.
Because the network cascade control system is the network control system of closed loop more than, analysis to network delay influence is more complex more than single-circuit network control system with the research of system performance. and the inner looping network delay will have a strong impact on the rapidity and the antijamming capability of inner looping network control system, and the while also will have a negative impact with stability and the controlling performance of external loop network delay to whole network cascade control system.
Difficult point for network delay research is:
(1) because network delay is relevant with factors such as network topology structure, communication protocol, offered load, the network bandwidth and packet sizes. to network delay greater than several and even dozens of sampling period, set up accurately predict, the mathematical model of estimation or identification, almost be impossible at present.
(2) occur in the previous node network delay in node transmitting network data process backward, in previous node, no matter adopt which kind of prediction or method of estimation, all can not know the exact value of the network delay that produces thereafter in advance in advance. time delay causes system performance to descend even causes system's instability, brings difficulty also for simultaneously the analysis and the design of control system.
(3) will satisfy in the network cascade control system, all node clock signals in different distributions place are unpractical fully synchronously.
Existing only in main transformer at network send between (control) device node and execution (sub-control) the device node (outer feedforward network), and the network cascade control system as shown in Figure 2 of (internal feedback network) between secondary transmitter node and execution (sub-control) the device node, its input R (s) and output Y 1(s) closed loop between is transmitted letter
Y 1 ( s ) R ( s ) = C 1 ( s ) e - τ 1 s C 2 ( s ) G 2 ( s ) G 1 ( s ) 1 + C 1 ( s ) e - τ 1 s C 2 ( s ) G 2 ( s ) G 1 ( s ) + C 2 ( s ) G 2 ( s ) e - τ 2 s - - - ( 1 )
In the formula: C 1(s) be master controller, C 2(s) be submaster controller; G 1(s) be main controlled device, G 2(s) be secondary controlled device; τ 1Expression send (control) device node to be transferred to the randomness network delay that is produced between execution (sub-control) the device node from main transformer network data; τ 2Expression is transferred to the randomness network delay that execution (sub-control) device node is produced with network data from secondary transmitter node.
Owing to comprise network delay τ in the denominator of the closed loop transfer function, shown in the equation (1) 1And τ 2Exponential term
Figure BSA00000355086300012
With
Figure BSA00000355086300013
The existence of time delay will worsen the control performance quality of system, even cause system's loss of stability, when serious system be broken down.
Reduce time delay to the sex key of system stability, just be to realize main transformer sent the network delay τ between (control) device node and execution (sub-control) the device node 1Exponential term
Figure BSA00000355086300021
And secondary transmitter is to the network delay τ that carries out between (sub-control) device node 2Exponential term
Figure BSA00000355086300022
From the denominator of equation (1), remove, promptly realize not comprising in system's closed loop secular equation the exponential term of all-network time delay, yet and then realization is to the compensation of network delay., realize compensation to network delay, at first must know the size of network delay. at present, the method that adopts usually is by to network delay τ both at home and abroad 1And τ 2Measurement, come delay compensation τ 1And τ 2Influence to system stability. still, because to network delay τ 1And τ 2Accurate measurement need satisfy the synchronous requirement of node clock signal, if adopt hardware to realize that node clock signal is synchronous fully, then need bigger economy input; If adopt software position signal, when then between node, transmitting owing to correction signal, may meet with the influence of network delay, be difficult to realize that nodal clock is synchronous fully. if adopt network delay is estimated, observation, identification or forecast method obtain the size of network delay, then at first must know the accurate probability distribution of network delay, or mathematical model accurately, but because the size of network delay and concrete procotol, factors such as offered load size and network topology structure are relevant, to the estimation of network delay, observation, all may there be deviation in identification or prediction.
Therefore, how to exempt the requirement synchronous to node clock signal, release is to estimation, observation, identification or the prediction of network delay between the node, can obtain simultaneously between the node time delay value accurately again, and then realize that having become in the research of network cascade control system needs one of key issue that solves to the compensating action of outer forward direction of network cascade control system and internal feedback path randomness network delay.
Summary of the invention
In order to solve the problems of the technologies described above, the invention provides a kind of network that relates to and exist only in main transformer and send between (control) device node and execution (sub-control) the device node (outer feedforward network), and the compensation method of the randomness network delay of the network cascade control system of (internal feedback network) between secondary transmitter node and execution (sub-control) the device node.
