CN101986166A - Test vehicle for partial discharge of power equipment on site - Google Patents

Test vehicle for partial discharge of power equipment on site Download PDF

Info

Publication number
CN101986166A
CN101986166A CN 201010259780 CN201010259780A CN101986166A CN 101986166 A CN101986166 A CN 101986166A CN 201010259780 CN201010259780 CN 201010259780 CN 201010259780 A CN201010259780 A CN 201010259780A CN 101986166 A CN101986166 A CN 101986166A
Authority
CN
China
Prior art keywords
partial discharge
trunk
test
discharge test
power equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010259780
Other languages
Chinese (zh)
Other versions
CN101986166B (en
Inventor
阎春雨
毕建刚
是艳杰
李炯
干元锋
缪中章
袁帅
杨圆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SCEEC ELECTRIC EQUIPMENT CO Ltd
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
SHANGHAI SCEEC ELECTRIC EQUIPMENT CO Ltd
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SCEEC ELECTRIC EQUIPMENT CO Ltd, China Electric Power Research Institute Co Ltd CEPRI filed Critical SHANGHAI SCEEC ELECTRIC EQUIPMENT CO Ltd
Priority to CN2010102597803A priority Critical patent/CN101986166B/en
Publication of CN101986166A publication Critical patent/CN101986166A/en
Application granted granted Critical
Publication of CN101986166B publication Critical patent/CN101986166B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The invention discloses a test vehicle for partial discharge of power equipment on site, comprising a chassis, a cab and a rear carriage with a door at the tail, wherein the rear carriage is separated into an operation control chamber and a test equipment chamber by a separator; the operation control chamber is used for placing a partial discharge free test power supply, a partial discharge tester, a workbench and a PC for control; the test equipment chamber is used for placing a partial discharge free exciting transformer, a partial discharge free resonance reactor, a partial discharge free coupling capacitor, a signal transfer box and accessory appliances; a testing platform which can be pulled out of the rear carriage from the test equipment chamber is arranged in the test equipment chamber; and the partial discharge free exciting transformer, the partial discharge free resonance reactor and the partial discharge free coupling capacitor are placed on the testing platform. The vehicle arrives at the testing site, the rear door is opened, the testing platform automatically extends out by virtue of a drive mechanism, and then the vehicle completes partial discharge test under rate voltage by one step by only simply connecting lines and obtains the test data in the operation control chamber within short time. The vehicle can meet the test requirement of partial discharge at 220kV and below.