Purpose of the present invention:
In the network cascade control system, the difficult problem of network delay " indeterminacy ", the present invention proposes a kind of release requirement synchronous to node clock signal, also exempt simultaneously delay compensation method, realize the segmentation of network delay, real-time, online and dynamic compensation and control to measurement, estimation or the identification of randomness network delay between its node.
The method that the present invention adopts is:
The first step: adopt main transformer to send (control) device node to replace the compensation model of network delay therebetween to the live network data transmission procedure of carrying out between (sub-control) device node, thereby the system that structurally realizes does not comprise the compensation model of network delay therebetween. no matter send (control) device node how complicatedly and uncertain to have to the network path of carrying out (sub-control) device node from main transformer, also no matter include therebetween what routers or (with) intermediate link, the network delay that information flow experienced is exactly a real network delay in the control procedure, has just realized the compensate function to its time delay in the information stream transmission process.
Second step: adopt secondary transmitter node to replace the compensation model of network delay therebetween to the live network data transmission procedure of carrying out between (sub-control) device node, thereby the system that structurally realizes does not comprise the compensation model of network delay therebetween. no matter how complicatedly and uncertain have to the network path of carrying out (sub-control) device node from secondary transmitter node, also no matter include therebetween what routers or (with) intermediate link, the network delay that information flow experienced is exactly a real network delay in the control procedure, has just realized the compensate function to its time delay in the information stream transmission process.
The 3rd step: at network cascade control system shown in Figure 2, the network delay collocation structure of enforcement the inventive method is as shown in Figure 3.
In Fig. 3, from the input R (s) and the output Y of system 1(s) closed loop transfer function, between is
Y 1 ( s ) R ( s ) = C 1 ( s ) e - τ 1 s C 2 ( s ) G 2 ( s ) G 1 ( s ) 1 + C 2 ( s ) G 2 m ( s ) 1 + C 1 ( s ) C 2 m ( s ) G 2 m ( s ) G 1 m ( s ) 1 + C 2 m ( s ) G 2 m ( s ) + C 2 ( s ) [ G 2 ( s ) - G 2 m ( s ) ] e - τ 2 s 1 + C 2 ( s ) G 2 m ( s ) + C 1 ( s ) e - τ 1 s C 2 ( s ) G 2 ( s ) [ G 1 ( s ) - G 1 m ( s ) ] 1 + C 2 ( s ) G 2 m ( s ) - - - ( 2 )
When major-minor controlled device prediction model equals its true model, i.e. G 1m(s)=G 1(s), G 2m(s)=G 2(s), submaster controller satisfies C 2m(s)=C 2(s) time, formula (2) but abbreviation be
Y 1 ( s ) R ( s ) = C 1 ( s ) e - τ 1 s C 2 ( s ) G 2 ( s ) G 1 ( s ) 1 + C 1 ( s ) C 2 ( s ) G 2 ( s ) G 1 ( s ) + ( s ) G 2 ( s ) - - - ( 3 )
In the closed loop transfer function, denominator of the network cascade control system shown in the formula (3), do not comprise network delay τ 1And τ 2Exponential term
Figure BSA00000355086300032
With Promptly realized closed loop secular equation 1+C 1(s) C 2(s) G 2(s) G 1(s)+C 2(s) G 2(s)=0 do not comprise the exponential term of network delay in, thereby eliminated the influence of network delay, improved the control performance quality of system, realized compensate function the randomness network delay to system stability.
The scope of application of the present invention:
The present invention is applicable in the network cascade control system, major-minor controlled device mathematical model is known, network exists only in main transformer and send between (control) device node and execution (sub-control) the device node (outer feedforward network path), and between secondary transmitter node and execution (sub-control) the device node (internal feedback network path), network delay can be greater than the compensation of randomness network delay and control of the network cascade control system in 1 and even dozens of sampling period.
The invention is characterized in that this method may further comprise the steps:
1, when sending (control) device node, main transformer is sampled cycle h 1During triggering, will adopt mode A to carry out work;
2, send (control) device node with control signal u when main transformer 1(s) by outer feedforward network path when carrying out the transmission of (sub-control) device node, will adopt mode B to carry out work;
3, be sampled cycle h when secondary transmitter node 2During triggering, will adopt mode C to carry out work;
4, when secondary transmitter node with model bias signal w 2(s) by the internal feedback network path when carrying out the transmission of (sub-control) device node, will adopt mode D to carry out work;
5, when carrying out (sub-control) device node controlled signal u 1(s) or (with) model bias signal w 2When (s) triggering, will adopt mode E to carry out work.
The step of mode A comprises:
A1: main transformer send (control) device node to work in the time type of drive, and it triggers the sampling period is h 1
A2: after main transformer send (control) device node to be triggered, to main controlled device G 1(s) output signal Y 1(s) and the prediction model G of main controlled device 1m(s) output signal y 1m(s) sample;
A3: to Y 1(s) and y 1m(s) implement additive operation, obtain model bias signal w 1(s);
A4: with given signal R of system (s) and w 1(s) and m 1(s) implement additive operation, obtain external loop systematic error signal e 1(s);
A5: to e 1(s) implement master controller C 1(s) computing, controlled signal u 1(s);
A6: with u 1(s), act on the predictive algorithm C of submaster controller as given signal 2m(s) with the prediction model G of secondary controlled device 2m(s) backfeed loop of Gou Chenging, it is output as y Cg2m(s);
A7: with y Cg2m(s) act on G 1m(s), it is output as m 1(s).
The step of mode B comprises:
B1: main transformer send (control) device node with control signal u 1(s), transmit to carrying out (sub-control) device node by outer feedforward network path.
The step of mode C comprises:
C1: secondary transmitter node works in the time type of drive, and it triggers the sampling period is h 2
C2: after secondary transmitter node is triggered, to secondary controlled device G 2(s) output signal Y 2(s) and the prediction model G of secondary controlled device 2m(s) output signal y 2m(s) sample;
C3: to Y 2(s) and y 2m(s) implement additive operation, obtain model bias signal w 2(s).
The step of mode D comprises:
D1: secondary transmitter node is with model bias signal w 2(s), transmit to carrying out (sub-control) device node by the internal feedback network path.
The step of mode E comprises:
E1: carry out (sub-control) device node and work in event driven manner;
E2: carry out (sub-control) device node controlled signal u 1(s) or (with) model bias signal w 2(s) trigger;
E3: in carrying out (sub-control) device node, with u 1(s) deduct model bias signal w 2(s) and prediction model G 2m(s) output signal y G2m(s), obtain inner looping systematic error signal e 2(s);
E4: to e 2(s) implement sub-control algorithm C 2(s), controlled signal u 2(s);
E5: with u 2(s) as drive signal, to secondary controlled device G 2(s) implement control; Thereby change G 2(s) state, and then change G 1(s) state is realized G 1(s) and G 2(s) control action;
E6: in node, finish simultaneously to G 2m(s) discreet value y 2m(s) calculating.
6, delay compensation method of the present invention is characterized in that it is by the embedded master controller C of main transmitter that main transformer send (control) device node 1(s) form, the shared same node of promptly main transmitter and master controller, main transformer send (control) device node employing time to drive triggered mode of operation (sampling period is h 1).
7, delay compensation method of the present invention is characterized in that carrying out (sub-control) device node is by the embedded submaster controller C of actuator 2(s) form, i.e. the shared same node of submaster controller and actuator, node adopt the event-driven triggered mode of operation (trigger pip are u 1(s) or (with) model bias signal w 2(s)).
8, delay compensation method of the present invention, it is characterized in that system comprises main transformer and send unit such as (control) device node, secondary transmitter node, execution (sub-control) device node, main controlled device and secondary controlled device, each unit carries out work according to the working method of setting separately.
9, delay compensation method of the present invention, it is characterized in that using really and send (control) device node to replace network delay compensation model therebetween, thereby the system that structurally realizes does not comprise the compensation model of network delay therebetween to the network data transmission process of carrying out external loop feedforward network path (sub-control) device node from main transformer.
10, delay compensation method of the present invention, it is characterized in that using really replacing network delay compensation model therebetween to the network data transmission process of carrying out inner looping feedback network path (sub-control) device node, thereby the system that structurally realizes does not comprise the compensation model of network delay therebetween from secondary transmitter node.
11, delay compensation method of the present invention is characterized in that exempting send (control) device node to measurement, observation, estimation or the identification of carrying out network delay (sub-control) device node from main transformer from structure.
12, delay compensation method of the present invention is characterized in that exempting secondary transmitter node to measurement, observation, estimation or the identification of carrying out network delay (sub-control) device node from structure.
13, delay compensation method of the present invention is characterized in that sending (control) device node, secondary transmitter node and the synchronous requirement of execution (sub-control) device node clock signal from the structure release to main transformer.
14, delay compensation method of the present invention is characterized in that realizing from structure the enforcement and concrete control strategy C of network delay compensation method 1(s) and C 2(s) selection is irrelevant.
15, delay compensation method of the present invention is characterized in that realizing that from structure the enforcement of network delay compensation method is irrelevant with the selection of concrete network communication protocol.
16, delay compensation method of the present invention is characterized in that as major-minor controlled device G 1(s), G 2(s) with its prediction model G 1m(s), G 2m(s) equate submaster controller C 2(s) with its prediction model C 2mWhen (s) equating, can realize full remuneration, improve the control performance quality of system outer forward direction of network cascade control system and internal feedback path randomness network delay.