Description

The on-the-spot partial discharge test car of power equipment
Technical field
The present invention relates to a kind of power transmission and transforming equipment presence states checking experiment device, thereby relate in particular to the instrument and equipment that the on-the-spot shelf depreciation of power equipment is required and high-tension apparatus is installed on the on-the-spot partial discharge test car of the power equipment that is suitable for mobile operating on the motor vehicle.
Background technology
For newly-built and operating high voltage substation, need carry out preventative test, overhaul of the equipments or repair based on condition of component to high-tension apparatus, as carry out on-the-spot partial discharge test.Safe operation in order to ensure high-tension apparatus, when these high-tension apparatuses are tested, the mode in past is that various surveying instruments and equipment are transported to test site respectively by vehicle, then tested device being carried out wiring successively measures, after a whole set of test was finished, the staff was organized into report with all test datas again.This traditional method has following drawback: (1) whole process complexity, and employ vehicle and personnel are numerous: because the high-tension apparatus kind is many, kind of test is many, needs wiring repeatedly and changes the test that testing tool just can be finished all high-tension apparatuses.(2) work efficiency is very low: because the volume and weight of testing tool and equipment is all bigger, cause certain difficulty to transportation.Also instrument and equipment to be carried from car during test, in the carrying carriage return, time-consuming after test is finished.(3) measuring accuracy is impacted: repeatedly carrying causes damage to instrument and equipment easily, can influence data precision; And test site is general remoter, and the weather complexity makes that the degree of integration of test data is low, and real-time is poor, the error that causes the staff to judge probably.
In order to overcome above-mentioned defective, occurred in the prior art a kind of various test apparatuses being incorporated into instruction carriage on the car body, as the patent No. is 200620063964.1 disclosed instruction carriages, it is divided into car body drives occupant area and master control district, in the master control district, be provided with various testing tools, as Insulation Resistance Tester, instrument for measuring DC resistance, the loop circuit tester, the high direct voltage controller, series resonance voltage and transformation shunting switch tester etc., and above-mentioned instrument all is connected with main control computer, in the process of test and test, by outside lead pilot system is linked to each other with tested equipment, finish experiment work by computing machine.But this instruction carriage is a built-in type, the outside tie of all test apparatuses all needs to be switched on the concentrated card extender that vehicle body right side band side opens the door on the frame, draws wiring with convenient to tested device, thereby makes troubles for execute-in-place, and make mistakes easily, work efficiency is lower.
Chinese patent Granted publication CN201382983 has announced a kind of " external mounted electric combined test car " for this reason, this instruction carriage comprises pilothouse, car door is opened in the trunk of afterbody, be provided with frame along the one side in the envelope of trunk, frame is provided with many and is used for power transmission and transforming equipment site test and the required various test apparatuses of repair based on condition of component test, on the car body of frame and test apparatus place side, offer uncovered, be equipped with on uncovered and the uncovered suitable sliding door that can outwards draw back, by opening sliding door test apparatus is directly linked to each other with tested device, when testing at the scene, only need be pulled outwardly open pull door, test apparatus directly is connected with equipment under test gets final product.
Above-mentioned two kinds of power test cars have only loaded the conventional test instrument, do not put that exciting transformer, no office are put resonance reactor, the required equipment of local discharge test such as coupling condenser are put in no office and load no office, the no office that need send means of transport will test usefulness in addition puts that exciting transformer, no office are put resonance reactor, no office puts high pressure testing equipments such as coupling condenser and is transported to the scene.After having arrived the scene, no office puts exciting transformer, no office and puts resonance reactor, no office and put coupling condenser and still will remove by crane or manpower and unload, install just and can operate, because no office puts exciting transformer, no office and puts that resonance reactor, no office are put the coupling condenser volume and quality is bigger, the simple transportation of loading is easy to extruding or jolts and damage these equipment, and loads and unloads these equipment at the scene and also bring great inconvenience.
The highest trial voltage that also has above-mentioned two kinds of power test cars generally below 10kV, can't be finished local discharge test work under the equipment rated voltage.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of required test apparatus of local discharge test that both had been mounted with, be mounted with the on-the-spot partial discharge test car of power equipment of the high-tension testing apparatus that local discharge test uses again, to solve the existing existing many deficiencies of power test car.
In order to realize the foregoing invention purpose, the technical solution adopted in the present invention is:
The on-the-spot partial discharge test car of power equipment, comprise the chassis and be installed in pilothouse and car door on the chassis and open trunk at afterbody, it is characterized in that, described trunk is separated in order to place non-local discharge test power supply by a dividing plate, instrument for measuring partial discharge, worktable, control is put exciting transformer with the operation pulpit of PC with in order to place no office, resonance reactor is put in no office, coupling condenser is put in no office, the testing equipment chamber of signal converting case and aid, be provided with one and can pull out test platform outside the trunk by the testing equipment chamber in that described testing equipment is indoor, exciting transformer is put in described no office, resonance reactor is put in no office, no office puts coupling condenser and is placed on the described test platform.