17, delay compensation method of the present invention, what it is characterized in that adopting is the compensation method that " soft " changes the control system structure, need not increases any hardware device again, and the software resource that utilizes existing network cascade control system intelligent node to carry just is enough to realize its compensate function.
18, delay compensation method of the present invention, the mode A of it is characterized in that are applicable to that main transformer send (control) device node periodic sampling and signal is handled.
19, delay compensation method of the present invention, the mode B of it is characterized in that are applicable to that main transformer send (control) device node transmitting network data.
20, delay compensation method of the present invention, the mode C of it is characterized in that are applicable to secondary transmitter node periodic sampling and signal are handled.
21, delay compensation method of the present invention, the mode D of it is characterized in that are applicable to secondary transmitter node transmitting network data.
22, delay compensation method of the present invention, the mode E of it is characterized in that are applicable to execution (sub-control) device node enforcement sub-control algorithm, and secondary controlled device is implemented control action.
The present invention has following advantage:
1, send (control) device node to carrying out (sub-control) device node (external loop through path) owing to having exempted to main transformer from structure, and secondary transmitter node is to the measurement of carrying out (inner looping feedback network) randomness network delay between (sub-control) device node, observation, estimate or identification, also exempted the synchronous requirement of node clock signal simultaneously, and then avoided the inaccurate evaluated error that causes of time delay estimation model, avoided the required waste that expends the node storage resources of time delay identification, also avoided simultaneously because the compensating error that " the empty sampling " that time delay causes or " many samplings " bring.
2, owing to realized with the selection of concrete network communication protocol irrelevantly from structure, thereby both be applicable to the network cascade control system that adopts wired network protocol, also be applicable to the network cascade control system of wireless network protocol; Both be applicable to the deterministic network agreement, also be applicable to the procotol of uncertainty.
3, owing to realized with the selection of concrete network communication protocol irrelevant from structure, thereby both be applicable to heterogeneous network cascade control system based on wired network protocol, also be applicable to heterogeneous network cascade control system, also be applicable to the delay compensation of the network cascade control system of heterogeneous (as wired and wireless mixing) simultaneously based on wireless network protocol.
4, owing to realized with the selection of the control strategy of concrete master (pair) controller irrelevant from structure, thereby both can be used for adopting the network cascade control system of conventional control, also can be used for adopting Based Intelligent Control or adopt the network cascade control system of complicated control strategy.
5, because the present invention adopts is the compensation method that " soft " changes the control system structure, thereby in its implementation procedure, need not to increase again any hardware device, the software resource that utilizes existing network cascade control system intelligent node to carry, just be enough to realize its compensate function, thereby can save hardware investment, be easy to be extended and applied.
Description of drawings
Fig. 1 exists only in network cascade control system block scheme in the through path for network.
Fig. 2 exists only in network cascade control system structural drawing in the through path for network.
Fig. 3 is outer forward direction of network cascade control system of the present invention and internal feedback path randomness delay compensation method structural drawing
In the block diagram of Fig. 1, system is by input signal (R), and main transformer send (control) device (S1/C 1) node, outer feedforward network, secondary transmitter (S2) node, the internal feedback network is carried out (sub-control) device (A/C2) node, secondary controlled device (G2) and output (Y2), and main controlled device (G1) and output (Y1) form.
Built-in main controller in the main transmitter, namely main transmitter and master controller share same node (S1/C 1), node adopts the time type of drive to carry out work, and the triggering cycle is h1, to the sampling of main controlled device implementation cycle, and to deviation signal enforcement C1Control.
Secondary transmitter (S2) be an isolated node, adopt the time type of drive to carry out work, the triggering cycle is h2, the secondary controlled device implementation cycle is sampled.
The built-in submaster controller of actuator, namely actuator and submaster controller share same node (A/C2), adopt event driven manner to carry out work, send (control) device (S by main transformer1/C 1) output signal node or (with) secondary transmitter (S2) output signal of node triggers by network, the output signal of its node drives executing agency, thereby changes secondary controlled device (G2) state, and then change main controlled device (G1) state.
The main transformer of system send (control) device (S among Fig. 11/C 1) node, secondary transmitter (S2) node and execution (sub-control) device (A/C2) node all is intelligent node, not only possess storage computing and communication function, but also possess software configuration and control function, these nodes comprise now the hardware such as intelligent node common in the industrial field bus control system (FCS) of extensive use and the Distributed Control System (DCS) or smart machine.
In the system of Fig. 2, the randomness network delay in the transfer of data has significant impact for Systems balanth and control performance quality. and the transfer of data of network cascade control system is experiencing from main transformer send (control) device node to the network data transmission time delay τ that carries out (outer feedforward network path) (sub-control) device node1, and secondary transmitter node is to the network data transmission time delay τ that carries out (inner looping feedback network path) between (sub-control) device node2Impact. time delay is relevant with the concrete factors such as procotol, offered load size and network topology structure, yet for the measurement of network delay or estimate or observation or identification have become the crucial precondition that realizes its compensation., the distributivity of each node by network connection is so that each node in the network cascade control system is difficult to satisfy the requirement of clock signal synchronization, simultaneously, because the randomness of network delay and sudden will accomplish that each step can both Accurate Prediction be impossible.
In the system of Fig. 3, do not comprise from main transformer and send (control) device node to the network delay prediction model of carrying out (external loop through path) (sub-control) device node, do not comprise from secondary transmitter node to the network delay prediction model of carrying out (inner looping feedback network) (sub-control) device node yet. exempted randomness network delay τ1And τ2Measurement, estimation, observation or identification, also exempted (main transformer send (control) device, secondary transmitter, execution (sub-control) device) the synchronous requirement of node clock signal simultaneously. when major-minor controlled device and its prediction model, and submaster controller and prediction model thereof be when equating, can realize the output signal Y from the input signal R (s) of system to system1(s) in the closed loop transfer function,, with network delay τ1And τ2Exponential term
Figure BSA00000355086300061
With
Figure BSA00000355086300062
From denominator, eliminate, namely realize not comprising in the closed loop characteristic equation network delay τ1And τ2Exponential term, thereby reduced the impact of time delay to the stability of a system, improved the control performance quality of system, realize compensation and control to the randomness network delay.
Embodiment
To make clearer above-mentioned and other feature and advantage of the present invention of those of ordinary skill in the art by describing exemplary embodiment of the present invention in detail below with reference to accompanying drawing 3.
Concrete implementation step is as described below:
The first step: the main transformer that works in the time type of drive send (control) device node to main controlled device G 1(s) output signal Y 1(s) and its prediction model G 1m(s) output signal y 1m(s) (sampling period is h to carry out periodic sampling 1), and to Y 1(s) and y 1m(s) implement additive operation, obtain model bias signal w 1(s); Main transformer send (control) device node according to the given signal R of system (s), to w 1(s) with intranodal compensating unit output signal m 1(s) subtract each other, obtain error signal e 1(s), to e 1(s) implement C 1(s) control, its output signal is u 1(s): on the one hand, with u 1(s) as the prediction model C of this intranodal by submaster controller 2m(s) and the prediction model G of secondary controlled device 2m(s) the given input signal of the negative feedback loop of Gou Chenging; On the other hand, with u 1(s) as the given signal of carrying out (sub-control) device node;
Second the step: by external loop feedforward network path with u 1(s) be transferred to execution (sub-control) device node, and it is in running order to trigger its node;
The 3rd step: the secondary transmitter node that works in the time type of drive is to secondary controlled device G 2(s) output signal Y 2(s) and its prediction model G 2m(s) output signal y 2m(s) (sampling period is h to carry out periodic sampling 2), and to Y 2(s) and y 2m(s) implement additive operation, obtain model bias signal w 2(s);
The 4th the step: by inner looping feedback network path with w 2(s) be transferred to submaster controller/actuator node, and it is in running order to trigger its node;
The 5th step: carry out the controller C in (sub-control) device node 2(s) by u 1(s) or (with) w 2(s) after the triggering, with signal u 1(s) and w 2(s) and yG 2m(s) subtract each other, obtain error signal e 2(s); To e 2(s) implement C 2(s) control, its control output signal is u 2(s): on the one hand, with u 2(s) as G 2m(s) input signal; On the other hand, with u 2(s) drive topworks, thereby change secondary controlled device G 2(s) state, and then change main controlled device G 1(s) state;
The 6th step: return the first step.
The above only is preferred embodiment of the present invention, and is in order to restriction the present invention, within the spirit and principles in the present invention not all, any modification of being done, is equal to replacement, improvement etc., all should be included within protection scope of the present invention.
The content that is not described in detail in this instructions belongs to this area professional and technical personnel's known prior art.