Described test platform is pulled out trunk by the trunk either side, and a side of pulling out test platform at trunk offers the sliding door that outwards draws back.
Described test platform is pulled out trunk by the trunk afterbody.
Described test platform comprises the track on being arranged at the bottom of the trunk railway carriage or compartment and moves the supporting plate that is placed on the described track.
Described test platform comprises that also one drives described supporting plate shifts out the shift-in trunk along described track driving mechanism.
Described driving mechanism comprise one on being fixed at the bottom of the trunk case reducing motor and be fixed on the gear on the described reducing motor output shaft and be laid on tooth bar on the supporting plate, described gear meshes with described tooth bar, drives described supporting plate along track travel.
Described driving mechanism comprises reducing motor that is fixed on the supporting plate bottom surface and the road wheel that is fixed on the described reducing motor output shaft, and described road wheel is walked on described track, drives described test carrying platform along track travel.
Be provided with the supporting leg of turning folding in the bottom surface of described supporting plate.
The present invention is equipped with a signal converting case in the indoor side of described testing equipment, the wiring of described signal converting case faces outer the setting, offer first uncoveredly on the side carriage plate of the trunk of signal converting case correspondence, described first is equipped with and first uncovered suitable first sliding door that can outwards open on uncovered.
Described operation pulpit is communicated with pilothouse, and the side in described operation pulpit is provided with rack, and worktable is arranged on operation pulpit opposite side, is placed with non-local discharge test power supply and instrument for measuring partial discharge in the rack, and control is placed on the worktable with PC; Described non-local discharge test power supply and instrument for measuring partial discharge are provided with outwardly, offer second uncoveredly on the side carriage plate of the trunk of rack correspondence, and described second is equipped with and second uncovered suitable second sliding door that can outwards open on uncovered.
The present invention offers view window on described dividing plate, so that the situation in operating personnel's viewing test canyon.
The present invention is equipped with the turning supporting leg that is folded in the described chassis on the chassis.
The present invention is provided with the roof platform at the top of described pilothouse and trunk, and described roof platform is provided with roof-mounted air-condition unit and turnover shooting and lighting device and loudspeaker.
Owing to adopted as above design proposal, car of the present invention arrives the testing ground, opens tail gate, automatically stretch out test platform by driving mechanism, only need simple line then, the once local discharge test task of finishing under the rated voltage obtains test for data in the operation pulpit in the short time.The present invention puts that exciting transformer, no office are put resonance reactor, coupling condenser is put in no office owing to load the office of having or not, and has saved in the present power test car no office and has put exciting transformer, no office and put resonance reactor, no office and put the coupling condenser manpower and remove and unload the inconvenience that is brought.Exciting transformer, no office are put resonance reactor, no office puts coupling condenser and moves to outside the trunk, can satisfy the high-potting requirement of 220kV and following grade, is an important breakthrough of electric combined test car high-potting aspect because no office is put in the present invention.The instrument that the on-the-spot partial discharge test car of power equipment of the present invention overcomes is in the past at the trial repeatedly carried, the wiring complexity, required staff is many, time-consuming shortcoming of taking a lot of work, only need 2-4 staff in short-term, to finish the measurement of partial discharge task, alleviate working strength, improved the precision of measurement data.
Description of drawings
The inner structure synoptic diagram that Fig. 1 sees from a side for the on-the-spot partial discharge test car of power equipment of the present invention.
The inner structure synoptic diagram that Fig. 2 sees from another side for the on-the-spot partial discharge test car of power equipment of the present invention.
Fig. 3 is the inner vertical view of the on-the-spot partial discharge test car of power equipment of the present invention.
Fig. 4 is the vertical view of test platform of the present invention.
Fig. 5 is the side view of Fig. 4.
Embodiment
For technological means, creation characteristic that the present invention is realized, reach purpose and effect is easy to understand, below in conjunction with concrete diagram, further set forth the present invention.
Fig. 1 is to the on-the-spot partial discharge test car of power equipment shown in Figure 3, comprise chassis 100 and be installed in pilothouse 200 and car door 310 on the chassis 100 and open trunk 300 that this trunk 300 is separated in order to place non-local discharge test power supply, instrument for measuring partial discharge, worktable, control with the operation pulpit 330 of PC with put exciting transformer, no office in order to the no office of placement and put the testing equipment chamber 340 that resonance reactor, no office are put coupling condenser, signal converting case and aid by a dividing plate 320 at afterbody.
The turning supporting leg 110 that is folded in the chassis 100 is installed on chassis 100, when doing local discharge test, put down supporting leg 110, make the on-the-spot partial discharge test car of whole power equipment be in a state stably, be difficult for vibrations, the test accuracy of the instrument for measuring partial discharge when testing to improve.
Top at pilothouse 200 and trunk 300 is provided with roof platform 400, roof platform 400 is provided with roof-mounted air-condition unit 410, to regulate the air themperature in pilothouse 200 and the operation pulpit 330, can guarantee that instrument for measuring partial discharge has good running environment, the accuracy of measurement data during with the assurance partial discharge test.Turnover shooting and lighting device 420 and loudspeaker (not shown) are set on roof platform 400 in addition, can illumination be provided and monitor whole measuring process for the partial discharge test process, safeguard work personnel's personal safety makes whole partial discharge test process safety, efficient, convenient.
Operation pulpit 330 is communicated with pilothouse 200, side in operation pulpit 330 is provided with rack 331, worktable 332 is arranged on operation pulpit 330 opposite sides, dispose non-local discharge test power supply and instrument for measuring partial discharge in the rack 331, control is placed on the worktable 332 with PC333, the control integrated computer control system of PC333, direct control instrument for measuring partial discharge on computers, the partial discharge test report be can generate after partial discharge test is finished automatically, staff's comparison and judgement made things convenient for.Be placed with tilting seat 334 in the space between rack 331 and worktable 332, personnel take with handled easily.
Non-local discharge test power supply in the rack 331 and instrument for measuring partial discharge's guidance panel are provided with to operation room 330, on the side carriage plate 350 of the trunk of rack 331 correspondences, offer uncovered (not shown), on uncovered, be equipped with and the uncovered suitable sliding door that can outwards open 351.On the angle in testing equipment chamber 340 signal converting case (not shown) is installed, the wiring of signal converting case faces outer the setting, on the side carriage plate 350 of the trunk of signal converting case correspondence, offer uncoveredly, on uncovered, be equipped with and this uncovered suitable sliding door that can outwards open 352.Draw back sliding door 351,352 and can finish wiring easily.
On dividing plate 320, offer view window 321, so that the situation in operating personnel's viewing test canyon 340.
In testing equipment chamber 340, be provided with the test platform that to pull out the trunk afterbody by the testing equipment chamber.In conjunction with referring to Fig. 4 and Fig. 5, this test platform comprises being laid on two tracks 341 and a supporting plate 342 is installed on the base plate of trunk railway carriage or compartment abreast, be provided with the roller 343 of walking in orbit in the both sides of supporting plate 342, this test platform also comprises a driving mechanism, this driving mechanism comprises a reducing motor 345 and is installed in the tooth bar 346 of supporting plate 342 1 sides, reducing motor 345 is fixedly mounted on the base plate of trunk railway carriage or compartment, on the output shaft of reducing motor 345, be installed with a gear 347, gear 347 and tooth bar 346 engagements, just can drive supporting plate 342 along track 341 walkings, supporting plate 342 is sent testing equipment chamber 340 or supporting plate 342 is drawn in testing equipment chamber 340 by the trunk afterbody.The office of having or not is installed on supporting plate 342 puts that exciting transformer 510, no office are put resonance reactor 540, coupling condenser 550 is put in no office.Be provided with the supporting leg (not shown) of turning folding in the bottom surface of supporting plate 342, after supporting plate 342 is drawn out testing equipment chamber 340, can put down supporting leg, to support supporting plate 342, and when supporting plate 342 needs propulsion trial canyon 340, supporting leg can be folded on supporting plate 342 bottom surfaces.
Resonance reactor is put in instruction carriage of the present invention is integrated required non-local discharge test power supply, the no office of the on-the-spot partial discharge test of power equipment put exciting transformer, no office, coupling condenser, instrument for measuring partial discharge and corresponding aid are put in no office.Car arrives the testing ground, opens tail gate, stretches out platform automatically by electronic control system, only needs simple line then, once finishes local discharge test and measuring task under the rated voltage, obtains the data of partial discharge test in the short time in the operation pulpit.Operation is equipped with air-conditioning system in the pulpit, can guarantee that instrument for measuring partial discharge has good running status, to guarantee the accuracy of partial discharge test measurement data.This instruction carriage also is equipped with integrated computer control system, and direct control instrument for measuring partial discharge can generate report after partial discharge test is finished automatically on computers, makes things convenient for staff's comparison and judgement.Be equipped with outer farm monitoring system and loudspeaker on the car, can monitor whole partial discharge test process, safeguard work personnel's personal safety makes whole partial discharge test process safety, efficient, convenient.
Instrument when the on-the-spot partial discharge test car of power equipment of the present invention overcomes on-the-spot in the past partial discharge test is repeatedly carried, the wiring complexity, required staff is many, time-consuming shortcoming of taking a lot of work, only 2-4 staff of need finishes the partial discharge test task under the rated voltage in short-term, alleviate working strength, improved the precision of measurement data.
The on-the-spot partial discharge test car of power equipment of the present invention utilizes the telescopic test platform of interior, during test no office put that exciting transformer, no office are put resonance reactor, no office puts coupling condenser and moves to outside the compartment, can satisfy the on-the-spot partial discharge test of 220kV and following grade.It is an important breakthrough of electric combined test car high-potting aspect.
More than show and described ultimate principle of the present invention and principal character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; that describes in the foregoing description and the instructions just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.The claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (13)