Claims (15)

1. outer forward direction of network cascade control system and the compensation method of internal feedback path random delay is characterized in that this method may further comprise the steps:
(1). when sending (control) device node, main transformer is sampled cycle h 1During triggering, will adopt mode A to carry out work;
(2). when main transformer send (control) device node with control signal u 1(s) by outer feedforward network path when carrying out the transmission of (sub-control) device node, will adopt mode B to carry out work;
(3). when secondary transmitter node is sampled cycle h 2During triggering, will adopt mode C to carry out work;
(4). when secondary transmitter node with model bias signal w 2(s) by the internal feedback network path when carrying out the transmission of (sub-control) device node, will adopt mode D to carry out work;
(5). when carrying out (sub-control) device node controlled signal u 1(s) or (with) model bias signal w 2When (s) triggering, will adopt mode E to carry out work.
2. compensation method according to claim 1 is characterized in that the step of described mode A comprises:
A1: main transformer send (control) device node to work in the time type of drive, and it triggers the sampling period is h 1
A2: after main transformer send (control) device node to be triggered, to main controlled device G 1(s) output signal Y 1(s) and the prediction model G of main controlled device 1m(s) output signal y 1m(s) sample;
A3: to Y 1(s) and y 1m(s) implement additive operation, obtain model bias signal w 1(s);
A4: with given signal R of system (s) and w 1(s) and m 1(s) implement additive operation, obtain external loop systematic error signal e 1(s);
A5: to e 1(s) implement master controller C 1(s) computing, controlled signal u 1(s);
A6: with u 1(s), act on the predictive algorithm C of submaster controller as given signal 2m(s) with the prediction model G of secondary controlled device 2m(s) backfeed loop of Gou Chenging, it is output as y Cg2m(s);
A7: with y Cg2m(s) act on G 1m(s), it is output as m 1(s).
3. compensation method according to claim 1 is characterized in that the step of described mode B comprises:
B1: main transformer send (control) device node with control signal u 1(s), transmit to carrying out (sub-control) device node by outer feedforward network path.
4. compensation method according to claim 1 is characterized in that the step of described mode C comprises:
C1: secondary transmitter node works in the time type of drive, and it triggers the sampling period is h 2
C2: after secondary transmitter node is triggered, to secondary controlled device G 2(s) output signal Y 2(s) and the prediction model G of secondary controlled device 2m(s) output signal y 2m(s) sample;
C3: to Y 2(s) and y 2m(s) implement additive operation, obtain model bias signal w 2(s).
5. compensation method according to claim 1 is characterized in that the step of described mode D comprises:
D1: secondary transmitter node is with model bias signal w 2(s), transmit to carrying out (sub-control) device node by the internal feedback network path.
6. compensation method according to claim 1 is characterized in that the step of described mode E comprises:
E1: carry out (sub-control) device node and work in event driven manner;
E2: carry out (sub-control) device node controlled signal u 1(s) or (with) model bias signal w 2(s) trigger;
E3: in carrying out (sub-control) device node, with u 1(s) deduct model bias signal w 2(s) and prediction model G 2m(s) output signal y G2m(s), obtain inner looping systematic error signal e 2(s);
E4: to e 2(s) implement sub-control algorithm C 2(s), controlled signal u 2(s).
E5: with u 2(s) as drive signal, to secondary controlled device G 2(s) implement control; Thereby change G 2(s) state, and then change G 1(s) state is realized G 1(s) and G 2(s) control action;
E6: in node, finish simultaneously to G 2m(s) discreet value y 2m(s) calculating.
7. method according to claim 1 is characterized in that it is by the embedded master controller C of main transmitter that main transformer send (control) device node 1(s) form, the shared same node of promptly main transmitter and master controller, main transformer send (control) device node employing time to drive triggered mode of operation (sampling period is h 1).
8. method according to claim 1 is characterized in that carrying out (sub-control) device node is by the embedded submaster controller C of actuator 2(s) form, i.e. the shared same node of submaster controller and actuator, node adopt the event-driven triggered mode of operation (trigger pip are u 1(s) or (with) model bias signal w 2(s)).
9. method according to claim 1, it is characterized in that system comprises main transformer and send unit such as (control) device node, secondary transmitter node, execution (sub-control) device node, main controlled device and secondary controlled device, each unit carries out work according to the working method of setting separately.
10. method according to claim 1, it is characterized in that with sending (control) device node to replace network delay compensation model therebetween from main transformer really to the network data transmission process of carrying out external loop feedforward network path (sub-control) device node, and with replacing network delay compensation model therebetween from secondary transmitter node to the network data transmission process of carrying out inner looping feedback network path (sub-control) device node really, thereby the system that structurally realizes does not comprise the compensation model of network delay.
11. method according to claim 1, it is characterized in that exempting sending (control) device node to carrying out (sub-control) device node from main transformer, and secondary transmitter node arrives measurement, observation, estimation or the identification of network delay between execution (sub-control) device node from structure; Release is sent (control) device node, secondary transmitter node and the synchronous requirement of execution (sub-control) device node clock signal to main transformer.
12. method according to claim 1 is characterized in that realizing from structure the enforcement and concrete control strategy C of network delay compensation method 1(s) and C 2(s) selection is irrelevant, and is irrelevant with the selection of concrete network communication protocol.
13. method according to claim 1 is characterized in that as major-minor controlled device G 1(s), G 2(s) with its prediction model G 1m(s), G 2m(s) equate submaster controller C 2(s) with its prediction model C 2mWhen (s) equating, can realize full remuneration, improve the control performance quality of system outer forward direction of network cascade control system and internal feedback path randomness network delay.
14. method according to claim 1, what it is characterized in that adopting is the compensation method that " soft " changes the control system structure, need not increases any hardware device again, and the software resource that utilizes existing network cascade control system intelligent node to carry just is enough to realize its compensate function.
15. method according to claim 1, the mode A of it is characterized in that is applicable to that main transformer send (control) device node periodic sampling and signal is handled; Mode B is applicable to that main transformer send (control) device node transmitting network data; Mode C is applicable to secondary transmitter node periodic sampling and signal is handled; Mode D is applicable to secondary transmitter node transmitting network data; Mode E is applicable to execution (sub-control) device node enforcement sub-control algorithm, and secondary controlled device is implemented control action.
CN2010105528735A 2010-11-18 2010-11-18 Compensation method of random time-delay of external forward and internal feedback path of network cascade control system Expired - Fee Related CN101986228B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105528735A CN101986228B (en) 2010-11-18 2010-11-18 Compensation method of random time-delay of external forward and internal feedback path of network cascade control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105528735A CN101986228B (en) 2010-11-18 2010-11-18 Compensation method of random time-delay of external forward and internal feedback path of network cascade control system

Publications (2)

Publication Number Publication Date
CN101986228A true CN101986228A (en) 2011-03-16
CN101986228B CN101986228B (en) 2013-09-04

Family

ID=43710579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105528735A Expired - Fee Related CN101986228B (en) 2010-11-18 2010-11-18 Compensation method of random time-delay of external forward and internal feedback path of network cascade control system

Country Status (1)

Country Link
CN (1) CN101986228B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103365210A (en) * 2012-03-31 2013-10-23 同济大学 Control method and control system for communication-limited network
CN106209474A (en) * 2016-07-27 2016-12-07 江南大学 A kind of network control system tracking and controlling method based on predictive compensation
CN106737661A (en) * 2016-11-21 2017-05-31 电子科技大学 A kind of controlled system with self-regulation of time delay force feedback remote-controlled robot
CN107219761A (en) * 2017-05-26 2017-09-29 海南大学 The input of one kind two two exports network decoupling and controlling system and is uncertain of delay compensation method
CN107463095A (en) * 2017-07-20 2017-12-12 南京邮电大学 A kind of output feedback controller design method with time-varying sampling period
CN109787861A (en) * 2016-08-01 2019-05-21 北京大学 Network data delay control method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104865922A (en) * 2015-03-21 2015-08-26 北京化工大学 Complete time delay compensation control method for chemical engineering multi-variable process

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1854501A (en) * 2005-04-07 2006-11-01 本田技研工业株式会社 Controller
CN201532575U (en) * 2009-11-05 2010-07-21 成都交大光芒实业有限公司 Timing system of distributive industrial monitoring apparatus

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1854501A (en) * 2005-04-07 2006-11-01 本田技研工业株式会社 Controller
CN201532575U (en) * 2009-11-05 2010-07-21 成都交大光芒实业有限公司 Timing system of distributive industrial monitoring apparatus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杜锋: "基于新型Smith预估器的网络控制系统研究", 《中国博士学位论文全文数据库 信息科技辑》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103365210A (en) * 2012-03-31 2013-10-23 同济大学 Control method and control system for communication-limited network
CN106209474A (en) * 2016-07-27 2016-12-07 江南大学 A kind of network control system tracking and controlling method based on predictive compensation
CN106209474B (en) * 2016-07-27 2019-04-09 江南大学 A kind of network control system tracking and controlling method based on predictive compensation
CN109787861A (en) * 2016-08-01 2019-05-21 北京大学 Network data delay control method
CN109787861B (en) * 2016-08-01 2021-03-02 北京大学 Network data delay control method
CN106737661A (en) * 2016-11-21 2017-05-31 电子科技大学 A kind of controlled system with self-regulation of time delay force feedback remote-controlled robot
CN106737661B (en) * 2016-11-21 2019-03-01 电子科技大学 A kind of controlled system with self-regulation of time delay force feedback remote-controlled robot
CN107219761A (en) * 2017-05-26 2017-09-29 海南大学 The input of one kind two two exports network decoupling and controlling system and is uncertain of delay compensation method
CN107463095A (en) * 2017-07-20 2017-12-12 南京邮电大学 A kind of output feedback controller design method with time-varying sampling period

Also Published As

Publication number Publication date
CN101986228B (en) 2013-09-04

Similar Documents

Publication Publication Date Title
CN101986228B (en) Compensation method of random time-delay of external forward and internal feedback path of network cascade control system
CN102063105B (en) Method for compensating uncertain network delay of forward passage of network cascade control system
CN101986229B (en) Time-varying network time delay compensation method of forward access of networked cascade control system (NCCS)
CN102033529B (en) Method for compensating for unknown network time delay in forward path of network cascade control system
CN102004480B (en) Compensation method for unknown network delay of network cascade control system
CN102004481B (en) Method for compensating unknown external feedback and inner loop network time delay of network cascade control system
CN102033531B (en) Time-varying delay compensation method for external forward and internal feedback channel of network cascade control system
CN102063106B (en) External feedback and inner loop nondeterministic network time delay compensation method of network cascade control system
CN101986231B (en) Method for compensating nondeterministic network delay of network cascade control system
CN102064931B (en) Delay compensation method for network control system
CN106802558A (en) A kind of two-output impulse generator network decoupling and controlling system method for compensating network delay
CN102033530B (en) Compensation method for external feedback and internal loop randomness network time delay of network cascade control system
CN101995870A (en) Forward channel random network time-delay compensation method for network cascade control system
CN102082687B (en) Unknown time delay compensation method for external forward and internal feedback paths of network cascade control system
CN102023626B (en) Nondeterministic time delay compensation method of external forward path and internal feedback path of network cascade control system
CN102063107A (en) Method for compensating random network delay of network cascade control system
CN101995872B (en) Compensation method of time variable network time delay of network cascade control system
CN102033535B (en) Time delay compensation method with double-control function between transmitter (controller) and actuator
CN101995871A (en) Network delay compensation method between transmitter node and (control) actuator node
CN102033534B (en) Method for compensating for varying network time delay in external feedback and inner loop network paths of network cascade control system
CN102063104A (en) Delay compensation method with double adjustment function between transducer and (controller) executer
CN106773730A (en) A kind of two input two exports network decoupling and controlling system time-vary delay system compensation method
CN101986230A (en) Network delay compensation method between transducer (controller) node and actuator node
CN106802555A (en) A kind of two-output impulse generator Delays In Networked Control System compensation method
Ting et al. Analysis and design of the time-delay compensation for networked control systems with random communication delay

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130904

Termination date: 20191118

CF01 Termination of patent right due to non-payment of annual fee