1. the on-the-spot partial discharge test car of power equipment, comprise the chassis and be installed in pilothouse and car door on the chassis and open trunk at afterbody, it is characterized in that, described trunk is separated in order to place non-local discharge test power supply by a dividing plate, instrument for measuring partial discharge, worktable, control is put exciting transformer with the operation pulpit of PC with in order to place no office, resonance reactor is put in no office, coupling condenser is put in no office, the testing equipment chamber of signal converting case and aid, be provided with one and can pull out test platform outside the trunk by the testing equipment chamber in that described testing equipment is indoor, exciting transformer is put in described no office, resonance reactor is put in no office, no office puts coupling condenser and is placed on the described test platform.
2. the on-the-spot partial discharge test car of power equipment as claimed in claim 1 is characterized in that described test platform is pulled out trunk by the trunk either side, and a side of pulling out test platform at trunk offers the sliding door that outwards draws back.
3. the on-the-spot partial discharge test car of power equipment as claimed in claim 1 is characterized in that described test platform is pulled out trunk by the trunk afterbody.
4. as the on-the-spot partial discharge test car of the described power equipment of each claim of claim 1 to 3, it is characterized in that described test platform comprises the track on being arranged at the bottom of the trunk railway carriage or compartment and moves the supporting plate that is placed on the described track.
5. the on-the-spot partial discharge test car of power equipment as claimed in claim 4 is characterized in that, described test platform comprises that also one drives described supporting plate shifts out the shift-in trunk along described track driving mechanism.
6. the on-the-spot partial discharge test car of power equipment as claimed in claim 5, it is characterized in that, described driving mechanism comprise one on being fixed at the bottom of the trunk case reducing motor and be fixed on the gear on the described reducing motor output shaft and be laid on tooth bar on the supporting plate, described gear and the engagement of described tooth bar drive described supporting plate along track travel.
7. the on-the-spot partial discharge test car of power equipment as claimed in claim 5, it is characterized in that, described driving mechanism comprises reducing motor that is fixed on the supporting plate bottom surface and the road wheel that is fixed on the described reducing motor output shaft, described road wheel is walked on described track, drives described test carrying platform along track travel.
8. the on-the-spot partial discharge test car of power equipment as claimed in claim 5 is characterized in that, is provided with the supporting leg of turning folding in the bottom surface of described supporting plate.
9. the on-the-spot partial discharge test car of power equipment as claimed in claim 1, it is characterized in that, in the indoor side of described testing equipment one signal converting case is installed, the wiring of described signal converting case faces outer the setting, offer first uncoveredly on the side carriage plate of the trunk of signal converting case correspondence, described first is equipped with and first uncovered suitable first sliding door that can outwards open on uncovered.
10. the on-the-spot partial discharge test car of power equipment as claimed in claim 1, it is characterized in that, described operation pulpit is communicated with pilothouse, side in described operation pulpit is provided with rack, worktable is arranged on operation pulpit opposite side, be placed with non-local discharge test power supply and instrument for measuring partial discharge in the rack, control is placed on the worktable with PC; Described non-local discharge test power supply and instrument for measuring partial discharge are provided with outwardly, offer second uncoveredly on the side carriage plate of the trunk of rack correspondence, and described second is equipped with and second uncovered suitable second sliding door that can outwards open on uncovered.
11. the on-the-spot partial discharge test car of power equipment as claimed in claim 1 is characterized in that, offers view window on described dividing plate.
12. the on-the-spot partial discharge test car of power equipment as claimed in claim 1 is characterized in that, the turning supporting leg that is folded in the described chassis is installed on the chassis.
13. the on-the-spot partial discharge test car of power equipment as claimed in claim 1, it is characterized in that, be provided with the roof platform at the top of described pilothouse and trunk, described roof platform is provided with roof-mounted air-condition unit and turnover shooting and lighting device and loudspeaker.
CN2010102597803A 2010-08-23 2010-08-23 Test vehicle for partial discharge of power equipment on site Active CN101986166B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102597803A CN101986166B (en) 2010-08-23 2010-08-23 Test vehicle for partial discharge of power equipment on site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102597803A CN101986166B (en) 2010-08-23 2010-08-23 Test vehicle for partial discharge of power equipment on site

Publications (2)

Publication Number Publication Date
CN101986166A true CN101986166A (en) 2011-03-16
CN101986166B CN101986166B (en) 2013-11-27

Family

ID=43710530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102597803A Active CN101986166B (en) 2010-08-23 2010-08-23 Test vehicle for partial discharge of power equipment on site

Country Status (1)

Country Link
CN (1) CN101986166B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107329063A (en) * 2017-08-10 2017-11-07 广州市恒力检测股份有限公司 A kind of electric-power safe instruments nigration car
CN110837029A (en) * 2019-11-18 2020-02-25 国网上海市电力公司 Transformer partial discharge induction voltage-resistant box and use method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200962133Y (en) * 2006-08-31 2007-10-17 珠海南自电气系统工程有限公司 Transformer station electrical test vehicle
CN201289515Y (en) * 2008-11-14 2009-08-12 上海沪光变压器有限公司 Mobile local discharge test device
CN201382983Y (en) * 2009-03-26 2010-01-13 苏州市华电电气技术有限公司 Outside-fitted type comprehensive power test vehicle
CN201800614U (en) * 2010-08-23 2011-04-20 中国电力科学研究院 On-site partial discharge test vehicle for power equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200962133Y (en) * 2006-08-31 2007-10-17 珠海南自电气系统工程有限公司 Transformer station electrical test vehicle
CN201289515Y (en) * 2008-11-14 2009-08-12 上海沪光变压器有限公司 Mobile local discharge test device
CN201382983Y (en) * 2009-03-26 2010-01-13 苏州市华电电气技术有限公司 Outside-fitted type comprehensive power test vehicle
CN201800614U (en) * 2010-08-23 2011-04-20 中国电力科学研究院 On-site partial discharge test vehicle for power equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107329063A (en) * 2017-08-10 2017-11-07 广州市恒力检测股份有限公司 A kind of electric-power safe instruments nigration car
CN107329063B (en) * 2017-08-10 2023-04-28 广州市恒力检测股份有限公司 Electric power safety tool removes test car
CN110837029A (en) * 2019-11-18 2020-02-25 国网上海市电力公司 Transformer partial discharge induction voltage-resistant box and use method thereof

Also Published As

Publication number Publication date
CN101986166B (en) 2013-11-27

Similar Documents

Publication Publication Date Title
CN101986163B (en) Field high-voltage dielectric-loss test vehicle for power equipment
CN201754170U (en) On-site high voltage dielectric loss test vehicle for power equipment
CN101515012B (en) External mounted electric combined test car
CN101561482B (en) Electric power transformer field calibration vehicle
CN102343854B (en) Alternating-current voltage-withstanding test vehicle for power cable
CN203094465U (en) Mechanical and electrical integration unmanned helicopter vehicle-mounted system
CN201383629Y (en) Comprehensive power test vehicle
CN201800614U (en) On-site partial discharge test vehicle for power equipment
CN103754148A (en) Full-automatic extra-high voltage test vehicle
CN105346428B (en) A kind of multi-functional UAV TT & C's vehicle configuration system
CN104385969B (en) Voltage transformer detects car
CN103963991B (en) A kind of electromechanical integration unmanned plane onboard system
CN202911610U (en) Mutual inductor moving check trolley
CN200962133Y (en) Transformer station electrical test vehicle
CN201382983Y (en) Outside-fitted type comprehensive power test vehicle
CN101986166B (en) Test vehicle for partial discharge of power equipment on site
CN201413390Y (en) Electric power transformer field calibration vehicle
CN207875481U (en) A kind of electric engineering car
CN203720274U (en) Movable-type detection device for transformer-like equipment
CN205248885U (en) It is alert with synthesizing breakdown van
CN202115411U (en) Ultrahigh voltage alternating current withstand voltage test vehicle
CN204488603U (en) A kind of combined power inspection vehicle of height integrated modular
CN103630783A (en) Mobile detection device of transformer equipment
CN205916014U (en) Car maintenance service cart
CN102285334A (en) Extra-high voltage alternating current withstand voltage test vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant